Directorate of Estates & Facilities Contractor s Rules and Regulations Notification and Acknowledgement

Similar documents
ESTATES DEPARTMENT. Management of Asbestos Policy and Procedures Document. Rev 9

ASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and

Policy, Responsibilities & Procedures

Asbestos Management Policy

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

Asbestos Management Plan

Asbestos Management Program

PROCEDURE (Essex) / Linked SOP (Kent) Asbestos Management. Number: U 1005 Date Published: 22 July 2015

Asbestos Management Plan. Policy, Organisation and Arrangements V2.2

ASBESTOS CONTAINING MATERIALS POLICY

Guide to Asbestos in the Workplace

Asbestos Policy. October Also available in large print (16pt) and electronic format. Ask Student Services for details.

Dance Centre, Jacobs Wells Road, Bristol, BS8 1DX

Asbestos Management Plan

Asbestos Management Program April 27, 2017

Asbestos Report and Management Plan. For C BBC Caversham Club

Corporate Health and Safety Policy

UNIVERSITY COLLEGE LONDON STANDARD ASBESTOS MANAGEMENT PLAN

b. Asbestos Control Program A premises specific Asbestos Management Plan that keeps exposure to and risks from asbestos, to a minimum by:

DJ.Sollis (Survey Services) Ltd. Asbestos Management Survey Preliminaries

Asbestos Refurbishment/Demolition Survey for Hoburne at

Asbestos Management Plan

Council Health and Safety Policy. Asbestos in Buildings - Code of Practice Contents. Introduction

Asbestos Policy & Guidance

Asbestos Policy & Guidance

Asbestos Update IOSH 2012 CONTROL OF ASBESTOS REGULATIONS Overview. ESG Asbestos Limited. Asbestos Update. Came into force on 6 th April 2012

Asbestos Permit to Work

Asbestos Survey Report

Asbestos Report and Management Plan. For J BBC Caversham FBIS Store

Duty to Manage Asbestos in Licensed Premises

Contractor safety for schools and services. Guidance

Local Rule: Engaging External Service Providers

SUBPART 56-5 PHASE IA: ASBESTOS SURVEY PLANNING AND DESIGN

Asbestos Policy and Management Plan

Asbestos Safety Toolkit

Rowan University Asbestos Management Program

GUIDANCE NOTE ASBESTOS CONTAINING MATERIALS IN PUBLIC BUILDINGS & RESIDENTIAL PREMISES

SUP 02 Avoiding danger from underground services during ground works Unified procedures for use within NHSScotland

Safety Management System

ENVIRONMENTAL ASSESSMENT CHECKLIST

Derbyshire Constabulary ASBESTOS MANAGEMENT POLICY POLICY REFERENCE 10/301. This policy is suitable for Public Disclosure

Asbestos Management Procedures

Rutgers Environmental Health and Safety (REHS)

Maintenance work in schools

For. Serco Group PLC. Bolton Customer Centre Manchester Road Bolton BL3 2QN. 3 rd April 2017

Managing Contractors Policy (ratified by Full Governing Body 7 th July 2015)

Asbestos Management Plan - Organisation Arrangements

HEALTH AND SAFETY GUIDANCE NOTE ASBESTOS

SG2:17 Asbestos Licences and Ancillary Work Involving the Scaffolding Contractor

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT ASBESTOS

CHAPTER 34 ASBESTOS. Where is it Found? 34 ASBESTOS. What is Asbestos?

Asbestos Management System

Asbestos in the home. Do s and don ts. for you - for your community - not for profit.

Education Infrastructure Service. Asbestos Management Process

LEGISLATIVE GUIDANCE NOTES

ICL Asbestos Management Plan 2017

Review date Edition no ID code. Yes No Yes No Y. Yes No Yes No. External queries relating to the document to be referred in the first instance to the

UW ASBESTOS MANAGEMENT PLAN MARCH 21, Scope: 2. Purpose. 3. Definitions / Acronyms

ASBESTOS GUIDELINES. GUIDANCE: Asbestos Page 1 of 14 Jan07/ver01

Wellhouse - The Place To Be

Catch22 policy Health and Safety

ASBES TOS SPECIALIS TS

The Health & Safety Policy

Asbestos Management Policy

Procedure: Safe management of asbestos and synthetic mineral fibres

Safe System of Work Policy

Policy. Paul Stephenson, Vice President Human Resources Effective date: October 2018 Review date: October 2021

3. Asbestos Handling Program

Page1. Asbestos (Health & Safety) Policy. Issue Date 07/03/2017 Issue 1 Document No: 010 Uncontrolled when copied

TECHNICAL SUPPORT ASSOCIATES HEALTH AND SAFETY POLICY STATEMENT

ASBESTOS MANAGEMENT PLAN PROCEDURE

Certification Application Form

Thames Valley District School Board. The Board has assigned the following responsibilities to ensure compliance with the above Policy and Legislation.

ASBESTOS CONTAINING MATERIALS (ACM) REFERENCE GUIDE. Environmental Health & Safety Office

Asbestos Management Plan

Conducting Asbestos Surveys

HEALTH AND SAFETY POLICY AND PROCEDURES

Asbestos Management Plan

HEALTH & SAFETY ASBESTOS POLICY & PROCEDURES APRIL S afety ervices. Direct.com

Asbestos Survey Report

Asbestos and Imperial College 0. Introduction slide

Asbestos. Do s and don ts. in the home. for you - for your community - not for profit.

Corporate Policy and Procedure

UCLH Asbestos Management Plan. July 2017

WESTERN CONNECTICUT STATE UNIVERSITY ASBESTOS ABATEMENT PROCEDURE E-101

Property Services Policies & Procedures Asbestos Management Plan

POLICY FOR THE MANAGEMENT OF ASBESTOS

1. Bid Form The Bid Form has been revised. All Bidders shall utilize the Bid Form attached to this Addendum for the submission of Bids.

Asbestos Elevator Industry Workshop November 25, 2015

J.P.asbestos Surveys Limited

Office of Design & Construction State University Plaza Albany, New York

Construction (Design and Management) Safety Guidance Document

Calvin College Asbestos Operations and Maintenance Plan

ESTATES DEPARTMENT Health & Safety Manager

Asbestos Management Plan

What is Asbestos? Asbestos was also used in household items, such as: oven gloves ironing board pads simmer mats for stoves fire blankets.

CONTRACTORS CODE OF PRACTICE

Asbestos Re-inspection Report

SECTION 16 ASBESTOS MANAGEMENT

Transcription:

Directorate of Estates & Facilities Contractor s Rules and Regulations Notification and Acknowledgement 1. NOTIFICATION Within the Directorate of Estates and Facilities at King s College London our aim is to undertake all work and activity across our estate in a manner that ensures students, staff, members of the public and contractors stay safe while on our estate. To help us achieve this we are asking all contractors who work on the King s College estate to take a number of basic steps: If you are working on a project, please ensure you have had the project induction and follow the designated procedures and safe systems of work. If you are carrying out planned or reactive works you must: o Always ensure that all members of your team have received the relevant estate and facilities campus site induction prior to starting work. o Always obtain a permit prior to undertaking any activity. o Always undertake a risk assessment (and method statements where applicable) and ensure all members of your team are properly briefed prior to starting work. o All permits must be signed off and handed back as specified by our safe systems of work. o Always report any hazard or near miss to our estates and facilities team so they can take the appropriate action and assist in the prevention of accidents. A copy of our Rules and Regulations for Contractors which explains in detail how those who work on our estate are to operate can be downloaded from our website at: http://www.kcl.ac.uk/aboutkings/orgstructure/ps/estates/contractors/index.aspx SIGNED ON BEHALF OF KING S COLLEGE LONDON Michael Coss Permit Office Coordinator 31-1-2017 Date Sent to Contractor: Attached: F064 and Acknowledgment Form (Asbestos) HS57 Page 1 of 2 King s College London 2013

Directorate of Estates & Facilities Contractor s Rules and Regulations Notification and Acknowledgement 2. EVIDENCE In order to ensure there are no delays to your work at King s College London, we require that the following details are provided in advance of works commencing so that your company can be set-up on our permit to work system. CONTRACTOR S DETAILS Company Name Address Phone Number Emergency Contact Number Name of Works/Service Manager Email address Phone Number DOCUMENTATION REQUIRED Public Liability insurance attached ( 5million minimum) Employers Liability Insurance attached ( 5million minimum) Professional Indemnity Insurance attached ( 5million minimum) KCL Form F064 (Asbestos ) completed and attached * Delete as appropriate 3. SUBMISSION We would be very grateful if you could sign and return this form, along with all supporting documentation to confirm that staff employed by your company and all your sub-contractors will abide by our rules and regulations whilst working on our estate. Please speak with your KCL contact if you have any questions or need any guidance on complying with our Rules & Regulations. A copy of this form and documentation must also be sent to compliance-estates@kcl.ac.uk to allow your details to be entered onto our permit system. AUTHORISED SIGNING AUTHORITY (FOR THE ABOVE COMPANY) 4. RECEIPT Date Received by King s College London: Date Details Added to the Permit to Work System HS57 Page 2 of 2 King s College London 2013

4.1 TYPE OF WORK King s College London has identified the presence of various asbestos-containing materials throughout many of the buildings owned, leased and/or otherwise occupied by the college. We have an extremely robust process in place of testing, removal, containment of asbestos, plus an online register with the locations of asbestos. Please read and complete the next questions carefully. If you should answer YES to any question, please tick the YES box, then proceed to the contractor s notification and Acknowledgement Form-FO64. If you have answered NO to the below questions, please tick the NO box, then proceed to the section Contractor Statement. Will your works involve any intrusive activities I.E? Access above ceiling systems, Removal, cutting, drilling, or other such disturbance of any building materials/structures Removal of tile or sheet flooring products (including the removal of the adhesive below) Work that may disturb any thermal insulation (i.e. Pipes, ducts, boilers etc.) Work on Fire Doors Work on or within riser cupboards/electrical-mechanical Work in Plant rooms/boiler houses Work that may disturb any fireproofing, thermal or acoustic insulation Access within a crawlspace, pipe chase, service area, or tunnel. Work that may disturb any fireproofing, thermal or acoustic insulation Any form of construction works Drainage works (Lifting covers, rodding drains, Jetting, CCTV surveys) YES Proceed to the contractor s notification and Acknowledgement Form-FO64 NO Proceed to the next section Contractor statement. HS57 King s College London 2017

CONTRACTORS STATEMENT COMPANY DETAILS Company name Address Email address Phone Number I/We will not be carrying out any works/activities within any king s buildings. or carry out any works/activities that will or may disturb known or unkown suspected asbestos-containing materials in areas/buildings constructed before 2000. Should there be any change to our works/activity which may cause any of the these to occur we will cease all works/activities, and report to the local Campus Maintenance Office for a review of our permit and RAM s. AUTHORISED SIGNING AUTHORITY (FOR THE COMPANY) Print Name: Date Received by King s College London: HS57 King s College London 2017

and Acknowledgement Form - F064 1 NOTIFICATION BY KING S COLLEGE LONDON 1.1 King s College London has identified the presence of various asbestos-containing materials throughout many of the buildings owned, leased and/or otherwise occupied by the college. For a complete listing of any asbestos containing or suspect asbestos material known to be present refer to the most recent version of the asbestos survey report/asbestos register maintained by the College s Compliance Co-ordinator. 1.2 The Health And Safety At Work Etc. Act 1974, the Management Of Health And Safety At Work Regulations 1999 (as amended), the Construction (Design And Management) Regulations 2015 and the Control Of Asbestos Regulations 2012 and associated approved codes of practice apply to all construction works (e.g. Maintenance and refurbishment) that may disturb asbestos or suspect asbestos-containing materials in the workplace. Such regulations and guidelines state that any disturbance of asbestos-containing materials may only be performed by workers or by an outside contractor who have first received the required training in asbestos related precautions. WORKING WITH ASBESTOS CAN BE DANGEROUS. INHALING ASBESTOS FIBRES CAN CAUSE VARIOUS TYPES OF LUNG DISEASE INCLUDING CANCERS. RISK OF LUNG CANCER FOR A SMOKER EXPOSED TO ASBESTOS IS GREATER THAN THE SUM OF THE INDIVIDUAL EFFECTS DUE TO SMOKING AND DUE TO ASBESTOS. 1.3 It is College Policy to employ an HSE Licensed Contractor to handle all asbestos removals including nonlicensed materials for example, gaskets 1.4 The following is a partial listing of typical activities that will or may disturb unknown or suspected asbestoscontaining materials in buildings constructed before 2000 and hence require the implementation of suitable asbestos precautions. Any contractor required to perform any of the following activities and/or similar tasks that may result in the disturbance of known or suspected asbestos-containing materials must first review the most recent version of the asbestos register and then undertake and action a suitable and sufficient refurbishment or demolition survey if required by the nature and extent of the works 1. The contractor must advise, through their risk management processes, their employees, agents, contractors and representatives as to the appropriate precautions and safety measures to be taken: Access above suspended ceiling systems Work on Fire Doors Access within a crawlspace, pipe chase, service area, or tunnel. Work that may disturb any fireproofing, thermal or acoustic insulation Work that may affect textured coatings Work that may disturb any thermal insulation (i.e. Pipes, ducts, boilers etc.) Removal of tile or sheet flooring products (including the removal of the adhesive below) Removal, cutting, drilling, or other such disturbance of any building materials/structures Access to any areas referred to as inaccessible on the latest version of the Electronic Asbestos Register (EAR) SIGNED ON BEHALF OF KING S COLLEGE LONDON Michael Coss Permit Office Coordinator 31/1/2017 Date Sent to Contractor: (PTO FOR CONTRACTOR S ACKNOWLEDGEMENT) 1 Further advice is available from the Estates and Facilities Operational Assurance Team (complianceestates@kcl.ac.uk) Contractor s notification and acknowledgement F064-05-HSEPO King s College London 2016 Page 1 of 2

and Acknowledgement Form - F064 2 ACKNOWLEDGEMENT AND INDEMNIFICATION BY CONTRACTOR 2.1 As a condition of any contract to provide services and /or materials to King s College London, we, the undersigned company, hereby agree to perform our work in such a manner so as not to disturb any asbestos-containing materials. To ensure that asbestos-containing materials are not disturbed we will undertake the following actions: i) Before work commences and in accordance with paragraph 1.4: a. Maintenance and reactive works site employees to review the asbestos register in liaison with the local operational teams. b. Project works contractor to review the refurbishment/demolition survey commissioned and any confirmation of remediation (as required) for these works. Advise, through our risk management processes, our employees, agents, contractors and representatives as to the appropriate precautions and safety measures to be taken. ii) 2.2 2.3 iii) Give written notice to the appropriate individual manager and/or Project Manager at the College that known or suspected asbestos-containing material(s) will be/needs to be disturbed and not commence work in the affected area until written confirmation has been received from the College representative (e.g. satisfactory certificate of reoccupation). iv) Halt work and give notice to the appropriate individual manager and/or Project Manager at the College if suspected/identified asbestos-containing materials are discovered or damaged during the provision of works for King s College London. We further represent that our company and our employees, agents, contractors and representatives: i) Are familiar and shall comply with all requirements set forth by the College as they pertain to work undertaken by an outside contract; ii) Will conduct our work in accordance with such requirements and in compliance with all regulations and guidelines pertaining to asbestos including the King s College London asbestos management plan; iii) Have attended asbestos awareness training within the last year and will maintain this annual training (e.g. by means of refresher training in accordance with regulation 10 CAR 2012) throughout the duration of the contract. iv) That we will be responsible for advising and continuing to advise, our employees, agents, contractors and representatives with respect to any potential exposure to any asbestos-containing material while on or about the property of King s College London. We indemnify King s College London and its officers, employees, agents and representatives from any loss, damage, cost or expense arising from any failure by our company and/or employees, agents, contractors and representatives to comply with any requirements set forth by the individual manager, Compliance Team and /or Project Manager and /or with any regulations or guidelines and/or our failure to oblige the conditions set out in paragraph 2.1 above and/or the subsections (i)-(iv) of this paragraph. COMPANY DETAILS PRINT COMPANY NAME: AUTHORISED SIGNING AUTHORITY (FOR THE ABOVE COMPANY) Date Received by King s College London: Contractor s notification and acknowledgement F064-05-HSEPO King s College London 2016 Page 2 of 2