Scoping Document. Precious Minerals Mining and Refining Corporation East Walker Clay Mine Expansion Project Lyon County, Nevada

Similar documents
Decision Memo Halliburton Ann Exploration Project U.S. Forest Service Austin Ranger District, Humboldt-Toiyabe National Forest Nye County, Nevada

Mount Diablo Baseline and Meridian. T42N, R54E, Section 29 and 30

Storrie and Rich Fire Area Watershed Improvement and Forest Road 26N67 Re-alignment Project

Scoping Document. Sardine/Cloudburst Meadow Restoration Project. United States Department of Agriculture. Forest Service.

Decision Memo. Cabin #5 Electric, Water, Septic Improvements

Scoping and 30-Day Notice and Comment Period for. Grassy Knob American Chestnut Planting

Decision Memo - Elko Grade Improvement Project, Jarbidge Ranger District, Elko County, Nevada

Kinder/Morgan Southern Natural Gas. Right-of-Way Maintenance Project Woody Vegetation Control. Decision Notice And Finding of No Significant Impact

General Location: Approximately 6 miles east of Huntsville, Utah along the South Fork of the Ogden River (Figure 1)

Decision Memo. Big Spring Gold LLC Big Spring Gold Exploration Project Plan of Operations #

PROJECT INFORMATION Manchester Ranger District Apple Tree Release and Maintenance Project

DECISION MEMO FOURTH OF JULY PARK 2 USDA Forest Service, Northern Region Red River Ranger District, Nez Perce National Forest Idaho County, Idaho

Public Rock Collection

Decision Memo. North Fork Calispell Creek Restoration Project

Environmental Assessment

Tenmile and Priest Pass Restoration Project Scoping Notice

Draft Decision Memo Santiam Junction Maintenance Station Truck Shop Extension

Bodie Hills Sage-Grouse Habitat Improvement Project Scoping Document

DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT

Decision Notice and Finding of No Significant Impact

DECISION MEMO SPECIAL USE AUTHORIZATION FOR GROUNDWATER MONITORING WELLS

DECISION MEMO. East Fork Blacktail Trail Reroute

DECISION MEMO. Bull Bear 1H-18 Oil and Gas Pipeline

Proposed Action: In response to resource specialist concerns raised during internal scoping, the following restrictions will apply:

DECISION MEMO MANHATTAN FUELS REDUCTION PROJECT U.S. FOREST SERVICE CANYON LAKES RANGER DISTRICT LARIMER COUNTY, CO

DECISION MEMO ISSUE AN AMENDMENT TO AN EXISTING SPECIAL USE PERMIT

DECISION MEMO POT MOUNTAIN TRAIL CONSTRUCTION USDA

SHASTA-MCCLOUD MANAGEMENT UNIT OVER SNOW VEHICLE TRAIL GROOMING AND SNOWMOBILE FACILITY MAINTENANCE PROPOSAL

U.S.D.A. Forest Service National Forest & Grasslands in Texas Angelina National Forest Angelina/Sabine Ranger District Jasper County, Texas

Small Project Proposal

Small Project Proposal

Preliminary Decision Memo Recreation Residence Septic Repairs

Decision Memo Raptor 1 and 9 Prescribed Burns Project

Michigan Wing-Civil Air Patrol

Hungry Creek Watershed Road Maintenance and Stony Quarry Development

KENTUCKY UTILITIES SPECIAL USE AUTHORIZATION AMENDMENT: MOUNT VICTORY TRANSMISSION TOWER REPLACEMENT DECISION MEMO

Draft Decision Memo OHV Trails 22 and 42 Reroute Project

DECISION MEMO SPECIAL USE AUTHORIZATION FOR PRIVATE ROAD PERMIT

PROJECT INFORMATION Warren Falls Parking Lot Expansion Project

PROPOSED ACTION FOR THE NAVAJO CINDER PIT RECLAMATION PROJECT

Decision Memo. Programmatic Forest Plan Amendment for Cultural Resource Protection Standards and Guidelines. United States Department of Agriculture

DECISION MEMO. Steve Simpson and Associates, Inc. Simpson #114 & #116 Gas Well Project Compartment 106

Civil Rights Impact Analysis for Sault Ste. Marie Conveyance/Raco Construction Project

SAGE CREEK BULK SAMPLING PROPOSED ACTION

DECISION MEMO. Wildlife Habitat Improvement Project Wildlife Opening Construction, Rehabilitation and Expansion FY

The location of the valve site is displayed on a map in the project file.

DECISION MEMO. Newfield Exploration Company Mineral Proposal PDU ASH #K1MB Compartment 16

USDA FOREST SERVICE DAKOTA PRAIRIE GRASSLANDS LITTLE MISSOURI NATIONAL GRASSLAND MEDORA RANGER DISTRICT BILLINGS COUNTY, NORTH DAKOTA

Background. Purpose and Need. Proposal. Mitigation and Design Features

DECISION MEMO SMART CREEK MINERAL EXPLORATION PROJECT

DECISION MEMO Robinhood Creek Helicopter Log Deck June, 2008

Decision Memo Starkey Elk Handling Facility Water System Improvements

Decision Memo. National Oilwell Varco East Northumberland Exploration Project Plan of Operations #

DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT (FONSI)

DECISION MEMO 4-H Tree Farm LLC Driveway Permit

DECISION MEMO Clay Butte Radio Repeater Relocation Project

I. Decision to be Implemented. II. Reasons for Categorically Excluding the Decision. A. Description of Decision - 1 -

DECISION MEMO Eureka Fire Whitebark Pine Planting

Decision Memo Hungry Creek Watershed Road Maintenance and Stony Quarry Development Project

Sage Steppe Ecosystem Restoration Strategy

BACKGROUND DECISION. June 2016 Page 1 of 6

DECISION MEMO JASON MINE-BAT HABITAT IMPROVEMENT AND MINE CLOSURE Section 22, T. 13S., R. 2W. Union County, Illinois

Final Decision Memo. Murphy Meadow Restoration Project. USDA Forest Service Willamette National Forest McKenzie River Ranger District

Moonlight Aquatic Organism Passage Project

Record of Decision Darroughs Hot Springs Geothermal Leasing Project

DECISION MEMO Divide Creek Barrier Enhancement

Notice of Proposed Action. Colorado Department of Transportation

USDA Forest Service Decision Memo. Mattie V Creek Minesite Rehabilitation Project

DECISION MEMO SFA EXPERIMENTAL FOREST HERBACEOUS POND RESTORATION AUGUST, 2009 ANGELINA/SABINE RANGER DISTRICT ANGELINA NATIONAL FOREST

DECISION MEMO. Griz Thin (Stand )

DECISION MEMO LOWER STILLWATER FISHERY ENHANCEMENT U.S. FOREST SERVICE DUCHESNE RANGER DISTRICT ASHLEY NATIONAL FOREST DUCHESNE COUNTY, UTAH

Preliminary Decision Memo 2017 BPA Utility Corridor Maintenance and Danger Tree Project

Huron-Manistee National Forests Mio Ranger District 107 McKinley Road Mio, MI 48647

Decision Notice and Finding of No Significant Impact for the Arizona Interconnection Project Access Roads Permitting EA

DECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT RAT RIVER RECREATIONAL TRAIL

Lambson Draw On/Off Allotment Livestock Conversion Decision Notice

Logo Department Name Agency Organization Organization Address Information Highway 35 Agriculture

DECISION MEMO. Kelly s Pond / NFSR 204 Hazard Tree Removal. USDA Forest Service Sam Houston National Forest Montgomery County, Texas

Re: Powerline Road Access Project, Pryor Mountains, Beartooth District Custer Gallatin National Forest

On/Off periods Improvements Grazing System. 2 fence segments. 1 water development, 2 cattle guards

PRELIMINARY DECISION MEMO

DECISION MEMO. Cheat-Potomac Ranger District Multiple Recreation Facilities and Related Granger-Thye Concessions Special Use Permit

SCOPING STATEMENT OF THE PROPOSED ACTION FOR THE

Lake Fire Restoration and Hazardous Tree Removal. Project Proposed Action and Scoping Document

DRAFT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT ROAD/TRAIL DECOMMISSIONING AND SEASONAL CLOSURE PROJECT U.S.

BANDIT TIMBER SALE Highlights Iron River Ranger District OTTAWA NATIONAL FOREST The Bandit Timber Sale Area is along the south side of FR 3110, 2.1 mi

DECISION MEMO REBEL CLAIMS EXPLORATION PROJECT

DECISION MEMO PAYETTE LAKES SKI CLUB BEAR BASIN AMENDMENT U.S. FOREST SERVICE PAYETTE NATIONAL FOREST MCCALL RANGER DISTRICT ADAMS COUNTY, IDAHO

Stream Reaches and Hydrologic Units

Decision Memo for Juniper Ridge Opal Mine

Notice of Solicitation of Applications for the Biorefinery, Renewable Chemical, and Biobased Product Manufacturing

DECISION MEMORANDUM: Quartz Dreams Minerals Exploration Project, Nogales Ranger District

Draft Pine Mountain Late- Successional Reserve Habitat Protection and Enhancement Project

Scoping: Midstate Telephone Company replacement of 20,000 feet of fiber optic telephone line Open for Comment: June 30 to July 29, 2015

Laguna Water System Improvement Environmental Assessment (EA)

Indian Creek Aquatic Restoration Project

DECISION MEMO FOR USDA FOREST SERVICE DAKOTA PRAIRIE GRASSLANDS LITTLE MISSOURI NATIONAL GRASSLAND MEDORA RANGER DISTRICT SLOPE COUNTY, NORTH DAKOTA

DECISION MEMO. Vipond Water Development

Upper Applegate Road Hazardous Fuel Reduction Project

United States Department of Agriculture. Forest Service. Beaverhead-Deerlodge National Forest. September 2014

Transcription:

Scoping Document Precious Minerals Mining and Refining Corporation East Walker Clay Mine Expansion Project Lyon County, Nevada United States Department of Agriculture Forest Service USDA Forest Service Humboldt-Toiyabe National Forest Bridgeport Ranger District Bridgeport, California April 2012

The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, gender, religion, age, disability, political beliefs, sexual orientation, or marital or family status. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, Room 326-W, Whitten Building, 14th and Independence Avenue, SW, Washington, DC 20250-9410 or call (202) 720-5964 (voice and TDD). USDA is an equal opportunity provider and employer. 2

Table of Contents 1. COMMENTS WELCOME... 4 2.LOCATION... 4 3.PURPOSE OF AND NEED FOR ACTION... 4 4.DECISION FRAMEWORK... 5 5.THE PROPOSED ACTION... 5 6.ENVIRONMENTAL PROTECTION MEASURES... 6 7.MONITORING... 8 8.PRELIMINARY ISSUES... 8 9.ALTERNATIVES... 9 10.COMMENT PROCESS... 9 11.ANALYSIS PROCESS... 10 12.CONTACT... 10 Attachments Figure 1: Project Location Figure 2: Proposed Disturbance Figure 3: Photographs Figure 4: Photographs 3

1. Comments Welcome The Bridgeport Ranger District of the Humboldt-Toiyabe National Forest welcomes your comments on the East Walker Clay Mine Expansion Project (Project) proposed by the Precious Minerals Mining and Refining Corporation (PMMR). The Project would consist of: minor improvements to existing Forest Service roads; surface mining disturbance; construction of a mine staging area, and surface water de-siltation ponds. Total Project-related disturbance would be up to approximately 45.8 acres. PMMR would use four Forest Service Roads, 764, 765, 765A, and 765B, to access the mine site for all mine-related traffic including over-the-road haul trucks which would transport the extracted mineral deposit to a rail road loading facility near Wabuska in Lyon County. The Forest Service is conducting an environmental analysis of the proposal in accordance with the National Environmental Policy Act of 1969 (as amended) (NEPA). As part of this analysis, the Forest Service is now seeking public comments specific to the proposed Project. The purpose of the scoping period is to identify the public's and agency concerns and clearly define the environmental issues regarding the proposal in accordance with the requirements of the NEPA. 2. Location The Project would be located on National Forest System lands in Lyon County, Nevada, within the Humboldt-Toiyabe National Forest, which is administered by the U.S. Department of Agriculture, Forest Service, Bridgeport Ranger District. The East Walker Clay Mine is located approximately 17 miles northeast of Bridgeport, California and 21 miles west-southwest of Hawthorne, Nevada in southern Lyon County, Nevada as shown on Figure 1. The mine site is located in the Pine Grove Hills, east of the East Walker River (Figure 2) and is entirely on public lands within the boundaries of the Humboldt-Toiyabe National Forest. The proposed Project area encompasses approximately 47.30 acres, which includes approximately 45.80 acres of new surface disturbance. The Project is located within: Mine locations: Township 7 North, Range 27 East, portions of Sections 20, 21, 28, 29 and 30 (Lyon County, Nevada); Access Locations: Township 7 North, Range 27 East, portions of Sections 11, 12, 14, 15, 16, 20, 21, 29 and 30 (Lyon County, Nevada). The general location of the Project is illustrated on Figure 1, with access routes presented on Figure 2. Primary access would be south from the City of Yerington, Nevada via Lyon County Road 3C, to existing Forest Service System Roads 764, 765, 765A, and 765B. The mine development equipment (including over-the -road materials haul trucks, service trucks, and pickup trucks) would use this route to access the proposed Project. 3. Purpose Of and Need for Action The purpose of and need for the Project is to extract economic mineral deposits on National Forest System lands in the Project area. The statutory right of PMMR to develop mineral resources on federally-administered lands is recognized in the General Mining Law of 1872, and is consistent with the Humboldt-Toiyabe National Forest Land and Resources Management Plan of 1986 (IV-50). Surface management regulations (36 CFR 228) require that all mineral exploration, development, and operation activities be conducted in a manner that minimizes adverse environmental impacts on National Forest surface resources (36 CFR 228.8). 4

4. Decision Framework Based on the environmental analysis and disclosure documented in the Environmental Assessment (EA) currently being prepared, the Deciding Official would decide: 1) whether to select the Proposed Action as proposed or modified, or as described in an alternative; 2) what mitigation measures may be needed; and 3) what monitoring is required. 5. The Proposed Action Background In 1998, the U.S. Forest Service issued PMMR an approved Mining Plan of Operations for the East Walker Clay Mine. After preparing an Environmental Assessment, on July 9, 1998, the Forest Service issued a Decision Notice/Finding of No Significant Impact (DN/FONSI) for the PMMR Mining Plan of Operations #02-98-04. The approval allows for the removal of an economic mineral from Mine #2. Under the Small Mine Operations Permit, PMMR may remove a maximum of 36,500 tons of material annually. To date, PMMR has extracted approximately 5,000 tons of material under their existing mining permits. PMMR now proposes to expand operations to include two mine sites: expansion of the existing approved site and an additional new mine site plus a staging area. The proposed action includes a year around operation to annually extract approximately 750,000 cubic yards (1,000,000 metric tons) from two surface mines. The economic deposit, a clay-based mineral, will be mined from the surface, crushed and partially dried on-site before being loaded into haul trucks which will transport the material to a rail siding near Wabuska, Nevada for distribution to markets. PMMR anticipates that the mine will have an economic life of ten (10) years. In 1999, PMMR received approvals for a Plan of Operations and Reclamation Plan from the State of Nevada, Department of Environmental Protection, Bureau of Mining Regulation and Reclamation, for extraction of a maximum of 36,500 tons of clay-based material annually. Use of Existing Roads Approximately 6.6 miles of existing Forest Service roads (Forest roads 764, 765, 765A, and 765B) would be used for all mine-related traffic, including 140 round trips per day based on an estimated 300 working days per year for the over-the-road haul trucks that will carry the extracted minerals to a rail siding and loading facility north of Yerington, Nevada. Mineral Extraction The economic material will be excavated, partially dried and hauled to a rail siding. The resource will be processed through a portable crusher, screen, dryer and conveyor belt for off-haul to a rail siding near Wabuska for shipment. No chemical processing is used in the mineral processing. Equipment Mechanized equipment proposed for the project includes: Dozers-Cat D10R or equivalent Front end loaders-cat 988G or equivalent Motor graders-cat 14G or equivalent End dump-24 ton capacity Water Trucks-3500 gallon capacity Excavators-Cat 350 or equivalent 5

Trucks (mineral haul)-double trailer Crushers and screens-lokotrak LT-150 tons per hour capacity, one at each mine site Portable propane-fueled dryers Overall Disturbance Disturbance has been calculated to include mine areas, minor road improvements and mine staging area as shown in Figure 2. The total anticipated new surface disturbance for this project would be approximately 45.80 acres which includes: Approximately 5.40 acres for the staging area; Approximately 14.00 acres for Mine Number 1, Approximately 22.90 acres for Mine Number 2, Approximately 1.60 acres improvements to FR-764, Approximately 1.60 acres improvements to FR-765, Approximately 0.30 acres improvements to FR-765A, Approximately 0.50 acres improvements to FR-765B, Approximately 1.00 acres of desiltation ponds, and Credit of approximately 1.5 acres for existing mine disturbance. Reclamation Upon completion of mining activities, all equipment and supplies would be removed from the project area and the mines would be contoured to blend with the existing topography. Disturbed areas would be reclaimed to restore vegetative cover as necessary. PMMR will submit a reclamation plan and reclamation bond for approval to the Forest Service and to the State of Nevada. 6. Environmental Protection Measures Environmental protection measures are proposed to avoid or minimize potential negative effects to resources surrounding and within the Project area. Specific measures currently include, but are not necessarily limited to: Air Quality Dust control would be accomplished by watering access routes and active mine areas as necessary. The State of Nevada Department of Environmental Protect has issued an air quality permit (AP1459-2764) for proposed surface disturbances. In addition, Forest road speed limits of 25 MPH during daylight and 15 MPH during night hauling would be applied to minimize dust generation. Water Quality Water used in mining and dust control activities would be obtained from a new water well to be located within the staging area. Water would be stored in two water tanks adjacent to the water well. Potable water would supplied by bottled water. Sanitary facilities would be portable restrooms which would be maintained by a local vendor. There would be no diversion of surface water. "De-siltation Ponds" would be constructed at both mine sites and within the staging area to capture surface water flows and settle out sediment before discharging the water into existing natural drainages. Surface water from the Project area flows through natural drainages to the East Walker River about 0.5 miles from Mine Number 2, the closest to the river. Approximately 2.25 miles of the western portion of the existing access road is located within a natural drainage which is tributary to the East Walker River. The road serves as the only surface 6

route to the mine site and will be maintained by PMMR to minimize sediment and runoff that could reach the east bank of the East Walker River. Solid Wastes All non-hazardous trash would be taken off of National Forest Service lands to the county landfill (or other approved disposal facility). Scenic Values Reclamation would be completed after cessation of mining activities to minimize potential visual impacts. Mine sites would be reclaimed following mining. All roads would be restored to their premining condition, e.g. 15 to 20 feet width, following completion of mining activities. Wildlife and Vegetation Qualified biologists would be contracted by PMMR to complete a biological evaluation as part of the analysis process. The biological evaluation would identify the existing flora and fauna within the Project area including threatened, endangered, and otherwise sensitive species of special status and their potential habitats. PMMR will avoid negative impacts to greater sage grouse in accordance with guidelines developed by a multi-agency, multi-state resource committee. PMMR would implement controls to prevent the spread of noxious weeds including the identification of noxious weed stands in the vicinity and washing vehicles moving in and out of the Project area as required. Cultural Resources Forest Service-approved archaeologists would be hired by PMMR to conduct a Class III inventory in the proposed Project area as part of the analysis process. Project construction would be designed to avoid cultural resources. If unevaluated archaeological or cultural sites or resources are encountered during Project work, activity in that area would cease immediately, the Forest Service would be notified, and the resource would be evaluated. The results of the evaluation would determine subsequent action. Hazardous Substances No. 2 diesel fuel would be used for the mining equipment and haul trucks, and unleaded gasoline or No. 2 diesel fuel would be used in the pickup trucks. Propane will be used in the material dryers. Other petroleum products, such as hydraulic oil or motor oil, would be used to service equipment as necessary. Fuel would be transported to the Project area by a local vendor. Fueling would occur every day or every other day, as required. Mine personnel would be instructed to manage products in a proper manner and to prevent spillage during fueling and servicing operations. Mining equipment would be equipped with absorbent pads, shovels, and buckets to clean up any spills that may occur. Mine support vehicles with service tanks would have appropriate warning signs and fire extinguishers. Equipment would have Forest Service-approved spark arrestors. PMMR would be required to have a proper spill response plan. PMMR would ensure that spill prevention measures are in place and containment, notification, and clean-up of any spills are accomplished as per regulation. Soils contaminated by petroleum spills would be removed and disposed of in an approved offsite waste facility. Material Safety Data Sheets would be on-site and available for reference. 7

Noxious Weed Prevention Control PMMR would implement controls to prevent the spread of noxious weeds including the identification of noxious weed stands in the vicinity and washing vehicles moving in and out of the Project area as required. Tribal Consultation Native American consultation would be carried out with area tribes to ensure tribal concerns are addressed and the project mitigated or modified to meet tribal standards. Land Use Analysis would include current land use, including, but not limited to recreation and grazing to determine potential impacts. Inventoried Roadless Areas (IRA) Although the existing roads are outside of any IRA, the proposed area of the mine encroaches on an IRA. Analysis would include addressing this situation. Socio-Economic Conditions Analysis would include impacts to the local economy and activity, and environmental justice. 7. Monitoring Forest Service minerals administrators would routinely monitor the operation to ensure compliance with the approved plan of operations. During the Project, PMMR would cooperate with the Forest Service to inventory and monitor noxious weeds and undesirable plants within areas of disturbance. At the conclusion of the Project, reclaimed areas would be monitored for at least three years to ensure successful establishment of vegetation, per the revegetation standards established in the Nevada Guidelines for Successful Revegetation for the NDEP, the Bureau of Land Management, and the Forest Service, are attained. Monitoring for the control of erosion and control of noxious weeds would be carried out in conjunction with reclamation monitoring. 8. Preliminary Issues The following preliminary issues have been identified for the Project by the Forest Service: Potential impacts to air resources; Potential impacts to water resources; Potential impacts related to hazardous substances; Potential impacts to wildlife; Potential impacts to vegetation; Potential impacts to American Indian resources and sites; Tribal Consultation; Potential impacts to land use; Potential impacts to Inventoried Roadless Areas (IRA); and Potential impacts to socio-economic issues. 8

9. Alternatives Currently three alternatives are being analyzed in detail. The Proposed Action: Alternative Number 1 The Plan of Operations would be approved, and PMMR would be authorized to conduct mining activities as proposed with up to approximately 45.80 acres of new disturbance. This alternative would include environmental protection measures, scheduling, monitoring, and reclamation as proposed under the Plan of Operations, as well as those measures agreed to in consideration of comments from the public, tribes, and the interdisciplinary team during analysis of the Proposed Action. The Proposed Action: Alternative Number 2 Mining operations would remain the same as those proposed in Alternative Number 1, except for the following. PMMR would improve the Forest Service road by placing up to 19 culvert crossings, eliminating some horizontal and vertical curves and, where necessary, widening the road to a maximum of 25 feet. The culverts would be removed at the end of the mining cycle as part of the overall Project reclamation. The No Action Alternative Under this alternative, the proposed Plan of Operations would not be approved by the Forest Service, and PMMR would not conduct expanded mining activities. Conditions at the Project area would remain unchanged. 10. Comment Process Written comments must be submitted to: Keith Whaley Project Lead Bridgeport Ranger District HC 62 Box 1000 Bridgeport, CA 93517-1000 Phone: (760) 932-5821 Fax: (760) 932-5899 E-mail: kwhaley@fs.fed.us For those submitting hand-delivered or oral comments the office telephone number is (760) 932-7070. Office business hours are 8:00 am to 4:30 pm, Monday through Friday, excluding holidays. The Bridgeport Ranger District office is located off Highway 395, south of downtown Bridgeport, California. Electronic (E-mail) comments may be submitted and must be a format such as an E-mail message, plain text (.txt), rich text format (.rtf), Acrobat (.pdf), or Word (.doc). You may submit e-mail comments to: comments-intermtn-humboldt-toiyabe-bridgeport@fs.fed.us Please place PMMR in the subject line. In order to be most useful comments should be received by 4:30 pm May 15, 2012. 9

Comments received in response to this solicitation, including names and addresses of those who comment, will be part of the public record and may be available for public review under the Freedom of Information Act. 11. Analysis Process An initial review of the proposed action by the Forest Service has indicated that the preparation of an Environmental Assessment (EA) is needed for this project. A tentative timeline has been developed for completion of this EA. Key steps are outlined below: Activity Approximate Dates Begin Scoping April 16, 2012 Public Meeting - Yerington May 2, 2012 Public Meeting - Hawthorne May 3, 2012 30 day public comment period ends May 15, 2012 Notice of Proposed Action Document June 4, 2012 Mailed Final EA prepared August 17, 2012 Final Decision Notice/FONSI signed August 24, 2012 45 day appeal period starts ( if needed) August 31, 2012 As described in this notice, comments received would be utilized to identify potential other actions, different alternatives, and/or effects to the proposed action. A second notice and opportunity to comment [Notice of Proposed Action (NOPA}] on this proposal would be issued as the analysis progresses. Those submitting comments during the 30-day NOPA period would be eligible to participate in the appeal process pursuant to Forest Service regulations at 36 CFR 215. 12. Contact For further information, contact Keith Whaley, Project Lead, at: Phone: (760)-932-5821 E-mail address: kwhaley@fs.fed.us 10

11