Conflict detection and resolution aid to controllers. Jean-Louis Garcia, DSNA

Similar documents
Final Project Report. Abstract. Document information

Work Package Final Report

SESAR Progress. Specific focus on ATC related WPs (WP4, WP5,WP10) Prepared for ODT by Bernard Brunner 17th September 2009

CDM & Sector Team Operation Validation Report

The SESAR Joint Undertaking is a EU body created by the EU Council (REG 219/2007)

SESAR Release 2 RESULTS

Operational Performance Requirements Analysis for the Conflict Detection Tool (CDT)

EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL EUROCONTROL EXPERIMENTAL CENTRE

Episode 3 D FTS on 4D trajectory management and complexity reduction - Experimental Plan EPISODE 3

Capacity Planning and Assessment Additional considerations

Identification of Spatiotemporal Interdependencies and Complexity Evolution in a Multiple Aircraft Environment

Improvement on the Acceptance of a Conflict Resolution System by Air Traffic Controllers. R. Flicker, Technical University Berlin

CDM & Sector Team Operations OSED & Requirements - Part 2 SPR

Final Project Report. Abstract. Document information

Final Project Report. Abstract. Document information

COFLIGHT AS A SERVICE

The role of research organizations in SESAR German Aerospace Center (DLR) Dr. Helmut H. Toebben Prof. Dr. Dirk Kuegler

Future Area Control Tools Support (FACTS) Peter Whysall

Agent-Based Modelling and Simulation of Trajectory Based Operations under Very High Traffic Demand

SESAR The European ATM Improvement Programme. Regional ANC 2012 Preparatory Symposium Michael STANDAR Moscow March 2012

International Civil Aviation Organization AIR TRAFFIC MANAGEMENT REQUIREMENTS AND PERFORMANCE PANEL (ATMRPP) TWENTY SIXTH WORKING GROUP MEETING

DCB/ASM Scenario Step1 System Definition Final

First ATC Support Tools Implementation (FASTI) Cognitive Task Analysis

Final Project Report. Abstract. Document information

Flight Data Management : includes tasks of loading, preparing and discarding flight progress strips, etc., and also includes computer updates.

Final Project Report. Abstract. Document information

TCT. Technical Document. TCT Component Test Document

Trajectory prediction and conflict resolution for Enroute-to-enroute Seamless Air traffic management TESA

THE ROADMAP FOR DELIVERING HIGH PERFORMING AVIATION FOR EUROPE. European ATM Master Plan

Implementation of the Dynamic Capacity Management in a high density area Project Number Project Manager

Measuring En Route Separation Assurance Performance. Ella Pinska, Brian Hickling

Final Project Report. Abstract. Document information

Human Reliability Assessment In ATM: the CARA tool

Final Project Report. Abstract. Document information

Controller and Pilot Evaluation of a Datalink-Enabled Trajectory-Based. Eric Mueller

A Conflict Probe to Provide Early Benefits for Airspace Users and Controllers

The Area Flow Multi-Sector Planner: A Fast-Time Study of MSP Coordination Activities. Kenny Martin ISA Software

HUMAN FACTORS. FASTI Human Factors and Managing the Transition Good Practice Guidelines. Making change in En-Route Air Traffic control DELIVERABLE

EVALUATION OF CONCEPTUAL CHANGES IN AIR TRAFFIC CONTROL USING TASK-BASED WORKLOAD MODELS

Analysis of Multi-Sector Planner Concepts in U.S. Airspace

Keywords: separation provision, conflict resolution strategy, conflict geometry, ATC

Assessing ATM performance with simulation and optimisation tools: The APACHE Project

SESAR Overview. WAKENET3 Europe Workshop. Paul Adamson SJU Programme Manager (WP6/12)

The Tactical Load Smoother for Multi-Sector Planning

Some Trends in Next Generation Air Traffic Management

Today s Operations Task Analysis

Episode 3 D WP4 Contribution Validation Strategy. Single European Sky Implementation support through Validation. Document information.

SESAR development and deployment

II) PHARE/NLR/PD /OSD2;2.0

Strategic Planning in Air Traffic Control as a Multi-Objective Stochastic Optimization Problem

SESSION 7A SESAR INNOVATIONS. Peter Hotham Chief of Technology & Innovation

Final Project Report. Abstract. Document information

METHODOLOGY FOR SAFETY RISK ASSESSMENT IN FUTURE AIR TRAFFIC MANAGEMENT CONCEPT OF OPERATIONS

Final Project Report. Abstract. Document information

SATCAS Standard Air Traffic Control Automation System

SESAR: a European initiative for an enhanced ATM system

A System Concept for Facilitating User Preferences in En Route Airspace

Not all or nothing, not all the same: classifying automation in practice

I-AM-SAFE Feasibility Study Report

MAT Report Principles and Layout

SESAR and ASAS Opportunity

The Effect of a Highly Automated Environment on Human Behaviour

Federal Aviation Administration FPAW Weather Integration Into NextGen

Final Project Report. Abstract. Document information

Extending CDM tools. CDM seminar workshop 26NOV18 Jérôme Dufossez Direction générale de l Aviation civile

InterFAB OPS Workshop 2 May 2016 Langen

Preliminary Cost-Benefit Analysis

Quantitative prediction of automation effects on ATCo Human Performance

Final Project Report. Abstract. Document information

Final Safety and Performance Requirements (SPR)

Network Manager User Forum Wrap-up 28/01/2016

NM Ops and technical evolutions

RESULTS OF THE PD/1++ TRIAL

Contextual note SESAR Solution description form for deployment planning

SESAR Exploratory Research. David Bowen Chief ATM, SESAR JU

SUPPORTING GLOBAL HARMONISATION AND. Michael Standar, SESAR JU Chief Strategy & External Affairs

Case study: Influences of Uncertainties and Traffic Scenario Difficulties in a Human-In-The-Loop Simulation

Annual Work Programme December Page 1 of 54

DOC Volume 2 of 2

EUROCAE Symposium & 54 th General Assembly. London, April 2017

Work Package Final Report

ATM & UTM INTEGRATION

Military Impact assessment of ATM Master Plan Deployment Packages and Deployment Scenarios

Master Plan edition 2

Annual Work Programme* Amendment n 1 Edition October 2015

Episode 3. Consolidated Validation Prototyping Report on Queue, Trajectory and Separation. Management EPISODE 3

Better pricing for ATM?

Clarifying Cognitive Complexity and Controller Strategies in Disturbed Inbound Peak ATC Operations

How the geometry of arrival routes can influence sequencing

EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL EUROCONTROL EXPERIMENTAL CENTRE PESSIMISTIC SECTOR CAPACITY ESTIMATION

Coordinated Arrival Departure Management

Final Project Report. Abstract. Document information

Commission hearing on the preparation for RP3

Single European Sky Interoperability Regulation

Evaluation of a Model of Expert Decision Making in Air Traffic Control

UNDERSTANDING CONFLICT-RESOLUTION TASKLOAD: IMPLEMENTING ADVISORY CONFLICT-DETECTION AND RESOLUTION ALGORITHMS IN AN AIRSPACE

FASTI PROGRAMME PROGRAMME MANAGEMENT PLAN

HPC ATM simulator for the performance assessment of TBO

Using Dynamic Risk Modelling in Single European Sky Air Traffic Management Research (SESAR)

SESAR PJ09 DCB

Transcription:

Conflict detection and resolution aid to controllers Jean-Louis Garcia, DSNA

Objectives Improved ANS operations productivity Increased collaboration and operational predictability Enhanced safety and security

Partners/Process Scope Feasibility Pre-industrial development & integration Industrialisation Deployment Operations V1 V2 V3 V4 V5 V6

The en-route capacity bottleneck The Sector Productivity is constrained by the tactical air traffic control mental process limitation Doubt Management is directly linked to the complexity and a very cognitive consuming element

How 0,78 M Stategy DOUBT FL310 T V Computation CAS Τ Life Coordination

Tactical controller tools Thales/DSNA Conflict detection & resolution tools Monitoring tools

Tactical controller tools Indra/DFS Conflict detection & resolution tools Monitoring tools

Some statistics EXE-04.07.02-VP-175 (OFA03.03.01) Tactical Controller Assistance Tools high 10 9 8 7 6 5 4 3 2 1 low Workload average (Bedford) Reference Solution TC PC All Sectors Significant workload decrease with Tactical Tools (Solution) Traffic in all measured scenarios was about 150 % of current sector capacity values Situational Awareness much better in solution scenario with Tactical Tools TC - Tactical Controller PC - Planning Controller high 10 9 8 7 6 5 4 3 2 1 0 low Situational awareness (China Lake) TC PC All Sectors Reference Solution 9

The way forward MONITORING Mona CONFLICT DETECTION Short term Medium term CONFLICT RESOLUTION What if Flight Level What if Heading What else Mature Partially mature Need more studies

Thank you for your attention More information: jean-louis.garcia@aviation-civile.gouv.fr

Advanced Separation Management Tools and new ATCO organization schemas Leticia González (Indra)

SESAR1 Partners in collaboration Sector Team Organisation Separation Provision in En Route/TMA

Before SESAR1 Current ACC Operations Coordination by procedures SESAR1 Goals Increased capacity Increased controller productivity Improve awareness Enhance cooperation Improve safety

SESAR1: Collaborative Control Collaborative Boundaries Co-ordination by exception Clearances to aircraft when required at any flight position to maintain separation Multisector Area (MSA) External Boundary (EMSB) Cleared to Climb XFL XFL Tactical Controller Multi Planner Tactical Controller Internal Boundary (IMSB)

Tools Supporting controllers in Collaborative Control Advanced Medium Term Conflict Detection Tool Tactical Controller Tools Advanced Conformance Monitoring What-if Function MSP Operations What-else Function Electronic Coordination

SESAR1: Advanced medium-term conflict detection Potential conflict are detected: Risk Time horizon 15 min Level bands instead of vertical profile Different types of risk based on flight position in the sector

SESAR1: Validation findings Collaborative Control Safety: Situational awareness increase Cost effectiveness: number of controllers in the planning activities is optimised Capacity: capacity increase. Flexible sector configuration, reduce number of clearances Controller productivity: efficiency increase. Better and more efficient solutions to solve conflicts.

Future activities in SESAR2020 Controller Tools and Team Organisation for the Provision of Separation in Air Traffic Management High Productivity Controller Team Organisation Collaborative Control Flight Centric ATC

Thank you for your attention More information: Leticia González lgmota@indra.es

Conflict Detection and Resolution Aid to Planner Controller Roberta Pigliacampo Leonardo-Finmeccanica

Partners involved Ground Based Separation Provision Enhanced Tools for Conflict Detection and Resolution

The challenges before SESAR1 Traffic demand expected to increase considerably Spreading of potential conflicts points or areas Limited benefits of existing Conflict Detection Tools Limited resolution advisories functionalities

The target solution Definition and Development of Advanced Conflict Detection and Resolution Tools Improved accuracy Improved safety Better use of ATC capacity Support in complex situation

What has been addressed in SESAR1 Controller Working Position TC PC Problems Warning and reminders Planned/Tactical trajectories Clearances Conflict Detection PC-Aid TC-Aid Monitoring Aids Trajectories Re-Conformance Trajectory Prediction Planned/Tactical trajectories TRACT

Planning Conflict Detection (1/2) Aircraft to aircraft encounter Aircraft to airspace encounter Uncertainty modelling with buffers

Planning Conflict Detection (2/2) Encounter classification What-if Support to team coordination HMI enhancements

Validation activities DSNA simulation ENAV simulation

Early findings and achievements Improved situation awareness Improved safety Dynamic workload distribution Support to entry/exit traffic flow management Good usability Needed for full implementation of Free Routing services

What remains to do SESAR 2020 Improved accuracy Improved safety Better use of ATC capacity SESAR 2020 Support in complex situation

Thank you for your attention More information: roberta.pigliacampo@leonardocompany.com