PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

Similar documents
Construction Engineering and Inspection Services Pembroke Road from Dykes Road to Silver Shores Boulevard Broward County, FL

1/2017. F&J Engineering Group, Inc North Lake Dasha Drive Plantation, FL 33324

BROWARD COUNTY. Solicitation Bid #V P1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure

MEET THE AE TEAM YOUR CEI SOLUTION YOUR PARTNERS

Overview. Construction Engineering and Inspection Services for Wiles Road from Riverside Drive to Rock Island Road

Introduction Who We Are

CEI Services Transit Bus Stop Infrastructure

NOVEMBER 13, 2017 S O L I C I T A T I O N N O. V P

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

The Gateway Expressway FTBA Conference. February 2-3, 2017

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

FY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8" 8" 8" 8" 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT.

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report

MDX PROCUREMENT/CONTRACT NO.: RFP MDX WORK PROGRAM NO.:

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

Project Type: Drainage and Storm Systems

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: --

ADA Training Design Case Studies MnDOT

CITY OF SAFETY HARBOR ENGINEERING

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

2018 ACEC OF FLORIDA FICE OUTSTANDING PROJECT AWARDS (OPA) PROGRAM PROJECT NOMINATION FORM

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Enclave at Black Point Marina Community Development District. 1 st Supplemental Engineer s Report Infrastructure Improvements

LO R (CENTER RIDGE ROAD)

ANNUAL INSPECTION REPORT 2017 TABLE OF CONTENTS

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director

PAVEMENT DESIGN MEMORANDUM

EXCAVATION WORK IN PUBLIC RIGHT-OF-WAY GENERAL NOTES

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

SR 50 PD&E Study

6/2017. Calvin, Giordano & Associates, Inc Eller Drive, Suite 600 Fort Lauderdale, FL 33316

36 JASPER THPMAS ROAD CRAWFORDVILLE, FL.

City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT

Construction Cost Estimation Preparation Manual (Metric Units)

EXIST PIPE 12 FT LANDSCAPING PROPOSED PLAN LEFT EXIST. R/W REPLACE INLET TOP EXIST PIPE

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

1/2017. Atkins North America, Inc W. Boy Scout Boulevard Tampa, FL 33607

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

NW 47TH AVENUE PROJECT DEVELOPMENT & ENVIRONMENTAL

MAINTENANCE OF TRAFFIC NOTES

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

B-PERMIT PLAN CHECK MANUAL

MAINTENANCE OF TRAFFIC NOTES

TRANSPORTATION. Governmental Projects

2311 Egg Harbor Road Susan Shin-Angulo Lindenwold, NJ Freeholder Liaison Phone Fax

Mainelli Wagner & Associates, Inc.

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

PERMITTING AND CONSTRUCTION MANUAL

INFRASTRUCTURE FINANCING PLAN FOR THE WOODGLEN SPECIFIC PLAN

CITY OF KELOWNA STANDARD DRAWINGS INDEX AND CROSS-REFERENCE TO MMCD

WAKULLA SITE PLANNING

IMPROVING I 81 IN MARYLAND

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

South Carolina Department of Transportation. Engineering Directive

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES

Project Scope of Work Contract Time Percentage of contract time added, excluding weather and holidays = 13.0% (<20%)

Tangerine Road Dove Mountain Boulevard to La Cañada Drive

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

TAMPA BAY NEXT MAJOR PROJECTS UPDATE

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Zoo Interchange Reconstruction

COUNTY OF SUTTER ENCROACHMENT PERMIT

FTBA 2018 Construction Conference Major Projects Update

ARCHITECT - ENGINEER QUALIFICATIONS ESCAMBIA COUNTY, FL

CITY OF ROCKLIN STANDARD DRAWINGS

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07

Highway Construction Program

Exposition Light Rail Transit Project

Modified FY ,100, ,329,791

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

CHAPTER 8 TRANSPORTATION ELEMENT

TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES

Shadow Lake Woods HOA

SPRR TUPELO ST. R UNION CITY BLVD. ZON PADRE PASEO DEEP CREEK ROAD ARDENWOOD COYOTE HILLS REGIONAL PARK PROJECT LIMITS PATTERSON RANCH ROAD BLVD. COMM

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES JANUARY 2018

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM

Design-Build and Design-Bid-Build

8 PROJECT IMPLEMENTATION

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

CITY OF NEW ORLEANS. Repaving the Gateway to the French Quarter: Implementing the Downtown Infrastructure Improvement Project

ROADWAY DESIGN AND CONSTRUCTION STANDARDS

Florida Department of Transportation

Final Air Quality Report

Information for File # RJH

Supersizing of Wake County s Solid Waste Convenience Centers

MEMORANDUM - CITY OF PASADENA DEPARTMENT OF PUBLIC WORKS

Broadway Grade Separation Study. Palo Alto Rail Committee Meeting November 29, 2017

Transcription:

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road

STAFFING MATRIX Construction Engineering and Inspection-Wiles Road

JAMES JEFFERS, P.E. Senior Project Engineer Years of Experience: 25 Directly managed the construction of the $43M Design Build Dixie Highway Flyover Bridge and $120M I-95 Managed Lanes project for FDOT district 4. FDOT Broward Construction Manager, wherein he delivered an annual work program averaging more than $250M. Under his leadership, the Broward Operations office continually exceeded District 4 goals and always led the district in achieving positive results. Project Engineer on similar urban arterials including Sunrise Boulevard, Hollywood Boulevard and SR 7.

HEMBERTH SALAZAR, P.E. Project Administrator Years of Experience: 12+ $12.6 Million Design-Build Miami-Dade Expressway Authority (MDX) ORT conversion project in SR-836 5 new toll gantry structures and modification to three currently existing in the SR-836 corridor and construction of an exit ramp from SR-836 west bound to access the FDOT District VI Office. Project Administrator / CSS / Senior Roadway Inspector. This $1.1 million project consisted of new drainage exfiltration trenches installation, milling and resurfacing, sidewalk reconstruction and pavement striping from US-1 to Grand Ave. and from SW 27th Ave. to SW 32nd Ave. City of Miami Milling and resurfacing of SR 5/US-1 from North of SE 17th St to Broward Blvd. D4 FDOT hybrid project which involves milling and resurfacing of SR 5/US-1 from North of SE 17th St to Broward Blvd. The project included miscellaneous safety, median landscape, signalization, drainage, signing improvements. It also included the reconstruction of a new approach slabs, wing walls, barrier walls, traffic separators, sidewalks and removal and application of new structural steel coating on the Tarpon River Bridge. FDOT D6 SR 973 (Galloway Rd.) from SW 41st St thru SW 96th St (Length of Project: 3.5 Miles) FDOT D4 SR 838 (Sunrise Boulevard) @ SR 7 Sidewalk Project next to the SFWMD Canal C-12 in Broward County FDOT D4 SR 84 @ SR 817 (University Dr.) Intersection in Broward County

RYAN SANTIAGO Contract Support Specialist / Senior Inspector Years of Experience: 15+ Contract Support Specialist on: SR-A1A from east of Mercedes River small bridge to Sunrise, 4.5 Mil. A1A/South Ocean Drive from Miami-Dade County Line to Seacrest Parkway, 4.8 Mil. A1A from NE 18 th ST to Oakland Park Blvd., 9.5 Mil. Biscayne Groupings, 32 Mil. Sr. Inspector on: NW 57th Ave. / Red Road Reconstruction Grouping, 40 Mil. Dixie Flyover Bridge Construction, 43 Mil. SR 5 (US-1/Federal Hwy), from Sheridan Street to SE 18 th Street, 12.5 Mil.

OTHER STAFF AND SERVICES Inspector / RCS/Secretary / Surveyor Logan Fasanella, RJ Behar & Company, Inc. 5 Years of Experience as an inspector in District 4 in Broward County Mona Catalona, Solid Consulting Engineers, Inc. 11 Years of Experience as a Resident Compliance Specialist and as a Secretary with FDOT District 4 in Broward County. Landon Alfie Cross, P.S.M., Carnahan Proctor Cross, Inc. 45 Years of Experience as Senior Project Surveyor

Project Over View The project involves roadway widening 4-6 lanes Lighting conduit placement ADA Compliance Bike lane construction Asphalt overbuild raising profile Tree Root pruning Signal upgrades Extensive drainage. Full replacment of curb and gutter. Gravity walls and unique L walls of varying heights. This is a mixed-use corridor, with both residential and commercial considerations. The fire station currently under construction at Rock Island Rd and Wiles Rd will not be directly impacted by operations.

Potential Issues Utility Relocations Utility relocation is a challenge in any project. The volume and variety of adjustments and relocations to be performed by maintaining agencies proves unique and will require a significant level of coordination between all parties. Of note are: 6 Gas Main (STA 242+90, 251+70, 253+00 and 263+50). 16 and 12 Water Mains requiring relocation throughout the project limits. We will rely upon our previous relationships with David Rivera and Max Chamorro (TECO) and Coral Springs Public Works Department to encourage them to relocate their lines and have the least impact upon construction. Buried fiberoptic French Drain located where it was not anticipated on east project. We will rely upon our previous relationship: David Rivera and Max Chamorro (TECO) Coral Springs Public Works Department

Potential Issues Lane Closures / Noise Ordinance A single lane closure will be allowed between 9:30PM and 7:30 AM. Noise ordinance (6:00 PM to 7:00 AM on weekdays, 6:00 PM to 9:00 AM weekends and holidays). Contractor to obtain a special permit allowing operations outside of the time constraints placed in the Coral Springs. Construction around Whispering Woods Development. This HOA is preparing to commence a resurfacing of the property. Property Manager, Mary Banmiller The roadway widening will impact the driveways Publix Plaza, 74 Ave, and multiple shopping centers. Must maintain access during roadway widening and driveway reconstruction at each affected entrance. The Whispering Woods Business Center - Completely dependent on accessibility from Wiles Rd.

Potential Issues Environmental The silt fence, inlet protection and outfall protection Special attention given to the 11-acre Whispering Woods Park containing wetland mitigation 13.9-acre Red Lichen Sanctuary Special care will be taken to ensure no runoffs will enter The Sanctuary during mast arm installation. Vacuum street sweeper at least twice a week or as directed by the Engineer. Cleanliness will be a topic of discussion during the regular progress meetings. Dust Control will be vital.

Public Coordination F&J will institute a proactive Public Involvement effort to ensure all motorist, businesses, and project stakeholders are kept informed of upcoming lane closures and changes in traffic patterns, if needed. Invite ALL stakeholders to our pre-construction conference. We will meet with the residents effected: Whispering Woods community Hidden Hammock/Butler Farms Careful coordination between the Contractor, the HCED and the property owners will be needed to ensure an issue free operation.\ Coordination with new fire station being built. Coordination with irrigation and landscaping with businesses and residents

Complete Streets Initiative Our team has extensive experience with not only the Complete Streets initiatives, but also with the road diet designs. Currently implementing Complete Streets initiatives: CEI services for Wiles Rd. from Rock Island Rd to SR7 CEI services for Pine Island Rd. from Nova Dr. to SR-84. We understand the importance of this initiative to make streets safe for all users.

OTHER CONSIDERATIONS F&J Team is currently on the Wiles Rd. phase 1 from Rock Island Rd. to SR-7 project with RJ Behar (R1261804P1). Open communication and coordination between overlapping projects. Local QA/QC oversight Francis Chin Sr. P.E. (45 Yrs Experience), and Osvaldo, Ossie Larrazabal, P.E. (14 Yrs Experience) Initial and bi-annual reviews of the Team to evaluate resources, equipment, certifications, documentation, and processes and recommend improvements. Skilled, proven reviews at no cost to Broward County. CBE with Broward County County Business Enterprise F&J is a DBE/SBE with FDOT

THANK YOU FOR YOUR CONSIDERATION