MATERIAL MASTER DATA IN SAP

Similar documents
AVANTUS TRAINING PTE LTD

Business case studies. (Logistic and production models)

Breakdown. Learn the implications of the breakdown field in Item Master Data

Product Introduction (PI) FAQ s. Version 1.2

One Software to manage your entire bakery business.

Successfully completing this course helps the reader prepare for the Microsoft Dynamics NAV Manufacturing certification exam.

An integrated Business Case Study U i ng i Microsoft fft D ynam cs NA N V NAV 2009 V enna Austria 28/10/2009

Once you have completed this topic, you will be able to create and verify opening balances for Business Partners.

MODULE CAPABILITY GUIDE

STP353: ASN Processing with Supply Network Collaboration

Bibliography. Literature. Other Sources

MICROSOFT DYNAMICS AX 2012 R2 POTENCY MANAGEMENT DEMO SCRIPT. December 2012 Version 1.0.0

3 October 2017 Page 1 of 5 BellHawk Systems Corporation

Helping you keep our pets healthy and active

Discrete Manufacturing Advanced in Microsoft Dynamics AX 2012

TRANSFORM EXPERIENCE. TRANSFORM BUSINESS.

GBI - Introductory Course 6/11/2015

Partners Site Help Documentation 07/23/2018

NSK Steering Systems America

Based on the narrative provide the best answer to the following questions about the swimlane and ERD diagrams:

APACHE V4 is the ERP (Enterprise Resource Planning) solution for industrial companies

SAP Model Company for Connected Manufacturing Version 1.0

Table of Contents A. Organization Production MRP Controller Person Responsible for the Supply Area... 5 B. Master Data...

Customizing Materials Management Processes in SAP. ERP Operations

The 12 Best Cool Solutions for Infor XA Users!

Enterprise Portal for Vendors and Brokers

2. Is it possible to manage bill of material with different BOM and routing version?

What s New In Order-to-Manufacture-to-Ship?

Dynamics AX 2012 Trade & Logistics

Material Requirements Planning (MRP) and ERP 14. Outline

An example of a paper product activity report and its ASC X12 interpretation can be found at the back of this guideline.

Foreword 7. 1 Production planning Planning approaches Planning strategies Definition of the example 17

Course Outline TO TRAIN

Version 3.2 February 2007

Prophet 21 CommerceCenter 10.5 New Features: Inventory New Features suite

Produce Traceability Initiative Best Practices for Product Substitutions

Collaboration of Production Process with Contract Manufacturers in Hi-Tech Industries

SPORTSMAN S GUIDE (SG)

Domestic Vendors. Bluestem Irvine Pa DC Minimum Vendor Shipping Requirements

Process flow of SpectrumERP

SPORTSMAN S GUIDE (SG)

New Vendor Instructions

Ascend s journey to higher quality material master data. Ocal Yilmaz Global MDM Leader Ascend Performance Materials

Inventory Replenishment

Owner of this document is: Scott Wiacek Purpose of this document

MRP Configuration - Adobe Interactive Forms (Japanese) - SCN Wiki

Kohls.com Direct Ship Network (DSN) 2013

SUPPLY CHAIN VISIBILITY AND CONTROL SOLUTIONS

Welcome to the course on the working process across branch companies.

Optimizing Reverse Logistics with SAP

Subbu Ramakrishnan. Manufacturing Finance with SAP. ERP Financials. Bonn Boston

Handling Unit Management (LO-HU)

880Grocery Products Invoice

Demo Script. Manufacturing Basics Classification: Internal and for Partners. SAP Business ByDesign Reference Systems. Version:

Test-king.C_TSCM42_65.80 Questions

Supplier Resource Guide

Content for Infor LN 10.5 Operations

SAP Business One. A Single System to Streamline Your Entire Business

Oracle Supply Chain Management Cloud: Order to Cash

Job Manager Great Features: All in One Database. Designed for Dynamics NAV 2013

Preparing to Enter/Update Items

Do it Best Corp. Advance Ship Notice (ASN) Guidelines

Enterprise Resource Planning & SAP. Agenda

Brunswick Access Control System Business Owner and Manager Guidelines

TABLE OF CONTENTS DOCUMENT HISTORY

Creating New Items via Data Sync

Microsoft Dynamics AX. Microsoft Dynamics AX. Factsheet. Microsoft. 1 Microsoft

Electronic Data Interchange (EDI) Requirements

Vendor Partnership Manual. Section 9 Inventory Management

This transaction set should not be used to communicate purchase order adjustments or changes.

KEY ISSUES in Advanced Operations Management. Timo Seppälä

Welcome to the introduction of the Intercompany Integration Solution for SAP Business One. In this course, we present the highlights of the basic

Section 2 <Ordering>

Manage Employee Access

SAP Business One Intercompany Purchasing

The very Best Cool Solutions for Infor XA Users!

Work Orders Quick Reference

Reading Sample. Introduction Product Cost Planning. Contents. Index. The Author. First-hand knowledge.

Purchase Orders MBS ARC (MERCHANDISE) MANUAL

ebecs Distribution Accelerator for Microsoft Dynamics

MJ Wylie, Johnson & Johnson Nick Manzo, 1WorldSync

December 17, 2007 SAP Discovery System version 3 English. RFID Enabled Integrated Inbound and Outbound Scenario with SAP Discovery System

Chapter 2 Enterprise Systems

Controlling Specification Management. Throughout the Food & Beverage Product Lifecycle

Vacation Approval for SharePoint 2003 or SharePoint 2007 solution End User Guide

JD Edwards EnterpriseOne Growing and Blending

PRODUCT INFORMATION MANAGEMENT

Functionality Guide. Copyright 2011 Development-X Limited

INTEGRATED. Reservations, Tracking, and Action Messages. Microsoft Dynamics NAV 5.0. Technical White Paper

T REV A

SILVER-CS ERP for Industries. Marketing document

Physical Inventory Counts and Physical Inventory Journal

RAMCO AVIATION SOLUTION

Managing Items. Explanation on beas extended view of Item Master Data

Bread and Bakery Sector

Physical Inventory Counts and Warehouse Physical Inventory Journal

ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner

Application Help for SAP TM Document version: SAP TM 9.2 SP CUSTOMER. Enterprise Services

880 Grocery Products Invoice

Wave Batch Picking. Contents. 1 Version KRC

Transcription:

MATERIAL MASTER DATA IN SAP

Master Data The term Master Data refers to a common data about customers, suppliers, partners, products, materials, accounts and other critical entities. At WhiteWave, the Central Master Data Team: Offers SAP knowledge and assistance to the business for new processes, changes to current process, and basic inquiries Manages the integrity of the data going into the system Materials - Raw, Packaging, Semi- Finished and Finished Goods, BOM s Routes, Production Versions, Packaging Instructions, and Batch Search Strategy Customer Trade, Broker, Indirect/MEI DATA ELEMENTS OWNED BY CENTRAL MASTER DATA TEAM Pricing- National Price, Intercompany Price, Pick-up Allowance, Pallet Layers, Min and Max Pallet Quantities, etc. Vendor/Grower- Material Service, Carrier, Copackers/plants and Growers 2

Material Master Data Material Master Data Forms Finished Goods- New Item Innovation Extend an Existing Item Semi-Finished Goods This is Plant example Trialstext. Go ahead and replace it with your own text Discontinued Items Price Changes Raw/Pack 3

Material Master Data Material Master Data Forms Finished Goods- New Item Innovation Extend an Existing Item Semi-Finished Goods This is Plant example Trialstext. Go ahead and replace it with your own text Discontinued Items Price Changes Raw/Pack 4

Material Master Data - Forms Several Forms are available on the Intranet site which reference Material Master Data, they are as follows: SAP Finished Good Material Setup and Disco Form: Used to request a new finished good setup in SAP Retail Unit UPC and GTIN Request Form: Used to request a new UPC assigned for a new product/pack-size 5

Material Master Data Forms Con t Several Forms are available on the Intranet site which reference Material Master Data, they are as follows: Pricing Price List Related Conditions: Used to create a NLP and update (make changes) to existing pricing Material- Raw or Packaging- Add Change or Extend: Used to create raw and packaging materials 6

Material Master Data Material Master Data Forms Finished Goods- New Item Innovation Extend an Existing Item Semi-Finished Goods Plant Trials Discontinued Items Price Changes Raw/Pack 7

Material Master Data New Item Innovation Finished Goods 1xxxxx Extending an existing item A new product is coming to market and needs to be added into SAP OR A new production location for an existing product or A new ship from location for an existing product Semi- Finished Goods 2xxxxx Brand New Product Most of the blends/ semi-finished will be within our facilities unless we provide to a Co-packer. For example, when 1/2 spinach and ½ kale to mixture changes to ¼ spinach and ¾ kale 8

Material Master Data New Item Innovation Finished Goods 1xxxxx Extending an existing item A new product is coming to market and needs to be added into SAP OR A new production location for an existing product or A new ship from location for an existing product Semi- Finished Goods Brand New Product Most of the blends/ semi-finished will be within our facilities unless we provide to a Co-packer. For example, when 1/2 spinach and ½ kale to mixture changes to ¼ spinach and ¾ kale 9

Material Master Data Finished Goods New Item Innovation Process 2 Analysis of set-up being requested: Master Data will review the request and respond with requirements based on the specific scenario 1 UPC Form and SAP FG Form Submitted to Master Data: Used to set-up or change a material in SAP Submitted by Project Champion during or after Kick-off (during development phase) 3 Master Data Set-up: Once all of the information has been received from the business, Master Data will set-up the materials in SAP 6 Notification of completion: Master Data will send an email to the pre-determined distribution list as well as the requestor that the entry is complete 5 4 Master Data sends for Cost Roll Release Hold in SAP: Once Master Data has received confirmation that the cost roll is completed, the information will be released in SAP for use 10

Material Master Data Finished Goods New Item Innovation Process 2 Analysis of set-up being requested: Master Data will review the request and respond with requirements based on the specific scenario 1 UPC Form and SAP FG Form Submitted to Master Data: Used to set-up or change a material in SAP Submitted by Project Champion during or after Kick-off (during development phase) 3 Master Data Set-up: Once all of the information has been received from the business, Master Data will set-up the materials in SAP 6 Notification of completion: Master Data will send an email to the pre-determined distribution list as well as the requestor that the entry is complete 5 4 Master Data sends for Cost Roll Release Hold in SAP: Once Master Data has received confirmation that the cost roll is completed, the information will be released in SAP for use 11

1 Material Master Data Finished Goods New Item Innovation UPC Form and SAP FG Form Submitted to Master Data: Used to set-up or change a customer in SAP When a new item is introduced, the UPC will need to be setup in SAP. Submitted by Project Champion during or after Kick-off (during development phase) (10) Business Days- Upon receipt of all valid data 12

Material Master Data Finished Goods New Item Innovation Process 2 Analysis of set-up being requested: Master Data will review the request and respond with requirements based on the specific scenario 1 UPC Form and SAP FG Form Submitted to Master Data: Used to set-up or change a material in SAP Submitted by Project Champion during or after Kick-off (during development phase) 3 Master Data Set-up: Once all of the information has been received from the business, Master Data will set-up the materials in SAP 6 Notification of completion: Master Data will send an email to the pre-determined distribution list as well as the requestor that the entry is complete 5 4 Master Data sends for Cost Roll Release Hold in SAP: Once Master Data has received confirmation that the cost roll is completed, the information will be released in SAP for use 13

2 Material Master Data Finished Goods New Item Innovation Note: The Master Data requirements will vary based on the type of set-up. Once the UPC Form and SAP Finished Goods (FG) Form is received by Master Data, a list of specific requirements will be requested. Analysis of set-up being requested: Master Data will review the request and respond with requirements based on the specific scenario Currently there are (3) Types of Scenarios as follows: Scenario 1 Scenario 3 Sub-Contract Co-Packer Production (we own some of the ingredients, we pay the location) Scenario 2 Internal Plant Production (we own the plant) Full-Service Co-Packer Production (we pay the co-packer, they produce the product) 14

Sample: Internal Plant Production Set-up Requirments Material Description: Manf. Plants: DCs Plants: First Ship: SAP Material Number(s) & Description(s) SAP Plant number(s) and Name(s) where produced SAP Plant number(s) and Name(s) where resupplied / shipped (DATE) SAP Needs: Packaging in Finished Good Packaging Qty in Finished Good Product Hierarchy (provide 18 digit number for existing; email request for new) If a new Product Family is needed, a new Profit Center must be created Profit Center Packaging Procurement Packaging R&D Director, Trade Marketing; Brand Finance Analyst; Director, S&OP (NEED ALL) Director, Routings - Both Blend and FG (attach new or indicate Copy From material) SNP Relevant. Please provide routings or copy from material GTIN Finished Good Creation Approval National Price List (attach form with approval) Plants Controller Product Supply James Martin Brand Manager / Requestor Sales Analyst Blend BOM - Per 1000 lbs (Please attach formula) Blend - lbs/gallon Blend Qty in Finished Good - Per 1000 cs Water % of blend Finished Good Warehouse Approval LCD for Product Order Group Brand R&D Food Scientist Brand R&D Food Scientist Brand R&D Food Scientist Brand R&D Food Scientist Product Supply Lead Supply Chain Optimization Gallon to Case Product Type (COPA) Portfolio (COPA) Flavor (COPA) Consumption (COPA) Consumer Pack Size (COPA) Oz Per Consumer Unit (COPA) Fat Content (COPA) 15

Sample: Subcontract Co-Packer Production Set-up Requirments Material Description: Manf. Plants: DCs Plants: First Ship: SAP Material Number(s) & Description(s) SAP Plant number(s) and Name(s) where produced SAP Plant number(s) and Name(s) where resupplied / shipped (DATE) SAP Needs: Packaging in Finished Good Packaging Qty in Finished Good Product Hierarchy (provide 18 digit number for existing; email request for new) If a new Product Family is needed, a new Profit Center must be created Profit Center Finished Good Warehouse Approval LCD for Product Order Group Packaging Procurement Packaging R&D Director, Trade Marketing; Brand Finance Analyst; Director, S&OP (NEED ALL) Director, Product Supply Lead Supply Chain Optimization Standard Cost (3rd party or full service co-pack) or Subcontract fee per 1000 cases Scrap at copackers SNP Relevant. Please provide routings or copy from material GTIN Finished Good Creation Approval National Price List (attach form with approval) Director, Co-manufacturing Manager, Co-manufacturing Director, Co-manufacturing Manager, Co-manufacturing Product Supply James Martin Brand Manager / Requestor Sales Analyst Finished Good BOM - Per 1000 cs Brand R&D Food Scientist Gallon to Case Product Type (COPA) Portfolio (COPA) Flavor (COPA) Consumption (COPA) Consumer Pack Size (COPA) Oz Per Consumer Unit (COPA) Fat Content (COPA) 16

Sample: Full Service Co-Packer Production Set-up Requirments Material Description: Manf. Plants: DCs Plants: First Ship: SAP Material Number(s) & Description(s) SAP Plant number(s) and Name(s) where produced SAP Plant number(s) and Name(s) where resupplied / shipped (DATE) SAP Needs: Finished Good Warehouse Approval LCD for Product Order Group Product Hierarchy (provide 18 digit number for existing; email request for new) If a new Product Family is needed, a new Profit Center must be created Profit Center Product Supply Lead Supply Chain Optimization Director, Trade Marketing; Brand Finance Analyst; Director, S&OP (NEED ALL) Director, Standard Cost (full service co-pack) per 1000 cases GTIN Finished Good Creation Approval National Price List (attach form with approval) Gallon to Case Product Type (COPA) Portfolio (COPA) Flavor (COPA) Consumption (COPA) Consumer Pack Size (COPA) Oz Per Consumer Unit (COPA) Fat Content (COPA) Director, Co-manufacturing Manager, Co-manufacturing James Martin Brand Manager / Requestor Sales Analyst 17

Material Master Data Finished Goods New Item Innovation Process 2 Analysis of set-up being requested: Master Data will review the request and respond with requirements based on the specific scenario 1 UPC Form and SAP FG Form Submitted to Master Data: Used to set-up or change a customer in SAP Submitted by Project Champion during or after Kick-off (during development phase) 3 Master Data Set-up: Once all of the information has been received from Master Data, the materials will be se-up in SAP 6 Notification of completion: Master Data will send an email to the pre-determined distribution list as well as the requestor that the entry is complete 5 4 Master Data sends for Cost Roll Release Hold in SAP: Once Master Data has received confirmation that the cost roll is completed, the information will be released in SAP for use 18

Material Master Data New Item Innovation Finished Goods 1xxxxx Extending an existing item A new product is coming to market and needs to be added into SAP OR A new production location for an existing product or a new ship from location for an existing product Semi- Finished Goods Brand New Product Most of the blends/ semi-finished will be within our facilities unless we provide to a Co-packer. For example, when 1/2 spinach and ½ kale to mixture changes to ¼ spinach and ¾ kale 19

Extending an Existing Item New Production Location 2 Information is requested: Master Data will initiate an email to collect the appropriate data 1 A new production location for an existing product or A new ship from location for an existing product The Supply Chain Planner will inform (via email): R&D Co-manufacturing Master Data Etc. 3 Master Data Set-up: Once all of the information has been received from the business, Master Data will set-up in SAP 6 Notification of completion: Master Data will send an email to the pre-determined distribution list as well as the requestor that the entry is complete 5 4 Master Data sends for Cost Roll Release Hold in SAP: Once Master Data has received confirmation that the cost roll is completed, the information will be released in SAP for use 20

Extending an Existing Item- New Ship From Location 1 2 Master Data Set-up: Once all of the information has been received from the business, Master Data will set-up in SAP New Ship From Location: The Supply Chain planner will submit a request for set-up to include source plant (where it is coming from), approved by warehouse finished goods 5 3 Master Data sends for Cost Roll Notification of completion: Master Data will send an email to the pre-determined distribution list as well as the requestor that the entry is complete 4 Release Hold in SAP: Once Master Data has received confirmation that the cost roll is completed, the information will be released in SAP for use 21

Extending an Existing Item NO FORMS NEEDED When an extension is needed on an existing item, no forms are required. All communication is sent via email 22

Material Master Data Finished Goods New Item Innovation Extending an existing item A new product is coming to market and needs to be added into SAP OR A new production location for an existing product or A new ship from location for an existing product Semi- Finished Goods 2xxxxx Brand New Product Most of the blends/ semi-finished will be within our facilities unless we provide to a Co-packer. For example, when 1/2 spinach and ½ kale to mixture changes to ¼ spinach and ¾ kale 23

Material Master Data Semi-Finished Goods 1 2 3 R&D contacts Master Data with a request for an identifier number Identifier number is created: Once created, Master Data will notify R&D in order to feed into the New Item Innovation Process See Finished Goods New Item Innovation Process 24

Material Master Data Material Master Data Forms Finished Goods- New Item Innovation Extend an Existing Item Semi-Finished Goods This is Plant example Trialstext. Go ahead and replace it with your own text Discontinued Items Price Changes Raw/Pack 25

Material Master Data Plant Trials Process 2 Analysis of set-up being requested: Master Data will review the request and respond with requirements based on the specific scenario 1 Plant Trial Request Form Submitted In order to set up a blend and semifinished good a trial number will need to be generated. Trial numbers always begin with letters and can be 18 characters (typically based on location). For example, Mt Crawford would begin with MTCxxxxxx) 3 Master Data Set-up: Once all of the information has been received from the business, Master Data will set-up in SAP 6 Notification of completion: Master Data will send an email to the pre-determined distribution list as well as the requestor that the entry is complete 5 4 Master Data sends for Cost Roll Release Hold in SAP: Once Master Data has received confirmation that the cost roll is completed, the information will be released in SAP for use 26

Plant Trials Plant Trials Form Upon determination of a plant trial, R&D will submit the Proposal for Plant Trial or Investigation Form Note: This form is maintained by R&D and submitted for processing to Master Data (28) Business Day notification with (15) Business Days for Master Data to process 27

Material Master Data Material Master Data Forms Finished Goods- New Item Innovation Extend an Existing Item Semi-Finished Goods This is an example text. Go ahead and replace it with your own text Plant Trials Discontinued Items Price Changes Raw/Pack 28

Discontinued Items Process At such a point in time the business has a need to discontinue an item in SAP, the following steps should take place: 1 2 3 4 Complete Form The Authorization Form for Finished Goods Item Discontinuation Form should be completed (found on SAP Finished Goods Material Set-up Workbook). Receive Approvals Once the form is completed, the form should be forwarded for approval as indicated on the form. Submit Discontinuation Form for processing The approved forms and any supporting documentation should be sent to the Central Master Data individual listed on the form. Notification of completion Once Central Master Data has completed the back-end process, an email notification will be sent to the predetermined group as well as the requestor 29

Discontinued Items Discontinued Form This form needs to be submitted as indicated on the form The process leads to an item being discontinued in SAP, once the forecast and inventory have been removed. Notice the tab on the bottom of the workbook will take you to the Authorization Form for Finished Goods Item Discontinuation 30

Material Master Data Material Master Data Forms Finished Goods- New Item Innovation Extend an Existing Item Semi-Finished Goods This is an example text. Go ahead and replace it with your own text Plant Trials Discontinued Items Price Changes Raw/Pack 31

Price Change Process At such a point in time the business has a need to adjust pricing in SAP, the following steps should take place: 1 Complete Form 2 3 Receive Appropriate Approvals Submit Forms for processing 4 Notification of completion The appropriate Form should be completed (found on the Intranet site under forms). Approvals required will vary from one pricing condition to the other. Please reference the individual request form for the appropriate authorizations. The approved forms and any supporting documentation should be sent to the address listed on the form (Master Data). Once Master Data has completed the back-end process, an email notification will be sent 32

SAP Request for Pricing Add Change Pricing Add/Change This form is required to create new or update existing NLP or other price list related (will affect the price on the order) Please note to always enter the dates on the front page and enter the materials on the related load sheet (1) Business Days *Exception EBF Daily Pricing Detailed Instructions are attached to the Workbook for completion of this form 33

Material Master Data Material Master Data Forms Finished Goods- New Item Innovation Extend an Existing Item Semi-Finished Goods This is an example text. Go ahead and replace it with your own text Plant Trials Discontinued Items Price Changes Raw/Pack 34

SAP Material Form- Raw or Packaging Add, Change or Extend Raw or Packaging This form is to be submitted when Procurement needs to create or extend a raw and/or packaged good. Any field with an (*) is a required field Some fields are capped at 40 characters and must be in CAPS (see form) (3) Business Days 35

SAP Material Form- Raw or Packaging Add, Change or Extend Multiple Raw or Packaging Materials If adding or extending one item, the form should be used. When multiple materials are requested, see the Spreadsheet tab at the bottom of the Excel document Notice and Example is provided in the worksheet 36

SAP Material Form- Raw or Packaging Add, Change or Extend Raw or Packaging The Raw or Packaging Form can also be used for BOM Changes. Notice the BOM Impact section towards the bottom of the form. This portion of the form is only to be used for BOM Changes for Packaging 37