THE USE OF ELECTRONIC COMMERCE IN THE MATERIALS PROCUREMENT IN SA CONSTRUCTION INDUSTRY

Similar documents
SUMMARY. The Directors consider the competitive advantages of Digitalhongkong include:

14. E-Commerce Applications and Infrastructures

The Complete Outsourcer s Billing Solution

The development of a national online vending specification

Ariba Network Enabling Business Commerce in a Digital Economy

1. What PPS Does. Public Procurement Service (PPS) : Central Procuring Agency

Overview. Service Description What does the service provide? 3. Context Basis of service (SIS), the solution 4-5

e-business Exchange (e-bx) Suite of Products A New Generation of Electronic Bill Presentment and Payment Solutions

EMV 3-D Secure Press Kit Q&A

63% of enterprises have a website

Fundamentals of Information Systems, Seventh Edition

VoIP Solution How to Make the Best Choice for Your Business

Clarification Note No. 3. RFP-SPPG for Implementation of a commercially available and proven business to business e-commerce solution

Cost Accounting CONSTRUCTION COMPUTER SOFTWARE

EDI Services. Leveraging your investments in EDI for e-business advantage.

T²Enterprise. Mapping Communication Translation Management. T 2 Tran. EDI solution Translation/transport Monitoring/tracking.

EMV 3-D Secure Press Kit Q&A

PPF PRODUCT SHEET: PAYTEQ PAYMENT FOUNDATION

What s new in Pastel Evolution Version New Add-On Module. New Features. Branch Accounting. Business Intelligence Centre Excel Genie

A CCOUNTS FOR EVERYTHING. Increase your customer service and profitability while also controlling costs, inventory and financial management.

Choosing a Managed Print Service Provider

@Remote Effectively manage your output devices and reduce costs

ΜΑΘΗΜΑ: : ΤΕΧΝΟΛΟΓΙΕΣ & ΕΦΑΡΜΟΓΕΣ

OpenBank - banking platform for e-money management based on blockchain technology (version 0.2)

EDI in the Procurement Process BOSCH EDI in the Procurement Process

Fundamentals of Information Systems, Seventh Edition

payshield 9000 The hardware security module securing the world s payments

Utility Systems product overview

Sprint s M2M and Service Enablement Platform

IBM Business Process Manager on Cloud

SSA Global Technologies BPCS Product Vision

AND SCIENCE COLLEGE SRM NAGAR, KATTANKULATHUR

Request for Proposal. Cosmos Sports & Entertainment - Toronto. Ticketing System. November 28, 2017 Proposals Due: 5:00 pm (EST), December 15, 2017

SWIFT Response to The European Commission s Green Paper on Retail Financial Services

Sage 50 Accounts, Accounts Plus & Accounts Professional Product Comparison Updated 13/05/2013

QUALITY INTEGRATED ENGINEERING SERVICES to the energy sector

IDEAS Product Overview

Integrating Payments: Design Principles For A Cashless Future. Monojit Basu, Founder and Director, TechYugadi IT Solutions & Consulting

esocket POS Integrated POS solution Knet

The software comes with purchase, sales, subcontractors, contract and payroll modules as standard, and other features are:

Mini MBA: e-procurement & Purchasing Management The Complete Course on e-procurement & Purchasing Management

Automated Invoice/P2P Processing

Digitalizing Procurement for Midsize Companies: The First Step in Doing More with Less

Appendix A: Outline of Construction Management Functions /Roles for each phase of the project (source: Construction Management Association of America)

E-INVOICING Action Required: OB10 Registration

Viewpoint Construction Software Vista 6.14 Product Enhancement Brief

MIS 300 Exam 1 Spring 2011

IBM Business Process Manager on Cloud

Event Magnet. Event Magnet I N F O R M A T I O N T E C H N O L O G Y S O L U T I O N S F O R E V E N T A N D B O O K I N G M A N A G E M E N T.

EMV 3-D Secure provides the path to fast, frictionless authentication

Introduction To E- Commerce

Mobile & Online Banking

How Can LuitBiz Help Your Company in ISO 9001:2008 Quality Certifications? Do What You Say. Improve It Say Whay You Do.

Microsoft Dynamics AX. Microsoft Dynamics AX. Factsheet

CONSTRUCTION MANAGER

IBM Content Manager OnDemand on Cloud

IBM Business Process Manager on Cloud

ANNEXURE A SCOPE OF WORK FOR PROFESSIONAL SERVICES: RESTORATION OF NON PAREILLE BUILDINGS. Principal Agent and Professional Architectural Services

The Norwegian public sector emarketplace ehandel.no experiences and challenges on interoperability

2.1. Introduction The P&SC strategy is to move to two simple Invoicing models.

Continuing the Evolution of Real-Time Payments in the U.S.

Overview. Models for E-Business. Evolutionary Patterns. Business Models. Brick to Click Distributor Start-up Intranets

onshore Service Policies Non-recurring Services refers to any services provided once or on demand.

An integrated sustainability platform

Product Comparison Document

Innovating Public Procurement Through KONEPS

IBM Emptoris Contract Management on Cloud

Business to Business Integration

UniWeb. Our electronic banking services system available directly on the Internet

South River Technologies Case Study: Labware

Copyright 2014 XiploTeq, All rights reserved Infopack

IBM Terms of Use SaaS Specific Offering Terms for US Federal. IBM Business Process Manager on Cloud for US Federal

PREPAID WATER METERING SYSTEM

What s New Guide. Sage Pastel Version 14

Microsoft Office Futures. Microsoft Corporation

E-Invoicing / E-Billing. International Market Overview & Forecast. Bruno Koch January 2019

Treasury Management Solutions

MAINTENANCE INFORMATION PACK

SCOPE OF WORK FOR PROFESSIONAL SERVICES: HET POSTHUYS ELECTRICAL UPGRADE

Cloud solutions for bigger business

General Terms and Conditions of Alfons W. Gentner Verlag GmbH und Co. KG for Advertising in Online Media

ASX CHESS Replacement

February 22, 2016 SUBMITTED BY: Brendan Malone. Salsa Labs, Inc Wisconsin Ave. Suite 200. Bethesda, MD

Why Fishbowl Manufacturing and Fishbowl Warehouse Are #1 Among QuickBooks Users

RFID is not a plug and play technology.it requires careful selection and tuning. Expertise is essential for its successful implementation.

INFORMATION TECHNOLOGY IN THE STRATEGY OF A MIDDLE- SIZED CONSTRUCTION COMPANY IT in middle sized construction company

OPRO. OXS Based Ad hoc Reporting for an ERP Solution. A study based on the solution for Terokaseiko Co., Ltd, Japan. OPRO Enterprise Case Study Series

IBM Emptoris Services Procurement on Cloud

Will the Online Banking e-payments stimulate e-commerce in Europe? Piet Mallekoote, CEO Currence Brussels, 4 May 2012

Why YukonSoft. Customer Environment. Customer Perceptions. Small Business Solutions. Hardware Opportunity. Software Opportunity. Financial Opportunity

MASH Logistics Saudi Arabia realises Scalability, Shipment Visibility CASE STUDY. and Synchronised Operations with CORVI - Freight Management System

EDI in e-commerce application and safety measures. Liu Dan

Sage 200 Commercials Datasheet

Benefits of integration

Catalogue Publishing - ShipCat

e-commerce Technologies

SIMPLIFIES AND STREAMLINES THE CLAIMS SUBMISSION, MONITORING AND RESOLUTION PROCESS

INFORMATION PAPER HKEx ORION CENTRAL GATEWAY

PROLOGUE WALTER V. VOLKER CHIEF EXECUTIVE OFFICER

Transcription:

THE USE OF ELECTRONIC COMMERCE IN THE MATERIALS PROCUREMENT IN SA CONSTRUCTION INDUSTRY Gustav Coetzee and Nellis Boshoff ABSTRACT South Africa is facing the challenge of providing housing and infrastructure to millions of its residents. The improvement of the construction process to enable and improve delivery of such scale is of paramount importance to the industry. The paper focuses on the use of Internet enabled electronic procurement of building materials. The CSIR in South Africa is developing a product called ezebuild in collaboration with the construction industry, IT companies and the major banks. ezebuild consists of a core building product library, tender management and bill of materials systems, integrated with an Internet enabled ordering and payment gateway. ezebuild gives contracting companies access to building materials suppliers via the Internet from a precompiled bill of materials. ezebuild provides materials suppliers, contractors and construction managers an easy to use tool that improves the overall management of materials procurement significantly. It also improve site processes since the procurement of materials can now be pre-scheduled and delivery of materials can occur on a just in time basis reducing site storage requirements and wastage significantly. Specific items addressed in the paper include: Construction Informatics Digital Library http://itc.scix.net/ paper w78-1998-15.content A process analysis of ezebuild and the related changes in the construction management process. The technologies used to implement ezebuild. A brief description of the project including: The merging of these diverse technologies to develop an integrated materials procurement solution or the construction industry; and Some of the difficulties that are encountered during the implementation of such an integrated system in the construction industry. Keywords Procurement Process, Electronic Commerce, Product Specification Library, Internet, Internet Shopping Mall

1. INTRODUCTION After several years of severe recession in the South African construction industry, government recently announced that up to R232 billion investments in infrastructure and facility development has been mooted. This implies at least a 20% growth in Gross Domestic Fixed Investment (GDFI) per annum. In addition to this, South Africa is facing a challenge to deliver housing and appropriate services to millions of its residents that has previously been deprived of proper shelter and services. Furthermore, the industry is suffering from a number of negative factor conditions, such as lack of skills training, low productivity and in particular adversarial relationships between client, contractor, sub-contractor and material supplier. The adversarial relationship even exists inside construction firms between head office and site. These factor conditions are impacting on the overall performance of the industry resulting in ever increasing cost of construction in South Africa. It is in this context that the CSIR and several industry partners, including IT companies and major banks have embarked on the development of an Internet based electronic materials and labour procurement process for the construction industry. The concept has been named ezebuild. The main aim of ezebuild is to reduce levels of adversity in the industry by re-engineering the procurement process. 2. CURRENT USE OF INFORMATION TECHNOLOGY IN PROCUREMENT A series of process analysis undertaken of the South African construction industry has revealed that a great deal of the latest information technology is used in the procurement process. The communication of information between the different systems is however largely still manually integrated. Table 1: Level of information technology usage in existing procurement process Process Information Technology Usage 1) Obtain prices Level 3: Process primarily manual with use of faxes to transmit information 2) Submit Tender Level 3: Process manual and likely to stay that way until digital signatures becomes acceptable practise on contracts. In some cases electronic information is submitted in addition to tender documents. 3) Request Level 2 and 3: The use of E-mail has become an accepted practise inside some of the more advance information technology users. 4) Order Level 3: Use of fax is currently the best practise although telephone calls are accepted as long as an order number is provided. The use of structured e-mail or other secure electronic communication should thus be acceptable. 5) Deliver Level 3: For obvious reasons this will remain the same. The delivery note is however also still paper driven. 6) Receiving and checking. Level 2: Delivery note information is recaptured into spreadsheet. 7) Progress Feedback Level 2: Current practise is for information to be forwarded by spreadsheet and then imported into cost control systems. 8) Cost Control Level 1: Information is captured once. Systems fairly well integrated to accounting systems. 9) Invoice Level 3: Invoices are posted from materials suppliers to contractors. 10) Payment Level 3: Payment takes place by cheque. Note on table 1: Level 1: Full seamless electronic integration of information.

Level 2: Full electronic transfer of information but re-capturing of information takes place at the processing point. Level 3: Manual transfer and re-capturing of information at the processing point. Communication is still largely taking place by fax, with limited use of electronic mail in the most technologically advanced companies. This implies limited sharing of information in the procurement process. Figure 1 depicts the existing procurement process in the South African construction industry. Table 1 gives each process and the level of technology integration through the use of information technology. 8) Cost Control Client 6) Receiving and checking 3) Request 7) Progress Feedback Construction Comp any Head Office 2) Submit Tender Construction Site 1) Obtain Prices 4) Order 9) Invoice 10) Payment 5) Deliver Supplier Figure 1: Existing materials procurement process. 3. RE-ENGINEERING THE PROCESS OF PROCUREMENT In the process of re-engineering the procurement process, the ezebuild project team has drawn extensively on the concepts such as a single integrated project database for a construction project as well as the concept of an industry wide knowledge base. The core information element of the procurement process is the bill of quantities. The bill of quantities includes the product specification for the project. Figure 2 demonstrates the role and importance of the bill of quantities in the procurement process. 4. DESIGNING EZEBUILD As mentioned earlier, the strategic requirement for ezebuild is to reduce the levels of productivity and adversity in the industry through improved sharing of information. A two phased approach has been adopted towards meeting this requirement.

1. Obtain Prices Items, quantities and prices 2.Submit Tender Items, quantities and prices 3. Request Items, quantities & date required Specification, Quantities & Prices Items & Quantities Items & Specification 4. Order 5. Deliver Specification & Quantities Items, quantities, date required & Specification Delivery Note Items & quantities 6. Receiving and Checking Construction 7. Progress Feedback Progress and Volume Bill Of Quantities Item, Quantity & Agreed Rates 8. Cost Control Delivery Note & Amount 9. Invoice Amount & Cheque 10. Payment Figure 2 Importance and use of bill of quantities in the procurement process Phase 1 requirements include: Develop access to materials and product specifications to which designers, contractors and materials suppliers have direct access. The ideal would be if the manufacturers maintain the product information themselves. Develop access to tender information in such a way that companies can access the information readily.

Develop a platform for a single bill of quantities with seamless sharing of information by project team members. Enable electronic ordering and payment transactions between suppliers and construction companies. Security must be defined to give team members access to relevant information only and protect the information from unauthorised access. Phase II requirement is to define a message standard that would allow for seamless electronic integration of processes and systems to eliminate the need for recapturing information. Based on the above requirements and the conceptual process model the following technical requirements were defined: Phase I: Network communication between the client, head office and construction site as well as material suppliers. High speed accesses to a database of building product specifications. Security and authentication of all transactions and interfaces to various systems. Phase II: Seamless integration of estimating, ordering, receiving and cost control process of construction companies with the single bill of quantities. Seamless integration of the stock control, order management, invoicing and payment processes of the material suppliers. An analysis of existing processes reveals that the transactions between the various systems and the project database are typically of low volume and relatively small size in comparison for instance to the amount of transactions banking networks handle. In addition to this, access to the database, particularly from the construction site, is on an ad hoc basis, which imply that these systems do not need a real time connection to communicate. Relatively low entry cost, software and hardware requirements make the Internet an ideal carrier to integrate these systems. Furthermore, technologies such as an Internet shopping mall and an Internet search engine provide proven facilities for order, invoice and payment management as well as authentication and secure communication based on the ISO 8583. 5. EZEBUILD ENABLEMENT The accessing of building product specification through the Internet is a project that was started by the CSIR in joint venture with an information technology company a number of years ago. The product specification library consists of approximately 12000 South African manufactured product specifications that have been scanned and indexed. The product specification library is available on the Internet and CD-ROM. Interior decorators, architects, engineers and construction companies use the information in the design and construction process. The product library is currently maintained through a bureau service, however developments are in process to develop a database driven version of the product specification library. This allows manufacturers and product developers to access and maintain product information. The intention is that the library will be migrated to relational database. The relational database

will in turn be used to publish information to the Internet. Figure 3 demonstrates the proposed use of a data warehousing methodology to maintain and update the product specification library. Manufacturer 1 Designers Manufacturer 2 Manufacturer 3 Manufacturers U p date Product Info Interactively Internet based database with product attributes Publish Product Info to WWW Electronic Product Specification Library Uses product specifications Suppliers Contractors Manufacturer 4 Quantity Surveyors Figure 3: Product specification library The concept of an Internet enabled project server is by now fairly well known and can almost be considered as state of the art. The project server allows the participants in the construction process to share information such as drawings, minutes of meetings and site instructions. In addition to this, the project server can also be used to enable the management of the procurement process. Figure 4 below depicts the enablement of the project server to accommodate electronic commerce. In order to enable electronic commerce, the project server needs to be enabled with an electronic shopping mall. An electronic shopping mall guarantees secure, authenticated electronic business transactions between parties. If the shopping mall is linked to a payment gateway, payment and transfer of funds can also be enabled. Secure transaction processing according to ISO 8583 requires that the project server be registered with the local digital certification authority. In the case of South Africa it is SACA (South African Certification Authority). The certification authority issues a digital certificate for the project server. The digital certificate consists of software that encrypts all data and transactions. The digital certificate also manages access control to the project server by the authentication of a user during the lock on procedure to the server. In addition to this, user security profiles in the database ensure that users only have access to

information in the database that they are entitled to. Users are enabled with a web browser to access the project server. Project Database Supplier Table Product Item & Quantities Table Quotation Data Table Progress Feedback Data Table Electronic Shopping Mall Order Management Transaction Processing Payment Management Transaction Record History Secure communications and transactions protocols based on ISO 8385 Digital Certificate Low level authentication of user and merchants Interface to electronic Payment Gateway Hardware and System Software Figure 4: Enablement of project server for electronic commerce 6. OPERATION OF EZEBUILD DURING PHASE I When a construction company decides to tender on a project, it can request the client to download the tender document to the contractors project server. The bill of quantities, which forms part of the tender document can be entered into the database on the project server. Figure 5 below depicts the proposed ezebuild process. The items table in the database must contain at least the following information: Specification of item Quantity Planned delivery date Estimated time between order and delivery Costing staff can use structured E-mail to request prices from suppliers, and eventually directly from manufacturers. The supplier can enter the information into a separate table consisting of the following information at least: Supplier Number Item Number

Quoted price Discount applicable Payment method Contractor Head Office Product Specification Library 0. Product Specification Product Manufacturers 2. Request Prices 8. Cost Control 10. Invoicing 11. Instruction to Pay 0. Product Specification Construction Site 4. Request 7. Receiving & Checking Project Server 1. Down load Tender document 3. Submit quotation 5. Order 9. Deliver Note Feedback 12. Payment Suppliers 6. Deliver Client Figure 5: Proposed process model On commencement of the project the contractor populates the bill of quantities with the preferred supplier information. A preliminary delivery schedule is attached to each item and suppliers are requested to add an approximated delivery time. The construction site requests delivery of items from the electronic shopping mall through an Internet browser. The electronic shopping mall generates an electronic order. The order is forwarded to the supplier by means of a structured E-mail who then delivers the material on site. Acceptance of materials delivered on site is fed back into the project server against items ordered. This immediately makes the information available for cost control purposes at head office.

The supplier confirms delivery of items on the construction site by feeding the information back to the electronic shopping mall. The electronic shopping mall generates an invoice. The invoice is forwarded to head office by means of a structured e-mail. Head office downloads information from the electronic shopping mall into the accounting system. Payment can be effected by instructing the electronic shopping mall to transfer funds from the contractors bank account to that of the supplier. 7. IN CONCLUSION It can be concluded that ezebuild hold great benefits for both improved productivity and improved communications in the construction industry. Some of these benefits include: Shared accessible information throughout the procurement process. The need for separate buyers disappears due to the fact that a continuous flow of information from the site to the supplier is created. Improved and direct access to the ordering system provides improved capabilities for just in time procurement. This allows for reduced levels of materials on site and thus reduced wastage. Using ezebuild contributes to increased use of information technology in the construction process and significant improvement of the process through sharing of information. Some of the problems experienced with the development of ezebuild are given below. The largest initial concern was the banking systems. However, although banks have mammoth legacy systems, the concepts of interoperability and message exchange are well established in the banking environment. This provided significant out of industry learning for the project team particular in the area of secure electronic transactions. However, the learning took time and delayed the process. The available electronic shopping malls operate on the principle of immediate payment. The construction industry required that the shopping mall operate on a principle of delayed payment. The electronic shopping mall software had to be customised to cater for this need. Connectivity of remote construction sites, as well as Internet bandwidth is proving to be one of the largest problems. Resistance to change and the acceptance of new operating procedures is proving to be one of the largest problems.

REFERENCES 1. Division of Building Technology CSIR and The South African Institution of Civil Engineering. INNOVATION IN THE CONSTRUCTION INDUSTRY (1996). 2. Porter, M E (1990). The competitive advantage of Nations. Macmillan, London and Basingstoke. 3. Department of Public Works (1997). Green Paper on creating an enabling environment for Reconstruction, Growth and Development of the Construction Industry. Department of Public Works, Pretoria, South Africa. 4. IES STRATEGY 1996-2000 (Integrated Engineering Solutions), Brian Zelly. From Preproceedings of Global Construct IT Futures, International Meeting, April 16-18, 1997. Bassenthwaite, UK. 5. FUTURE PROSPECTS FOR THE UK CONTRACTOR, Richard Baldwin & Professor Rachel Cooper. From Pre-proceedings of Global Construct IT Futures, International Meeting, April 16-18, 1997. Bassenthwaite, UK. 6. Ecnet Electronic Commerce. Paddy Gray. http://www.ecnet.co.za/overview. 7. Benchmarking summary report. Project Information Integration on European Construction Projects. November 1997. Scenic Benchmarking. Brian Atkin et al. http://www.teleconstruct.com/scenic.