Advanced Wastewater Treatment Plant Plant Profile

Similar documents
Wastewater Treatment. Where does wastewater go when it leaves your house?

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

Wastewater Treatment Processes

2017 Annual Performance Report

Duffin Creek Water Pollution Control Plant Technical Information

WATER AND WASTEWATER FACILITY CLASSIFICATION APPLICATION FORM

PERMIT TO OPERATE SILVER CLOUD CT., MONTEREY, CA TELEPHONE (831) FAX (831)

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

6.2 Umgeni Water Owned Wastewater Works

Tour of Altamonte Springs Regional Water Reclamation Facility

Polishing Ponds. Biosolids Storage. Ammonia Removal. Digesters. Thickeners. Pretreatment. Final Clarifiers. Primary Clarifiers.

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION

MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT

CEDAR CREEK Wastewater Treatment Facility

Tour of Regional Water Reclamation Facility

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

Anderson Water Pollution Control Plant

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

BIOLOGICAL WASTEWATER BASICS

MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System

Chapter 2: Description of Treatment Facilities

Palmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed

Ellis Creek Water Recycling Facility, City of Petaluma

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals

Mid-Halton Wastewater (Sewage) Treatment Plant Expansion And Effluent Sewer Public Information Centre # 1 May 14, 2009

Waste Water Treatment Plant Overview and Tour

RM of Gimli Wastewater Treatment Plant: Notice of Alteration Request Environment Act Licence No. 2587

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

THE SEQUENCED AERATION PROCESS MONTAGUE, MASSACHUSETTS

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview

AN OPERATOR S PERSPECTIVE; THE FIRST NEREDA WWTP IN KINGAROY, AUSTRALIA.

Operation and Control of Multiple BNR Processes in One WWTP

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng

Yours very truly, Municipality of West Perth. Environmental Services

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below:

RESTRICTED URBAN REUSE OF KONYA (TURKEY) MUNICIPAL WASTEWATER TREATMENT PLANT EFFLUENTS VIA RECLAIMED WATER DISTRIBUTION SYSTEM

CLR Process. Vertical Loop Configuration

ECO Smart Aerobic Waste Water Treatment System. Optimising the re-use and recycling of waste water

UPGRADING GAZA WASTEWATER TREATMENT PLANT. Gaza City is populated with 550,000 inhabitants and it forms 45% of the Gaza strip population.

Need-to-Know Criteria Wastewater Treatment Operator Class IV

WEAO STUDENT DESIGN COMPETITION 2019 PROJECT STATEMENT

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

Dundalk Wastewater Treatment Plant

Need-to-Know Criteria Wastewater Treatment Operator Class III

Advanced Wastewater Treatment and Disposal Systems. Wastewater Utility Operation and Management for Small Communities

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017

Chapter 2 Screening Approach and Criteria

Best Practice in Sewage and Effluent Treatment Technologies

Core Notes for Module 6 (Elective) of the Course Environmental Engineering Sustainable Development in Coastal Areas Mr M S Haider

Turbo4bio System For the Treatment of Sewage & Organic Effluents

2017 Annual Performance Report

The operator stated that the rollers in one of the drum filters was recently replaced.

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

Water Resources Director: Chris Graybeal

Technical Memorandum No. 1

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant

FEASIBILITY REPORT OF 250 KLD SEWAGE TREATMENT PLANT

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information

Regional Municipality of Halton Skyway Wastewater Treatment Plant Expansion Municipal Class Environmental Assessment Study

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION

STRUCTURAL AND OPERATIONAL STUDY OF 339 MLD SEWAGE TREATMENT PLANT AT AMBERPET

CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY

Current Treatment Approaches and Planning for the Future A Panel Discussion

Case History: Anaerobic and Aerobic Treatment of Textile Wastes at South Carolina Textile Plants. Introduction

BIO-BATCH TM. Sequencing Batch Reactor (SBR) Water & Wastewater Treatment

FAIRMONT WASTEWATER TREATMENT PLANT

EVW 2 Hynds Commercial Wastewater Systems April 2013

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION

AMPC Wastewater Management Fact Sheet Series Page 1

AMPC Wastewater Management Fact Sheet Series Page 1

3) Din Daeng WWTP. Outline of the Project. Appendix 2-9

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

SEWAGE TREATMENT PLANT TECHNOLOGY BY COMPLETE WATER SOLUTION BHALERAO HEIGHTS, AKURDI, PUNE

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES WASTEWATER TREATMENT OPERATIONS DIVISION

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System

EXPRESS TERMS: Existing Part 650 is repealed in its entirety and New Part 650 is adopted.

EPA Waste Water Discharge Licence Application

ATTACHMENT I EXISTING SOUTH LAREDO WASTEWATER TREATMENT PLANT

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

Design, Construction and Startup of the First Enhanced Nutrient Removal Plant in Maryland Funded by the Chesapeake Bay Restoration Fund

AS-H Iso-Disc Cloth Media Filter

6 WASTEWATER. 6.1 Overview. 6.2 Darvill Wastewater Works

Wastewater Treatment clarifier

Need-to-Know Criteria Wastewater Treatment Operator Class II

2015 Spring Conference

Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013

Case Study. Biological Help for the Human Race. Bathurst Municipal Wastewater Treatment Works, New South Wales, Australia.

Contents General Information Abbreviations and Acronyms Chapter 1 Wastewater Treatment and the Development of Activated Sludge

SHAFDAN (Greater Tel Aviv Wastewater Treatment Plant) - Recent Upgrade and Expansion

WASTEWATER TREATMENT SYSTEM

Case Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia.

Wastewater treatment objecives

WWETCO FlexFilter and Bio-FlexFilter

Transcription:

Advanced Wastewater Treatment Plant Plant Profile 2008

Brief History Wastewater treatment started in Penticton in 1948 with a Package Primary / Secondary plant at what is now the Alberni Lift Station. The existing plant location has had a Secondary Activated Sludge Treatment Plant since 1960, with a design capacity of 5.5 ML/d. In 1970, the plant capacity was increased to 8.2 ML/d with construction of additional primary and secondary clarifiers, plus chemical coagulation facilities for phosphorus removal. Between 1970 1985, a number of improvements and increases to the plant's treatment capacity were made to cope with increasing wastewater flows and loads. In 1985 the BC Waste Management Branch prepared a report which reviewed the requirements for discharge of municipal effluents to the Okanagan Lake system. It was determined continued surface discharge of treated effluent to Okanagan Lake, Okanagan River and Skaha Lake would be possible, provided advanced tertiary treatment was implemented to ensure high quality effluent. The report recognized that land application proposals would also require advanced tertiary treatment. Stanley & Associates Engineering Ltd. completed a Liquid Waste Management Plan for the City in 1987, and was subsequently commissioned by the City to provide design, construction management and plant commissioning services for a new Advanced Wastewater Treatment Plant (AWWTP). The new and expanded AWWTP, with biological nutrient removal, was constructed and commissioned in the fall of 1990. The plant is designed to treat 18.2 ML/d with a hydraulic capacity of 36.2 ML. After the plant was commissioned, an optimization study was conducted on the Bio reactor that showed a capacity up to 28.0 ML/day is available for the Bioreactor. The BC Ministry of Environment paid for 75 percent of the cost of the new facility through the Okanagan Water Quality Control Project. Original Plant Circa 1958 Located on Alberni Ave.

Collection System The wastewater collection system has eleven pumping stations. Two of these are larger in size using 50 and 60 horsepower pumps while the remaining are 3 to 5 horsepower. One larger station is located at the south end of the city using two water-cooled submersible pumps with a stand-by power plant. The other larger station located at the north end of the city has three submersible pumps with a stand-by power plant. New Alberni St. Lift Station Installation The Plant In 2007 the Advanced Wastewater Treatment Plant (AWWTP) received 4,950 Million Litres (ML) of influent from the sanitary sewer system. Compared to 2006 s influent flow of 5,061 ML. This decrease in flow may be the result of the Cities initiative in water conservation. The 2007 average daily influent flow rate was 13.6 ML/day. The average influent flow rate per person was 399 litres/day/person, based on the 2007 Penticton population estimate of 34,002 people (from 1997-2007 BC Stats) http://www.bcstats.gov.bc.ca/data/pop/pop/mun/mun2007a.asp

Treatment Plant Goals & Objectives completed for 2007 included Liquid Waste Management Plan completed and signed off by the Minister of Environment. Completed the Request for Qualifications (RFQ) process to select a qualified consultant to start design work for AWWTP upgrade. Earth Tech and Stantec were chosen. Completed the Request for Proposal process for Preliminary Design, Detail Design and Construction Management work for AWWTP upgrades. Earth Tech was chosen. Started Functional Pre-Design with Earth Tech, to be completed February 2008. Preliminary Design, Detail Design and Tendering of the Septage Receiving Facility completed. A three year training plan for staff is in it s third year and continues to promote the development and retention of staff. 100% of staff completed the 2.4 C.E.U. s necessary to retain EOCP certification. Construction of a chemical dosing facility completed at Lakeside North Lift Station, to correct an ongoing odour problem for residents of Lakeside Rd. 9 out of 10 capital upgrade projects planned this year were completed Creation of a Foreman s position and one added Operator III position were put in place to improve the staff structure for the AWWTP and to help attract and retain staff. Methane Gas Boiler replacement completed as part of the equipment replacement capital fund. Treatment Plant Goals & Objectives planned for 2008 Preliminary Design and Detailed Design for the AWWTP plant expansion. Continue with the annual equipment upgrading program that is set out in the budget, which is designed to maintain reliable and efficient operation of the AWWTP. Construction of a septage receiving facility at the AWWTP. Preliminary Design, Detailed Design and Construction of a new effluent line to south end of Penticton that will be used to expand the effluent irrigation system and effluent disposal in the busy summer months. Monitor dilution ratio s into Okanagan River Channel daily. Continue to introduce new technology into the treatment systems which will then help to produce safe waters. Support the direction from council for the sewer connection of the Penticton Indian Band areas into the WWTP. Maintain a full complement of staff to help support operation activities during the year in which larger capital projects are proposed. Finalize the operational certificate as part of the AWWTP upgrade. Meet the divisional performance measures that are set for the WWTP.

Headwork s and Primary Treatment Headwork s & Primary treatment consists of the following: three Archimedes screw pumps, mechanical bar screen, Pista degritter, six rectangular primary clarifiers, two flow equalization basins and two sludge fermenters to supplement the phosphorous removal process. The existing digesters from the old activated sludge process are now used for primary sludge digesting and some secondary sludge (RAS) digesting. Primary Tanks with Odor Control Covers Secondary and Tertiary Treatment Secondary & Tertiary treatment consists of biological phosphorous and nitrogen removal, based on the modified University of Cape Town (UCT) process. This is followed by two secondary clarifiers, plus three low head sand media filters with automatic backwash. Bioreactors

Disinfection Method Chlorination consists of three chlorine contact tanks followed by de-chlorination with Sulphur Dioxide. Chlorine Contact Tanks Sludge Conditioning and Composting Consists of the primary sludge being fermented, and then treated by anaerobic digesters. The methane gas produced by the digesters is used for plant buildings and sludge process heating. Mixed Liquor Suspended Solids (MLSS) is thickened in a settling tank (2% solids), gravity belt thickened(6%), belt filter press dewatered (13%) and then composted at our compost site at the landfill. Composting is by static pile aeration method, which produces a Class A compost. This conditioning / fertilizing product is recycled to City Parks, landscapers, the public and orchardists for agriculture use.

Gravity Belt Thickener/Belt Filter Press Effluent Irrigation System The treated effluent can be stored in two emergency on-site 36,000 m3 storage basins for re-use. Irrigating with the effluent is done by three 60 hp 8 stage vertical turbine pumps. Maximum pumping capacity is approximately 100 l/sec. In 2007 603 ML went out for Irrigation, accounting for 12.2% of the total plant flow. The city currently irrigates the Penticton Golf and Country Club (29.1 hectares) and King s Park (5.1 hectares). Kings Park

River Outfall In 2007 the AWWTP discharged 4,415 Million Litres (ML) of effluent to the Okanagan river channel. The AWWTP average effluent discharge flow to the Okanagan river channel in 2007 was 12.1 ML/day, compared to an average effluent discharge flow to the Okanagan river channel of 10.8 ML/day in 2006. Okanagan River Outfall Plant Staffing The plant staff includes one (1) Wastewater Foreman, two (2) Wastewater Operator III s, one (1) Wastewater Operator II, two (2) Wastewater Operator I s, one (1) Okanagan University Water Quality Student, one (1) Millwright, one (1) Electrician, and the Wastewater Treatment Supervisor. Odour Control Systems Three types of systems control plant odours. Odours are removed from the concrete covered fermenters, the fabric covered primary / equalization tanks by a positive displacement blower discharging into the bioreactor aeration system. Digester hoppers and degrit building have odours removed by activated carbon canisters systems. The Headwork s area has a Sol-Air odour control unit which utilizes Ultraviolet light to neutralize odorous gases. Process Control The Supervisory Control and Data Acquisition (SCADA) system consist of Wonderware software, controlled through Modicon programmable logic controllers. Alarms at the plant and lift station communicate through a wireless modem system.

Effluent Quality The treated effluent has less than 0.2 mg/l total phosphorous, less than 5 mg/l BOD and TSS, less than 1.0 mg/l ammonia as nitrogen, and fecal coliforms shall not exceed 2.2 MPN per 100mL. This quality of effluent is required to protect and preserve both the highly valued trout and kokanee spawning resource and the recreational value of the Okanagan river channel. Effluent Sample 2007 Completed Projects The following repairs and replacement took place in 2007 for the Advanced Wastewater Treatment Plant: Primary Tank #4 rebuilt ($8,359) Primary Tank #5 rebuilt ($8,359) Sludge conveyor relining ($2,429) Lakeside North pump rebuilt ($1,988) Wilson St. pump rebuilt ($1,875) Staff Innovations for 2007 Installed washer and dryer to clean uniforms resulting in a $3,000-$4,000 / year savings over outsourcing of laundering. Restructuring of the AWWTP staff, which included a new Foreman s position to define a clearer hierarchy was put in place in October and has worked well. In

addition to aiding with attraction and retention, it also created two Operator III positions. Two new Suspended Solids meters were purchased and installed on the Bio-reactor, to help reduce the daily lab routine. These meters have also helped operations understand what happens with solids throughout the day and night, as our grab samples in the past were always taken at the same time. BCWWA conference in Penticton with two staff members competing in Top Op s challenge. Confined space entry/rescue, Hazard Identification/Risk Assessment and Chlorine leak response training by STC Consulting (Kelly Kaye). Two day course attended by all WWTP staff. Chlorine Leak Response Training Conversion of a slide gate in the Chlorine Contact tank to an overflow gate was envisioned and completed in house saving the purchase of a new gate. Methane gas scrubber was designed by staff while viewing a similar scrubber in another WWTP. This has allowed boiler cleaning intervals to increase by 300%.

Purchase of a utility vehicle to allow staff to clean storage ponds safely and efficiently, has allowed the City to ensure that if required the storage ponds will perform as intended. Cleaning of Emergency Storage Ponds Planned Projects for 2008 The Wastewater Treatment Plant has $90,000.00 (Capital) budgeted this year for equipment repair/replacement. The following projects are scheduled: Screens building roof replacement Replace Moyno pump press Replace one set of gas detectors Purchase one set of primary chains Replace primary tank odour tarp Replace sludge conveyor gear box Replace safety equipment Tie in Digester to SCADA $15,000 $16,000 $5,000 $12,000 $2,000 $2,500 $5,000 $20,000 For more information contact: Berne Udala, Wastewater Quality Supervisor 250-490-2551 berne.udala@penticton.ca