STI /15392 /1 April, 2009

Similar documents
1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained.

2.2 Copies of any records and other connected papers that may be required by the Bureau shall be made available at any time on request.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF GALVANIZED STEEL BARBED WIRE FOR FENCING ACCORDING ACCORDING TO IS 278:2009 (Fourth Revision)

SCHEME OF TESTING AND INSPECTION CERTIFICATION OF PHOSPHORIC ACID, FOOD GRADE ACCORDING TO IS 10508:1983

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SELF BALLASTED LAMPS FOR GENERAL LIGHTING SERVICES ACCORDING TO IS 15111(Part 1 & 2):2002

BUREAU OF INDIAN STANDARDS (CMD II)

DOC:STI/9573/2 January 2003

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

DOC:STI/3087/4 September 2006

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF MALLIABLE CAST IRON PIPE FITTINGS ACCORDING TO IS: 1879:2010 (Third Revision)

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SWITCHES FOR DOMESTIC & SIMILAR PURPOSE ACCORDING TO IS 3854:1997

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF STEEL WIRE ROPES FOR GENERAL ENGINEERING PURPOSES ACCORDING TO IS 2266:2002 (Fourth Revision)

1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SWITCH-SOCKET-OUTLETS (NON-INTERLOCK TYPE) ACCORDING TO IS 15787:2008

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF TAPER ROLLER BEARINGS ACCORDING TO IS 12102:1987

BUREAU OF INDIAN STANDARDS (Central Marks Department - III) Our Ref : CMD-III/16: Oct 2006

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT III

BUREAU OF INDIAN STANDARDS ( CENTRAL MARKS DEPARTMENT-III ) Our Ref: CMD-III/16:

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF GRAIN ORIENTED ELECTRICAL STEEL SHEET AND STRIP ACCORDING TO IS 3024:2006 (Second Revision)

2.1 All records of tests and inspection shall be kept in suitable forms approved by the Bureau.

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

2. Test Records - All records of tests and analysis shall be kept in suitable forms approved by the Bureau.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ALLUMINIUM ALLOY TUBES FOR IRRIGATION PURPOSES; WELDED TUBES ACCORDING TO IS: 7092 (PART I)-1992

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

2.2 Copies of any records and other connected papers that may be required by the Bureau shall be made available at any time on request.

CENTRAL MARKS DEPARTMENT III. Our Ref : CMD-III/16: Mar 2007

BUREAU OF INDIAN STANDARDS (CENTRAL MARKS DEPARTMENT-III)

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

BUREAU OF INDIAN STANDARDS (Central Marks Department III) Our ref: CMD-III/16: November 2007

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICAATION OF VENEERED DECORATIVE PLYWOOD ACCORDING TO IS 1328:1996 (Third Revision)

1.2 All the testing equipment shall be periodically checked and calibrated and records of such checks/ calibration maintained.

2.0 TEST RECORDS - All records of tests and inspection shall be kept in suitable forms approved by the Bureau.

Doc: STI/1223(Section-2)/5 Oct 2003

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III

1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained.

BUREAU OF INDIAN STANDARDS CMD-II

SPECIFICATION ACCORDING TO IS

BUREAU OF INDIAN STANDARDS (Central Marks Department-III) Our Ref : CMD-III/16: October 2008

CENTRAL MARKS DEPARTMENT-III. Our Ref.:CMD-III/16:

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF COPPER SULPHATE ACCORDING TO IS :

CENTRAL MARKS DEPARTMENT-III

CMD-II(Legal) CMD-II/16:

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF FLAVOURED MILK ACCORDING TO IS 4709: 1968

SCHEME OF TESTING AND INSPECTION FOR CERIFICATION OF SISAL ROPES PART 1 UNTARRED VARIEITES ACCORDING TO IS 1321(Part 1):2003 (Fourth Revision)

(अन भ ग अध क र ) (स ए ड -3)

DOC: STI/8783(Part 4/Sec1)/1 August 1998

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF RESPIRATORY PROTECTIVE DEVICES FULL FACE MASKS ACCORDING TO IS 14166:1994

CENTRAL MARKS DEPARTMENT II. Ref: CMD-II/16:

1.1 All the testing apparatus shall be periodically checked and calibrated and records of such checks/calibration maintained.

Doc: STI/1166/6 July 2008

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SLUICE VALVE FOR WATER WORKS PURPOSES (50 TO 1200 MM SIZE) ACCORDING TO IS 14846:2000

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SILVERED GLASS MIRRORS FOR GENERAL PURPOSES ACCORDING TO IS :

CENTRAL MARKS DEPARTMENT-II. Our Ref: CMD-II/16: Subject: Information of revised version of Alumino-Ferric as per IS 299.

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III

CENTRAL MARKS DEPARTMENT-3. Our Ref: CMD-3/16: Subject: STI as per IS 13714: 1993 DUNNAGE PALLETS-WAREHOUSING

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PLASTIC FEEDING BOTTLES ACCORDING TO IS : 1999 (Incorporating Amendment No.

CENTRAL MARKS DEPARTMENT-2. Ref: CMD-2/16:

2. Test Record - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

2.0 TEST RECORDS- All records of tests and inspection shall be kept in suitable forms approved by the Bureau of Indian Standards.

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS

1.1 All the testing apparatus shall be periodically checked and calibrated and records of such checks/calibration maintained.

(ड चद र ) ञ न क ई (स ए ड -3)

2. Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained.

2. 0 Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

CENTRAL MARKS DEPARTMENT-II

1.1 All the testing apparatus shall be periodically checked and calibrated and records of such checks/calibration maintained.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF TITANIUM DIOXIDE, ANATASE, FOR PAINTS ACCORDING TO IS :

GUIDELINES FOR IMPLEMENTATION OF IS 13334(PART 1):2014

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF HAND OPERATED STIRRUP-TYPE SPRAYER ACCORDING TO IS 1971:1996 (Fifth Revision)

CENTRAL MARKS DEPARTMENT-II

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF BORAX ACCORDING TO IS 1109:1980

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SHAVING CREAMS ACCORDING TO IS ( Incorporating Amendment No.

CENTRAL MARKS DEPARTMENT (FCT) Ref: CMD-II/16:

CENTRAL MARKS DEPARTMENT-2

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ORDINARY PORTLAND CEMENT, 33 GRADE ACCORDING TO

1.1 All the testing apparatus shall be checked periodically and records of such checks shall be maintained.

CENTRAL MARKS DEPARTMENT (FCT) Ref: CMD-II/16:2933 (Part 1)

CENTRAL MARKS DEPARTMENT II. Subject: Implementation of revised Indian Standard Specification for Nitric Acid

2. 0 Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

MARKS DEPARTMENT-III. ROs/BOs may also propose the implementation date in view of revision of Indian

2. TEST RECORDS: All records of tests and analysis shall be kept in suitable forms approved by the Bureau.

ALUMINIUM CONDUCTORS FOR OVERHEAD TRANSMISSION PURPOSES

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF TOOTH PASTE ACCORDING TO IS 6356: 2001 (Third Revision)

स ल न प ए, (द सर स श धन) (स श धन 1 स 6 श "मल)

2. Test Record - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF 53 GRADE ORDINARY PORTLAND CEMENT ACCORDING TO IS:

(अAण प छक यल ) व D. ब (क.म.0व. 2) CENTRAL MARKS DEPARTMENT-2. Our Ref: CMD-2/16:

BUREAU OF INDIAN STANDARDS (CENTRAL MARKS DEPARTMENT-III) Our Ref: CMD-III/16:1239(Pt 1) 11 Oct 2004

क द य म हर व भ ग-2 CENTRAL MARKS DEPARTMENT -2

Subject: Implementation of IS 9798:2013 Low Pressure Regulators for use with Liquefied Petroleum Gas (LPG) Specification (Second Revision).

Transcription:

CENTRAL MARKS DEPARTMENT-III Our Ref : CMD-III/16:15392 30 04 2009 Subject : Finalized STI as per IS 15392 : 2003 Aluminium and Aluminium Alloy Bare Foil Food Packaging The Scheme of Testing and Inspection for IS 15392:2003 Aluminium and Aluminium Alloy Bare Foil Food Packaging has been finalized as DOC: STI/15392/1, April 2009. A copy of the same is enclosed. The finalized document of STI stated above would come into force with immediate effect. This issues with the approval of DDGM. Encl: As stated Sd/30 04 09 R. Dhinakaran Sc.E. & Dirctor (CMD-III) Circulated to: All ROs/BOs/BIS Labs, Copy to: (CMD-1) (MTD) ITS: With request to post in intranet Page 1 of 6

SCHEME OF TESTING & INSPECTION FOR CERTIFICATION OF ALUMINIUM & ALUMINIUM ALLOY BARE FOIL FOR FOOD PACKAGING ACCORDING TO IS 15392:2003 1. LABORATORY A laboratory shall be maintained which shall be suitably equipped and staffed where different tests given in the specification shall be carried out in accordance with the methods given in the specification. 2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau. 2.1 All testing apparatus/measuring instruments shall be periodically checked and calibrated and records of such checks/calibration shall be maintained. Tensile testing machine shall be calibrated at least once in a year. 2.2 Copies of any records and other connected papers that may be required by the Bureau shall be made available at any time on request. 3. QUALITY CONTROL It is recommended that, as far as possible, Statistical Quality Control (SQC) methods may be used for controlling the quality of the product during production as envisaged in this Scheme [See IS 397(Part I):2003, to IS 397(Part 4):2003]. 3.1 In addition, effort should be made to gradually introduce a Quality Management System in Accordance with IS/ISO 9001. 4. STANDARD MARK The Standard Mark, as given in Column (1) of the First Schedule of the licence shall be suitably marked on each package of Aluminium & Aluminium Alloy Bare Foil for Food Packaging provided always that the material thus marked conforms to every requirement of IS 15392. 4.1 OTHER MARKING - In addition on each foil package shall also be marked with the following details: a) Name or trade mark of the manufacturer; b) Size (Width & Thickness); c) Grade; d) Surface Condition; e) Control unit No./Lot No. f) Date of Manufacturing: g) Net Quantity h) Licence Number (CM/L No..). 5 LEVELS OF CONTROL - The tests, as indicated in Table 1 attached and at the levels of control specified therein, shall be carried out on the whole production of the factory which is covered by this scheme and appropriate records and charts maintained in accordance with paragraph 2.0 above. All the production which conforms to the Indian Standards and covered by the licence shall be marked with certification mark of the Bureau. Page 2 of 6

5.1 Control Unit For the purpose of the Scheme of Testing and Inspection, all the rolls/sheets of same size and same surface condition manufactured in a shift shall constitute one control unit. 5.2 In respect of all other clauses of the specification, the factory will maintain appropriate controls and checks to ensure that their product conforms to the requirements of those clauses. 6. REJECTIONS A separate record shall be maintained giving information relating to the rejection of the production not conforming to the requirements of the specification and the method of its disposal. Such material shall in no circumstances be stored together with that conforming to the specification. 7. SAMPLES The licensee shall supply, free of charge, the samples required in accordance with the Bureau of Indian Standards (Certification) Regulations, 1988, as subsequently amended, from the factory or go downs. The Bureau shall pay for the samples taken by it from the open market. 8 REPLACEMENT Whenever a complaint is received soon after the goods with Standard Marks have been purchased and used, and if there is adequate evidence that the goods have not been misused, defective goods or their components are replaced or repaired free of cost by the licensee in case the complaint is proved to be genuine and the warranty period (where applicable) has not expired. The final authority to judge the conformity of the product to the Indian Standard shall be with the Bureau. The firm shall have own complaint investigation system as per IS/ISO 10002. 8.1 In the event of any damages caused by the goods bearing the Standard Mark, or Claim being filed by the Consumers against BIS Standard Mark and not Conforming to the relevant Indian Standard, entire liability arising out of such non conforming product shall be of licensee and BIS shall not in any way be responsible in such cases. 9. STOP MARKING The marking of the product shall be stopped under intimation to the Bureau if, at any time, there is some difficulty in maintaining the conformity of their product to the specification, or the testing equipment goes out of order. The marking may be resumed as soon as the defects are removed under intimation to Bureau. 9.1 The marking of the product shall be stopped immediately if directed to do so by Bureau for any reason. The marking may then be resumed only after permission by the Bureau. The information regarding resumption of markings shall also be sent to the Bureau. 10. PRODUCTION DATA The licensee shall send to BIS as per the enclosed proforma-1 to be authenticated by a Chartered Accountant, a statement of quantity produced, marked and exported by him and the trade value thereof at the end of each operative year of the licence. Table 1 Page 3 of 6

SCHEME OF TESTING & INSPECTION FOR CERTIFICATION OF ALUMINIUM & ALUMINIUM ALLOY BARE FOIL FOR FOOD PACKAGING ACCORDING TO IS 15392 : 2003 TABLE 1 LEVELS OF CONTROL (Clause 5 of the Scheme of Testing and Inspection) Clause Requirement TEST DETAILS Clause 7 Material 7.1 & 7.2 Test Method Reference LEVELS OF CONTROL No. of Frequency Samples Raw Material IS :737 One Each consignment of up to 4 tonne Finished Material REMARKS In case a test certificate is received with each consignment of raw materials, further testing would not be necessary. 5 Pinhole count 5 IS 15392:2003 One Every 5 th roll/sheet 6 Freedom from defects 6 -do- One Every 5 th roll/sheet 9 Lubricants 9.2 & 9.3 IS 15392:2003 Five One control unit 12 Dimensions 11 &12 IS 15392:2003 Five One control unit The lot shall be passed if samples pass. In case of failure of one or more samples, 100% inspection should be done and those conforming to the requirement be marked. 13 Tensile Properties 13 IS:13237 1 One control unit If any sample fails to comply with the requirements, two additional samples one from the same rolls/ sheets and one from other rolls/sheets shall be selected and tested. If both the samples pass the lot shall be accepted. 14 Surface Conditions 14 IS 15392:2003 Each roll/sheet Page 4 of 6

PERFORMA - 1 PROFORMA FOR OBTAINING PRODUCTION DETAILS Period covered Name of Licensee CM/L No. Name of Articles (s) Grade/Type/Size/Variety/Class/Rating IS No. 1.1 Brand/Trade/Name(s) of BIS Certification Marked Products 2.0 Total production of the articles(s) Licensed for certification marking 2.1 Total production of the article(s) Conforming to Indian Standard 3.0 Production covered with BIS Certification Mark and its Value a) Quantity b) Value (Rs.) 3.1 Brand Name used on production covered under BIS Certification Mark 3.2 Calculation of marking fee on unit-rate basis; Marking Fee per unit a) Unit b) Quantity covered with BIS Certification Mark c) Marking fee rounded off in whole rupees as obtained by applying unit rates given in (a) on quantity given in (b) Note: Incase a clause is not applicable, suitable remarks may be given against it. 4.0 Quantity not covered with BIS Certification Mark. If any, and the reasons for such non-coverage 4.1 Brand Name under with non certified goods were sold 5.0 Quantity Exported with BIS Standard Mark and its value 5.1 Brand Name under which BIS Certified goods are exported 6.0 Authentication by Chartered Accountant or by the manufacturer by giving an affidavit/undertaking Page 5 of 6

Page 6 of 6 STI /15392 /1