RPR CONSTRUCTION COMPANY, INC.

Similar documents
DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

PAULDING COLLEGE & CAREER ACADEMY

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

ADDENDUM 2 - JULY 14, 2015

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

TABLE OF CONTENTS Public Safety Building

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Division 00 Procurement and Contracting Requirements

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

APPLICATION AND CERTIFICATE FOR PAYMENT

Project Manual Index of Specifications Shenandoah Schools Concession Building

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

RIVERSIDE CHURCH OF CHRIST. Lafayette, LA

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

CSO / BSU NW2 NORTH RESIDENTIAL NEIGHBORHOOD PHASE #2 VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

4.1.3 Project Manual

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS

Kimberly School District New Elementary School

KU West Campus LEEP II High Bay Facility Project # , A (c)

Schedule of Values Cruise Terminal 2 Expansion

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages

Minneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

VOLUME 4 DIVISION SPECIFICATIONS

McPherson Contractors, Inc.

Item # 1: Attached are the revised Table of Contents and Specifications added: Section Cabinets and Vanities

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

DESIGN & CONSTRUCTION GUIDELINES

CIRCLE K SUB-CONTRACTOR BID FORM

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

Henderson County High School Career and Technical Education Addition and Renovation Addendum # 1

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8

Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

PROJECT MANUAL FOR: HUMPHREYS CO. SHERRILL BUILDING RENOVATIONS: NEW URGENT CARE CLINIC & EXTENSION SERVICE OFFICE

TABLE OF CONTENTS. (Δ = Rev 06/08)

B. RESIDENTIAL MASTER PLUMBER $ $ $

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample

SECTION PAYMENT PROCEDURES

C P A. Presented By Jason G. Smith, CCM, LEED AP. Founder and Principal of Construction Analysis and Planning, LLC

Northwestern Facilities

PROJECT MANUAL PROJECT LABOR AGREEMENT

Project Manual for the TCU ADDITION AND MEDICAL IMAGING RENOVATION. Lincoln, Nebraska. ESA Project No

HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

CAMPUS STANDARDS HANDBOOK

BILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST

Work Performed Please see the attached list of Construction Codes and mark all that your company typically performs

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7

J~e~~r Senior Director of Construction Services Facilities Design and Construction UNIVERSITY OF CALIFORNIA, SAN DIEGO.

NAAHB Workgroup Index General Ledger Account

City of Westerville Guide to Commercial Inspections

Smokey Ridge, Christiansburg, Virginia

Building Excellence IV Capital Levy Projects Under Construction

BUREAU Joe Iuviene, AIA January 20, 2017

1.5 Other than persons listed above, number of full-time office employees: 1.6 Number of full-time, permanent field employees:

DOCUMENT BID DOCUMENT

CITY OF TACOMA Department of Public Utilities Tacoma Power

City Of Mendota Construction Procedures

AMENDMENT OF SOLICITATION

Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017

Town of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and

EAST CENTRAL REGIONAL WATER RECLAMATION FACILITY PROCESS WATER SYSTEM PROJECT

CONSTRUCTION COST BREAKDOWN THIS IS FORM CCB

TABLE OF CONTENTS SECTION TITLE PAGE. Bidder s Signature Page List of Subcontractors Construction Agreement Guaranty...

MCCARTY ARCHITECTS, P.A. POST OFFICE BOX 440 / 533 WEST MAIN STREET TUPELO, MS / FOR ANSWERS TO QUESTIONS CONTACT: JUSTIN HARRINGTON

A. Remove Table of Contents and insert new attached Table of Contents.

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE # 5A Metal and Structural Steel 09/01/11

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR

ADDENDUM 3 - JULY 24, 2015

MYCO Development & Construction 1 LLC

Construction Summary

City of Gary DEPARTMENT OF COMMERCE BUILDING DIVISION

Prequalification Form

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Quantity Estimated Mobilization 1 LS

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Concrete. Conveying Systems. Doors, Windows & Interiors

REVISED BID FORM. To Procurement Services, Room 1104, 900 East Broad Street, Richmond, Virginia:

Nassau County Building Department

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

DALLAS-FORT WORTH INTERNATIONAL AIRPORT

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

Bid Package 22A Plumbing Systems

March 2018 Progress. Work Completed, Week Ending 3/23/18:

Appalachian Log Structures Construction Cost Estimating Guide

Transcription:

CLARIFICATION NO.: 01 RPR CONSTRUCTION COMPANY, INC. PROJECT NAME: CHRISTUS Trinity Mother Frances Rose Stadium Addition and Renovation DATE: November 26, 2017 This Clarification forms a part of the Contract Documents of the above referenced project and modifies, amends, deletes from, and/or adds to the original Specifications and Drawings and should be included in preparing your proposal. GENERAL: 1. N/A SPECIFICATIONS: Add the following specification sections in their entirety and add to the existing table of contents: 1. 000020 - Invitation To Submit Proposal 2. 000030 - Instructions To Proposers 3. 000040 - Sealed Proposal Form 4. 000050 - Information Available To Proposers 5. 000060 - Supplementary Conditions 6. 000070 - Special Conditions DRAWINGS: 1. N/A Page 1 of 1 301 SSE LOOP 323 TYLER, TEXAS 75702 PHONE: (903) 592-7166 FAX: (903) 592-2349

INVITATION TO SUBMIT PROPOSALS 000020 PROJECT: ARCHITECTS: CONSTRUCTION MANAGER: CHRISTUS Trinity Mother Frances Rose Stadium Press Box Addition and Renovation Tyler, Texas PBK Architects 14001 Dallas Parkway, Ste. 400 Dallas, Texas 75240 (972) 233-1323 office RPR Construction Company, Inc. 301 SSE Loop 323 Tyler, Texas 75702 (903) 592-7166 office (903) 592-2349 fax Article 1 SEALED PROPOSALS Separate sealed proposals are requested from interested contractors and material suppliers for the various items of work required for the construction of the CHRISTUS Trinity Mother Frances Rose Stadium Press Box Addition and Renovation, Tyler, Texas. Sealed proposals will be received by the Construction Manager, RPR Construction Company, Inc., until 2:00 p.m. on November 2, 2017, at the office of RPR Construction Company, Inc., Tyler, Texas. Sealed proposals will be privately opened by the Construction Manager. Dollar amounts of sealed proposals will not be made public until after the award of the contract or within seven (7) days after the date of final selection of proposals, whichever is later, as required by Senate Bill 669 effective September 1, 1999. Proposals will be received until 2:00 p.m. on November 2, 2017 via the following methods: 1. Mailed Proposals will be accepted at: RPR Construction Company, Inc., 301 SSE Loop 323, Tyler, Texas 75702. 2. Facsimile Proposals will be accepted at: (903) 592-2349. 3. Emailed Proposals will be accepted at: bids@rprconstruction.com. Sealed Proposals received by Construction Manager prior to formal sealed proposal opening will be opened and tabulated prior to 10:00 am. Subcontractors and material suppliers are encouraged to review Instructions for Sealed Proposals to determine if his sealed proposal is to be submitted to a general work category contractor or to the Construction Manager. PROJECT DESCRIPTION In general, the project consist of 4,792 square foot of additions and renovations to an existing press box including but not limited to demolition, erosion control, earthwork, termite control, pavement markings, asphalt paving, utilities, storm drainage, fencing, retaining wall, concrete, masonry, structural steel, rough carpentry, millwork, waterproofing, insulation, composite wall panels, metal wall panels, metal roofing, modified roofing, joint sealants, steel and wood doors, aluminum storefront, hardware, metal studs and drywall, tiling, acoustical ceiling, painting, signage, fire extinguisher cabinets, toilet accessories, elevator, plumbing, HVAC, fire sprinkler, electrical and special systems. CHRISTUS TMF ROSE STADIUM PRESS BOX INVITATION TO SUBMIT PROPOSALS 000020-1

INVITATION TO SUBMIT PROPOSALS 000020 CONTRACT Sealed proposals will be based on a single lump-sum contract for individual work disciplines or selected groups of work disciplines. Sealed proposals will be awarded based upon the following criteria. The following list is not necessarily in order of importance. 1. Purchase price 2. Past performance 3. Safety record 4. Reputation of the vendor and of vendor s goods and services 5. Quality of vendor s goods and services 6. Extent to which goods and services meet Owner needs 7. Vendor s past relationship with Owner, Construction Manager and Architect 8. Any other relevant factor that a private business entity would consider in selecting a vendor 9. Time required to deliver materials or perform work RPR Construction Company, Inc. is requiring that all Contractors / Suppliers provide a valid email address. PROPOSALS SHALL BE GOOD FOR (45) DAYS AVAILABILTY OF CONTRACT DOCUMENTS 1. Contract Documents are available at the following locations: a. RPR Construction Company, Inc. Office, 301 SSE Loop 323, Tyler, Texas 75702 - (VIEWING ONLY). b. RPR Construction Company, Inc. Office, 301 SSE Loop 323, Tyler, Texas 75702 (CD PDF ONLY MAY BE PURCHASED FOR $5.00). c. RPR Construction Company, Inc. Website Planroom www.rprconstruction.com (passkey - 110217200) - (VIEWING OR DOWNLOAD). d. J & S Blue Print Company, 326 S College, Tyler, Texas 75702, (903) 592-0399 / Fax (903) 592-0380 - (FULL OR PARTIAL SETS MAY BE PURCHASE FOR THE COST OF REPRODUCTION). 2. All copies of any portion of the Contract Documents shall remain the property of the Architect no matter how secured and shall be returned to the Construction Manager immediately after the competitive sealed proposal date. SEALED PROPOSAL SECURITY Sealed proposal security in the form of a Bid Bond made payable to RPR Construction Company, Inc. in an amount equal to 5% of the proposal is requested of Proposers for all contracts over $200,000.00 with capacity of bonding their work. END OF SECTION CHRISTUS TMF ROSE STADIUM PRESS BOX INVITATION TO SUBMIT PROPOSALS 000020-2

PART 1 ARCHITECTS PBK Architects 14001 Dallas Parkway, Ste. 400 Dallas, Texas 75240 (972) 233-1323 office CM INSTRUCTIONS TO PROPOSERS 000030 PART 2. OWNER Tyler Independent School District Tyler, Texas PART 3 RECEIPT AND OPENING OF SEALED PROPOSALS Separate sealed proposals are requested from interested subcontractors and material suppliers for the various items of work required for the CHRISTUS Trinity Mother Frances Rose Stadium Press Box Addition & Renovations project in Tyler, Texas. Sealed proposals will be received by the Construction Manager, RPR Construction Company, Inc., until 2:00 p.m. on November 2, 2017, at the office of RPR Construction Company, Inc., Tyler, Texas. Sealed proposals will be privately opened by the Construction Manager. Dollar amounts of sealed proposals will not be made public until after the award of the contract or within seven (7) days after the date of final selection of proposals, whichever is later, as required by Senate Bill 669 effective September 1, 1999. Proposals will be received until 2:00 p.m. on November 2, 2017 via the following methods: 1. Mailed Proposals will be accepted at: RPR Construction Company, Inc., 301 SSE Loop 323, Tyler, Texas 75702. 2. Facsimile Proposals will be accepted at: (903) 592-2349. 3. Emailed Proposals will be accepted at: bids@rprconstruction.com. Sealed Proposals received by the Construction Manager prior to the deadline may be opened for tabulation only. Subcontractors and material suppliers are encouraged to review Instructions To Proposers to determine if his sealed proposal is to be submitted to a general work category contractor or to the Construction Manager. Questions concerning the construction documents should be addressed to RPR Construction Co., Inc. by fax (903) 592-2349 or by email at bids@rprconstruction.com. Carefully read all portions of the proposal package and fill out all forms completely. PART 4 METHOD OF SEALED PROPOSAL Sealed proposals will be received by Work Categories as listed below. Proposals that exclude any Specification Section of a given Work Category may not be considered. Sealed proposals combining more than one Work Category will be accepted. PART 5 WORK CATEGORIES A. Each Work Category shall include Specification Sections Division 00, Division 01, Invitation To Submit Proposals, Instructions To Proposers, Sealed Proposal Form, General Conditions, Agreement, Supplementary General Conditions and Special Conditions, and the related Drawings and Specification Sections including all items inferred by the documents for the Work Category. B. Receive, Handle and Install (RHI) DEFINITION When the Instructions to Proposers states that a specific Work Category is to (RHI) materials or equipment furnished by another Work Category, the (RHI) Work Category Sub Contractor is responsible for all materials / equipment management including the following: 1. Accept delivery of material / equipment, confirm material / equipment has not been damaged in transit and confirm bill of laden accurately identifies the material / equipment received. If there is a discrepancy between what the vendor has noted to have been shipped and what is actually received or CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-1

CM INSTRUCTIONS TO PROPOSERS 000030 if the material is damaged in shipment the (RHI) Trade Sub Contractor is to notify Construction Manager immediately. 2. Furnish personnel and equipment to unload material / equipment in a manner so as not to damage material / equipment. 3. Furnish personnel and equipment to properly store material / equipment in location(s) acceptable to the Construction Manager and protect material / equipment from damage or loss due to inclement weather, vandalism and / or theft. Any claim for damage or loss will be filed against the Builder s Risk Policy provided by the Owner, but the (RHI) Sub Contractor will be responsible for all justification for the claim to the insurance company and be responsible for payment of the deductible. 4. Furnish personnel to inventory material / equipment received to insure that materials stored are as shown in shipping receipts and as noted in approved submittals. Any discrepancies are to be brought to the attention of the Construction Manager in ample time to avoid any delays to the progress of the project due to insufficient or incorrect material / equipment. This requirement also includes reviewing the submittals and Contract Documents to confirm that ample material is available to complete the installation(s) in accordance with the Contract Documents. Failure to do so will result in the cost of supplementary material being deducted from the (RHI) Contractor s contract. 5. Furnish personnel to properly install material / equipment in accordance with approved shop drawings and the Contract Documents as amended by approved change order(s) without damaging or wasting material / equipment furnished by others. 6. (FO) Denotes furnish FOB to Jobsite. 7. No designation noted, Furnish and Install complete. C. Subcontractor Performance and a Labor and Materials Payment Bonds may be a requirement for Work Categories 4A, 5A, 5B, 5C, 7D, 8D, 9B, 21A, 22A, 23A, 23C, 26A, 27A, 27B, 28A and 28B. Construction Manager and / or Owner may require the other successful subcontractors / suppliers to furnish Performance and a Labor and Material Payment Bonds, each in the amount of 100% of his subcontract amount and written in favor of RPR Construction Company, Inc. The cost of said bonds shall be added to the Sealed Proposal and will be included in the Subcontract. D. ACCEPTABLE PROPOSALS 1. Sealed proposals combining more than one Work Category may not be accepted if any such Work Category is not listed below. 2. Sealed proposals combining all of the below Work Categories will not be accepted. E. WORK CATEGORIES WORK CATEGORIES SPECIFICATION SECTION 1A. GENERAL WORK Metal Fabrications (RHI) 055000 Rough Carpentry 061000 Miscellaneous Rough Carpentry 061053 Sheathing 061600 Hollow Metal Doors and Frames (RHI) 081113 Wood Doors (RHI) 081400 Door Hardware (RHI) 087100 Door Thresholds and Seals 087300 Miscellaneous Specialties (RHI) 100100 Corner Guards (RHI) 102613 Toilet, Bath and Laundry Accessories (RHI) 102813 Fire Extinguishers Cabinets (RHI) 104400 Residential Appliances (FO) 113100 Ice Machines (FO) 114683 2. Wood blocking at windows. 3. One-hour rated expansion joint filler. CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-2

CM INSTRUCTIONS TO PROPOSERS 000030 4. Handrails, guardrails, wall rails, counter supports, ladders or bollards (RHI). 5. Downspout boots (RHI). 6. Knox box (RHI). 7. Door hardware for Access Controls install all door hardware including power supplies for access controls in door and frames. Coordinate with electrical and access control subcontractors. 8. Furnish, install and remove when required temporary pan stair infill. 9. Furnish, install and remove when required perimeter fall protection. 10. Receive, store and assemble door hardware by door number at time of delivery. 11. Remove, store and re-install a minimum of five rows of stadium seating the full length of the new Press Box. 2A. SITE WORK & SITE DEMOLITION Geotechnical Data 023200 Paving Removal 024113.13 Structure Demolition (as required to complete this work category) 024116 Selective Demolition (as required to complete this work category) 024119 Site Grading and Preparation 312200 Subgrade Preparation and Compaction 312313 Sprinkling 312323.16 Compaction Rolling 312323.23 Embankment 312413 Excavation Protection (as required to complete this work category) 315000 Flexible Paving Repair 320117 Rigid Paving Repair 320129 Lime Treated Subgrades 321113.13 Cement Treated Base Courses or Subgrades 321133 Hot Mix Asphaltic Concrete Pavement 321216 Coal Tar Seal Coat 321236.16 Asphalts, Oils and Emulsions 321273 1. Haul off all debris and materials for this scope. 2. Haul off all spoils generated by this work category. 3. All civil layout and grade control. 4. All work in accordance with geo-technical report. 5. Sub-grade to be +/- 0.10 foot. 6. Erosion control as directed by CM including construction entrance, silt fence, filter dyke, sediment traps and soil retention blankets on slopes greater than 4:1 (furnish, install, maintain and remove at project completion). 7. Concrete washout areas as directed by CM (furnish, install, maintain and remove at project completion). 8. Tree protection as directed by CM (furnish, install, maintain and remove at project completion). 9. Saw cut where necessary to provide a clean cut for patching into existing work. 10. Replacement of topsoil once site concrete is complete. 11. Provide sand cushion at site concrete and slab on grade. 12. Provide dust control. 13. Shoring (furnish, install and remove) as required for this scope of work. 14. Excavation for retaining walls and provide backfill material. 15. Patch asphalt at street (curb cuts) as required. 16. Clean streets weekly or as required. 17. Demo existing building slabs or paving for installation of new concrete footings and piers. 18. Project will require multiple mobilizations. 19. Site does not allow for stockpiling of materials. All materials will be stored off site and imported daily. Any existing materials to be reused will need to be stored offsite. 20. All demo & haul off of all buildings, concrete, asphalt flat work, storm pipe, inlets, curbs, slabs, fence, trees and stumps. 21. Stockpile on site as needed, fill material for all keystone walls and structural retaining walls. 22. Tree removal per note 7 on sheet C3.00. 2B. SELECTIVE BUILDING DEMOLITION Structure Demolition (as required for this work category) 024116 Selective Demolition (as required for this work category) 024119 CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-3

CM INSTRUCTIONS TO PROPOSERS 000030 1. Provide all haul off cost for this scope of work. 2. Provide all required pressbox demolition. 3. Grind floor at room 307 Film Deck. 4. Shoring (furnish, install and remove) (as required to complete this work category). 5. Remove and return items noted to Owner. 2C. SEGMENTAL RETAINING WALL Segmental Concrete Unit Masonry Retaining Wall 323223.14 1. Haul off all debris and excess materials generated by this Work Category. 2. All excavation, backfill, leveling pad, crushed stone, geo textile fabric and drainage collection system. 2D. PAVEMENT MARKINGS Paintings and Coatings (as required to complete this work category) 099000 2. Handicap parking signs with poles. 3. Concrete wheel stops. 4. Parking striping, HC logos, cross walks and fire lane striping. 5. Paint accessible ramps. 6. All directional signage. 7. Remove existing striping as required. 2E. UTILITIES Selective Demolition (as required to complete this work category) 024119 Paving Removal (as required to complete this work category) 024113.13 Excavation Protection 315000 Flexible Paving Repair 320117 Rigid Paving Repair 320129 Water Main Pipe and Fittings 331116 Water Valves 331216.13 Fire Hydrants 331219 Sanitary Sewer Lines 333313 Storm Drainage Utilities 334000 HDPE Pipe 334113 PVC Storm Sewer Drain Lines 334114 1. Haul off all debris and excess materials generated by this Work Category. 2. Lay out of all work (as required to complete this work category). 3. Dispose offsite, all spoils generated by this work category. 4. All pumping necessary to keep excavations free from water (as required by this work category). 5. All protection and safety barricades, devices, covers, etc., shall be provided by each Contractor as it relates to the safe conduct of his Work in accordance with all local, State and Federal regulations. 6. All TxDOT coordination, permits and fees associated with boring under state highway as required. 7. Existing storm drainage pipe and structure demolition (as require to complete this work category). 8. All concrete and steel reinforcement at drainage structures. 9. Concrete border around all cleanouts. 10. Tie-in all roof drain lines to storm sewer. 11. Saw cut, remove and replace all concrete and asphalt as require for installation of all materials in this work category. 12. All site utilities including hook-ups for irrigation, domestic, sanitary, gas, fire and storm sewer as indicated on plans to within 5 of building. 13. All required borings. 14. All irrigation, domestic, fire and sanitary meters, check valves, required vaults and fees associated with utilities including any three-way contract(s) with City. 15. All drainage structures including fasteners and bolts, meter vaults, excavation, backfill, shoring, embedment erosion control and barricades, concrete work related to utility work and pavement patching at all utilities. CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-4

CM INSTRUCTIONS TO PROPOSERS 000030 16. Adjust ALL existing clean-outs, manholes, utility boxes, vaults, downspout boot tie-ins, etc as required to accommodate new grades. 17. Traffic rated lids at all new and existing as required. 18. Membrane curing at utilities only. 19. Work per note 8 on sheet C5.02. 2F. FENCING Chain Link Fence and Gates 323113 Decorative Fences and Metal Gates 323119 Adjustment of Fences 323160 Removal and Reconstruction of Fences 323170 2. Furnish and install all hardware required for gates. 2G. LANDSCAPING AND IRRIGATION Seeding 329219 2. Furnish and install all sleeves (as required to complete this work category). 3. Replacement / fine grade of topsoil. 4. All sod, steel edging, boulders, pebbles, plants and planting materials. 5. Hydromulch all areas disturbed by construction not identified to receive sod. 6. Temporarily irrigate all hydro mulched and sodded areas. 3A. CONCRETE Geotechnical Report 023200 Under-slab Vapor Barrier Retarder 030580 Concrete Forming and Accessories 031000 Waterstops 031513 Concrete Construction Joints (Civil) 031516 Concrete Reinforcing 032000 Metal Reinforcement for Concrete Pavement and Site Structures 032100 Cast In Place Concrete 033000 Miscellaneous Cast In Place Concrete 033053 Membrane Concrete Curing 033923 Self-Leveling Underlayment 035400 Termite Control 313116 Excavation Protection 315000 Drilled Concrete Piers and Shafts 316329 Sealing of Joints in Rigid Pavement 320119.61 Rigid Paving Repair 320129 Concrete Paving 321313 2. Lay out of all work (as required to complete this work category). 3. All protection and safety barricades, devices, covers, etc., shall be provided by each Contractor as it relates to the safe conduct of his Work in accordance with all local, State and Federal regulations. 4. All pumping necessary to keep excavations free from water (as required to complete this work category). 5. Dispose offsite, all spoils generated by this work category. Sub grade to be left +/-.10 foot. 6. No earth forming of grade beams or footings. 7. Dispose of concrete washout. 8. Concrete paving. 9. Sidewalks, steps and ramps. 10. Stair pan concrete. 11. Concrete light pole bases. 12. MEP housekeeping pads. 13. Condensing unit pads. CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-5

CM INSTRUCTIONS TO PROPOSERS 000030 14. Transformer pad. 15. Concrete border at all electrical pull boxes and plumbing cleanouts. 16. Reinforcing steel material except in masonry. 17. Cushion sand provided by others (RHI). 18. Anchor bolts (RHI). 19. Concrete embeds (RHI). 20. Bollards (RHI). 21. Stamped and integral colored truncated domes or pavers at accessible ramps. 22. Grout column base plates and infill blockouts. 23. All saw cutting for control joints. 24. Install slip resistant stair nosing. 25. Shoring stem walls as required. 26. Rub all exposed concrete walls. 27. Shoring deck as required. 28. Furnish and install gravel bed, filter fabric, weeps and backfill at stem walls. 29. All waterproofing at concrete walls. 30. Site Concrete Structures 31. Mow strips at building and fencing. 32. Drill and place concrete piers. 33. Paving demo as required to transition ramps per detail 6 on sheet S3.02. Specific Exclusions: 1. Drainage structures. 2. All concrete associated with utilities unless noted in inclusions. 4A. MASONRY Unit Masonry 042000 Architectural Cast Stone 047200 Flexible Flashings (as required to complete this work category) 076500 Building Sealants (as required to complete this work category) 079200 2. Lay out of all work (as required to complete this work category). 3. All protection and safety barricades, devices, covers, etc., shall be provided by each Contractor as it relates to the safe conduct of his Work in accordance with all local, State and Federal regulations. 4. All pumping necessary to keep excavations free from water (as required to complete this work category). 5. All masonry reinforcing steel, grout, accessories, and thru-wall flashing requirements. 6. Brick veneer to match existing. 7. Below grade CMU. 8. Clean masonry. 9. Anchor bolts set in CMU. 10. All grout / concrete in CMU block. 11. Shoring, forming, concrete, grouting and attachment of embeds to steel at all masonry. 12. Infill existing openings as required 13. Protect all roof areas while working on roof. 14. Loose lintels (RHI). 15. All cast stone and fasteners as specified. 5A. STRUCTURAL STEEL & MISCELLANEOUS METALS (FABRICATION ONLY) Structural Steel Framing (FO) 051200 Steel Floor Decking (FO) 053113 Steel Roof Decking (FO) 053123 Metal Fabrications (FO) 055000 Steel Stairs Handrails and Railings (FO) 055100 Decorative Metal Railings (FO) 057300 1. Welding certificates and all required submittals. 2. All materials delivered to job-site. 3. Furnish weld plates at stair handrail. 4. Edge angle / CMU. CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-6

CM INSTRUCTIONS TO PROPOSERS 000030 5. Light gauge closure plate at slab. 6. Expansion anchors. 7. Window sill braces 8. Metal gates and fencing made out of steel (provide steel backing for panic hardware) 9. Steel detailing. 10. Tube steel framing at parapet metal roof supports. 11. Steel cabinet supports. 12. Loose galvanized lintels. 13. Shear studs. 14. Site does not allow for stockpiling of large materials quantities. All materials will be shipped in sequence of erection. 15. Slip resistant nosing on all steps. 16. Steel attachments for Cast Stone. 17. Steel brick support angle attached to CMU. 18. Additional wall bracing below windows wider than 6-0. 19. Galvanized diamond plate sidewalk covers. 20. Decking on light gauge framing. 21. Stainless steel railings. 5B. STRUCTURAL STEEL (ERECTION ONLY) Structural Steel Framing 051200 Steel Floor Decking 053113 Steel Roof Decking 053123 Metal Fabrications 055000 Steel Stairs Handrails and Railings 055100 Decorative Metal Railings 057300 1. Haul off all debris and materials for this scope. 2. Perimeter fall protection at each floor and roof (furnish, install and remove). 3. Weld certificates and all required submittals. 4. Provide epoxy anchors for steel to masonry connections (as required by this work category). 5. Epoxy gel at edge angle / CMU. 6. Light gauge closure plate at slab. 7. Expansion anchors. 8. Window sill braces. 9. Erect all steel to steel items. 10. Tube steel framing at parapet metal roof supports. 11. Shear studs at each floor (may require to be installed at different times). 12. Site does not allow for stockpiling of large material quantities. All materials will be shipped in sequence of erection. 13. Metal gates and fencing made out of steel. 14. Steel brick support angle attached to CMU. 15. Decking on light gauge framing. 16. Edge angle / CMU. 17. Galvanized diamond plate sidewalk covers. 18. CMU wall bracing. Specific Exclusions: 1. Downspout boots, counter supports, ladders or bollards. 5C. STRUCTURAL STEEL & MISCELLANEOUS METALS (FABRICATION and ERECTION) Structural Steel Framing 051200 Steel Floor Decking 053113 Steel Roof Decking 053123 Metal Fabrications 055000 Steel Stairs Handrails and Railings 055100 Decorative Metal Railings 057300 1. All specifications, inclusions and exclusions listed in Work Categories 5A and 5B. CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-7

CM INSTRUCTIONS TO PROPOSERS 000030 6D. MILLWORK Architectural Woodwork 064000 Building Sealants (as required to complete this work category) 079200 Educational Casework 123550 2. All cabinet hardware as specified. 3. All interior wood trim. 4. Window sills. 5. Furnish and install all grommets. 7A. JOINT SEALANTS AND WATERPROOFING Concrete Construction Joints (Civil) 031516 Self-Adhering Sheet Waterproofing 071326 Cold Fluid-Applied Waterproofing (Below Grade) 071614 Fluid Applied Air Barrier System 072620 Flexible Flashings 076500 Building Sealants 079200 Sealing of Joints in Rigid Pavement 320119.61 2. Exterior paving / sidewalk joint. 3. Building slab joints. 4. Exterior building joints. 5. Caulk between all dissimilar exterior materials. 6. Backer rod. 7D. ROOFING & SHEET METAL Rough Carpentry (as required to complete this work category) 061000 Self-Adhering Sheet Waterproofing 071326 Prefinished Metal Roofing 074113 Modified Bitumen Membrane Roofing System 075219 Roof Related Sheet Metal (as required to complete this work category) 076200 Flexible Flashing (as required to complete this work category) 076500 Roofing Accessories 077200 Roof Scuttle (hatches) and Heat / Smoke Vents 077233 Building Sealants (as required to complete this work category) 079200 2. Coordination and interface with all trades impacted by this scope of work. 3. Daily clean-up and debris removal. 4. Demolition, disposal, and replacement of existing roofing as required. 5. Protect all roof areas while working on roof. 6. Removal and replacement of existing roofing and flashings required at tie-ins. 7. Existing downspout modifications. 8. Downspout connections and/or transitions to subsurface drainage system. 9. All required pre-finished sheet metal, flashings, counter flashings, sheet membrane flashing, vapor retarder, insulation, as required. 10. Membrane under metal parapet cap. 11. Metal soffit panels. 12. Metal wall panels. 13. Roof related wood blocking. 14. Pitch pans and grout at all roof top handrails, equipment supports and piping. 15. Pre-finished flashing at all roof top equipment. 16. Pre-finished gutter and downspouts. 17. Pre-finished parapet caps. 18. Pre-finished fascia metal. 19. Metal wall panel at backside of parapet. 20. Walk pads. 21. Pre-finished metal splash pan. CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-8

22. Self adhering membrane under metal roof. CM INSTRUCTIONS TO PROPOSERS 000030 7E. EXPANSION CONTROL (FO) Expansion Control (FO) 079500 7F. ARCHITECTURAL METAL PANELS Metal Composite Material Wall Panels 074213 Building Sealants (as required to complete this work category) 079200 2. Provide all hoisting equipment required to install panels. 3. Protect all roof areas while working on roof. 4. All soffit, fascia and wall panels. 5. All pre-finished flashings, counter-flashing, metal drip edge and sealants associated with this work category. 8A. HOLLOW METAL DOORS AND FRAMES (FO) Hollow Metal Doors and Frames 081113 1. Coordination with hardware supplier. 2. Coordinate with wood door supplier. 3. Louvers in hollow metal and wood doors. 8B. WOOD DOORS AND FRAMES (FO) Wood Doors 081400 1. Coordinate with hardware supplier. 2. Coordinate with hollow metal supplier. 8D. ALUMINUM FRAMED ENTRANCES AND STOREFRONTS Building Sealants (as required to complete this work category) 079200 Aluminum Framed Entrances and Storefronts 084100 Glazed Systems 088000 2. Aluminum sill pans with end dams. 3. Furnish and install all hardware on aluminum storefront doors including electric panic devices, electric strikes and power supplies. Coordinate with electrician. 4. Caulking interior and exterior of aluminum frames. 5. All break metal and required sealants around all aluminum frames. 6. Protect all roof areas while working on roof. 7. Demo existing windows. 8. All glass at millwork. 9. Ticket windows. 9A. LATH AND PLASTER Cold-Formed Metal Framing 054000 Joint Sealants (as required to complete this work category) 079200 Cement Plastering 092400 2. Protect all roof areas while working on roof. 3. Metal lathe and support system for plaster system. 4. Vent screeds. CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-9

CM INSTRUCTIONS TO PROPOSERS 000030 9B. DRYWALL Cold Formed Metal Framing 054000 Rough Carpentry 061000 Miscellaneous Rough Carpentry 061053 Sheathing 061600 Thermal Insulation 072100 Spray-On Acoustical Insulation 072129 Firestopping (as required to complete this work category) 078400 Building Sealants (as required to complete this work category) 079200 Gypsum Wallboard Systems 092116 2. Lay out of partitions and door openings. 3. Protect all roof areas while working on roof. 4. All plywood attached to metal studs. 5. All 2X blocking attached to metal studs. 6. Fiberglass reinforced panels. 7. Sound batts extending 4 each side of partitions at gyp ceilings. 8. Fire seal partitions to deck as required. 9. REFER TO REFLECTED CEILING PLANS FOR FRAMING REQUIRED AT GYP CEILINGS. 10. Control joints at gypsum board every 30 maximum unless specified otherwise. (coordinate locations with architect). 11. Gypsum board at firewalls. 12. Fire tape and sealant as required at joints, bottom, top, and ends of gypsum firewalls. (Penetration firestopping by others.) 9C. TILING Building Sealants (as required to complete this work category) 079200 Tiling 093000 2. Floor prep as required. 3. Granite thresholds. 4. Waterproofing membrane (as required to complete this work category). 9D. ACOUSTICAL CEILING Thermal Insulation (above lay-in ceilings) 072100 Building Sealants (as required to complete this work category) 079200 Acoustical Panel Ceilings 095102 2. Insulation above acoustical ceilings. 3. Sound batts extending 4 each side of partitions at acoustical ceilings. 9E. RESILIENT AND CARPET 2. All vinyl tile and rubber base. 3. Floor prep as required. 4. Flooring at elevator. 5. Stair coverings. CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-10

CM INSTRUCTIONS TO PROPOSERS 000030 9G. PAINTING Building Sealants (as required to complete this work category) 079200 Gypsum Wallboard Systems (all related to tape, bed and texture) 092116 Paint and Coating 099000 2. Multiple paint colors. 3. Paint exposed structure above. 4. Protect all concrete floors during painting. 5. Sealed concrete floors. 6. Caulk exterior masonry control joints. 7. Caulk between all dissimilar materials at exterior of building. 8. Caulk all cast stone joints. 10C. WALL PROTECTION (FO) Corner Guards (FO) 102613 10E. PANEL SIGNS AND LETTERS Graphics 101400 10G. FIRE EXTINGUISHER CABINETS (FO) Fire Extinguishers and Cabinets (FO) 104400 1. Fire extinguishers. 10I. TOILET ACCESSORIES (FO) Toilet Accessories (FO) 102813 10K. SUN CONTROL DEVICES Aluminum Canopy 107313 10M. MISCELLANEOUS SPECIALTIES (FO) Miscellaneous Specialties (FO) 100100 11C. APPLIANCES (FO) Residential Appliances (FO) 113100 Ice Machines (FO) 114683 14A. ELEVATOR Hydraulic Elevators 3500 lbs 142400 CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-11

CM INSTRUCTIONS TO PROPOSERS 000030 21A. FIRE SPRINKLER Firestopping (as required for this work category) 078400 Building Sealants (as required for this work category) 079200 Access Doors and Frames (as required for this work category) 083113 Basic Fire Protection System Requirements 210010 Fire Protection System 211314 Excavation Protection 315000 2. Lay out of all work (as required to complete this work category). 3. Access doors (as required for this work category). 4. Dispose offsite, all spoils generated by this work category. 5. All pumping necessary to keep excavations free from water (as required to complete this work category). 6. All protection and safety barricades, devices, covers, etc., shall be provided by each Contractor as it relates to the safe conduct of his Work in accordance with all local, State and Federal regulations. 7. Protect all roof areas while working on roof. 8. Sprinkler heads to be centered in ceiling tile. 9. Start work 5 outside of building. 22A. PLUMBING Firestopping (as required for this work category) 078400 Building Sealants (as required for this work category) 079200 Access Doors and Frames (as required for this work category) 083113 Basic Plumbing Requirements 220010 Plumbing Submittal Procedures 220090 Gauges, Meters, and Thermometers 220520 Valves General 220524 Pipe and Pipe Fittings General 220530 Isolation Devices 220534 Plumbing Identification 220554 Piping Insulation 220720 Commissioning of Plumbing Systems 220800 Domestic Water Piping and Appurtenances 221117 Soil, Waste and Sanitary Drain Piping, Vent Piping and Appurtenances 221317 Condensate Piping 221318 Access Doors 223334 Plumbing Fixtures and Fixture Carriers 224001 Excavation Protection 315000 2. Lay out of all work (as required to complete this work category). 3. Access doors (as required to complete this work category). 4. Dispose offsite, all spoils generated by this work category. 5. All pumping necessary to keep excavations free from water (as required by this work category). 6. All protection and safety barricades, devices, covers, etc., shall be provided by each Contractor as it relates to the safe conduct of his Work in accordance with all local, State and Federal regulations. 7. Furnish, install and maintain a temporary water supply system for use by all Sub Contractors during the construction period. 8. Protect all roof areas while working on roof. 9. Tie all roof drains into storm water system. 10. Condensate and auxiliary drain lines. 11. Sand / oil separator including test basin, cleanouts, pipe and fittings to tie back into sanitary. 12. Concrete border around all cleanouts. 13. Concrete house keeping pads (as required to complete this work category). 14. Final connection of all appliances. 15. Extend all utilities 5 outside building and make final connections to site utilities. 16. Gas service lines and sleeves from meter. 17. Domestic water connection to existing. 18. Sawcutting, concrete removal, and pour-back for plumbing in existing. 19. Demo all existing plumbing where required. 20. Stainless steel splash guards at mop sinks. CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-12

CM INSTRUCTIONS TO PROPOSERS 000030 Specific Exclusions: 1. Sewer beyond 5 outside building. 23A. HVAC Firestopping (as required to complete this work category) 078400 Building Sealants (as required to complete this work category) 079200 Access Doors and Frames (as required to complete this work category) 083113 Fixed Louvers 089100 Basic Mechanical Requirements 230000 HVAC Submittal Procedures 230090 Roof Curbs 230532 Identification for HVAC Piping and Equipment 230553 Duct and Grille Insulation 230713 Refrigerant Piping Insulation 230721 Commissioning of Mechanical Systems 230800 Programmable Control Devices for HVAC 230913 Refrigerant Piping 232300 Metal Ductwork 233113 Access Doors 233333 HVAC Fans 233416 Bipolar Ionization Air Purification System 234323 Small Capacity Split System Units 238127 Variable Refrigerant Flow HVAC Systems 238130 Electrical Unit Heaters 238239 2. Lay out of all work (as required to complete this work category). 3. Access doors (as required to complete this work category). 4. Dispose offsite, all spoils generated by this work category. 5. All pumping necessary to keep excavations free from water (as required to complete this work category). 6. All protection and safety barricades, devices, covers, etc., shall be provided by each Contractor as it relates to the safe conduct of his Work in accordance with all local, State and Federal regulations. 7. Protect all roof areas while working on roof. 8. Concrete house keeping pads (as required to complete this work category). 9. Provide filter media for HVAC during construction and replace with new prior to owner acceptance. 10. Fill roof pitch pans with non-shrink grout. 11. Starters for mechanical equipment. 12. Roofing insulation, ½ sheetrock and duct board inside mechanical curbs if required. 13. Condensate and auxiliary drain lines. 14. Coordinate directly with Testing, Adjusting and Balancing Contractor during the test and balance and keep Construction Manager notified of progress. 15. HVAC demolition requirements. 23B. TESTING, ADJUSTING AND BALANCING Testing, Adjusting and Balancing for HVAC 230593 23C. MECHANICAL (PLUMBING / HVAC COMBINED) 1. All specifications, inclusions and exclusions listed in Work Categories 22A and 23A. CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-13

CM INSTRUCTIONS TO PROPOSERS 000030 26A. ELECTRICAL Firestopping (as required to complete this work category) 078400 Building Sealants (as required to complete this work category) 079200 Access Doors and Frames (as required to complete this work category) 083113 Electrical 260000 Electrical Submittal Procedures 260090 Electrical Demolition 260511 Low Voltage Electrical Power Conductors and Cables 260519 Grounding and Bonding for Electrical Systems 260526 Raceways and Conduits for Electrical Systems 260533.11 Boxes and Fittings for Electrical Systems 260533.13 Provisions for Communications, Security and Safety Systems 260534 Identification for Electrical Systems 260553 Electrical Commissioning 260800 Testing of Electrical System 260811 Electrical Power Monitoring and Control 260913 Time Switches 260916 Contactors 260921 Lighting Controls 260941 Low Voltage Electrical Service Entrance 262100 Low Voltage Distribution Transformers 262213 Panel Boards for Distribution Switchgear 262416 Wiring Devices 262726 Fuses 262813 Enclosed Safety Switches and Circuit Breakers 262816 Surge Protective Devices 264300 Lighting 265000 General Communication Systems Requirements 270500 General Electronic Safety and Security System Requirements 280500 Excavation Protection 315000 2. Lay out of all work (as required to complete this work category). 3. Access doors (as required to complete this work category). 4. Coordinate this work with special systems subcontractors. 5. Provide power to all special systems equipment. 6. Furnish, install, maintain and remove and project completion, a complete temporary electrical service and distribution system and temporary lighting for use by all Sub Contractors during the construction period. 7. All pumping necessary to keep excavations free from water (as required by this work category). 8. All protection and safety barricades, devices, covers, etc., shall be provided by each Contractor as it relates to the safe conduct of his Work in accordance with all local, State and Federal regulations. 9. Sawcut, remove and replace all concrete and asphalt as require for installation of new underground raceways. 10. Dispose offsite all spoils generated by this work category. 11. Concrete house keeping pads (as required to complete this work category). 12. Concrete border around all electrical pull boxes. 13. Install access control, communications, fire alarm and security power supply box and provide / connect power. 14. Related hook-ups for equipment and appliances. 15. Raceway requirements for ALL special systems. 16. Electrical demolition requirements. 17. Transformer pads & electrical related housekeeping pads. 18. Remove and return stadium light fixture to Owner and reinstall new Owner provided fixtures. CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-14

CM INSTRUCTIONS TO PROPOSERS 000030 27A. COMMUNICATIONS Firestopping (as required to complete this work category) 078400 Building Sealants (as required to complete this work category) 079200 Access Doors and Frames (as required to complete this work category) 083113 General Communication Systems Requirements 270500 Data and Telephone Cable Plant 271030 2. Access doors (as required to complete this work category). 3. Coordinate this work with electrical subcontractor. 27B. AUDIO / VIDEO SYSTEMS Firestopping (as required to complete this work category) 078400 Building Sealants (as required to complete this work category) 079200 Access Doors and Frames (as required to complete this work category) 083113 General Communication Systems Requirements 270500 Audio-Video Equipment Brackets and Coaxial Cabling 274018 Integrated Audio-Video Systems and Equipment for Stadium 274116 Sound Reinforcement System 275125 2. Access doors (as required to complete this work category). 3. Coordinate this work with electrical subcontractor. 28A. SECURITY / ACCESS CONTROL SYSTEMS Firestopping (as required to complete this work category) 078400 Building Sealants (as required to complete this work category) 079200 Access Doors and Frames (as required to complete this work category) 083113 General Electronic Safety and Security System Requirements 280500 Integrated Building Access Control System 281327 Integrated Premises Intruder Alarm System 281624 Integrated Video Surveillance System 282320 2. Access doors (as required to complete this work category). 3. Coordinate this work with electrical subcontractor. 28B. FIRE ALARM SYSTEMS Firestopping (as required to complete this work category) 078400 Building Sealants (as required to complete this work category egory) 079200 Access Doors and Frames (as required to complete this work category) 083113 Fire Detection and Alarm System 284621 2. Access doors (as required to complete this work category). 3. Coordinate this work with electrical subcontractor. PART 6 SEALED PROPOSAL FORM Each sealed proposal shall be submitted on the Sealed Proposal Form as included in Specifications with all the blank spaces filled in. PART 7 WITHDRAWAL OR REVISION OF SEALED PROPOSALS Any Sealed Proposal may be withdrawn or revised in writing prior to the scheduled time for opening of Competitive Sealed Proposals. After opening, no Sealed Proposal may be withdrawn for forty five (45) calendar days. CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-15

CM INSTRUCTIONS TO PROPOSERS 000030 PART 8 AVAILABILITY OF CONTRACT DOCUMENTS 1. Contract Documents are available at the following locations: a. RPR Construction Company, Inc. Office, 301 SSE Loop 323, Tyler, Texas 75702 - (VIEWING ONLY). b. RPR Construction Company, Inc. Office, 301 SSE Loop 323, Tyler, Texas 75702 (CD PDF ONLY MAY BE PURCHASED FOR $5.00). c. RPR Construction Company, Inc. Website Planroom www.rprconstruction.com (passkey - 110217200) - (VIEWING OR DOWNLOAD). d. J & S Blue Print Company, 326 S College, Tyler, Texas 75702, (903) 592-0399 / Fax (903) 592-0380 - (FULL OR PARTIAL SETS MAY BE PURCHASE FOR THE COST OF REPRODUCTION). 2. All copies of any portion of the Contract Documents shall remain the property of the Architect no matter how secured and shall be returned to the Construction Manager immediately after the competitive sealed proposal date. PART 9 SUBCONTRACT FORM The Form of Agreement between Sub Contractor and Construction Manager will be a RPR Construction standard subcontract agreement. The standard Form of Agreement is available for review in the office of the Construction Manager, RPR Construction Company, Inc. PART 10 EXAMINE CONTRACT DOCUMENTS AND VISIT SITE Before submitting a Sealed Proposal, Sub Contractors / Suppliers should carefully examine the Contract Documents; visit the site of work; fully inform themselves as to all existing conditions and limitations, including those of labor; and shall include in the Sealed Proposal a sum sufficient to cover the cost of all items contemplated by the Contract Documents. No consideration will be granted for any alleged misunderstanding of the material, article or piece of equipment to be furnished or work to be done; it being understood that the tender of a Sealed Proposal carries with it the agreement to all items and conditions referred to herein or indicated in the Contract Documents. PART 11 DISCREPANCIES OR OMISSIONS Should a plan holder find discrepancies or omissions from the Contract Documents, or should the plan holder be in doubt as to their meaning, the plan holder should at once notify the Construction Manager, who will notify the Architect who will, time permitting, issue a written instruction in the form of an addendum to all plan holders of record. Neither the Owner, RPR Construction Company, Inc., nor the Architect will be responsible for any oral explanations or interpretations of the Contract Documents. PART 12 ADDENDA All addenda issued during the time of sealed proposals shall become a part of the Contract Documents and receipt thereof shall be listed in the Sealed Proposals. PART 13 MATERIAL ONLY PROPOSALS Proposals for work categories shown to be furnish only (FO), shall be accompanied by a letter stating availability of materials and anticipated delivery date. Timing of materials is most critical to this project and will be considered in evaluating proposals. PART 14 SALES TAX The Sub Contractor shall not be required to pay state sales or use taxes on materials or equipment which are affixed and made part of the real estate of this Project since the Owner is a public school and is exempt from paying state sales tax. The Sub Contractor shall include all other taxes required by law in his Competitive Sealed Proposal. PART 15 PROJECT COMPLETION DATE Owner desires to complete as soon as possible but no later than July 1, 2018. END OF SECTION CHRISTUS TMF ROSE STADIUM PRESS BOX INSTRUCTIONS TO PROPOSERS 000030-16

SEALED PROPOSAL FORM 000040 FOR WORK CATEGORY # (Insert Work Category # and Description) Subcontractor / Supplier: Phone Number: TO: RPR Construction Company, Inc. 301 SSE Loop 323 Tyler, Texas 75702 FOR: CHRISTUS Trinity Mother Frances Rose Stadium Press Box Addition and Renovation Tyler, Texas PART 1 GENERAL A. The Sub Contractor / Supplier, in compliance with your invitation for sealed proposals for the CHRISTUS Trinity Mother Frances Rose Stadium Press Box Addition and Renovation, Tyler, Texas, having examined the plans and the specifications entitled CHRISTUS Trinity Mother Frances Rose Stadium Press Box Addition and Renovation and other related documents and being familiar with the site of the proposed work, and with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, tools, equipment, machinery, equipment rental, transportation, superintendent, perform all work, provide all services and to construct all work in the Work Category stated below in accordance with the Contract Documents set forth therein, and at the prices stated below. These prices are to cover all expenses incurred in performing the work required for that Work Category. B. After Sealed Proposals are received, tabulated and evaluated by RPR Construction Company, Inc., and the successful subcontractor / supplier for each category of work has been determined, said subcontractor / supplier agrees to meet with RPR Construction Company, Inc., for purposes of determining any contract overlaps or omission. For purposes of these meetings, the subcontractor / supplier agrees to provide a complete, detailed cost breakdown; a list of all subsubcontractors proposed for use in the work; and a list of all items, materials and their manufacturers proposed for use in the work. C. The Sub Contractor / Supplier, if awarded a subcontract, agrees to commence work and to fully complete this Work Category in accordance with a schedule to be established in collaboration with RPR Construction Company, Inc., under the provisions of the Supplementary General Conditions of the Specifications. PART 2 ADDENDUM / CLARIFICATION RECEIPT Receipt of the following Addenda or Clarification to the Contract Documents are acknowledged: Addendum No. Dated: Clarification No. Dated: Addendum No. Dated: Clarification No. Dated: Addendum No. Dated: Clarification No. Dated: Addendum No. Dated: Clarification No. Dated: Addendum No. Dated: Clarification No. Dated: Addendum No. Dated: Clarification No. Dated: CHRISTUS TMF ROSE STADIUM PRESS BOX SEALED PROPOSAL FORM 000040-1

SEALED PROPOSAL FORM 000040 PART 3 BASE PROPOSAL A. The undersigned agrees to perform all (herein insert the title of the Work Category as it appears in the Instructions to Proposers) work for Work Category # as described in the Contract Documents for the Lump Sum of ($ ) All applicable taxes are included in the above Base Proposal. B. Breakout for haul off site of debris generated by this Work Category (this amount shall be included in base proposal above). ($ ) C. Breakout for scaffolding or lift equipment to perform work on the stadium side ONLY of the press box by this Work Category (this amount shall be included in base proposal above). ($ ) D. Amounts shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern. PART 4 COST FOR BOND Add ($ ) PART 5 ALTERNATE(S) Alternate One Provide decorative metal fencing and pilasters as shown in contract documents. Provide ticket booths and canopy at three (3) locations as indicated in contract documents. Provide asphalt top coat and re-strip parking lot as shown in contract documents. Add / Deduct ($ ) Alternate Two Provide visitor side access drive, stairs and ramp as shown in contract documents. Refer to demo plans for additional scope at alternate. Add / Deduct ($ ) Alternate Three Install new LED stadium lighting provided by Owner. Add / Deduct ($ ) Alternate Four Provide new sound system. Refer to MEP documents. Add / Deduct ($ ) Alternate Five N/A Add / Deduct ($ ) Alternate Six N/A Add / Deduct ($ ) Alternate Seven N/A Add / Deduct ($ ) CHRISTUS TMF ROSE STADIUM PRESS BOX SEALED PROPOSAL FORM 000040-2