DI (FH) Dieter Herz - Herz & Lang GmbH. House of the Future

Similar documents
PASSIVHUSKONFERENSEN KNIVSTA OKTOBER 2017

Passive House: Overview

Passive House: Overview

Built examples and project certification. Zeno Bastian, Passive House Institute

Zero Energy Building Example in Estonia. Tõnu Mauring

Future tree planting on the two acre lot will offset remaining lifetime carbon emissions.

A prototype architecture for passive and plus energy building in Estonia

Passiv Haus Institut. Certification as "Quality Approved Passive House" Criteria for Non-Residential Passive House Buildings

Dienstleistung. Certification as "Quality Approved Passive House" Criteria for Residential-Use Passive Houses

Passivhaus Projects and Benefits

D3.9_Overall Refurbishment Plan DRAFT CS03. Hotel Restaurant Valcanover

LOW-ENERGY HOUSING ESTATE SUNDAYS

4.2.3 MINERGIE ORIGIN AND ORGANISATION

ENERGETIC MONITORING AND OPTIMIZATION OF A SOLAR HOUSE

Passive houses for the Northern climate

Solar Energy Technologies

EuroPHit. Outlines for training modules for designer

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 31 May Aberdare, Rhondda Cynon Taff, Wales

CASE STUDIES - CENTRE FOR SUSTAINABLE BUILDING (ZUB) KASSEL, GERMANY

Press Release. Zero Energy Building for Seoul. Fraunhofer ISE Leads Interdisciplinary Team and Develops Energy Concept

Bruck an der Mur. Project summary. Energy concept: Background for the renovation reasons

COMPARISON OF TWO PASSIVE HOUSE SCHOOLS IN NORWAY AND GERMANY

PassivHaus/ EnerPHit Introduction. Maiia Guermanova behalf of

Energy Efficient Buildings in Germany An Introduction

Long-term monitoring and smart heat pumps for nzeb

Project Description. Projected build start date 12 Apr 2010 Projected date of occupation 28 Feb

Project Description. Projected build start date 01 Mar 2010 Projected date of occupation 01 Aug Energy target.

Passive Design Solutions. Passive House The Road to Net-Zero

Apartment building Sodastraße 40 in Ludwigshafen, DE

Optimization of air tightness and night ventilation for Passive houses in Italian climates under Fanger and Adaptive comfort models

Project Description. Projected build start date 19 Apr 2010 Projected date of occupation 30 Sep

PASSIVE HOUSE FACT SHEET (pg 1 of 2)

Passive house optimization for Southern Italy based on the New Passivhaus Standard

Learnings from residential PH design and procurement in Australia. Luc Plowman

Energy-Efficient Passive House using thermal mass to achieve high thermal comfort

Modeling the Brillhart House

Available online at ScienceDirect. Energy Procedia 91 (2016 )

St Loyes Extra Care Facility PHPP Pre-Assessment Report

Work Package 2: Performance of naturally ventilated buildings

Building Sustainability Why Passive House?

Achieving the nearly zero energy building concept - A study based on practical experience

The Elithis Tower is an experimental and demonstration. Elithis Tower in Dijon, France. nzeb case studies

Verified net Zero Energy Building with air source heat pumps for SME

Catalogue of Learning Targets. Certified PHPP Expert

TRANSSOLAR. 6 th Canadian German Conference on Energy Efficiency Retrofits in Buildings. September 22, 2015 Toronto

AM-55, AM-56) B U I L D I N G P A R T N E R S H I P S F O R E N E R G Y S E C U R I T Y

Project Description. Projected build start date 01 May 2010 Projected date of occupation 01 Nov Belfast, County Antrim, Northern Ireland

Promoting Building Energy Efficiency in Germany

EnerPHit. Criteria for Residential-Use Refurbished Buildings

Healthy Buildings 2017 Europe July 2-5, 2017, Lublin, Poland

Residential New Construction Passive House The Nordeast Nest Case Study Tim Eian, Dipl.-Ing., Certified Passive House Planner & Consultant

School Tito Maccio Plauto Cesena (IT)

THE PASSIVE HOUSE STANDARD

EnerPHit and EnerPHit +i

PHPP Report. Beattie Passive Inchkeith Drive

Energy Efficient Building Envelope Kiev,

State Of The Art Office Building & Campus For Maharashtra Energy Development Agency(MEDA) At AUNDH, PUNE

Near zero energy building with steel solutions case study. Jyrki Kesti, Technology Director, Ruukki Construction

Sustainable Building Façade and Advanced Fenestration Systems

IEA HPT Annex 49 Vögelebichl Innsbruck Monitoring and simulation of two multi-family houses with heat pump, PV and collectors

PASSIVHAUS Designed for you to enjoy maximum comfort with minimum energy.

SOLAR XXI: A Portuguese Office Building towards Net Zero-Energy Building

Passivhaus in Australia

25 years of Passive House! An international solution for sustainable and energy efficient buildings

Radon Levels and Indoor Air Quality in Northern Ireland Certified Passive House Buildings

The Centre for Sustainable Building (ZUB) * A Case Study

Zero Energy House in Japan: Actual results and future target. Isamu Ohta Misawa Homes Institute of Research & Development CO., LTD.

SOLAR PHOTOVOLTAIC ENERGY

Passivhaus Introduction

House Pillon Year of construction (2008), Caldaro (IT)

Project Description. Projected build start date 15 Aug 2011 Projected date of occupation 19 Dec Existing external wall construction

COMPARISON OF ENERGY USE INDICATORS OF A NON-RESIDENTIAL PASSIVE HOUSE WITH ASHRAE 90.1 BUDGET BUILDING

OPEN COMPETITION Energy Design of High Performance Buildings Organised by EC-JRC and ESRU

Assignment 3 Integrated Energy Design

SURNA Grow Facility: Systems Comparison - IEA


Strutt & Parker Positive Energy

nzeb Germany - Strategy to improve energy efficiency in the German building sector and the leading role of public buildings Dr.-Ing.

PASSIVE HOUSE OBJECT DOCUMENTATION

INTEGRAL BUILDING AND ENERGY DESIGN OF AN OFFICE BUILDING COMPARISON OF INITIAL DESIGN IDEAS WITH MONITORED RESULTS

Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles

F. Flourentzou Lefkosia new townhall passive bioclimatic Minergie design. Flourentzos Flourentzou: Innovation park EPFL Lausanne, Switzerland

Analysis of Heating Energy of Ventilation Systems in Non- Residental Passive Houses in Estonia

PASSIVE HOUSE. is a building, which doesn t need an active type of heating. Dr. Ing Mihail Stancu

Bringing German Energy Design Home (to where it all began)

The Net-Zero building Solar 2002

Design specifications for the Future Creating a masterpiece

Case study of an ECBC Compliant, Energy Efficient Building: Aranya Bhawan, Jaipur

Adaption of the passive house concept in northern Sweden - a case study of performance

Project Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec

Energy Statement. Gainsford Road. For Pocket Living. XCO2 energy. May 2016

Primary School Retrofit Project

ENERGETIC EFFECTS OF DEMAND CONTROLLED VENTILATION RETROFITTING IN A BIOCHEMICAL LABORATORY BUILDING

Towards nzeb buildings: a historical building case study

Retrofit of an historical building toward NZEB

E-learning, designph and PHPP 9

DISCOVERIES AT NET ZERO. Michael Leckman Diamond Schmitt Architects Chris Piche Integral Group

Optimisation and Cost Analysis of a Lithium Bromide Absorption Solar Cooling System

Analysis of a plus-energy house for improved building and HVAC system design

Transcription:

DI (FH) Dieter Herz - Herz & Lang GmbH House of the Future

Office Overview Overall planning old/new build Architechture + Technical planning Building measurement+ expert advice PH-Consulting + Certification Training + Development www.herz-lang.com

We need new recipes! Special attributes in heated non-residential buildings Standard Non-Res High heating demand in spite of high internal heat gains, (facilities, light, people,..) High cooling demand caused by internal gains, missing systems for passive cooling (shading, ventilation, brine energy,..) and normally high requirements to summer comfort in working areas. This causes higher costs for cooling than for heating

We need new recipes! Special attributes in heated non-residential buildings Passive Non-Res Minimal heating demand by consequent avoiding of losses and using the high internal heat gains, (facilities, light, people) Minimal cooling demand by integrated shading concepts and using passive cooling (ventilation over night and brine energy) to meet the high requirements to summer comfort in working areas. This causes low costs for cooling and heating

Passive Art Museum Ravensburg 2012 1st PH-Museum worldwide with PHI Certification Recycled brick facade! Passive House Consulting Source: architekten professor arno lederer, jorunn ragnarsdóttir, marc oei Quelle: Herz & Lang GmbH

Building envelope: Thermal bridges Thermal bridge influence: U TB,total = 0,05 W/(m²K)!! Influence of thermal bridge pile foundation U TB, piles = 0,04 W/(m²K) Quelle: Herz & Lang GmbH 8

Building envelope: Garage ceiling Garage ceiling 26 cm Insulation Thermal Conductivity: 035 U = 0,136 W/(m²K) incl. Bracket (System Abakus) Quelle: Herz & Lang GmbH 9

Building envelope: Brick facade Brick facade 24 cm Insulation Thermal conductivity: 032 U = 0,137 W/(m²K) incl. Brackets and wind anchor Quelle: Herz & Lang GmbH Source: Modersohn, Herz & Lang GmbH 10

Building envelope: Conduit ventilation Passive house facade enables conduit to run through the facade Source: Herz & Lang GmbH Quelle: Herz & Lang GmbH 11

Building envelope: Revolving door Improvements for use in a Passive House - Double glazing Ug = 1,1 W/(m²K) - Insulated curved panels - Thermal break profiles in the vertikal, floor and ceiling ring - Double brush seal - Standard position to 360, warm side returns to the inside after rotation Source: architekten professor arno lederer, jorunn ragnarsdóttir, marc oei; Blasi GmbH Quelle: Herz & Lang GmbH

Building envelope: Revolving door Source: Herz & Lang GmbH Quelle: Herz & Lang GmbH

Building envelope: Air tightness (n 50 < 0,40 1/h) Air tightness results: n 50 = 0,30 [1/h] q 50 = 0,71 m³/(m²h)

Building envelope: Vaulted roof Vaulted roof 30 cm Insulation Thermal conductivity: 040 U = 0,127 W/(m²K) Source: architekten professor arno lederer, jorunn ragnarsdóttir, marc oei Quelle: Herz & Lang GmbH

Building Services Requirements for the indoor environment for the protection of works of art Room air temperature 20-24 C Relative humidity 50 % +/- 5 % Heating and cooling - Gas absorption heat pump 40kW, COP 1.6 with borehole heat exchangers 15kW and buffer tank - Concrete core temperature control for heating and cooling of ceilings (base load) - Flow temperature max. 35/28 C for CCTC (concrete core temperature control) and post heating ventilation max. 35/28 C - Domestic hot water via decentralized mounted boilers Source: Vogt und Feist. Herz & Lang GmbH

Building Services Ventilation - Large unit with heat and moisture recovery (Menerga) - VOC/CO2- sensors and motion detectors control the ventilation / air flow - Fresh air rate minimized by air recirculation mode (90%) - Supply air temperature 20-24 C in the standard case at higher heating load (peak) with 30-35 C - Conditioning (humidification and dehumidification) - Brine heat exchanger for preheating of fresh air to about 5-7 C, also for cooling Lighting - Occupancy sensor and ambient light sensor - Fluorescent lights, single spotlights and LEDs Source: Vogt und Feist, Herz & Lang GmbH

Passive Courthouse/Prison Korneuburg 2012 1st jail and courthouse PHI certified in Austria and worldwide 68.000 m³ enclosed space (RC+Hybrid) 27.000 m² Heated area Construction Cost 65 Mil. Euro Quelle: Herz & Lang GmbH Source: Arge Dieter Mathoi Architekten & dina4

Office building Airoptima = energy + Shell: baseplate 20cm, EIFS 20cm, roof 45cm Technology: brine heat pump, 8*decentral ventilation systems Treated floor area = 910 m² Space heat demand = 4,9 kwh/(m²a) End energy consumption = 29.800 kwh Photovoltaics = - 56.000 kwh

Thermal simulation and PHPP-calculation Thermal simulation PHPP zone model

PHPP Simulation PHPP Simulation PHPP Simulation PHPP Simulation PHPP Simulation PHPP Simulation kwh PHPP and Simulation in comparison space heat demand and gains solar+internal 7,000 6,000 5,000 4,000 3,000 2,000 gains solar + internal (PHPP) gains solar + internal (Sim.) space heat demand (PHPP) space heat demand (Sim.) 1,000 0 Jan Feb Mar Apr Mai Jun

Passive School Buchloe/Bavaria 2013 New build Secondary school in Passive House standard: Concrete construction with ventilated façade and EIFS(PS) 8200 m² Treated floor area Passive House Standard: Energy requirement for heating <15kWh/(m²a) Heating and warm water through ground water heat pump Central Ventilation: 84% Heat recovery Source: Reisch; Lederer-Ragnasdotir-Oei

Passive School Buchloe/Bavaria 2013 PHPP-calculation 7 zones model zone 1: classroom zone 2: auxiliary rooms zone 3: gymnasium zone 4: break hall zone 5: library zone 6: aministration zone 7: technic

Explorer Hotel Fischen / Bavaria 2010 1st Passive Hotel worldwide with PHI certification 76 rooms TFA 2.522 m² Economy Class 3-Stars High comfort Low energy costs Zero carbon building Source: Sieber-Renn Architektur

Explorer-Hotel Montafon / Austria 2011 1st Passive Hotel in Austria with PHI certification 100 rooms TFA 3.568 m²

Explorer-Hotel Neuschwanstein / Bavaria 2013 100 rooms TFA 3.481 m²

Passive House Centre of Excellence Kempten / Bavaria 2012 Source: Sozialbau Kempten, Architekt Huber

District Court Günzburg / Bavaria 1st Passive-Courthouse in Germany Passive House is the current building standard for Bavarian government buildings since 2011 Source: Lehmann Architekten

Postquartier Ravensburg Office building 6.600 m² treated floor area Quelle: Herz & Lang GmbH Source: AB Berger Röcker, Georg Reisch GmbH

Helmholzzentrum Competition Munich 2013 Passive House Consulting Source: Sauerbruch & Hutton Berlin

Museum of Bavarian history Regensburg 2013-2018 Passive House Consulting Source: woernerund partner/frankfurt

Baaderstraße 7, Munich EnerPHit Pilot project - Certification 2013 Source: PETER FINK ARCHITEKTEN GMBH

House of the Future = Zero Carbon Building Basic : Passive House PHI PH-Consulting: Ensure energy efficiency in design, construction and use