RECOMMENDATIONS FOR ENHANCING UIC CODE 406 METHOD TO EVALUATE RAILROAD INFRASTRUCTURE CAPACITY

Similar documents
Contents. 1 Basic Terms of Railway Operation... 1

From single to double track: effects of alternative extension measures

Applying multiscaling analysis to detect capacity resources in railway networks

TIMETABLE BASED DESIGN OF RAILWAY INFRASTRUCTURE

UIC CODE 406. Capacity. 1st edition, June 2004 Original. La Capacité Kapazität

Computation and evaluation of scheduled waiting time for railway networks

Chapter 1. Introduction. 1.1 Research motivation

Simulation model of a Single Track Railway Line

UIC CODE 406. Capacity. 2nd edition, June 2013 Original. Capacité Kapazität

2016 INFORMS RAS Problem Solving Competition

Outlining the timetable of a railway system according to its capacity computation

CALCULATION OF THE CAPACITY OF SWITCH AREA WITHIN RAILWAY STATIONS WITH THE USE OF SIMULATION METHODS

Postprint. This is the accepted version of a paper presented at RailTokyo2015. Citation for the original published paper:

RCS-DISPO The rail control system for all situations.

Performance design and planning for a mature rail network

Abstract. 1 Introduction

Banedanmark TMS. ETCS as the foundation for attractive and efficient railway service

Determining the Causes of Train Delay

Capacity measurement with the UIC 406 capacity method

There are many questions we will need to ask when we start planning a train service such as:

Network Evaluation Model NEMO

INVESTIGATION ON THE CAPACITY CONSUMPTION AT DUTCH RAILWAYS FOR VARIOUS SIGNALLING TECHNOLOGIES AND TRAFFIC CONDITIONS

Network Modelling and Capacity Challenges. Nigel Best and Clare Waller

Supporting tools for automated timetable planning

Simulation of Railway Operation on the line from Zagreb to Karlovac by OPENTRACK

GPS-Android based Location Tracking System for Public Transportation (TrackIT) R.R.Vithanage B

Network Safeworking Rules and Procedures

Trade & Transport Corridors. European Projects & Initiatives

Appendix F.4 Charges - Unit prices and values of the parameters linked to the train

RULES RESPECTING MINIMUM QUALIFICATION STANDARDS FOR RAILWAY EMPLOYEES

Different look into alternatives in railway projects

METROPOLITAN RAILWAY NETWORK TRACK OCCUPATION PROTOCOL

20 years of rail liberalisation in Europe: key lessons and future prospects

Assessing Risks to Inform Resilience: a Criticality Assessment of the British Railway Network

DEVELOPING AN INTEGRATED TRANSPORT STRATEGY FOR JORDAN: THE FOUNDATION FOR INTEGRATING JORDAN IN THE IMPLEMENTATION OF A REGIONAL RAIL SYSTEM

DRAFT RAIL OPERATION REPORT DOCUMENT 6.7. The Northampton Gateway Rail Freight Interchange Order 201X. Regulation No: 5 (2) (q)

Timetable management and operational simulation: methodology and perspectives

SNCF eliminates disruptions and delays on its telecommunication services with remote wireless backup power monitoring

ASPECTS ON THE CAPACITY FOR DOUBLE TRACK LINES WITH BLOCK SYSTEM; COMPRESSED TIMETABLE

Simulation Based Economic Efficiency Evaluation

Dr.METRO: a demand-responsive metro-train operation planning program

Knowledge Areas According to the PMBOK edition 5. Chapter 4 - Integration

Acton Parking Committee. Presented by:

2 INTERMODAL COMPETITORS AND THEIR ADVANTAGES TODAY

1 Traffic information for applicants and traffic operators

Transport object platform (TOP)

Author(s): De Martinis, Valerio; Toletti, Ambra; Corman, Francesco; Weidmann, Ulrich; Nash, Andrew

ONTIME (Optimal Networks for Train Integration Management across Europe)

Impact of Train Type Heterogeneity on Single-Track Railway Capacity

CFIRE. Evaluating the Use of Operational Management Techniques for Capacity Improvements on Shared-use Rail Corridors. CFIRE January 2016

EFFICIENT HINTERLAND TRANSPORT INFRASTRUCTURE AND SERVICES FOR LARGE CONTAINER PORTS

CONTENTS OPERATING SCHEDULES...18 TRANSPORTATION SCHEDULES...20

Stockton Freight & Passenger Rail Mobility Enhancement

Linkage of a conventional line dispatch system with the Shinkansen dispatch system

EXAMINATION OF SIMULTANEOUS METHODS APPLICATION FOR SECONDARY SORTING IN SLOVAKIA

TRANSPORT, TRANSPORT TRENDS AND THE ECONOMY

IRIS (Integrated Railway Information System) The CFR IT system

PolyMETREXplus. Towards European urban balance

That will also contribute to achievement of a number of objectives and policies in the Regional Policy Statement.

DISTRICTWIDE MODAL DEVELOPMENT OFFICE (MDO) RAIL CONSULTANT SERVICES SCOPE OF SERVICES FM# Ad # 19627

BIG DATA ANALYSIS IN RAILWAY DELAYS. Fabrizio Cerreto PhD student Transport modelling DTU Management Engineering

Simulation analysis of the effect of doubling and electrification on the reliability of the rail networks: A Case Study of Tehran-Mashhad railroad

Compiled by Rajan Humagai

7 9 May 2012, Dubrovnik, Croatia 2 nd International Conference on Road and Rail Infrastructure

Goal 1 Provide for a balanced and multimodal regional transportation system that meets existing and future needs.

Introduction. Public services in transport in EU and Central Europe

Document Compilation and Approval

A parametric model of the train delay distribution to improve planning of heavy haul cycle times

CONDITION OF THE SERBIAN RAILWAYS INFRASTRUCTURE AND CHANCES FOR ITS FAIRL INCLUSION IN THE EUROPEAN RAILWAYS

Building capacity through structured heavy haul operations on single-track shared corridors in North America

2015 HDR, all rights reserved.

Hampton Roads Transportation Planning Organization. Hampton Roads Passenger Rail Study Data Collection. Phase 2A. Presentation To.

Rules Respecting Minimum Qualification Standards for Railway Employees. June 23, 2009* *This rule is not in effect until the regulation is revoked.

A study of the performance and utilization of the Swedish railway network

Opportunities for the railway business environment in the Danube region

Evolution of the Data Warehouse at the Russian Railways. Igor Movchikov, Head of R&D department

Final Report Basic Analysis (Phase A) Final Version 10/24/2017

Performance analysis: improving the Dutch railway service

Joint design standard for running times, dwell times and headway times

STRATEGIC INFRASTRUCTURES AND TRANSPORT PLAN PEIT. FIGURE 25. The rail network. Actions under the PEIT

Benefit Cost Analysis Narrative

Planning tomorrow s railway - role of technology in infrastructure and timetable options evaluation

Transactions on the Built Environment vol 34, 1998 WIT Press, ISSN

German modelling, example VISEVA-W

Shift2Rail - to deliver the ERRAC vision of the future railway?

USING BANEDANMARK S TMS TO DEVELOP CONCEPT TIMETABLE 2030

KANSAS & OKLAHOMA RAILROAD, INC.

ViziRail Description

USING SIMULATION MODELING TO ASSESS RAIL TRACK INFRASTRUCTURE IN DENSELY TRAFFICKED METROPOLITAN AREAS

CID Book 1. Generalities

Rural transport survey techniques Session: 5.5 Part 1

Rural transport survey techniques. Part 1

Data aggregation for detailed analysis of train delays

Development of the I-70 Corridor of National Significance

TRB Workshop on Road Vehicle Automation

Fahrplan eck Str g Zu

Delay Performance of Different Train Types Under Combinations of Structured and Flexible Operations on Single-Track Railway Lines in North America

Impact of Operational Practices on Rail Line Capacity: A Simulation Analysis

Social Networks and elearning: New Model for Learning at Workplace

Control rules for dispatching trains on general networks with multiple train speeds

Transcription:

RECOMMENDATIONS FOR ENHANCING UIC CODE 406 METHOD TO EVALUATE Tobias Lindner Prof. Dr. Joern Pachl Li Transportation Research Board 89 th Annual Meeting 1

STRUCTURE OF PRESENTATION UIC Code 406 main contents Problems caused by applying the Code General disadvantages of using the Code method Methods to evaluate capacity without a given timetable Conclusion Li Transportation Research Board 89 th Annual Meeting 2

UIC CODE 406 MAIN CONTENTS general characteristics 1st edition published in 2004 based on UIC Code 405, which was published in 1996 22 pages compression method for evaluating infrastructure capacity Li Transportation Research Board 89 th Annual Meeting 3

UIC CODE 406 MAIN CONTENTS compression method a fast, easy and efficient method, which can also be applied by railroads without much experience with complex capacity models had to be found UIC compression method is fully analytical based on the blocking time model Li Transportation Research Board 89 th Annual Meeting 4

UIC CODE 406 MAIN CONTENTS compression method UIC compression method is timetable-dependent the consumed capacity is derived from the timetable by virtually moving the blocking time stairways together as close as possible during the compression, it is not allowed to chance the sequence of trains in this example, the occupancy rate is 69 % Li Transportation Research Board 89 th Annual Meeting 5

UIC CODE 406 MAIN CONTENTS compression method occupancy rate limits if the occupancy rate does not exceed the limits, typical train paths have to be added (enrichment process) Li Transportation Research Board 89 th Annual Meeting 6

UIC CODE 406 MAIN CONTENTS compression method results: infrastructure exploitation by a timetable maximum number of additional train paths problem (1): in the description how to execute UIC compression method many details are left open rather non mentioned wide scope of interpretation decreasing significance Li Transportation Research Board 89 th Annual Meeting 7

PROBLEMS CAUSED BY APPLYING THE CODE dividing the railway line into compression partitions Code: partitions have to be limited by two neighboring stations or nodes creating an additional train path in spite of 100 % occupancy in the examined section It is absolutely necessary to execute the compression method between any meeting points. Li Transportation Research Board 89 th Annual Meeting 8

PROBLEMS CAUSED BY APPLYING THE CODE dividing the railway line into enrichment partitions Code: freight trains: you have to observe the route section between two nodes passenger trains: the whole distance a train travels has to be inspected In any case it is necessary to observe the whole train course. Li Transportation Research Board 89 th Annual Meeting 9

PROBLEMS CAUSED BY APPLYING THE CODE speed or direction bundling of train paths Code: does not contain any information about it but: To keep the lost capacity resulting from the construction of additional train paths as low as possible, additional train paths could be bundled with the already existing paths of the origin timetable. Li Transportation Research Board 89 th Annual Meeting 10

PROBLEMS CAUSED BY APPLYING THE CODE speed or direction bundling of train paths bundling leads to an enlarging number of trains until the whole capacity is utilized problem: the enrichment of bundled passenger train paths might be contrary to the ambition of creating synchronized timetables Conclusion: It is necessary to make a decision between a minimization of capacity loss and a decreasing market suitability. Li Transportation Research Board 89 th Annual Meeting 11

PROBLEMS CAUSED BY APPLYING THE CODE consideration of circulation plans influencing market suitability Code: does not contain any information about it but: as an aspect of market suitability, it is expedient to consider the attribution of additional train paths to circulation plans background: it does not make sense to construct a maximum number of additional train paths which would not be transferable into practice Li Transportation Research Board 89 th Annual Meeting 12

PROBLEMS CAUSED BY APPLYING THE CODE creating further additional train paths in an already large enriched timetable Code: does not contain any information about it The occupancy limit is not fully utilized. Although it is possible to create an additional train path, it contains a very long meeting / running time. It is not adequate to concentrate on the occupancy rate limits. Li Transportation Research Board 89 th Annual Meeting 13

PROBLEMS CAUSED BY APPLYING THE CODE occupancy conflicts in stations Code: does not contain any information about it Only following UIC Code: An occupancy problem may occur without being recognized. Also in this case it is not adequate to concentrate on the occupancy rate limits. Station occupancy has to be considered in any case. Li Transportation Research Board 89 th Annual Meeting 14

GENERAL DISADVANTAGES OF USING THE CODE METHOD connection between the construction of the original timetable and the evaluated capacity capacity loss can be minimized by bundling of train paths This also applies for the origin timetable. Changes of the train combinations may lead to different capacity results without varying the number of trains. problem (2): UIC Code 406 capacity results depend on the timetable. You cannot compare evaluation results of different lines (with different timetables). You only can evaluate the enrichment ability of a specific timetable on a specific line. Better use a method which is not based on a given timetable? Li Transportation Research Board 89 th Annual Meeting 15

METHODS TO EVALUATE CAPACITY WITHOUT A GIVEN TIMETABLE timetable can be considered by a virtual traffic diagram (enrichment of an empty timetable by model trains) applying compression method to model timetable it is necessary to define a standardized time variation curve, otherwise the maximum capacity is based on purely bundled paths Li Transportation Research Board 89 th Annual Meeting 16

METHODS TO EVALUATE CAPACITY WITHOUT A GIVEN TIMETABLE North American freight lines: on-demand basic, an evaluation based on a specific timetable would not fit to that kind of operation advantages: capacity results more based on infrastructure characteristics (intention of UIC Code 406 is fulfilled) results of different infrastructures can be compared applicable for American freight lines Although by applying a method which is not based on a given timetable, it is not possible to compare different lines featuring different market needs. Li Transportation Research Board 89 th Annual Meeting 17

CONCLUSION (1) Doing a revision of UIC Code 406, the standardization how to execute the compression method can be improved. increasing result significance (2) To evaluate capacity based on infrastructure characteristics: It could be better to apply the compression method on a virtual traffic diagram. Li Transportation Research Board 89 th Annual Meeting 18