Agenda. PMBOK Guide Third Edition. PMI Standards Background. PMI Life Cycle Plan for Standards. Presented by Kevin Chui, PMP. How Did We Get Here?

Similar documents
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition

Why does the PMBOK change? Ensures standards are up-to to-date and reflect ever-evolving evolving knowledge in the profession Standards are aligned, i

PMP PMBOK 5 th Edition Course Agenda

PMP PMBOK Guide Sixth Edition Training Course Agenda

Mentored Course Plan PMP (2013 version)

Intensive Course Plan CAPM 5 (2013 version)

Appendix. Process Inputs and Outputs

Project Management Professional

Project Management Professional (PMP) Boot Camp

PMI Scheduling Professional (PMI-SP)

Project Management Framework with reference to PMBOK (PMI) July 01, 2009

Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Changes

Project Cost Management

Project Management Process Groups. PMP Study Group Based on the PMBOK Guide 4 th Edition

Project Management Professional (PMP) Examination Content Outline

Objectives of Project Management Framework. What are the Characteristics Of Project. Activities involved Project Management

GUIDE TO THE CHANGES IN PMP simpl learn i

Project Management Professional (PMP)

The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th

Table of Contents. Introduction xxv. Assessment Test xxxvi. Chapter 1 What Is a Project? 1. Is It a Project? 2. Projects versus Operations 3

PMBOK Guide 6 th Edition: What s in it for Me??? Cheryl C Allen, MS, PMP C Allen Associates

Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition, and ISO 21500

Knowledge Areas According to the PMBOK edition 5. Chapter 4 - Integration


Project Management Professional (PMP) Exam Prep Course 00 PMP Application & Exam

PROJECT MANAGEMENT OVERVIEW

CAPM Exam Preparation Training - Online

Project Management Framework

PMP TRAINING COURSE CONTENT

Expert Reference Series of White Papers. Changes to the. PMBOK Guide, 4th Edition, and What You Should Know

Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013)

Overview of Project Management Process

Project Management Concepts, Tools & Techniques

Project Management Professional Training

Compiled by Rajan Humagai

Project Communications Management

PMP Course Content. Chapter 1. Introduction to PMP Objectives of PMP Requirements for PMP Exam About PMP Exam PMP Exam Syllabus.

Ninth Edition. Rita Mulcahy, PMP, etai. Rita Mulcahy s. Inside this book:

PMBOK 2012 FIFTH EDITION CHANGES

Chapter One PROJECT MANAGEMENT OVERVIEW

Successful Project Management. Overview Houston Community College Fall, 2017

Content Break-up & Methodology for awarding Contact Hours / PDUs

Is this a project? Do I really have to plan?

Comparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500

Borderlink Resources Limited.

The Standard for Program Management

Integration Mgmt / Initiating Process Group 4.1 Develop Project Charter

PRINCESS NOURA UNIVESRSITY. Project Management BUS 302. Reem Al-Qahtani

PMP. Processexam.com. PMI Project Management Professional. Exam Summary Syllabus Questions

RESKILL. Be Future Ready. PMP Course Agenda. Globally Trusted Education Provider

PMBOK Guide Sixth Edition Updates and Agile Alignment By Tony Johnson July 2017

Facilitated Methods: Division of Blash Enterprises Inc. Copyright 2017 All rights reserve. Greta Blash, PMP, PMI-ACP, PMI-PBA Facilitated Methods

Ice s

LookingGlass - Project Management Professional Exam Prep (PMP01)

7.11b: Quality in Project Management: A Comparison of PRINCE2 Against PMBOK

MASTERING PROJECT MANAGEMENT - PROJECT MANAGEMENT PROFESSIONAL ( PMP ) CERTIFICATION SEMINAR

Welcome Introducing the New Project Management Body of Knowledge (PMBOK) v6

Software Project & Risk Management Courses Offered by The Westfall Team

What Can CMMI Learn From the PMBOK?

Integration Knowledge Area

Portfolio Management Professional (PfMP)

Initiation Group Process. Planning Group Process

PMP MOCK EXAMS BASED ON PMBOK 5TH EDITION

Errata 1 st Printing. Errata 2 nd Printing

INFORMATION TECHNOLOGY PROJECT MANAGEMENT. Fourth Edition. International Student Version. Jack T. Marchewka WILEY. John Wiley & Sons, Inc.

Methods of IT Project Management

PMP 2 Days Classroom Training

Project Management Professional (PMP) Exam Prep Course 1 - Application and the PMP Exam

Project Management Professional(PMP ) Course

Construction Project Management Training Curriculum Integration Map

PMP Exam Prep Study Group Input-Output-Tools #3a

Contrasting CMMI and the PMBOK. Systems Engineering Conference October 2005

Certified Associate in Project Management (CAPM)

Falcon Training PMP & CAPM Exam Preparation Course

NEW HORIZONS ONLINE LIVE. Certified Associate of Project Management (CAPM ) PMBOK Guide, 5th Edition DAY 3

S O Seminar Objective

Project Management Knowledge Areas SECTION III

Project Management Processes A process is a set of interrelated actions and activities performed to create a product, service, or result

PMP MOCK EXAMS BASED ON PMBOK 5TH EDITION

Management Consulting and Project Management: Hand in Glove

PMKI Taxonomy. PMKI-TPI.php Industries, General & Reference PMKI-XTR.php PM History

PMP Q&As. Project Management Professional. Pass PMI PMP Exam with 100% Guarantee. Free Download Real Questions & Answers PDF and VCE file from:

CSU Project Management Certificate Program. Project Scope Management

Project Integration Management

Information Technology. Project Management, Sixth Edition

Managing Information Technology Projects, Sixth Edition

Project Management Institute (PMI) Practice Standard for Configuration Management

Guten Tag. (good day)

Project Management Professional Training

Project Management Training Brochure

Disampaikan Oleh: Muhammad Azani Hs

Project Management CSC 310 Spring 2018 Howard Rosenthal

PROCESS TRAINING. DIR PM Lite 2.0 Process Training v2.0 1

PgMP Exam Prep Training - 4 Days

JapanCert 専門 IT 認証試験問題集提供者

10 weeks 36 hours. Hone your project management knowledge and take your career to the next level with our Project Management training.

Professional Training Services

Definition. Name of the tool or technique Project mission statement

Project Management Processes

Project Management Professional (PMP) Certification Exam Preparation Program Course Outline with Outcomes

Transcription:

Agenda PMBOK Guide Third Edition Presented by Kevin Chui, PMP Vice President, PMI Hong Kong Chapter Background PMBOK Guide 2004 Update Project Structural Changes to the Standard Process Group Changes Knowledge Area Changes New Examination Questions and Discussion 2 Background How Did We Get Here? 1987 2000 1983 1996 2004 3 4 PMI Standards Background PMI Life Cycle Plan for Standards 1969 PMI founded 1983 PMI Special Report on Ethic, Standards, and Accreditation the Standards portion was The Project Management Body of Knowledge (PMBOK) 1987 PMBOK Standard was published 1996 A Guide to the Project Management Body of Knowledge (PMBOK Guide) [first edition] was published 1999 PMI accredited as a Standards Development Organization (SDO) by ANSI 2000 The PMBOK Guide - 2000 Edition [second edition] was published Standard Published One year of Celebrations New Project Team formed and the Standard is revised with a planned schedule of 3 years New Edition of Standard Published One year of Schedule Reserve PMI Plans for a four year refresh cycle for all Standards 5 6 1

PMBOK 3rd Edition Project Volunteer Facts PMI s Standards & Certification 266 total volunteers participated 19 countries covering all of the continents 98 (37%) volunteers were from outside the U.S.A. 52 industries were represent by all volunteer s 73 (28%) volunteers participated in a formal Preliminary Exposure Draft review/survey Project team members CAPM and PMBOK Guide Third Edition Managing projects PMP and PMBOK Guide Third Edition Specialists PMBOK Guide Third Edition and practice standards Managing programs Program Mgt. Standard in development & studying market needs for certification Consultants helping organizations improve their pm maturity OPM3 and Ancillary Products & Services certifications (Q3 05) Managing portfolios / strategic business focus Portfolio Mgt. Standard in development 7 8 Structural Changes to the Standard PMBOK Guide 2004 Overview of Major Changes No new Knowledge Areas Chapter 3 new and moved to a separate section Expanded description of Project Management Integration from three to seven processes changed from 39 to 44 5 new processes (7 added, 2 deleted) 14 process name changes Inputs, Tools & Techniques and Outputs, are now tightly integrated & consistently placed New Process Flow Diagrams added Expands and improves the Glossary and the Index 9 10 Structural Changes to the Table of Contents 2000 Edition Sections Section I The Project Management Framework Chapters 1, 2, and 3 Section II The Project Management Knowledge Areas Chapters 4 through 12 Section III Appendices Appendix A through G Section IV Glossary and Index Third Edition Exposure Draft Sections New; Renamed / Moved Section I The Project Management Framework Chapters 1 and 2 Section II The Standard for Project Management of a Project Chapter 3 Project Management for a Project Section III The Project Management Knowledge Areas Chapters 4 through 12 Section IV Appendices Appendix A through F Section V Glossary and Index Chapter 1 Introduction - Clarifies differences between a project and operations Areas of Expertise: Combines the management discussion with the application areas and soft skills into one section Standard definitions of program and program management, portfolio and portfolio management More detailed discussion of PMO variations 11 12 2

Chapter 2 Project Life Cycle and Organization - Process Groups Changes Clarifies distinction between project life cycles and product life cycles Defines stakeholders in relation to the project team Adds a discussion of the role of the PMO in organizations Introduces concept of a project management system Difference between Project Life Cycle and the five Process Groups 13 14 Chapter 3 Project Management for a Project - The Project Management Process Groups Describes requirement to address the five Process Groups and their constituent processes Increases emphasis of Initiating Process Group and Closing Process Group Increases emphasis on consolidated Project Management Plan Adds Monitoring to the existing Controlling Process Group Increases emphasis on Monitoring and Controlling the project Includes new graphics for the five Process Groups Plan Act Do Check Initiating Monitoring & Controlling Executing Project management integration and process iteration occurs throughout the project Closing 15 16 The Initiating Process Group The Process Group 2000 Edition Initiating Initiation (5.1) Third Edition Initiating New ; Renamed/Moved Develop Project Charter (4.1) Develop Project Scope Statement (4.2) 2000 Edition Project Plan Development (4.1) Scope (5.2) Scope Definition (5.3) Activity Definition (6.1) Activity Sequencing (6.2) Resource (7.1) Activity Duration Estimating (6.3) Schedule Development (6.4) Cost Estimating (7.2) Cost Budgeting (7.3) Third Edition New ; Renamed / Moved Develop Project Management Plan (4.3) Scope (5.1) Scope Definition (5.2) Create WBS (5.3) Activity Definition (6.1) Activity Sequencing (6.2) Activity Resource Estimating (6.3) Activity Duration Estimating (6.4) Schedule Development (6.5) Cost Estimating (7.1) Cost Budgeting (7.2) 17 18 3

The Process Group (continued) The Executing Process Group 2000 Edition Quality (8.1) Organizational (9.1) Staff Acquisition (9.2) Communications (10.1) Risk Identification (11.2) Qualitative Risk Analysis (11.3) Quantitative Risk Analysis (11.4) Risk Response (11.5) Procurement (12.1) Solicitation (12.2) Third Edition New ; Renamed / Moved Quality (8.1) Human Resource (9.1) Communications (10.1) Risk Management (11.1) Risk Management (11.1) Risk Identification (11.2) Qualitative Risk Analysis (11.3) Quantitative Risk Analysis (11.4) Risk Response (11.5) Plan Purchases and Acquisitions (12.1) Plan Contracting (12.2) 2000 Edition Executing Project Plan Execution (4.2) Quality Assurance (8.1) Team Development (9.3) Solicitation (12.3) Source Selection (12.4) Contract Administration (12.5) Third Edition Executing New ; Renamed / Moved Direct and Manage Project Execution (4.4) Perform Quality Assurance (8.2) Acquire Project Team (9.2) Develop Project Team (9.3) Information Distribution (10.2) Information Distribution (10.2) Manage Stakeholders (10.4) Request Sellers (12.3) Select Sellers (12.4) 19 20 The Monitoring and Controlling Process Group The Closing Process Group 2000 Edition Controlling Integrated Change Control (4.3) Scope Verification (5.4) Scope Change Control (5.5) Third Edition Monitoring and Controlling New ; Renamed / Moved Monitor and Control Project Work (4.5) Integrated Change Control (4.6) Scope Verification (5.4) Scope Control (5.5) 2000 Edition Closing Third Edition Closing New ; Renamed/Moved Schedule Control (6.5) Cost Control (7.4) Quality Control (8.3) Performance Reporting (10.3) Risk Monitoring and Control (11.6) Schedule Control (6.6) Cost Control (7.3) Perform Quality Control (8.3) Manage Project Team (9.4) Performance Reporting (10.3) Risk Monitoring and Control (11.6) Contract Administration (12.5) 21 Administrative Closure (10.4) Contract Closeout (12.6) Close Project (4.7) Contract Closure (12.6) 22 Knowledge Areas Changes Process Groups Process Flow Diagram 23 24 4

Overview of Removal of the concept Core and Facilitating Addition of several placeholders for representing concepts, input/output, or tools/techniques Organizational Process Assets, Enterprise Environmental Factors, Project Management Information System, Project Management Methodology, Project Management Plan, Risk Register 25 Chapter 4 - Project Integration Management 2000 Edition 4.1 Project Plan Development 4.2 Project Plan Execution 4.3 Integrated Change Control Third Edition Exposure Draft New ; Renamed / Moved 4.1 Develop Project Charter 4.2 Develop Preliminary Project Scope Statement 4.3 Develop Project Management Plan 4.4 Direct and Manage Project Execution 4.5 Monitor and Control Project Work 4.6 Integrated Change Control 4.7 Close Project 26 Chapter 4 - Project Management Integration Enhances explanation of defined project management integration processes Provides description of integration from the aspect of the project management process groups Provides clear description of integration across all project management processes Includes 4 new processes and 2 renamed processes all of which, have been significantly expand. Chapter 5 Project Scope Management 2000 Edition 5.1 Initiation 5.2 Scope 5.3 Scope Definition 5.4 Scope Verification 5.5 Scope Change Control Third Edition New ; Renamed/Moved Moved to Project Integration Management & renamed 5.1 Scope 5.2 Scope Definition 5.3 Create WBS 5.4 Scope Verification 5.5 Scope Control 27 28 Chapter 5 Project Scope Management Initiation is now in Chapter 4 and broken into two pieces. Scope now refers to planning for scope management, not defining the detailed scope statement. Scope Definition now refers to defining the detailed project scope statement, not creation of the WBS. A new process, Create WBS, is added. Scope Management Plan is expanded to cover planning for scope definition, create WBS, scope verification, and scope control. It is now the output of scope planning. 29 Chapter 6 Project Time Management 2000 Edition 6.1 Activity Definition 6.2 Activity Sequencing 6.3 Activity Duration Estimating 6.4 Schedule Development 6.5 Schedule Control Third Edition New ; Renamed/Moved 6.1 Activity Definition 6.2 Activity Sequencing 6.3 Activity Resource Estimating 6.4 Activity Duration Estimating 6.5 Schedule Development 6.6 Schedule Control 30 5

Chapter 6 Project Time Management Moved Activity Resource Estimating into Chapter 6 (6.3) Deleted PERT and the PERT figure Improved the PDM and ADM figures Dropped outdated figures: Project Network Design with Dates ; Bar (Gantt) Chart; and Milestone Chart Added figure for Milestone Schedule, Summary Schedule, and Detailed Schedule Added Critical Chain to Tool & Technique reference Chapter 7 Project Cost Management 2000 Edition 7.1 Resource 7.2 Cost Estimating 7.3 Cost Budgeting 7.4 Cost Control Third Edition New ; Renamed/Moved Moved to Project Time Management (Chapter 6) 7.1 Cost Estimating 7.2 Cost Budgeting 7.3 Cost Control 31 32 Chapter 7 Project Cost Management Chapter 8 Project Quality Management Bottom- up cost estimating is focused on the work packages or individual activities Project budgeting is tied directly to the WBS as an aggregation of lower level components Project cost control now includes Earned Value Management 2000 Edition 8.1 Quality 8.2 Quality Assurance 8.3 Quality Control Third Edition New ; Renamed/Moved 8.1 Quality 8.2 Perform Quality Assurance 8.3 Perform Quality Control 33 34 Chapter 8 Project Quality Management The distinction between project quality and product quality is strengthened Continuous Process Improvement is added as an element of both Perform Quality Assurance and Perform Quality Control Chapter 9 - Project Human Resource Management 2000 Edition Deleted/Moved 9.1 Organizational 9.2 Staff Acquisition 9.3 Team Development Third Edition New ; Renamed/Moved 9.1 Human Resource 9.2 Acquire Project Team 9.3 Develop Project Team 9.4 Manage Project Team 35 36 6

Chapter 9 - Project Human Resource Management Chapter 10 - Project Communications Management Manage Project Team added as a Controlling & Monitoring process Non-team stakeholder issues are now in Chapters 2 and 10 Organizational chart and position description explanations are expanded Tools & Techniques now include: networking, virtual teams, ground rules, conflict management, observation and conversation, project performance appraisals, issue log 37 2000 Edition 10.1 Communications 10.2 Information Distribution 10.3 Performance Reporting 10.4 Administrative Closure Third Edition New ; Renamed/Moved 10.1 Communications 10.2 Information Distribution 10.3 Performance Reporting Incorporated within Section 4.7, Close Project 10.4 Manage Stakeholders 38 Chapter 10 - Project Communications Management Administrative Closure process information is merged into Chapter 4, Close Project process A new process, Manage Stakeholders, is added 39 Chapter 11 - Project Risk Management 2000 Edition 11.1 Risk Management 11.2 Risk Identification 11.3 Qualitative Risk Analysis 11.4 Quantitative Risk Analysis 11.5 Risk Response 11.6 Risk Monitoring and Control Third Edition New ; Renamed/Moved 11.1 Risk Management 11.2 Risk Identification 11.3 Qualitative Risk Analysis 11.4 Quantitative Risk Analysis 11.5 Risk Response 11.6 Risk Monitoring and Control 40 Chapter 11 - Project Risk Management Increases focus on opportunities (vs. threats) Options based on project complexity Qualitative Risk Analysis Response Identification Quantitative Risk Analysis Enhances Risk Management activities: risk categories, definitions of probability and impact Risk Register starts in Risk Identification, enhanced through other risk processes Closer integration with other processes 41 Chapter 12 Project Procurement Management - 2000 Edition Deleted/Moved 12.1 Procurement 12.2 Solicitation 12.3 Solicitation 12.4 Source Selection 12.5 Contract Administration 12.6 Contract Closeout Third Edition New ; Renamed/Moved 12.1 Plan Purchases and Acquisitions 12.2 Plan Contracting 12.3 Request Seller Responses 12.4 Select Sellers 12.5 Contract Administration 12.6 Contract Closure 42 7

Chapter 12 - Project Procurement Management Consistent use of the terms buyer and seller The project team as the buyer of products, materiel, goods, and services for the project The project team as either the buyer of the project or the seller of the project under a contract Added a sub-process on seller performance evaluation to contract administration Clarified various input, tools, techniques, and outputs as identified by project management practitioners Removed use of the words procure, solicit, and solicitation The Updated PMP Credential Examination New exam available on 30 September 2005 To sit for the exam based on PMBOK 2000: Apply before 29 August 2005 Take the exam before 24 September 2005 43 44 PMP Certification Criteria Process Areas and Tasks Candidates Need to Indicate # of Hours No Change to education requirement - 35 contact hours of project management education Project Management Experience No change to experience hours requirement More concrete documentation of PM experience - >Need to demonstrate experience in tasks required to effectively lead and direct projects Initiating Conduct Project Selection Methods Define Scope Document Project Risks, Assumptions and Constraints Identify and Perform Stakeholder Analysis Develop Project Charter Obtain Project Charter Approval Define and Record Requirements, Constraints and Assumptions Identify Project Team and Define Roles and Responsibilities Create the WBS Develop Change Management Plan Identify Risks and Define Risk Strategies Obtain Plan Approval Conduct Kickoff Meetings Executing Execute Tasks Defined in Project Plan Ensure Common Understanding and Set Expectations Implement the Procurement of Project Resources Manage Resource Allocation Implement Quality Management Plan Implement Approved Changes Implement Approved Actions and Workarounds Improve Team Performance Controlling Measure Project Performance Verify and Manage Changes to the Project Ensure That Project Deliverables Conform to Quality Standards Monitor All Risks Closing Obtain Final Acceptance for the Project Obtain Financial, Legal, and Administrative Closure Release Project Resources Identify, Document and Communicate Lessons Learned Create and Distribute Final Project Report Archive and Retain Project Records Measure Customer Satisfaction 45 46 The Application Process The Exam Complete your application on-line Provide contact information for each project submitted as part of the application - If selected for audit, PMI will contact managers indicated 10% of all applicants currently pulled for audit PMI will send an Eligibility Letter electronically Within 10-14 working days (2-3 weeks) Good for one year Call designated center to schedule the exam At most three attempts within the one-year eligibility period Have to wait for one year after failing three exams Computer-based 4 Hour Time Limit 200 Multiple Choice Questions (25 pretest questions) 4 Answers Each Passing mark: 143 out of 175 (81%) 47 48 8

PMP Examination Specifications Questions? Domain Initiating Executing Monitoring and Controlling Closing Professional and Social Responsibility Percent of Questions 11.57 22.71 27.50 21.03 8.57 8.62 Published October 2004! For more information, please contact: Dottie Nichols, PMP Manager, Standards Project Management Institute E-mail: dottie.nichols@pmi.org Phone: +610-356-4600 extension 1158 49 50 9