The Project Design Document

Similar documents
PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM FOR SSC A/R (CDM-PoA-DD-SSC-AR) - Version 01. CDM Executive Board Page 1

CDM Programme of Activities - Rules and Procedures

Sustainable Development Impacts of NAMAs: An integrated approach to assessment of co-benefits based on experience with the CDM

PROGRAMME OF ACTIVITIES (POA) REQUEST FOR REGISTRATION - INFORMATION AND REPORTING CHECK CHECKLIST

CLEAN DEVELOPMENT MECHANISM PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-CPA-DD) Version 01 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

CDM Module 1. Introduction to Programmatic CDM (PoA) Lesson 2. How does the Programmatic CDM Work? Select Next to begin. Menu November 2011.

JOINT IMPLEMENTATION PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM Version 01 - in effect as of: 01 November CONTENTS

Registration - Information and reporting checklist (Version 2.0) The main changes between version 1.0 and version 2.0 are the following:

CDM for Small Renewable Energy Development

Background information on existing PoA regulations

COMPONENT PROJECT ACTIVITIES DESIGN DOCUMENT (CPA-DD)

PART I. Programme of activities (PoA)

The Clean Development Mechanism sub-component

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 02 - in effect as of: 1 July 2004) CONTENTS

Energy and Carbon Finance Program - ongoing work to enhance the regional distribution of CDM

Clean Development Mechanism. Lessons learned and future directions. Martin Hession CDM Executive Board

CLEAN DEVELOPMENT MECHANISM SMALL-SCALE PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-SSC-CPA- DD) Version 01 CONTENTS

THE GOLD STANDARD POA RULES AND GUIDANCE ANNEX F (GSV2.2)

Amendments to PS, VVS and PCP based on CMP10 decisions

PoA Implementation in Asia and Pacific

CLEAN DEVELOPMENT MECHANISM SMALL-SCALE PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM (CDM-SSC-PoA-DD) Version 01 CONTENTS

Renewable energy project bundling and PoA, Sources for further information

PROJECT IDEA NOTE (PIN)

This document replaces Annex F dated 23 November 2009 in the rule updates section.

Capacity Building Workshop on Development of CDM Activities and NAMA for Public And Private Sector In Zimbabwe

Climate Change Mitigation Policies Conventional Versus Sustainable Development Scenarios in Emerging Economies

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD)

Annex 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01.2) CONTENTS ABBREVIATIONS... 3 I. INTRODUCTION...

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD)

Version 03.0 Page 1 of 38

REPORT OF THE SEVENTH MEETING OF THE EXECUTIVE BOARD Annex 5

Version 03.0 Page 1 of 50

Overview of CDM Documentation and Procedures

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD)

Working in a broad partnership in the Kenya Miniwind Project

UNFCCC/CCNUCC. CDM Executive Board PROPOSED NEW BASELINE AND MONITORING METHODOLOGY FOR A/R (CDM-AR-NM) Version 04

CLEAN DEVELOPMENT MECHANISM CDM-EB07-A04-GLOS. Glossary CDM terms. Version 07.0

Making transition tangible: Approaches for MRV of NAMAs for transformational change towards a low-carbon energy future

CLEAN DEVELOPMENT MECHANISM PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM (CDM-PoA-DD) Version 01 CONTENTS

POAs A DOE perspective Asia and Pacific Regional Workshop, Bangkok October Nick Stantzos, Head of DOE, TUV Rheinland China

Annex 3 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01) CONTENTS I. INTRODUCTION

Al-Shaheen CDM Project Experience

Criteria Catalogue: VER+

CLEAN DEVELOPMENT MECHANISM PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM (CDM-PoA-DD) Version 01 CONTENTS

Tips on PDD Preparation

CLEAN DEVELOPMENT MECHANISM CDM-SSCWG40-A05

DRAFT TEXT on CMP 11 agenda item 4 Issues relating to the clean development mechanism. Draft decision -/CMP.11

Comments on the Draft CDM Validation and Verification Manual

THE GOLD STANDARD PROGRAMME OF ACTIVITIES GUIDANCE DOCUMENT

Version 01.0 Page 1 of 21

Revision of PoA-related regulatory documents

Draft revision of the Sampling Guidelines and development of technology specific eligibility criteria for PoAs

Small-scale Methodology Energy efficiency measures in thermal applications of non-renewable biomass

CLEAN DEVELOPMENT MECHANISM SMALL-SCALE PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM (CDM-SSC-PoA-DD) Version 01 CONTENTS

UNFCCC/CCNUCC DRAFT STANDARD FOR THE DEVELOPMENT OF ELIGIBILITY CRITERIA FOR THE INCLUSION OF A PROJECT ACTIVITY AS A CPA UNDER THE POA. I.

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD)

Cost and duration of planning, approving and executing Clean Development Mechanism (CDM) projects

CLEAN DEVELOPMENT MECHANISM PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM (CDM-PoA-DD) Version 01 CONTENTS

Fuel Switching VER Project

Validation of CDM Projects Real life examples of what a DOE looks for

Experience of the Clean Development Mechanism as a result based mechanism for methane abatement

Afforestation/Reforestation Afforestation/Reforestation Clean Development Mechanism Projects in Uttar Pradesh State August

Draft Small-scale Methodology SSC-III.BG: Emission reduction through sustainable charcoal production and consumption

Electric vehicles or use of hydrogen in the Norwegian transport sector in 2050?

CARBON MARKETS AND MRV

CDM Methodologies and their Application

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD)

Annex 27 GENERAL GUIDELINES FOR SSC CDM METHODOLOGIES. (Version 19.0) CONTENTS

ANNEX AN THE GOLD STANDARD MICRO-PROGRAMME OF ACTIVITIES DESIGN DOCUMENT TEMPLATE

CDM Validation & Verification Manual

GOLD STANDARD PASSPORT

Wrap up of project cycle and methodologies break up session

Annex 33 IMPLEMENTATION PLAN FOR THE CLEAN DEVELOPMENT MECHANISM PROJECT STANDARD, VALIDATION AND VERIFICATION STANDARD AND PROJECT CYCLE PROCEDURE

Outcome of the Small-Scale Working Group

Draft Small-scale Methodology AMS-II.G: Energy efficiency measures in thermal applications of non-renewable biomass

The combined effect of regulation and support in agriculture and energy sector related to biogas production

Concepts of Clean Development Mechanism. Confederation of Indian Industry

MARKET MECHANISMS UNDER THE UNFCCC CDM & JI

CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-SSC-PDD) Version 03 - in effect as of: 22 December 2006 CONTENTS

Agriculture and the carbon market

CLEAN DEVELOPMENT MECHANISM SMALL-SCALE PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM (CDM-SSC-PoA-DD) Version 01 CONTENTS

Approved consolidated baseline and monitoring methodology ACM0013

Standardized Crediting Framework Rwanda Pilot Second Capacity Building Workshop

JOINT IMPLEMENTATION PROGRAMME ACTIVITY DESIGN DOCUMENT FORM (JPA-DD) Version 01 CONTENTS

Comparative assessment of framework conditions for biogas production in Norway and Denmark

PROJECT DESCRIPTION: VCS Version 3

Climate Financing CDM and NAMA in Rwanda

From: Climate Focus Subject: Response to the Call for Public Inputs on PoA Date: 03 September 2008

The World Bank 1818 H Street, NW, Washington, DC 20433, USA

Energy Efficiency CDM Projects (small-scale) - Bundling & PoA

CDM Methodologies and their Application

Sustainable Development Benefits of CDM Projects

Small-Scale CDM & Bundling: Criteria, Advantages & Status

Nordic solutions for unlocking a decarbonised, sustainable energy future

CDM project review - technology and regulation aspects

Risk Based Verification Cambodia cook stove project

Initiative on Standardized Baselines. Julie Godin, Carbon Finance Specialist Carbon Finance Unit World Bank

Chapter 1 Introduction

SSC POA VALIDATION REPORT

Transcription:

Downloaded from orbit.dtu.dk on: Feb 11, 2018 The Project Design Document Olsen, Karen Holm Publication date: 2012 Link back to DTU Orbit Citation (APA): Olsen, K. H. (2012). The Project Design Document [Sound/Visual production (digital)]. Twente Course on CDM Project Formulation, Twente, Netherlands, 21/03/2012 General rights Copyright and moral rights for the publications made accessible in the public portal are retained by the authors and/or other copyright owners and it is a condition of accessing publications that users recognise and abide by the legal requirements associated with these rights. Users may download and print one copy of any publication from the public portal for the purpose of private study or research. You may not further distribute the material or use it for any profit-making activity or commercial gain You may freely distribute the URL identifying the publication in the public portal If you believe that this document breaches copyright please contact us providing details, and we will remove access to the work immediately and investigate your claim.

The Project Design Document Karen Holm Olsen kaol@risoe.dtu.dk Twente course on CDM project formulation 21-22 March 2012

Outline: What is a PDD? Types of templates Contents an overview An example Pitfalls

What is a PDD? An official document used for validation of a CDM project One of three documents required for registration of a project, along with the validation report and a Letter of Approval (LoA) from the host country Most DNAs issue the LoA based on the PDD

Types of PDD templates Specific PDD-templates exist for different types of CDM projects: http://cdm.unfccc.int/reference/guidclarif/index.html#pdd Large-scale project activities (CDM-PDD) Small-scale project activities (CDM-SS-PDD) Afforestation and reforestation project activities (CDM-AR-PDD) Small-scale afforestation and reforestation project activities (CDM- SSC-AR-PDD) Programmes of activities (CDM-POA-DD) and CDM Programme Activities (CDM-CPA-DD) generic and first CPA

Contents an overview A PDD template contains the following sections: A. General description of project activity B. Application of a baseline and monitoring methodology C. Duration of the project/crediting period D. Environmental impacts E. Stakeholder comments Annexes: 1. Contact information of project participants 2. Information on public funding 3. Baseline information 4. Monitoring information

An example EE stoves in Zambia

A. General description of the project (PoA-DD) A.1Title of the small-scale programme of activities (PoA) Fuel Efficient Stoves in Zambia A.2 Description of the small-scale programme of activities The goal of the proposed PoA is to install fuel efficient cooking stoves throughout rural Zambia This PoA is a voluntary action, which will be implemented by 3RL. Contribution to SD: - environmental, social and economic benefits

A. General description of the project (PoA-DD) A.3 Coordinating/managing entity and participants of SSC-POA 3RL is a private entity and will act as the managing entity of the PoA A.4 Technical description of the small-scale programme of activities 1. The geographical boundary for the proposed PoA is the country of Zambia. All CPAs included in the PoA will be implemented in Zambia 2. Description of a typical small-scale CDM programme activity (CPA) 3.Technology or measures to be employed by the SSC-CPA 4.Eligibility criteria for inclusion of a SSC-CPA in the PoA:

Figure 1: Zambia - the geographical boundary of the proposed PoA

A.4.3. Assessment and demonstration of additionality The proposed PoA reduces GHG emissions through the installation of fuel efficient stoves that reduce the total quantity of non-renewable biomass used by each participating household for cooking purposes. The PoA is additional as it relies solely on carbon finance to ensure its implementation. There are no other lines of revenue from the project other than from the sales of CERs. There is no other incentive to undertake the PoA, nor is there any regulation in Zambia mandating this activity. The assessment of the PoA s additionality is addressed utilizing the step-wise approach outlined in the UNFCCC Methodological Tool: Tool for the demonstration and assessment of additionality (Version 05.2)

A.4.4. Operational, management and monitoring plan for the programme of activities (PoA) A.4.4.1. Operational and management plan: Manufacturing and distribution CPA household identification and stakeholder engagement Construction Data collection Monitoring A.4.4.2. Monitoring plan: 3RL will implement a monitoring plan for the PoA, to be applied during each monitoring period. A Random Sample Group (RSG) of stove users will be identified for inclusion in the monitoring survey A.4.5. Public funding of the programme of activities (PoA): There will be no public funding involved in the proposed PoA.

SECTION B. Duration of the programme of activities (PoA) B.1. Starting date of the programme of activities The starting date of the proposed PoA is 01/04/2011, which is the estimated date of commencement of real action in the PoA, and this shall not be earlier than the commencement of validation of the programme of activities, i.e. the date on which the CDM-POA-DD is first published for global stakeholder consultation B.2. Length of the programme of activities 28 years (7 years x 4)

SECTION C. Environmental Analysis C.1. The choice of level at which the environmental analysis is undertaken The environmental analysis was chosen to be undertaken at PoA level because there is no variation in the stove technology and its installation throughout the CPAs C.2. Documentation on the analysis of the environmental impacts, including transboundary impacts: No negative environmental impacts have been identified from the proposed PoA and this has been confirmed by the Environmental Council of Zambia C.3. Please state whether in accordance with the host Party laws/regulations, an environmental impact assessment is required for a typical CPA, included in the programme of activities (PoA) In accordance with Zambian regulations, an EIA is not required for typical CPAs included in the proposed PoA. This has been confirmed by the Environmental Council of Zambia, indicating that the project has positive impacts on the environment.

SECTION D. Stakeholders comments D.1. Please indicate the level at which local stakeholder comments are invited: Local stakeholder consultation is done at SSC-CPA level D.2. Brief description how comments by local stakeholders have been invited and compiled: Local stakeholders will be invited to participate in a consultation for the implementation of each CPA.This will comprise of a meeting within the local community of the CPA s designated geographical boundary. The consultation will invite local community leaders and representatives, householders, NGOs etc. D.3. Summary of the comments received D.4. Report on how due account was taken of any comments received

SECTION E. Application of a baseline and monitoring methodology E.1. Title and reference of the approved SSC baseline and monitoring methodology applied to a SSC-CPA included in the PoA: Each CPA in the proposed PoA will apply the approved small-scale baseline and monitoring methodology II.G. Energy efficiency measures in thermal applications of non-renewable biomass;version 2. E.2. Justification of the choice of the methodology and why it is applicable to a SSC-CPA E.3. Description of the sources and gases included in the SSC-CPA boundary E.4. Description of how the baseline scenario is identified and description of the identified baseline scenario The baseline scenario, as identified above, is the continued use of non-renewable biomass as fuel on open, 3-rock fires for cooking purposes in rural areas of Zambia. Barriers identified in Section A.4.3. indicate that there is no possibility for Zambia s rural poor, due to economic reasons, to access the market for fuel-efficient cooking stoves.

Section D: Baseline and monitoring methodology E.5. Assessment and demonstration of additionality of SSC-CPA E.5.1. Assessment and demonstration of additionality for a typical SSC-CPA: E.5.2. Key criteria and data for assessing additionality of a SSC-CPA Section A.4.3. of this PoA-DD, above, identifies the criteria for assessing the additionality of the proposed PoA as a whole. It is proposed that the same criteria are applied to the assessment of additionality for each SSC-CPA proposed under the PoA

E.6. Estimation of Emission reductions of a CPA: E.6.1. Explanation of methodological choices, provided in the approved baseline and monitoring methodology applied, selected for a typical SSC-CPA: Leakage Assessment: (Leakage is defined as an indirect off-site emission not included in the project boundary) Equipment for the proposed PoA is being manufactured specifically for the PoA and not transferred from another location, outside the project boundary. Under this premise, leakage does not need to be considered.to account for all uncertainties a fixed Leakage Correction Factor (Ly) of 0.99 will be applied. E.6.2. Equations, including fixed parametric values, to be used for calculation of emission reductions of a SSC-CPA: Ex-ante emissions calculations: E.6.3. Data and parameters that are to be reported in CDM-SSC-CPA-DD form:

E.7. Application of the monitoring methodology and description of the monitoring plan: E.7.1. Data and parameters to be monitored by each SSC- CPA: Ex-post emissions calculations: E.7.2. Description of the monitoring plan for a SSC-CPA: E.8 Date of completion of the application of the baseline study and monitoring methodology and the name of the responsible person(s)/entity(ies) 1st November 2010, Nick Marshall, 3 Rocks Ltd. Annexes: 1-4

Thanks!