HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification

Similar documents
Hydrologic Calibration:

GENERAL OVERVIEW MEETING JANUARY 10, 2019

What to Expect When You re Expecting A LOMR. Mark Seidelmann, PE, GISP ASFPM 2015, Atlanta Georgia

Project Summary: - Hydrologic Models. - LiDAR Based - 10 Synthetic Events - No Historic Events - 100yr Runoff is Largest - Assumes Even Rainfall

Title Advanced Hydraulic Modeling to Support Emergency Action Plans

Hydrologic, Hydraulic, and Ecological Modeling Issues and Implementation for the Blind River Fresh Water Diversion Project

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

WEST SHORE LAKE PONTCHARTRAIN HURRICANE AND STORM DAMAGE RISK REDUCTION STUDY FINAL INTEGRATED FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT

Modeling a Complex Hydraulic Environment Using a 1-D Approach Supplemented with Simple 2-D Principles Manas Borah Ed Dickson June 5, 2014

Alternatives for Willow Creek Flood Mitigation Study

By Roger Churchwell San Joaquin Area Flood Control Agency.

SECTION III: WATERSHED TECHNICAL ANALYSIS

IMPROVED MODELING OF THE GREAT PEE DEE RIVER: DOCUMENTATION IN SUPPORT OF FEMA APPEAL. Horry County, South Carolina

CALCASIEU PARISH ENGLISH BAYOU BASIN STORMWATER MASTER PLAN. NTB Associates, Inc. Solving Tomorrow's Problems Today...

San Luis Obispo Creek Watershed Hydrologic Model Inputs

PA of NY&NJ - TETERBORO AIRPORT RUNWAY 6-24 Engineered Material Arresting System (EMAS) UNSTEADY-STATE FLOODPLAIN ANALYSIS

Analyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure

WEST SHORE LAKE PONTCHARTRAIN HURRICANE AND STORM DAMAGE RISK REDUCTION STUDY INTEGRATED DRAFT FEASIBILITY REPORT AND ENVIRONMENTAL IMPACT STATEMENT

City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017

Louisiana Watershed Resiliency Study (LaWRS) Shona Gibson February 27, 2017

Sabine Pass to Galveston Bay, Texas Coastal Storm Damage Reduction and Ecosystem Restoration Project. An Update

P R O G R E S S R E P O R T P R O G R E S S R E P O R T R E S T O R A T I O N

Are You Ready for Risk and Uncertainty Analysis?

Climate and Land Use Consequences to 100-Year Flooding

TABLE OF CONTENTS. 1.0 Background Watershed Description Hydrology - HEC-HMS Models Hydraulics - HEC-RAS Models...

Roland Ottolini, PE Director, Lee County Division of Natural Resources 09/11/2018

DRAFT. Jacob Torres, P.E.; Nick Fang, Ph.D., P.E.

6/9/2014. An overview of the upcoming 25th anniversary of the highly visible, multijurisdictional, Outline of Presentation

American Water Resources Association Philadelphia Metropolitan Area Section

Red River Flooding. June 2015 Caddo and Bossier Parishes. Presented by: Richard Brontoli RRVA, Executive Director

GISHYDRO: Developing Discharges and Watershed Parameters

Engineering Report Preliminary Floodplain Study. Executive Summary

Mountain States Chapter International Erosion Control Association Conference

Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study

A Federal Family Comes Together Association of State Floodplain Managers Conference

MIDAS CREEK PROJECT. FINAL DESIGN REPORT SKR Hydrotech 4/11/2012

Flood Control Planning Below Alluvial Fans

Little Bear Brook Flood Hazard Assessment and Redevelopment Area Regional Stormwater Management Analysis. Progress Meeting

SECTION IV WATERSHED TECHNICAL ANALYSIS

Upper San Jacinto River Regional Watershed Flood Mitigation Plan Preliminary Scope of Services. July 2, 2018

Review Budget and Timeline for XP-SWMM Phase II Project and Determine Next Steps

STRUCTURAL PLAN COMPONENT APPENDIX

Bridge Replacement Project. Preliminary Hydraulic Study. Lincoln, California BRLS-5089 (021) BRIDGE 19C Mcbean Park Drive at Auburn Ravine

DRAFT FOREST VIEW, ILLINOIS SECTION 205 FLOOD RISK MANAGEMENT APPENDIX E HYDROLOGY AND HYDRAULIC ANALYSIS

Presentation Overview

Airport Master Plan. Floodplain Report. Prepared by: Prepared for: Illinois Department of Transportation

JD 14 Project Area Project Team Meeting

Flood Risk Management on the Elwha: Case Study of the Federal Levee Modification Project

Case Studies in Hazard Class Reductions Implementation of NY s Guidance for Dam Hazard Classification

Risk. Management Center

MRG Bernalillo to Belen GRR

Hey and Associates, Inc.

Prepared for: City of Jeffersonville. November Prepared by

Outlet Structure Modeling

August 2016 Flood Preliminary Report Amite River Basin

Technical Memorandum. Hydraulic Analysis Smith House Flood Stages. 1.0 Introduction

Who s in Charge!? 8/9/2018. Houston Geological Society Presents. Peak Floods Brays Bayou

Questions & Responses from April 26, 2017 Public Presentation

5/25/2017. Overview. Project Background Information. Project Background Information Modeling Approach Model Development Results Next Steps

BMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts

Lower South Mayde Creek Flood Risk Reduction Effort. Jonathan St. Romain, P.E. Project Manager. March 21, 2018

Little Sugar Creek and Briar Creek Subbasin, Mecklenburg County, NC. Hydraulic Analyses - HEC-RAS Models

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

Appendix B HYDROLOGIC AND HYDRAULIC MODELING

Freight Street Development Strategy

DRAFT. Technical Memorandum. Whitney Road Drainage & Safety Enhancements Phase III Hydraulic Update. Prepared For:

PWD s Systematic Watershed-wide Approach to Stormwater Mgmt.

Green Infrastructure. Jesse Schomberg University of Minnesota Sea Grant Program

Pajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington

Estimating the 100-year Peak Flow for Ungagged Middle Creek Watershed in Northern California, USA

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Brian Rast, PE, CFM, PMP Lead Silver Jackets Coordinator, Kansas and Missouri Kris Lander, PE, CFM Hydrologist. June 4, 2015

DRAINAGE MASTER PLAN FOR THE TOWN OF BLOOMING GROVE AND VILLAGES OF WASHINGTONVILLE AND SOUTH BLOOMING GROVE

Coastal Restoration and Protection Projects - SLFPA-East and Vicinity

COOPERATING TECHNICAL PARTNER INFORMATION EXCHANGE. First Order Approximations

FLOOD CHARACTERISTICS

Aberdeen Airport Drainage Study. Todd Yerdon, PE Al Erickson, PE

Computer Determination of Flow Through Bridges

Fargo-Moorhead Metropolitan Area Flood Risk Management Project

CLAY STREET BRIDGE REPLACEMENT

3.3 Acceptable Downstream Conditions

Blake C. Kronkosky, PE

Technical Memorandum No Basis of Comparison

Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South

Appendix VI: Illustrative example

ABC S OF FRESHWATER WETLAND DESIGN: CONCEPT TO CONSTRUCTION

SAW MILL RIVER DAYLIGHTING ANALYSIS AT RIVER PARK CENTER

Will be modified map from GIS 6/16 EOD

Characterizing the Soap Lake Floodplain CHAPTER 2

Modernization of High Hazard Dams in Austin, Texas. TFMA Spring Conference May 23, 2007

EXPERT PANEL ON DIVERSION PLANNING AND IMPLEMENTATION SEDIMENT DIVERSIONS UPDATE

Integrated Watershed Modeling of the Alewife Brook: Developing the Right Tools for Climate Change Preparedness

Project Drainage Report

Fort Leonard Wood, Missouri. September 2013

S.R. 4031, SECTION FVR OVER BEAVER RUN SEGMENT 0170, OFFSET 6093 EAST NANTMEAL TOWNSHIP, CHESTER CO. ENGINEERING DISTRICT 6-0

ENGINEERING AND CONSTRUCTION BULLETIN

NEW ORLEANS DISTRICT AND THE AND THE

Transcription:

HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification OFMA 2017 Annual Conference September 19, 2017 Presented by: Jeff Doudrick, PE, ENV SP Project Manager HNTB Corporation

Agenda Project Description and Objectives Path to LAMP Benefit Determination Modeling Approach August 2016 Flood Calibration and Results Path Forward Discussion 2

3 Project Location

4 Study Area Focus

Project Objectives Evaluate steps to certify and accredit the existing levee system associated with the Marvin Braud Pump Station Marvin Braud North Marvin Braud West Laurel Ridge Reduce flood risk Reduce flood insurance rates Improve Community Rating System (CRS) rating 5

6 FEMA LAMP

Collaboration Continuous, collaborative communication with key stakeholders 7 Meetings & Technical Work-Shops with FEMA Region VI, FEMA LOMR, DOTD, and Parish Formal and informal meetings/communications with USACE and CPRA Peer-review available reports and studies Not re-inventing the wheel Incorporated available relevant data & information 7

Path to LAMP Determination Interior influenced by Exterior Recommended 2D Model Recommended Coincident Event Analysis 471,640 = 89.3 miles of survey completed Program Implementation Plan H&H Modeling, FEMA LAMP ( Sensitivity Analyses ) Levee & Pump Station Inspection Levee & Channel Surveys Geotechnical Field Data Collection & Analyses Hydrologic & Hydraulic Modeling Data Collection & Develop Plan Recommended LAMP Overall rating of the Marvin Braud Levee System - Unacceptable MB Pump Station Requires updated O&M Manual & updated Operations Procedures Five 80-ft soil borings 8

9 Hydrologic & Hydraulic Modeling- Approach

Model Formulation: HEC-RAS v5.0 with 2-D Interior Drainage System Modeling Started with current effective FEMA hydraulic model (1-D) Decided on HEC-RAS 2-D to better represent the interconnected flow of the bayous and canals 10

Model Formulation: HEC-RAS v5.0 with 2-D Exterior River Modeling Started with update of current effective FEMA hydraulic model (1-D) Backwater impact at Highway 22 Expanded 1-D Modeling to include reach from Diversion to Maurepas 1-D Modeling produced artificially high WSEL at downstream end Decided on full 2-D model for exterior and interior 11

Initial Model Development Combined Interior-Exterior Model (~ 400 sq. miles) to provide the best representation of overflow from the Amite River into the interior of the levee system AMITE RIVER SPANISH LAKE INTERIOR LAKE MAUREPAS EXTERIOR MB PUMP STATION 12

Initial Model Development, 2D Grid SPANISH LAKE 13

Initial Model Development, Surface SPANISH LAKE 14

Initial Model Development, Roughness SPANISH LAKE 15

16 August 2016 Historic Flood

August 2016 Historic Flood Largest flood of record Somewhere between a 100yr and 500yr event Nearly 1/3 of homes within Ascension Parish flooded Happened in the middle of building our model Lots of data collected for model calibration 17

18 August 2016 Historic Flood

2-D Model Calibration: Aug 2016 Event PORT VINCENT SPANISH LAKE INTERIOR LAKE MAUREPAS EXTERIOR 19

2-D Model Calibration: Aug 2016 Event 18.0 RAINFALL 18.0 PORT VINCENT Cumulative Rainfall Depth (in) 16.0 14.0 12.0 10.0 8.0 6.0 4.0 2.0 0.0 8/6 8/8 8/10 8/12 8/14 8/16 8/18 8/20 8/22 8/24 Cumulative Rainfall (in) RAINFALL RAINFALL RUNOFF Cumulative Rainfall Runoff (in) (SERC SCS CN Method) Stage (ft) 16.0 14.0 12.0 AMITE 10.0 8.0 6.0 4.0 2.0 0.0 8/11 8/13 8/15 8/17 8/19 8/21 8/23 8/25 USGS Stream Gage 07380120 5.0 LAKE MAUREPAS 8.0 MB PUMP STATION Stage (ft) 4.5 4.0 3.5 3.0 2.5 2.0 BLIND RIVER AMITE Stage (ft) 7.0 6.0 5.0 4.0 3.0 EXTERIOR INTERIOR 1.5 2.0 1.0 0.5 0.0 8/11 8/13 8/15 8/17 8/19 8/21 8/23 8/25 USGS Stream Gage 301324090382400 USGS Stream Gage 07380215 1.0 0.0 8/11 8/13 8/15 8/17 8/19 8/21 8/23 8/25-1.0 USGS Stream Gage 073802282, DS USGS Stream Gage 073802282, US 20

2-D Model Calibration: Aug 2016 Event 10.0 BLACK BAYOU DS 12.0 BLACK BAYOU US 9.0 8.0 GAGE MODEL 10.0 GAGE 7.0 6.0 8.0 Stage (ft) 5.0 4.0 Stage (ft) 6.0 MODEL 3.0 4.0 2.0 1.0 2.0 0.0 8/11 8/13 8/15 8/17 8/19 8/21 8/23 8/25 USGS Stream Gage 073802245 HEC-RAS WSE 0.0 8/11 8/13 8/15 8/17 8/19 8/21 8/23 8/25 USGS Stream Gage 0738022395 HEC-RAS WSE 14.0 GRAND GOUDINE 9.0 BAYOU FRANCOIS 12.0 8.0 Stage (ft) 10.0 8.0 6.0 MODEL GAGE Stage (ft) 7.0 6.0 5.0 4.0 MODEL GAGE 4.0 3.0 2.0 2.0 1.0 0.0 8/11 8/13 8/15 8/17 8/19 8/21 8/23 8/25 0.0 8/11 8/13 8/15 8/17 8/19 8/21 8/23 8/25 USGS Stream Gage 0738022295 HEC-RAS WSE USGS Stream Gage 073802273 HEC-RAS WSE 21

22 2-D Model Calibration: Aug 2016 Event

Coincident Event Analysis Questions: What is the 100-year interior event? What is the source of flooding for a 100 year event? Analysis: USACE EM 110-2-1413 (used as guidance) Over 100 Possible Model Runs Using Different Frequency Event Combinations 27 Critical Combinations Used for Analysis 23

Coincident Event Analysis, Flooding Sources AMITE RIVER SPANISH LAKE INTERIOR LAKE MAUREPAS EXTERIOR MB PUMP STATION 24

25 Coincident Event Analysis - Precipitation

Coincident Event Analysis, Storm Surge 14 Tropical Storm Allison Gage Data Gage Height (ft) 12 10 8 6 4 2 LAKE MAUREPAS PORT VINCENT 0 6/2/2001 6/9/2001 6/16/2001 6/23/2001 6/30/2001 Date Amite River at Hwy 22 Near Maurepas Amite River at Port Vincent Hurricane Isaac Gage Data 14 12 Gage Height (ft) 10 8 6 4 2 LAKE MAUREPAS PORT VINCENT 0 8/25/2012 0:00 9/1/2012 0:00 9/8/2012 0:00 9/15/2012 0:00 9/22/2012 0:00 Date/Time Amite River at Port Vincent Amite River at Hwy 22 Near Maurepas 26

27 Preliminary Mapping

28 Preliminary Mapping

29 Preliminary Mapping

Path Forward to Levee Certification Address Existing Levee Deficiencies Refine HEC-RAS 2D model to include other areas of interest Evaluate projects that could enhance level of protection Full certification Engineering and Design Re-Mapping 30

Model Improvements Added Colyell Creek Basin Broke out Henderson Bayou Additional survey Added more bridges and culverts Focused on Exterior (flow, wetland n-values) 31

32 Next Steps

Discussion