Welcome to our Open House!

Similar documents
OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017

D-1. SOUTH PEACE EAST AND WEST SOP PROJECTS PATRICK HENN, DEVELOPMENT MANAGER PRRD Board of Directors Meeting, April

SunEEarth Alberta Solar Development Inc.

C&B Alberta Solar Development ULC

Welcome to Capital Power s Halkirk 2 Project Open House #2

WHO ARE WE? Willow Ridge Wind Project

Project siting. Lanfine. Wind resource assessment. Wind Power Project

Pteragen Canada Inc.

Please sign in at the front desk and provide your contact information if you would like to receive project updates.

Seven Generations Energy Ltd.

Burdett Solar GP Corp.

Greengate Power Corporation

Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document

Oldman 2 Wind Farm Limited

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Up to 9.5MW AC solar project located near Burdett, Alberta

NaturEner Wild Rose 1 Energy Inc.

Welcome To The Public Open House For The Wainfleet Wind Energy Project August 24, 2010

Solar Krafte Utilities Inc.

COMMUNITY FUND AND INVOLVEMENT

St. Paul s Presbyterian Church, 2045 Stella 40 Foot Road, Amherst Island Time:

Grande Prairie Generation, Inc.

WELCOME. WELCOME to the Proposed Willow Ridge Wind Project Open House

stirling wind PROJECT

Willow Ridge Wind Project Frequently Asked Questions. Popular Questions Who is the developer of the proposed project?

C&B Alberta Solar Development ULC

Pembina NGL Corporation

Welcome. Welcome to our Open House for the. Kent Hills Wind Farm Expansion

Nexen Inc. OPTI Canada Inc.

Alberta Power (2000) Ltd.

Amherst Island Wind Energy Project - Renewable Energy Approval Amendment Modification Report #4

South Canoe Wind Project: Environmental Fact Sheet

TransAlta Corporation

Alberta Electric System Operator Needs Identification Document Application

Suncor Energy Inc. Errata to Decision Firebag Substations and Power Plant Expansion and Industrial System Designation Amendment

Environmental Baseline Study: Noise. Total E&P Canada Ltd. Calgary, Alberta

Connacher Oil and Gas Limited

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

We are here to:

THE PROJECT. What is happening? Why is this facility needed? Why did you choose this location?

Welcome. to the Community Meeting for the Niagara Region Wind Project. Thank you for coming!

Notice of Technical Meeting

E.L. SMITH SOLAR FARM PROJECT UPDATE

Welcome. Windy Point. The WIND FARM. Thank you for coming to the Windy Point Wind Farm Open House. AGENDA WIND FARM

Decision GTE Solar Inc. Brooks Solar Power Plant. January 31, 2013

C&B Alberta Solar Development ULC

Aquatera Utilities Inc.

Renewable Energy Services Ltd.

E.L. Smith Solar Farm Project Open House. Lower Level

AMHERST ISLAND WIND ENERGY PROJECT CONSULTATION REPORT. Appendix C. Project Notices

APPENDIX M COMMUNITY ENGAGEMENT

Decision D ATCO Electric Ltd. Swan Hills F.P.L. 744S Substation Decommission and Salvage. November 8, 2018

Whynotts Community Wind

Welcome to the Lyrenacarriga Wind Farm public information event

List of Figures... xii. List of Tables... xiii. List of Appendices...xv. Glossary... xvii Project Summary and Facility Overview...

YOUR LOCAL DEVELOPER

NIAGARA REGION WIND FARM PROJECT

Tullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT

EAST-WEST TIE TRANSMISSION PROJECT

NIAGARA REGION WIND FARM PROJECT

LARICINA ENERGY LTD. STONY MOUNTAIN PIPELINE PROJECT DESCRIPTION DOCUMENT FEBRUARY 2012

C&B Alberta Solar Development ULC

BEFORE THE OHIO POWER SITING BOARD

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Decision D The City of Calgary. Bonnybrook Cogeneration Expansion Project. May 17, 2018

Wednesday, February 15, :00 9:00 p.m. Sedalia Hall 1st Avenue, Sedalia, Special Area 3, Alberta

Peace Region Electricity Supply Project open house

Victorian Temporary Standby Emergency Power Supply

NOVA Chemicals Corporation

AMHERST ISLAND WIND ENERGY PROJECT PROPERTY LINE SETBACK ASSESSMENT REPORT. File No April Prepared for:

Bow Lake Wind Project. Community Liaison Committee July 23, 2014

Technical Requirements for for Wind Power Projects. James Murphy Manager, Project Development Ontario Sustainable Energy Association

Photomontages SECTION 10

A proposed new gas-fired power station on the Wilton International site

Decision D Alberta Ltd. (BluEarth) Bull Creek Wind Power Project Noise Complaints

Wind Power Regulatory Process Review

Summary of Proposed Changes to the Technical Guide to Renewable Energy Approvals

South Australian Multiple Land Use Framework

Lake Elsinore Advanced Pumped Storage

Appendix D: A selection of slides from presentations at local Community Council meetings

Lloydminster to Spruce Lake 138kV Transmission Line Projects

Oldman 2 Wind Farm Limited

Harvest Operations Corp.

Quality Wind Project. Operations Workshop Clean Energy BC, October 2014

This report includes the following information for review and consideration by NBDELG for approval under the EIA Regulation.

Welcome. Welcome and thank you for taking the time to come to this information session for our proposed Denzell Downs wind farm.

BLACKWOOD WIND FARM WELCOME TO OUR EXHIBITION

WHO ARE GAELECTRIC? RENEWABLE ENERGY TARGETS WHY SOLAR ENERGY?

electricity future REPORT TO COMMUNITIES

Strong Breeze Wind Project

The Leader in Wind Energy

Lakeshore Looks to the Future with Renewable Energy

EPCOR Distribution & Transmission Inc.

Garvagh Glebe Wind Energy Project County Leitrim

Amisk Hydroelectric Project Update

1.0 Introduction and background

DESCRIPTION OF THE PROJECT CHANGE

Crudine Ridge Wind Farm

Your Trusted Sustainability Partner. Candlewood Solar. New Milford CT

Overview. Bhlaraidh and Stronelairg wind farm proposals. SSE Renewables. Site locations. This exhibition

Transcription:

Welcome to our Open House! Please sign in at the front desk and provide your contact information if you would like to receive project updates. We invite you to walk around and look at the displays. If you have questions or comments, please ask one of our representatives or fill out a comment form and we ll be in touch. Thank you for attending!

Hand Hills Wind Project Background Development work on the Hand Hills Wind Project has been underway since 2007. BluEarth acquired the Hand Hills Wind Project from Joss Wind Power Inc. in the fall of 2012. On August 31, 2012 after several years of study, including wind resource analysis, environmental and heritage studies and assessments, public and agency consultation and turbine siting, the Hand Hills Wind Project received Alberta Utilities Commission approval to construct and operate. Since receiving the approval, BluEarth has been consulting with stakeholders, meeting with the involved municipalities and completing technical and environmental studies. Technical studies and major advancements in wind turbine technology have led us to select a new turbine for the project. BluEarth will be filing an amendment to our approved Alberta Utilities Commission application in June 2017 to reflect the changes to the turbines.

Hand Hills Wind Project Project Description Facility size: up to 78.2 MW capacity of renewable power Number of turbines: up to 34 turbines 34.5-kilovolt electrical collector system and fibre-optic cable New ATCO transmission line will connect the new Highland 572S substation to the Alberta electricity grid at Coyote Lake 963S substation, 13 km south of the project Access roads, temporary construction roads, and an operations and maintenance building Located approximately 28 km northeast of Drumheller, Alberta and 3 km south of Delia, Alberta Delia Highway 9 Hanna Starland County Special Areas No. 2 LEGEND Proposed Turbine Proposed Project Lands Road Highway Railroad Property Line Municipal Boundary Highway 851 Township Road 300 Range Road 164 Preliminary layout

Hand Hills Wind Project Environmental Considerations As a condition of the Alberta Utilities Commission (AUC) permit, and to update our knowledge of the environmental conditions at the site, BluEarth has consulted with Alberta Environment and Parks and is conducting various environmental studies in 2017. Studies planned or underway during 2017 will assess: Spring and Fall Bird Migration Spring and Fall Bat Migration Breeding Birds Nesting Raptors Sensitive Species (e.g., Sharp-tailed Grouse, Burrowing Owl and Amphibians) Wetlands Listed Plants Habitat Mapping Results of the 2017 environmental surveys will be provided to Alberta Environment and Parks for their review and comment. The AUC Power Plant application will also consist of: An Environmental Evaluation to outline the site conditions and potential Project impacts on the environment Environmental Protection Plan to provide mitigations to reduce potential environmental impacts Noise Impact Assessment to assess predicted noise levels at residences to ensure that the Project does not cause noise level limits to be exceeded

Hand Hills Wind Project Sound Wind energy projects must meet the detailed Alberta Utilities Commission (AUC) regulatory requirements for noise control Detailed noise modelling is undertaken to ensure the AUC sound level requirements of 40 dba (night time) are met at all residences. The noise modelling considers: Topography (hills and slopes); Ground cover (trees, water, grass); and Existing noise sources (oil & gas infrastructure, highways). Studies of the noise conditions within the Hand Hills Wind Project area are an important factor in selecting the final turbines for the Project. * Permissible Sound Level (PSL) includes sound contribution from ambient (i.e., background) noise, other regulated facilities (e.g., oil and gas infrastructure, power/utilities infrastructure), and any newly proposed regulated facilities (i.e., the Project). Nighttime PSL at receptors in rural environments is 40 dba (AUC Rule 012 Noise Control)

Hand Hills Wind Project Project Benefits What are the benefits of wind development? Employment temporary jobs during construction (approximately 100,000 person hours) and permanent jobs associated with the operations and maintenance of the Project (4 to 5 full-time positions). New Investment in the form of local services and supplies such as infrastructure improvements, fuel, accommodation, meals and supplies for employees, construction personnel, and contractors who will spend time in the local communities. Landowners and Community wind turbines are compatible with other land uses, such as farming, and can serve as a financial boost for rural economic development. Municipal Tax Revenues municipal taxes paid by wind companies to rural communities can be important, and the project does not increase demand on municipal services or public works such as sewer and water upgrades. Clean Energy wind energy provides societal benefits by offsetting harmful emissions such as carbon dioxide, oxides of nitrogen, and sulphur dioxides that are created through conventional, thermal power generation.

Hand Hills Wind Project Project Schedule Application for Amendment Approval to Alberta Utilities Commission (AUC) June 2017 AUC & Municipal Development Permit Approvals September 2017 Alberta Electric System Operator Renewable Energy Program Contract Awarded December 2017 Project Financing & Procurement Commencement January 2018 Earliest Start of Project Construction June 2018 Expected Commercial Operation December 2019

BluEarth Renewables Headquartered in Calgary, BluEarth Renewables is a private independent renewable power producer, focused on the acquisition, development, construction and operation of wind, water, and solar projects. BluEarth s mission is to be the Canadian renewable energy leader by developing, building, and operating a portfolio that optimizes people, planet, and profit. BluEarth believes it has the power to change the future TM by demonstrating how to be sustainable and profitable, leaving the world a better place. For more information, visit bluearth.ca. BluEarth has 18 operating power generation facilities Bull Creek Wind Facility NE of Provost, Alberta Constructed in 2015 Bow Lake Wind Facility NW of Sault Ste Marie, Ontario Operational in 2015 2 3 4 Solar Wind Hydro Development Pending Acquisition 6

Hand Hills Wind Project Alberta Climate Leadership Plan Electricity generation is the second largest source of emissions in Alberta, responsible for 17%, or 45 megatonnes of greenhouse gas emissions in 2014. Coal fired generation represents 85% of total emissions from the electricity sector. The Alberta government is currently looking for opportunities to reduce emissions. They have committed to increasing renewable energy generation to 30% by 2030 through investments in wind, solar and hydroelectric technologies. BluEarth intends to bid the project into the Renewable Energy Program (REP) process, which would award long-term generation contracts for wind energy projects. The REP is a competitive process based on power price, so it will encourage competition among developers that will ultimately result in lower power prices from renewable energy projects.

0 2 4 6 Kilometres Photomontage Close-up of Turbine Location Distance to Nearest Infrastructure: 3.8km Hand Hills Wind Project PHOTOMONTAGE OF PROPOSED WIND TURBINES FROM VANTAGE POINT 1 SOUTHEAST OF SITE Index Map Highway 9 Delia Highway 851 Township Road 300 Original Photograph Photograph and Site Location Range Road 164 Township Road 300 Legend!b b Camera Location Proposed Wind Turbine Photograph Viewshed Project Location Road Waterbody Wooded Area 0 500 1,000 1,500 Metres Note: This photomontage is a general visual simulation of the proposed wind turbines. The final layout and design is subject to change. Date: May 31, 2017 Photo Taken: May 25, 2017 Projection: NAD 1983 UTM Zone 12N Sources: AltaLIS, Natural Resources Canada. Map17-0242 - Hand Hills - Vantage Point 1 V2

0 2 4 6 Kilometres Photomontage Close-up of Turbine Location Distance to Nearest Infrastructure: 3.7km Hand Hills Wind Project PHOTOMONTAGE OF PROPOSED WIND TURBINES FROM VANTAGE POINT 2 NORTHEAST OF SITE Index Map Craigmyle Delia Highway 9 Highway 851 Township Road 300 Original Photograph Photograph and Site Location Highway 9!b Range Road 164 Legend b Camera Location Proposed Wind Turbine Photograph Viewshed Project Location Road Waterbody Wooded Area 0 500 1,000 1,500 Metres Note: This photomontage is a general visual simulation of the proposed wind turbines. The final layout and design is subject to change. Date: May 31, 2017 Photo Taken: May 25, 2017 Projection: NAD 1983 UTM Zone 12N Sources: AltaLIS, Natural Resources Canada. Map17-0242 - Hand Hills - Vantage Point 2 V2

Photomontage Close-up of Turbine Location Distance to Nearest Infrastructure: 3.9km Hand Hills Wind Project PHOTOMONTAGE OF PROPOSED WIND TURBINES FROM VANTAGE POINT 3 NORTHWEST OF SITE Index Map Craigmyle Delia Highway 9 Highway 851 Township Road 300 0 2 4 6 Kilometres Original Photograph Photograph and Site Location Main St S!b Township Road 310 Highway 851 Legend b Camera Location Proposed Wind Turbine Photograph Viewshed Project Location Road Waterbody Wooded Area 0 500 1,000 1,500 Metres Note: This photomontage is a general visual simulation of the proposed wind turbines. The final layout and design is subject to change. Date: May 31, 2017 Photo Taken: May 25, 2017 Projection: NAD 1983 UTM Zone 12N Sources: AltaLIS, Natural Resources Canada. Map17-0242 - Hand Hills - Vantage Point 3 V2

Photomontage Distance to Nearest Infrastructure: 2.2km Hand Hills Wind Project PHOTOMONTAGE OF PROPOSED WIND TURBINES FROM VANTAGE POINT 4 WEST OF SITE Index Map Craigmyle Delia Highway 9 Highway 851 Township Road 300 0 2 4 6 Kilometres Original Photograph Photograph and Site Location!b Range Road 172 Legend b Camera Location Proposed Wind Turbine Photograph Viewshed Project Location Road Waterbody Wooded Area 0 500 1,000 1,500 Metres Note: This photomontage is a general visual simulation of the proposed wind turbines. The final layout and design is subject to change. Date: May 31, 2017 Photo Taken: May 25, 2017 Projection: NAD 1983 UTM Zone 12N Sources: AltaLIS, Natural Resources Canada. Map17-0242 - Hand Hills - Vantage Point 4 V2

Photomontage Hand Hills Wind Project PHOTOMONTAGE OF PROPOSED WIND TURBINES FROM VANTAGE POINT 5 WEST OF SITE Index Map Craigmyle Delia Highway 9 Distance to Nearest Infrastructure: 367 m Highway 851 Township Road 300 0 2 4 6 Kilometres Original Photograph Photograph and Site Location Range Road 173!b Legend b Camera Location Proposed Wind Turbine Photograph Viewshed Project Location Road Waterbody Wooded Area 0 500 1,000 1,500 Metres Note: This photomontage is a general visual simulation of the proposed wind turbines. The final layout and design is subject to change. Date: May 31, 2017 Photo Taken: May 25, 2017 Projection: NAD 1983 UTM Zone 12N Sources: AltaLIS, Natural Resources Canada. Map17-0242 - Hand Hills - Vantage Point 5 V2

Photomontage Distance to nearest infrastructure in FOV: 2.7km Close-up of Turbine Location Hand Hills Wind Project PHOTOMONTAGE OF PROPOSED WIND TURBINES FROM VANTAGE POINT 6 EAST OF SITE Index Map Craigmyle Delia Highway 9 Highway 851 Township Road 300 0 2 4 6 Kilometres Original Photograph Photograph and Site Location Legend Range Road 162!b b Camera Location Proposed Wind Turbine Photograph Viewshed Project Location Road Waterbody Wooded Area 0 500 1,000 1,500 Metres Note: This photomontage is a general visual simulation of the proposed wind turbines. The final layout and design is subject to change. Date: May 31, 2017 Photo Taken: May 25, 2017 Projection: NAD 1983 UTM Zone 12N Sources: AltaLIS, Natural Resources Canada. Map17-0242 - Hand Hills - Vantage Point 6 V2

Hand Hills Wind Project Thank you for attending! Please take the time to fill out a comment form and tell us what you think about the project changes. If you have any additional questions that were not answered, or if you have further comments or feedback, please include it on the comment form and provide us with your name and contact information. Questions and comments can also be sent to the contact information provided on the comment form. Comments must be received by June 16, 2017 for consideration in our decisionmaking process and for inclusion in any amendments filed with the Alberta Utilities Commission. For more information on BluEarth and the Hand Hills Wind Project, visit: www.bluearth.ca/handhills projects@bluearth.ca 1-844-214-2578