DATA ITEM DESCRIPTION

Similar documents
Number: DI-HFAC-81743A Approval Date: Office of Primary Responsibility: AS/AIR 4.6 Applicable Forms: N/A

DATA ITEM DESCRIPTION TITLE: TRAINING SITUATION DOCUMENT Number: DI-SESS-81517C Approval Date:

Headquarters U.S. Air Force

711th Human Performance Wing

Number: DI-IPSC-81427B Approval Date:

Number: DI-IPSC-81427B Approval Date:

DATA ITEM DESCRIPTION

DATA ITEM DESCRIPTION TITLE: TRAINING EVALUATION DOCUMENT Number: DI-PSSS-81524C Approval Date:

DATA ITEM DESCRIPTION

STATEMENT OF WORK SMALL SPACECRAFT PROTOTYPING ENGINEERING DEVELOPMENT & INTEGRATION (SSPEDI) Space Solutions (SpS)

Centerwide System Level Procedure

DEPARTMENT OF DEFENSE STANDARD PRACTICE

DEPARTMENT OF DEFENSE HANDBOOK ACQUISITION OF SOFTWARE ENVIRONMENTS AND SUPPORT SOFTWARE

CMMI for Acquisition Quick Reference

Section M: Evaluation Factors for Award HQ R LRDR Section M: Evaluation Factors for Award For HQ R-0002

NATO QUALITY ASSURANCE REQUIREMENTS FOR DESIGN, DEVELOPMENT AND PRODUCTION AQAP-110

REQUEST FOR DEVIATION (RFD) Army Materiel Command (AMC)

CMMI V2.0 MODEL AT-A-GLANCE. Including the following views: Development Services Supplier Management. CMMI V2.0 outline BOOKLET FOR print.

Policy and Procedure Examples

EXPRESS PROGRAMMATIC STATEMENT OF WORK TABLE OF CONTENTS

A Practitioner s Guide for Implementing DoD Parts Management

BHG Operational Awareness Program May 8, 1998 Configuration Management Revision 0 Page 1 of 11 CONFIGURATION MANAGEMENT

Version 1.0. The Contract Management Standard Final Edition. Version 1.0

Appendix T Human Factors Engineering Project Plan Template

Version 1.0. The Contract Management Standard Final Edition. Version 1.0

7/2/2009. Suggested Requirements for a Definition. HSI Definitions and Domains. 1). The definition shall distinguish HSI from other, related fields.

The Integrated Baseline Review (IBR)

DATA ITEM DESCRIPTION

DATA ITEM DESCRIPTION

PURCHASE ORDER ATTACHMENT Q-201 SOFTWARE QUALITY SUBCONTRACTOR REQUIREMENTS TASK DESCRIPTIONS - PURCHASE CATEGORY "A"

TECHNICAL REVIEWS AND AUDITS

PMI Scheduling Professional (PMI-SP)

OCRWM Title: Quality Assurance Requirements and Description DOE/RW-0333P, Revision 19 Page: 2 of 149

NATO Integrated Quality Requirements for Software throughout the Life Cycle

International Diploma in Project Management. (Level 4) Course Structure & Contents

MIL-HDBK-512A 31 October 2001 SUPERSEDING MIL-HDBK October 2000 DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT

Sensor Package Integration for the X-65B Experimental Unmanned Combat Air Vehicle -- Navy (UCAV-N) Statement of Work.

INTRODUCTION TO PARTS MANAGEMENT

Distribution Statement A. Approved for public release; distribution is unlimited.

Space product assurance

7. Project Management

Dimensions for Project Success Enabled by the Sponsor / P 3 M Relationship

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

AMCOM EXPRESS BUSINESS AND ANALYTICAL STATEMENT OF WORK TABLE OF CONTENTS

DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT

Request for Solutions: High Energy Laser (HEL) Flexible Prototype. 11 December 2018

GENERAL SERVICES ADMINISTRATION

DEPARTMENT OF DEFENSE HANDBOOK GUIDANCE FOR ACQUISITION OF TRAINING DATA PRODUCTS AND SERVICES (PART 1 OF 5 PARTS)

RISK MANAGEMENT SUPPLEMENT TO IEEE

TOPIC DESCRIPTION SUPPLEMENT for the SYSTEMS ENGINEERING SURVEY DESCRIPTION

I. Development, Submittal, and Acceptance of a Quality Management System

GENERAL REQUIREMENTS FOR ENGINEERING AND DESIGN

SECTION C - DESCRIPTION / SPECIFICATIONS / STATEMENT OF WORK

AIR FORCE SUSTAINMENT CENTER

Quality Management System Manual

REQUEST FOR OFFER RFO: For: Business Continuity Program Development Consultant Services. For: Covered California

PMP Exam Prep Coaching Program

RFP: The Center for Environmental Excellence Task on Stormwater. Introduction

LOGISTIC SUPPORT ANALYSIS DEFENCE STANDARD

Scoping Framework: Scoping Projects for Easier Cost Estimating

DI-MGMT-XXXXX (Technical Data DID) April 13, 2017

M3 Playbook Guidance. 1.1 Establish Initial Customer PMO and Processes. Human Resources (HR)/Staffing Plan

Essential Duties (Roles and Responsibilities)

PUBLIC CONTRACT CODE SECTION

CONTRACT CONDITIONS, TECHNICAL, STANDARD FOR

ATTACHMENT 1 QUESTIONNAIRE

GUIDELINES FOR THE PREPARATION AND MAINTENANCE OF THE COST ANALYSIS REQUIREMENTS DESCRIPTION

SECTION QUALITY CONTROL

Sawdey Solution Services

New Mexico. Content CAREER READINESS. Standards. and. Benchmarks GRADES K-8

Project Planning and Management (PPM) V2.0. WBS Dictionary

CONTRACT CONDITIONS, TECHNICAL, STANDARD FOR

Project Procedures 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /21/2012 PAGE 1 OF 13 BASIS OF OPERATION

Cost Estimating Documentation Guide

IBG GSA Schedule. IBG's GSA Schedule 70 contract number is: GS-35F-0546W

SECTION CONTRACTOR QUALITY CONTROL

Data Item Description

DEPARTMENT OF DEFENSE HANDBOOK MECHANICAL EQUIPMENT AND SUBSYSTEMS INTEGRITY PROGRAM

Project Management Auditing Guide

ISO 9001: 2008 Engineering Design Construction Quality Management System Sample - Selected pages (not a complete plan)

1.0 BASIS OF ESTIMATE (BOE) HOW TO

AREA HFAC. AMSC A6121 on Stwent A. Approved for public release; distribution is unlimited. MIL-STD May ,..

Space Flight Configuration Management Requirements

This resource is associated with the following paper: Assessing the maturity of software testing services using CMMI-SVC: an industrial case study

KITCHEN RENOVATION PROJECT PLAN 1

Applying Systems Engineering to ITS Projects: Advancing Beyond Federal Rule 940. INCOSE IW Transportation Working Group January 27, 2015

RWA GSA Schedule Contract Prices Contract Number GS 35F-0112J With IFF

UNCLASSIFIED FY Note FY15 increases for Soldier sensory performance, training effectiveness and Soldier system architecture research.

National Aeronautics and Space Administration Washington, DC 20546

DATA ITEM DESCRIPTION

Number: DI-SESS Approval Date:

DI-FNCL-XXXXX (Quantity & Technical Data DID) September 2, 2016

Cover Page ASSISTANT SECRETARY OF THE NAVY (RESEARCH, DEVELOPMENT AND ACQUISITION) Department of the Navy Contracting Professional Development

GENERAL AND ORGANISATIONAL REQUIREMENTS

QRS-108 Supplier Quality Plans

MECHANICAL EQUIPMENT AND SUBSYSTEMS INTEGRITY PROGRAM

ARTICLE 4 SPECIFICATIONS AND SCOPES OF WORK

OPERATIONS INTEGRITY MANAGEMENT SYSTEM

Space project management

Transcription:

DATA ITEM DESCRIPTION Title: HUMAN SYSTEMS INTEGRATION PROGRAM PLAN Number: Approval Date: 20070404 AMSC Number: N7716 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: N/AIR 4.6 Applicable Forms Use/relationship: The Human Systems Integration Program Plan (HSIPP) describes the contractor s human systems integration (HSI) program, identifies the HSI elements, and how the HSI domains will be managed and integrated with other program elements. a. This Data Item Description (DID) contains the format and content preparation instructions for the HSIPP resulting from applicable tasks delineated in the contract Statement Of Work (SOW). Requirements: 1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions shall be as cited in the current issue of the Department of Defense Index of Specifications and Standards (DOD ISS) at the time of the solicitation. 2. Format. The HSIPP format maybe be contractor selected but shall contain all of the Elements discussed below. Unless effective presentation would be degraded, the initially used format shall be used for all subsequent submissions. All updates shall be conspicuously indicated in a manner consistent with standard editorial practices. 3. Tailoring. The HSIPP may be tailored to reflect the program needs, acquisition category and phase of development. Additionally, the HSIPP shall contain proposed tailoring of the requirements and guidelines as applicable to the contract, in addition to any tailoring already accomplished by the procuring activity. Proposed tailoring of the guidelines shall identify specific provisions, by paragraph, as applicable including supporting rationale. If no tailoring is proposed beyond that specified by the procuring activity, this shall be stated. 4. Content. The HSIPP shall contain the following information: a. Table of contents, list of illustrations, acronyms/abbreviations. b. Overview. Provide the HSIPP purpose and scope, system description, mission description, operational environment, predecessor system(s) and related lessons learned, system acquisition strategy, acquisition category and phase of development. Describe the overall Human Systems Integration (HSI) objective and integration strategy of individual HSI domain objectives. Describe what must be accomplished in the application of HSI to the system development, consistent with the contract statement of work (SOW), system requirement and specification(s) and Work Breakdown Structure (WBS). c. Organization Identify and describe the contractor s primary organizational element(s) 1

c. Organization. Identify and describe the contractor s primary organization elements(s) and HSI working group responsibility, authority and accountability for complying with HSI requirements. Define the functions and internal structure of this element(s), to the individual HSI domain level. Include the number of proposed personnel on an annual basis and summary job descriptions for key positions (e.g. HSI manager, domain leads, practitioners) and minimum required qualifications. Describe each domain's interactions with all other HSI domains and program integrated product teams or working groups. Describe the relationships of the HSI element(s) to other organizational elements responsible for areas impacted by HSI such as systems engineering and those charged with hardware and software design, test and evaluation, integrated logistic support, other engineering specialty programs (e.g. availability, reliability, maintainability, configuration management, and risk management) and government HSI elements. d. HSI in Support of Affordability and Performance Goals. Describe the methods by which the contractor will identify and conduct tradeoffs between HSI domains in support of HSI primary goals: reduce total system ownership costs, optimize total system performance and ensure that the system is built to accommodate the characteristics of the user population that will operate, maintain, and support the system. e. HSI Issues and Risks Describe the approach and procedures for identifying, documenting, validating, prioritizing, tracking, reporting, resolving and mitigation verification of HSI issues and risks over the life of the program. Describe the process for trading off the HSI risk and issues between HSI domains, and between HSI and other disciplines. Explain the contractor procedures for communication and conflict resolution. Present the method and process for integrating HSI issues and risks with those issues and risks tracked by the government team. f. Human Systems Integration in subcontractor efforts. If any work related to system components or software having operator, maintainer or supporter interface is to be performed under subcontract describe the subcontractor s organizational element responsible for human system integration and the subcontractors HSI process and activities. Fully described the method(s) by which the prime contractor monitors subcontractor compliance. Provide a complete description of the overall process for the flow down and implementation of requirements and integration across subcontractors and all HSI domains. g. Human Systems Integration in system analysis. Identify those HSI efforts in system analysis, which are contractually applicable, and the organizational element(s) responsible for their performance. Describe HSI participation in requirements flow down, alignment and derivation; system mission analysis; determination of system functional requirements and capabilities; determination of system architecture; allocation of system functional requirements to humans, hardware, or software; development of system functional flows; and performance of system effectiveness analyses, studies and modeling, Describe the analyses to be conducted in support of system definition (e.g., manpower estimation, critical function analysis and allocation, personnel safety and survivability analyses) for each HSI domain. Also describe any data, computer programs, databases, models or other information required from the procuring activity. 2

h. Human Systems Integration in System design. Describe the HSI effort in system design to ensure compliance with the applicable provisions of the HSI requirements and guidance specified in the contract. Describe HSI participation in studies, tests, mock-up evaluations, dynamic simulation, usability assessments, detail drawing reviews, systems and program reviews and system design and performance specification preparation and reviews. Describe the development and evaluation of conformance to benchmarks or criteria for performance. Explain the planned involvement of end-user personnel (e.g., Soldiers, Airmen, Sailors, Civilians etc.) in design assessments. i. Human Systems Integration in procedure development. Describe the HSI effort in procedure development to ensure compliance with the contract HSI requirements. Describe the methods, models, simulation tools and processes to ensure that: (1) Operator, maintainer and supporter functions and tasks are allocated, organized, and sequenced for optimal operational effectiveness with efficient levels of manpower and personnel, appropriate human factors, safety, occupational health, survivability, and habitability, training and minimizing system life cycle cost. (2) The results of HSI analyses and design activities are incorporated into operational, technical, and training publications and in training system design. j. Human Systems Integration in Habitability. Describe methods by which the contractor will analyze, design and validate requirements for the physical environment (e.g., adequate personnel space and environment control) and, if appropriate, requirements for personnel services (e.g., medical, and mess) and living conditions (e.g., berthing, education, recreation and personal hygiene) that have an impact on meeting or sustaining system performance or the quality of life. k. Human Systems Integration in Personnel Survivability Describe the methods by which the contractor will analyze, design and validate requirements for systems with missions that might require exposure to natural and combat threats, Describe the methods by which the contractor shall ensure that operator, maintainer and support personnel survivability is analyzed and that results are incorporated into system design to facilitate personnel survivability. Issues to be addressed include: protection against fratricide, detection, protection from injury, nuclear, biological, and chemical effects; the integrity of the crew compartment; life support equipment and provisions for rapid egress when the system is severely damaged or destroyed. l. Human Systems Integration in manpower, personnel and training. Describe the methods by which the contractor will analyze, design and validate operator, maintainer and support personnel and training requirements based upon human performance requirements developed from system analysis data. Described the following: Tradeoff analysis involving numbers, knowledge, skills and abilities of personnel, active duty versus reserves, military versus civilian personnel, contractor versus DOD personnel. Experience level analysis. Manpower affordability analysis. Tradeoff analysis between system design and Training requirements (e.g., user interface commonality, usability and complexity versus training cost)s 3

Manpower and personnel estimation, analysis and reporting. Estimates of the life cycle cost of operations and support related to manpower, personnel and training m. Human Systems Integration in Environment, Safety and Occupational Health (ESOH) Describe the methods by which the contractor will analyze, design and validate the prevention of ESOH hazards where possible and manage ESOH hazards where they cannot be avoided. Include The strategy for incorporating ESOH considerations into the system acquisition process Methods of documenting hazardous materials used in the system or system manufacturing, and a plan for system demilitarization and disposal n Human Systems Integration in Human Factors Engineering. Describe the approach by which the contractor will apply Human Factors Engineering principles, methods, criteria, best practices and standards to ensure operator, maintainer and support personnel system interfaces are designed to optimize human performance and maximize total system performance (human, hardware, software). Describe the Human Factors Engineering activities including mission and functional analyses, system design requirement analyses, human versus system functional allocation, modeling and simulation, human system interface design and procedures, system design inputs and evaluations, design reviews, drawing reviews and sign-off, user surveys and test and evaluations o. Human Systems Integration in test and evaluation Describe HSI participation in test and evaluation as an integrated effort within the contractor s total test and evaluation program Include specific information to show how and when the contractor will test, evaluate and validate requirements related to human systems integration. Identify design milestones at which HSI tests are to be performed to assess compatibility among human performance, manpower, personnel and training requirements, and systems design aspects of human, and hardware interfaces. Describe test and demonstration objectives and proposed test methods. Also identify the number, location and role of human systems integration personnel involved in test and evaluation. Provide a summary test schedule that depicts HSI tests, evaluations, and demonstrations in relationship to project milestones such as system design releases, project level design reviews, development test, operational test, first article demonstration tests, and commencement of procuring activity testing. p. Data Sources. Identify contractor, industry, technical society and government standards and documents that will be applied to the HSI effort and activities and any proposed tailoring of those standards and documents. Also identify primary customer requirements documents and contract documents that impact the contractor s HSI effort and activities. q. Human Systems Integration deliverable data products. Identify and briefly describe each human systems integration deliverable data product specified in the contract or proposed by the contractor. 4

r. Time-Phase schedule and level of effort. Provide a milestone chart that identifies each separate human systems integration effort to be accomplished during each acquisition phase. The schedule shall show key HSI decision points and their relationship to the program decision points. s. HSI Program Quality Control. Describe the approach for periodically assessing the quality of HSI program efforts over the course of the system development contract. Describe the method and criteria for evaluating the quality (relative success, progress) in each HSI domain. Describe how the prime contractor will asses the following measures of subcontractor HSI program success: top level leadership, focus on human-centered design, source selection policy, organizational integration of HSI domains, documentation Integration into the procurement process, quantitative human performance, HSI technologies, test and evaluation assessments, highly qualified practitioners, and education and training. Define the frequency by which these assessments shall be made and provided to the customer. 5. End of. 5