Northwest Business Park, Building 5, Bay 3. Issued for Tender: August 24, Substantial Date: November 17, 2017

Similar documents
Interior Construction Specification. Dr. Kalinowski. 2nd Floor, United Health Centre Street, Edmonton, AB

CITY OF OCEAN CITY COUNTY OF CAPE MAY, NEW JERSEY ADDENDUM #1 FEBRUARY 16, 2016 CITY CONTRACT NO

Addendum No. 1. Joliet Junior College 1215 Houbolt Road Joliet, IL DATE: October 11, 2017

Addendum No. 1. Joliet Junior College 1215 Houbolt Road Joliet, IL DATE: October 16, 2017

PAWLEYS ISLAND TOWN HALL

Addendum No. 1 Page 1 of 1

Project Location: 2220 E. League City Parkway, League City, Texas 77573

DOCUMENT ADDENDUM

ADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4

ADDENDUM NO. 3. Item 3 NOTICE OF OPPORTUNITY - REPLACE in its entirety with the attached ***REVISED 08/03/2018

CITY OF PANAMA CITY BEACH WWTF INFLUENT SCREENS REPLACEMENT April 14, 2017

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.

GOREE ARCHITECTS, INC Bellaire Blvd., Suite 105 Bellaire, TX Tel (713)

1. Meeting minutes from the pre-bid conference are attached for inclusion in the Bid Documents.

The following shall be incorporated into the Contract Documents dated 12 MARCH 2018.

All Approved Contractors / Interested Parties Re: ADDENDUM #1 Project: Burton ISD Rock Building Renovation Date: April 9, 2015

MEMORANDUM. Taylor Schoel with Walter Schoel Engineering. DATE: August 29, Addendum 1 - Green Drive Culvert Replacement.

Tiger Drylac Canada Inc. Batching Room and Storage Addition 110 Southgate Drive, Guelph, ON December 4, 2017

Cooling Tower Replacement Western Guilford High School Guilford County Schools. Pre-bid Conference May 3, 2018

DEAN + TYLER + BURNS ARCHITECTURE

ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. 1. September 9, to the BIDDING DOCUMENTS for

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S.

Spring Lake Public Schools. Spring Lake, MI. March RE: High School Storage Buildings

AG Permit Set Addendum #03 Addendum Date: 9/26/2016

November 26, 2009 File: TP#3A TO ALL POTENTIAL BIDDERS. Bid Package No. 3A Glazing, Curtain Wall and Windows

2. Clarification: The building address is 801 Henderson Street.

The bid is being postponed to comply with State rules requiring 4 calendar days for receipt of bids after an addendum.

10/16/2017 REQUEST FOR PROPOSALS. Accounting-Bookkeeping Services. Two (2) Year Term

Oxford & Area Trails Association River Philip Bridge Construction, Oxford, N.S Project No.: OATA003 SECTION 1.0 INSTRUCTION TO BIDDERS

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:

DOCUMENT BID FORM - STIPULATED SUM (MULTIPLE-PRIME CONTRACTS) Bidder:.

Town of Middleton. Storm Water Outfall Repair & Soil Stabilization. Connaught Avenue. June 20, 2014

Refer to Section Proposal Form/All Trades (issued) a. Revised Alternate No. 2 b. Added Alternate No. 3

ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP. ADDENDUM DATE: February 10, BID DATE: February 15, 2017, 11:30 a.m.

Memphis Housing Authority Capital Improvements Department 700 Adams Street, Room 107 Memphis, Tennessee

Addendum No. 1 Page 1 of 2

REVISED BID FORM. To Procurement Services, Room 1104, 900 East Broad Street, Richmond, Virginia:

REQUEST FOR PROPOSAL Excavation / Site Services. Hamilton International Air Cargo Logistics Facility

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR

REQUEST FOR PROPOSALS AUDIT

707 Minnesota Ave., Suite 506 Kansas City, Kansas Tel Fax

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA

DOCUMENT BID PROPOSAL

The Home Depot U.S.A., Inc. Instructions to Bidders

COUNTY OF ALAMEDA. REVISED BID DUE DATE: 2:00 p.m., THURSDAY, NOVEMBER 17, 2016

Blatt PE Center Fire Alarm Upgrades November 12, 2012 State Project No. H27-I851-B

Request for Quotations Airport Secure Access System

1. Pre-Bid Meeting: The Meeting was held on July 15, 2013 at 1:30PM at Kiser Middle School.

DOCUMENT BID FORM - STIPULATED SUM

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

Main Building Auditorium

PHASE 3: MAIN AND SECOND LEVEL RENOVATION EDUCATION CENTRE SASKATCHEWAN RIVERS PUBLIC SCHOOL DIVISION NO. 119

CHARLES COUNTY GOVERNMENT ITB NO WHITE PLAINS FAILING SEPTIC SYSTEM IMPROVEMENTS

PROJECT MANUAL for Phantom Canyon Tunnel Repair Project. Location On Fremont County Road miles North of Intersection US Highway 50 with FCR 67

Town of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and

Addendum! Project No: HFX A0 Client Project No: MISC Project: MacAulay Sports Field Project Date: March 23, 2015 Addendum No: 2

BID Addenda No. Date Issued Addenda No. Date Issued

School Risk Assessment

REQUEST FOR QUOTATIONS Crushed Gravel

WINDOW REPLACEMENT FOR ARCHITECT'S NO NORWOOD ELEMENTARY SCHOOL. A. Project Name: Window Replacement for Norwood Elementary School.

RFQ Drainage Ditching and Culvert Replacement

PORTLAND COMMUNITY COLLEGE SW 49 th Avenue Portland, Oregon ADDENDUM NO. 4

Request for Quotations Arras Weir Maintenance

Please have your pre-qualification document submitted before closing at 3:00:00 p.m. Local Time Thursday January 29, 2009.

Section IV. Bidding Forms

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services

STANTEC ARCHITECTURE ARCHITECTS PLANNERS ENGINEERS 3001 Bee Caves Road Suite 300 Austin, TX April 29, 2016

PROJECT MANUAL PT 17-05

Cattaraugus County Little Valley County Center Court Renovations Second Floor Little Valley, NY

ADDENDUM #2. Design/Build Contractor RFP Bid # for the. Joint-Use 21 st Century Post-Century Education Center.

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

ADDENDUM NO. 3 REQUEST FOR PROPOSALS HANGAR 1610/1612 FIRE SUPPRESSION RETROFIT PROJECT

BID FORM This Bid is submitted to: City of Glasgow 126 East Public Square Glasgow, KY 42141

BID PROPOSAL FORM C.I.P. NO PROJECT: VETERANS PARK SHOOTING RANGE LEAD ABATEMENT/DEMO

CITY OF MARSHALL, MINNESOTA

BIDDING INFORMATION FOR HOLLY HILL ADMINISTRATION COMPLEX RENOVATION AND ADDITION. for the COUNTY OF ORANGEBURG. Project Number: FY

BARBADOS WATER AUTHORITY

INVITATION TO TENDER Tender-08 ADIDAS SPORTSPLEX REMEDIATION

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

ADDENDUM #001 Date: March 21, 2019

STANDARD SPECIFICATION SECTIONS. November 2016 Physical Resources Design, Engineering and Construction

C & H Schonsee. Edmonton, AB PROJECT SPECIFICATIONS

I INVITATION TO BID City of Fort Morgan Water Distribution Department Waterline Isolation Project

JEFCO GYM HVAC ADDITIONS TO ARCHITECT'S NO AES, BES, CES, PGES, SRES B.C. NO

ADDENDUM #1 NWIT Exterior Repainting Various Locations, New Westminster, BC

TRIAD ENGINEERING CONSULTANTS, INC.

FORM OF TENDER RITHET RESERVOIR DRAIN PROJECT ( TITLE OF CONTRACT ) T 34/16 ( OWNER S CONTRACT REFERENCE NO. )

SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR HIGH SERVICE PUMP REPAIR ADDENDUM 3

Invitation for Bids for Armed and Unarmed Security Guard Services ADDENDUM NO. 1 ACKNOWLEDGEMENT NOTICE

Dick s Sporting Goods Demolition Package

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.

Aboriginal Initiatives

PROJECT MANUAL Volume 1. Project: Clayton Greenway System -Mark s Creek Bridge Replacement

WINTER SAND TENDER Friday September 7, 2018 at 1:10 p.m.

ADDENDUM ITEMS: This addendum consists of 2 pages and the following attachments: Pre-Bid Conference Sign-in Sheets, and SE-330, Lump Sum Bid Form.

NORTHERN COLLEGE DRY HYDRANT

TENDER Window & Door Hardware Replacement, Exterior Cladding & Washroom Upgrades Northern S. S. Sturgeon Falls, ON

PROJECT MANUAL FOR: CP AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP HULSTON HALL STAIR TOWER REPAIRS

REROOFING THE CAREER TECHNICAL SCHOOL FOR THE CLEBURNE COUNTY BOARD OF EDUCATION HEFLIN, ALABAMA

SAN ANTONIO WATER SYSTEM University Pump Station Improvements Project SAWS Job No Solicitation No. B DD

Transcription:

Exterior Alterations and New Office/ Warehouse for All Weather Shelters Northwest Business Park, Building 5, Bay 3 13459-149 Street Edmonton, AB Issued for Tender: Site Visit: Available upon request. Closing Date: August 31, 2017 @ 2:00 PM Substantial Date: November 17, 2017 Reference: 17.6300 100, 10130 105 Street, Edmonton, AB T5J 1C9 p.780-423-1811 f 780-425-1988 wolskidesign.com

All Weather Shelters Exterior Alterations and New Office/Warehouse Page 1 Part 1 General 1.1 BID INFORMATION Date: Submitted by: (name) (address) To: Jeffrey Van Dyke, Industrial Design and Construction Lead Edmonton On Properties Suite 200, 12420-104 Avenue NW Edmonton, AB T5N 3Z9 Project: All Weather Shelters Exterior Alterations and New Office/ Warehouse 13459-149 Street NW Edmonton, AB T5L 2T3 Tender The Tender will close on Thursday, August 31, 2017 @ 2:00 PM. All tender submissions are to be submitted via Email to the following parties: Jeffrey Van Dyke, Industrial Design and Construction Lead, One Properties. jvandyke@oneproperties.com Céline Therriault, Interior Designer, Wolski Design Group Ltd. celinet@wolskidesign.com Questions All questions during the time of tender will be addressed to the following parties: Céline Therriault, Interior Designer, Wolski Design Group Ltd. celinet@wolskidesign.com Chris Green, Principal, Wolski Design Group Ltd. chrisg@wolskidesign.com No questions will be accepted prior to 24 hours of tender closing.

All Weather Shelters Exterior Alterations and New Office/Warehouse Page 2 Site Access There is no mandatory site visit. Should a proponent wish to see the site, they are to contact the following for access: Jeffrey Van Dyke, Industrial Design and Construction Lead, One Properties. jvandyke@oneproperties.com 1.2 OFFER.1 Having examined the Place of The Work and all matters referred to in the Instructions to Bidders and the Contract Documents prepared by the named Consultants for the above mentioned project, we, the undersigned, hereby offer to enter into a contract using CCDC 2-2008 Contract form, to perform the Work for the price of: $ Bid Price before Taxes $ 5% GST $ Total Bid Price.2 Taxes: 1.3 ACCEPTANCE dollars, in lawful money of Canada..1 Applicable federal taxes GST are included in the Bid Price..1 Refer to Section 00 21 13 - Instructions to Bidders for Conditions of acceptance..2 This offer shall be open to acceptance and is irrevocable for twenty (20) calendar days from the Bid closing date and time..3 If this Bid is accepted by the Owner within the time period stated above, they will: 1.4 APPENDICES.1 Execute the 'Agreement' within seven (7) days of receipt of the form of execution..2 Furnish the required insurances within seven (7) days of receipt of the Agreement in the form described in the Supplementary Conditions..3 Commence work within five (5) days after written notification of acceptance of this bid..4 Complete the Work in 10 calendar weeks from notification of acceptance of this Bid by the 17th day of November, 2017..1 A list of the Contract Documents is appended hereto and identified as 'Appendix A'..2 A bid breakdown is appended hereto and identified as 'Appendix B'..3 A list of Separate Prices is appended hereto and identified as 'Appendix C'.

All Weather Shelters Exterior Alterations and New Office/Warehouse Page 3.4 A list of Breakout Prices is appended hereto and identified as Appendix D..5 A list of Alternative Prices is appended hereto and identified as 'Appendix E'..6 Bidder Contacts: Provide information regarding the assigned project manager and site superintendent Appendix 'F'..7 Construction Schedule: Provide a construction Schedule in a gantt chart format as Appendix 'G' Successful Bidder Only. 1.5 ADDENDA.1 The following Addenda have been received. The modifications to the Contract Documents noted therein have been considered and all costs thereto are included in the Bid Price..1 Addendum # Dated..2 Addendum # Dated..2 When the Consultant establishes that the method of valuation for Changes in the Work will be net cost, plus a percentage fee in accordance with CCDC 2 - Article GC 12.1 Indemnification of the General Conditions, our percentage fee will be:.1 See attached ONE Properties Supplementary General Conditions 1.6 BID FORM SIGNATURE(S)

SUPPLEMENTARY GENERAL CONDITIONS FOR CCDC-2 2008 STIPULATED PRICE CONTRACTS ON ONE PROPERTIES PROJECTS The Owner and Contractor agree to the following amendments: 1. These Supplementary General Conditions supersede the CCDC-2 Supplementary General Conditions. 2. Revise G.C. 5.3.1.2 Progress Payments to read Application for payment is to be delivered to ONE Properties and the Consultant in draft form prior to the end of the billing month. ONE Properties and the Consultant will approve or advise of necessary changes within 48 hours. Once approved the final invoice and Consultant s Certificate of Payment are to be delivered to the ONE Properties Edmonton Accounting Department no later than the 5 th day following the end of the billing period. Failure to adhere to this procedure or timeline may result in delayed payments. 3. Revise G.C. 5.3.1.3 payment terms to read no later than 45 days from the date of the approved invoice. 4. Add G.C. 5.4.4 as follows: The Contractor shall supply the following to the Consultant; a) All record drawings in Digital format; b) Maintenance manuals, with warranties in Digital format; c) Quality Assurance / Quality Control Manuals in Digital format; d) LEED documents required for inclusion in the owners submission; e) A schedule for completion of any seasonal items; f) One PDF copy of the Real Property Report including a letter of Compliance issued by the Local Authority having jurisdiction; g) A lot grading certificate approved by the Local Authority having jurisdiction; h) All project close-out documents required by the Contract Documents and the Owners Close out Procedures are to be submitted within 30 days of Substantial Completion. i) Sign off by Prime Consultant confirming all deficiencies are complete and a list of seasonal deficiencies. ONE PROPERTIES CCDC-2 Supplementary GC s 2016-11-07

5. Until the Contractor has complied with its obligations under paragraph 4, the Owner may withhold the following sums: a. an amount equal to five percent (5%) of the Contract Price attributable to the mechanical Work; plus b. an amount equal to five percent (5%) of the Contract Price attributable to the electrical Work; plus c. an amount equal to one percent (1%) of the balance of the Contract Price. 6. At the time of substantial performance, the Owner may retain up to 2 (two) times the value of any deficiencies (as established by the consultants) for a deficiency holdback. The total sum of deficiency holdback shall be released upon Contractor completion of all deficiency items. 7. Delete G.C. 5.5.3 and Supplementary G.C. 5.5.3 in its entirety. 8. Add GC 5.10 Quality Control a. G.C. 5.10.1 The Contractor acknowledges that the Owner and its Consultants have a Quality Control Program in place over and above the Contractors own internal programs. The Contractor agrees to be bound by all requirements and processes of the Owner and Consultant s QC Program. 9. Add GC 6.2.3 as follows: a. G.C. 6.2.3.1 Change Order markups for subcontractors are limited to 5% for overhead and 5% for fee, no other markups are allowed. b. G.C. 6.2.3.2 Contractor mark up on subcontractors will be limited to 5% for fee, no other markups are allowed. c. G.C. 6.2.3.4 Contractors mark up on own forces work will be limited to 5% for overhead and 5% for fee, no other markups are allowed. 10. Add G.C. 9.4.2 The Contractor shall be deemed to be the Prime Contractor as it applies to the Occupational Health and Safety Act. 11. The Contractor shall provide within 10 days of contract award, a cash flow projection for the project. The cash flow shall be updated whenever there is a significant variance from the original cash flow projection or whenever ONE Properties requests an update. 12. The Contractor is permitted 1 temporary project sign at location approved by ONE Properties prior to placement, not to exceed 8 x 8. No Subcontractor or Consultant signage is permitted. END OF SUPPLEMENTARY CONDITIONS ONE PROPERTIES CCDC-2 Supplementary GC s 2016-11-07

All Weather Shelters Exterior Alterations and New Office/Warehouse Page 4 The Corporate Seal of (Seal) (Bidder - please print) was here-unto affixed in the presence of: Authorized signing officer Title Authorized signing officer Title If this Bid is a joint venture or partnership, add additional forms of execution for each member of the joint venture on the appropriate form or forms, as above.

All Weather Shelters Exterior Alterations and New Office/Warehouse Page 5 Appendix A: The following is the list of Contract Documents referred to in the Bid Form submitted by: (Bidder) (Owner) dated to which this Appendix is an integral part of the Bid Form. The list of Contract Documents include the following:.1 Documents and Specifications cited in the Table of Contents..2 Drawings List cited at or near the beginning of the package of drawings.

All Weather Shelters Exterior Alterations and New Office/Warehouse Page 6 Appendix B Bid Breakdown: All prices to include GC s and Fees and can be submitted 24 hours after closing. Item Cost Office Buildout including Mechanical and Electrical. 50' of storefront glazing to 10' including framing and Demo. Supply and install 200amp 347/600-volt service. Adjust gas piping. Connect lights, heaters, fans, doors. Fence and Gate. Hose bib in warehouse. MUA complete with roof support, opening and power. N/A N/A N/A Total

All Weather Shelters Exterior Alterations and New Office/Warehouse Page 7 Appendix C Separate Prices: The following is the list of Separate Prices referred to in the Bid Form submitted by: (Bidder) (Owner) dated to which this Appendix is an integral part of the Bid Form. Refer to Section 01 29 00 - Payment Procedures: We submit the following Separate Prices for additions or deletions to the contract. Prices are NOT include in base bid. All prices include materials, cost of labour, performance of work, overhead, profit/together within all related charges exclusive of GST. Separate Item Description Price $ Separate #1 $ Separate #2 $ Separate #3 $ Separate #4

All Weather Shelters Exterior Alterations and New Office/Warehouse Page 8 Appendix D Breakout Prices: The following is the list of Breakout Prices referred to in the Bid Form submitted by: (Bidder) (Owner) dated to which this Appendix is an integral part of the Bid Form. We submit the following Breakout Prices for additions or deletions to the contract. Prices are include in base bid. All prices include materials, cost of labour, performance of work, overhead, profit/together within all related charges exclusive of GST. Breakout Item Description Price MUA including all related structural, roofing and $ Breakout #1 electrical. Breakout #2 Breakout#3 Breakout #4 $ $ $

All Weather Shelters Exterior Alterations and New Office/Warehouse Page 9 Appendix E - Alternatives: The following is the list of Alternatives referred to in the Bid Form submitted by: (Bidder) (Owner) dated to which this Appendix is an integral part of the Bid Form. Refer to Section 01 29 00 - Payment Procedures: Item Description Alternate Price Price of Specified Item Alternative # 1 (Add) (Deduct) $ $ Section: Alternative # 2 (Add) (Deduct) $ $ Section:

All Weather Shelters Exterior Alterations and New Office/Warehouse Page 10 Appendix F: Bidder Contacts Project Manager: Name: Phone: Email: Number of Years with Company: Attach curricula (CV) to Appendix G Site Superintendent: Name: Phone: Email: Number of Years with Company: Attach curricula (CV) to Appendix G

All Weather Shelters Exterior Alterations and New Office/Warehouse Page 11 Appendix G: Construction Schedule Successful Bidder Only. Attach a construction schedule outlining all phases or work, subtrade breakdown with timelines. END OF BID FORM - STIPULATED PRICE DOCUMENT