BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

Similar documents
BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

Bill of Quantity (BOQ)

Bill of Quantity (BOQ)

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS

Jericho Agro Industrial Park

Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL Bill of Quantity : Package2 - Lot 3

Rehabilitation of Omar Bin El Khattab, Al Karama, and Saeed Dakka Roads in Jabalia by Using Crushed Material

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2

BILL SUMMARY. March 15, 2018 BILL No. DESCRIPTION AMOUNT

July Bill No.1: Preliminaries

Bill No.1: Preliminaries

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES

Specialty Applications. for Keystone Walls

Maine Turnpike Authority

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1

Bill of Quantity (BOQ)

STRUCTURAL STEEL FRAMING

CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES

SINAR AHS BILL OF QUANTITIES Cost code Description Unit Qty 1 SINAR AHS Contractors General Conditions Site Works Setting out works: Rates

Annex II- Lot 2. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State

Requirements for Measuring and Pricing of Structural Concrete

Annex III- Lot 3. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 8 Admin Units in localities of Sinar State

Estimate FOR THE SEPTIC TANK

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

Table of Contents. Chapter 1 : Introduction 1. Chapter 2 : Structure and design 15

Annex I- Lot 1. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 7 Admin Units in localities of Sinar State

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT

SPECIFICATION FOR REINFORCED SOIL WALL

ITEM 442 METALS FOR STRUCTURES

REPUBLIC OF KENYA THE NATIONAL TREASURY Telegraphic Address: THE NATIONAL TREASURY Finance - Nairobi POBox

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

50 lbs (23 kg) of + #8 (+2.36 mm) material plus 50 lbs (23 kg) of pile run material.

Requirements for Measuring and Pricing of Traffic Signs and Road Markings

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

SECTION MEASUREMENT AND PAYMENT

Bill of Quantity (BOQ)

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition

Minimum Sample and Test Requirements (MSTR)

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

Method of Measurement for Road Works Series MM Pavements

CATCHMENT STRUCTURE 13M X 15M

PROPOSED COMPLETION OF ROAD INFRASTRUCTURE AND MAINTENANCE WORKS AT EXPORT PROCESSING ZONES AUTHORITY - ATHI RIVER. ITEM NO.

1.02 RELATED WORK: Refer to the following sections for related work:

INSTALLATION MANUAL FOR MODULAR EXPANSION JOINT (LG SYSTEM)

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

Bill of Quantity (BOQ)

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND

Scanned by CamScanner

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY

Bridge Manual - Part I - June CHAPTER 5 SPECIAL PROVISIONS AND ESTIMATE

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

TERMS OF REFERENCE FOR SERVICE CONTRACTING

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

SECTION 303 CULVERTS

A Provide for Contractor's Office, Store etc. Sum

Section REINFORCING STEEL

Elevated Slab Sequence

SECTION STORM DRAINAGE

CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE

TABLE OF CONTENTS

METALS Commissioning of Metals Structural Steel Framing Steel Studs... 2

Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill No Description Unit Qty

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

KANPUR SMART CITY LIMITED

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2017-Tender Capital Works

G. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations.

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

Attachment A Repair Knee Brace on High Arch Salt Building Fayette County, Mill Run Stockpile #24 Project # Building #PA

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

WORKS DESCRIPTION Unit. Quantity Unit price Total USD

Keuka Studios May 2008 SECTION {05720} CABLE RAILING SYSTEM {CABLE RAILING SYSTEM} Display hidden text for Specifier Notes.

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

DRAFT. Draft Bill of Quantities. Drainage

SECTION CAST-IN-PLACE CONCRETE

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS

Maine Turnpike Authority

Special Provision No. 541S01 October OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced with the following:

Clarification of ITB Amendment No. 1 Pre-Bid meeting Minutes. Excavation and leveling of the Jericho Agro Industrial Park

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS

CW 3240 RENEWAL OF EXISTING CURBS TABLE OF CONTENTS

SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address:

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

Whatcom County Bid ADDENDUM NO. 2 West Badger Road / Bertrand Creek Bridge #50 Replacement CRP Federal Aid BRS-2037(107)

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

Transcription:

United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES

Lot #2 Construction & Rehabilitation of Wadi Gaza Bridge

SECTION 1: Demolition, Excavation and Backfilling Works Introduction: the contractor shall visit the site and make all investigations deemed necessary to ascertain the nature of the existing conditions of the structures to be demolished or to receive any alteration, and satisfy him as to the form and nature of works to be carried out, and the existing site conditions. It shall be understood that all salvaged materials and fittings are the UNDP property and stored as instructed by the UNDP. 1.1 Cutting & Removal of the existing demolished bridge elements (damaged foundations, concrete lining, approach slabs, end and retaining beams, piers, walls, deck, upstand beams, ground slab, protection fill, protection lining, retaining beams, hand rails, and whatsoever obstructing the works to be executed according to the design drawings ), and transporting of surplus material to approved places. The price includes all safety precautions that any deemed necessary for executing the works inclusive of supplying and erecting support scaffolding to support the bridge slab if required before demolishing the damaged slab and piers according to approved shop drawings and engineer's instructions. The contractor has to submit a workplan regarding this item for approval of the Engineer. (Demolished bridge length is about 40m and average width =6m) Lump Sum 1 1.2 Cleaning the site area of bridge and cutting and removal of existing artificial fill and rubbish to the natural ground level (Wadi bottom level) to flow naturally, In addition to transportation of surplus material to approved places. M 3 1500

1.3 Excavation in any kind of soil/concrete from natural levels to bottom levels of caps according to drawings, and Engineer s instruction. Note: Payment to the contractor according to engineering measurement 1.4 Backfilling from the excavated level to the bottom level of the ground slab using granular fill (Kurkar) compacted to 98% of maximum dry density in layers not exceeding 25cm thick. 1.5 Ditto, but for the inclined embankments. SECTION 1 M 3 150 M 3 400 M 3 100

SECTION 2: Concrete Works The following items include: Using new plywood 18mm thick for concrete fair face works Polythene sheet for concrete elements exposed to the soil Supply and cast plain concrete B200-10cm thick as shown in drawings Supply and fix concrete shuttering using tie-rods patent rods, after removal of tie caps it will be filled with non shrinkage cement grout. Supply reinforcement steel bars, bend, shape and fix to specified locations, Supply and cast ready-mixed concrete using mechanical vibrators, curing, and testing, required admixtures for concrete. Two coats of water-proof hot bitumen for all elements under the ground level (piers, walls and pile caps) and the backside of walls, Make openings and sleeves in the walls with the required steel detailing. Clean of existing steel reinf. 2.1 Supply and cast reinforced concrete (B350) for Pile Foundations, of depth 10m, and diameter 40cm. The price includes steel pipe casing, the casing to be removed and cutting the top 40cm to the bottom of concrete cap foundation, drilling and all other requirements to complete the works as per drawings and engineer s instructions. Linear Meter 220 2.2 Supply and cast reinforced concrete (B350) for piles caps Type1, as per drawings and engineer s instructions. M 3 22 2.3 Ditto, but for type 2 including drilling and fixing new steel bars with approved epoxy and applying bonding agent to the existing concrete, as per drawings and engineer s instructions. M 3 3

2.4 Supply and cast reinforced concrete (B- 350-fair face) for piers type 1, (Fair Face finished for sides not exposed to earth including supplying and fixing 2cm kalkal in girder support and 300x200x25mm galvanized steel plates as per drawings and engineer s instructions. M 3 15 2.5 Ditto, but for type 2 (including backwalls). Price shall includes 2cm kalkal in the backwalls and drilling and fixing new steel bars with approved epoxy and applying bonding agent to the existing concrete, as per drawings and engineer s instructions. M 3 5 2.6 Supply and cast reinforced concrete (B- 350 fair face) for Bridge solid slab, Fair Face finished, (thickness=20cm) including drop beams, inverted beams and all other required works according to drawings. Including supplying and fixing 300x200x25mm galvanized steel plates to main girders as detailed in drawings, and according to engineer's instructions. M 2 230 2.7 Supply and cast reinforced concrete (B- 300) for the concrete lining ground slab 15cm thick including expansion joints and polythene sheet (0.15mm thick) under slab, price includes excavation for the ground slab. As per drawings and engineer s instructions. M 2 500 2.8 Ditto, but for the concrete approach slab 15cm including expansion Joint and all requirements as per drawings and engineer s instructions. M 2 60 2.9 Ditto, but for edge beams 20x100cm. As per drawings and engineer s instructions. M 3 10 2.10 Ditto, but for retaining and end beams 20x50cm. As per drawings and engineer s instructions. M 3 7 2.11 Ditto, but for 10cm thick slab for the protection embankment fill including expansion Joint and all requirements as per drawings and engineer s instructions. M 2 200

2.12 Supply and apply special painting material (FOSROC Brush Bond or SIKA Top Seal 107) for any concrete elements above the ground level (piers, walls, beams and slab). M 2 710 SECTION 2

SECTION 3: Miscellaneous Works 3.1 Supply, assemble and fix Elastomeric bearing joint, (Bearings TYPE 1) according to German Standards DIN 4141 Part 14, plan size 200x300mm with a total thickness of 30mm (two elastomeric layers 8mm each and three reinforcing steel shims with 3mm each) and with allowable vertical load of 750kn. As detailed in drawings, and according to Engineer s instructions. No. 15 3.2 Supply and lay compacted asphalt binder course (3/4 nominal aggregate size) 7 cm average thickness, compacted to at least 98%, including spraying the slab with RC2 binder coat at the rate of 1.0 kg/m 2 and all required tests. All in accordance with the specifications, drawings, and Engineer s instructions. M 2 350 3.3 Supply and lay approved sub-base material (Kurkar) for the carriageway (under the approach slab) with CBR >30% in layers of 15cm thickness each with watering and compaction up to 98% of maximum dry density MDD. The price includes preparation of subgrade to design levels and compaction up to 95% according to modified Procter test. M 3 60 3.4 Ditto but Kurkar, of 10 cm thick in one layer for sidewalks with CBR >30% and compaction to 95 %. M 2 40 3.5 Supply and lay pre-cast concrete interlock tiles 6cm thick for the sidewalks on a layer of 5 cm clean sand. Price include compaction and filling joint with sand to required grades, Shape, pattern and color are as advised by the engineer. M 2 40

3.6 Supply and install handrail of the bridge comprising of F3 & F1.5 galvanized steel pipes with required welding. The work includes fixing and painting as per the drawings and engineer s instructions. The painting should be done by using a primer polyzinc layer and two layers of colored paint according the drawings and Engineer s instructions. Price also includes painting of curbstone according to engineer's instructions. Linear Meter 200 3.7 Supply and install double galvanized steel pipes 4 including all fittings and welding and hanging holder. The holder consists of (80x45x6mm) galvanized steel section and fixed to the bottom of bridge slab through galvanized steel Plates and anchored to the slab through 3F20 anchors according to Engineer s instructions. The item also includes connecting the pipes with the existing manholes at the both ends of the bridge. The contractor shall coordinate with the PALTEL regarding transferring the telephone lines. MR 50 3.8 Supply and fix signboard showing allowed vehicles to pass over the bridge as per drawings. The work shall include galvanized steel posts, concrete foundations, Timber or ply backboards and all other required works. No. 2 3.9 Supply and fix cast iron rainwater drainage grit 90x40cm including galv. Steel plate tray and galv. Steel pipe 6 and all necessary fittings and pieces as indicated in drawings and according to the engineer's instructions. No 4

3.10 Maintain and clean out the existing gutters and Paltel manholes at the both ends of the bridge to the operational conditions. Price includes supply and installs missing cast iron grills and covers 25 tons capacity and connecting the gullies to the wadi flow using pipes of the same existing size and type of pipes and all requirements according to the engineer s instructions. L.S 1 SECTION 3

Section No. 1 SUMMARY OF LOT#2 Section Description Value Demolition, Excavation, Backfilling and Stone Works. 2 Concrete Works 3 Miscellaneous Works Total VAT ZERO Grand Total Grand Total in Words. Contractor Authorized Person to sign Signature Stamp Date... Address.. Tel. Fax