Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Similar documents
Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project PHASE 2 MONTHLY COST AND SCHEDULE UPDATE AS OF SEPTEMBER 30, 2018 NOVEMBER 2018

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

Capital Rail Constructors a Clark & Kiewit Joint Venture Jim Ansari Senior Vice President & General Manager

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project

Second Avenue Subway

Eglinton Crosstown LRT Construction Liaison Committee

Building Excellence IV Capital Levy Projects Under Construction

Dulles Corridor Metrorail Expansion. Providing Safe Transportation for Northern Virginia

Phase 2 Exposition Metro Line Project

Phase 2 Exposition Metro Line Project

EVALUATION OF ALTERNATIVES CARRIED FORWARD

Auburn University Construction Project April

Phase 2 Exposition Metro Line Project

Metropolitan Washington Airports Authority. Phase 2: Extension To Dulles Airport/Route 772 STATEMENT OF WORK

Metropolitan Washington Airports Authority. Phase 2: Extension To Dulles Airport/Route 772 STATEMENT OF WORK

PROJECT COMPLETED. Bayside High School. Comprehensive Additions and Renovations

Seattle Public Schools Building Excellence IV Projects Under Construction

CARVER ELEMENTARY SCHOOL PROJECT May 2017 Monthly Status Report

Phase 2 Exposition Metro Line Project

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Customer Service and Operations Committee. Board Information Item III-B. October 9, 2014

Construction Project Briefing. October 10, 2018

Dulles Corridor Metrorail Project Phase 2 Package B

Metropolitan Washington Airports Authority. Phase 2: Extension To Dulles Airport/Route 772 STATEMENT OF WORK

Photos by Susie Fitzhugh. BEX IV Projects Update: Arbor Heights, Genesee Hill, Pinehurst, Thornton Creek

CTA Capital Construction Update August 8, 2007

Building Excellence IV Capital Levy Projects Under Construction

Construction Project Briefing. May 9, 2018

ADDENDUM 2 - JULY 14, 2015

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Capital Projects Update

Doing Business with the Metropolitan Washington Airports Authority

July 15, 2010 Report No. 11 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY

Construction Project Briefing. November 19, 2014

DULLES CORRIDOR METRORAIL PROJECT Extension to Wiehle Avenue

ORANGE VISTA HIGH SCHOOL PHASE I

Construction Project Briefing. March 9, 2016

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #07. Latrobe Elementary School. Greater Latrobe School District

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

UPCOMING DESIGN & CONSTRUCTION PROJECTS 3 rd Quarter 2018 Rev 2 (Project & Construction Management)

Second Avenue Subway

Construction Project Briefing. September 11, 2013

3.6 Construction Methods

APPENDIX H- ALTERNATIVES PREVIOUSLY CONSIDERED

Construction Update. April 2016

Update on FCPS Construction/Renovation Projects. November 2015

Property Condition Assessment

Auburn University Construction Project Update March 2010

Project Manual Index of Specifications Shenandoah Schools Concession Building

Aviation Capital Construction Program Update

Construction Update. March 2018

June 10, 2010 Report No. 10 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY

Construction Update. May 2016

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT

CONSTRUCTION REPORT. Zionsville Community Schools Zionsville, Indiana. October 2014 TSC NO

HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District

Construction Project Briefing. July 11, 2018

Auburn University Construction Project Update June 2010

Arbor Heights Elementary School. Concrete for South Building Foundation Stem Walls

Wissahickon School District Natatorium & Central Plant Project. Project Update March 27, 2017

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7

Building Excellence IV Capital Levy Projects Under Construction

Construction Project Briefing. November 14, 2012

MONROE COUNTY ZONING OFFICE

March 24, 2011 Report No. 17 MONTHLY CONSTRUCTION PROGRESS REPORT

Phase 1 Final Revised Baseline Budget Approved June 9, 2016

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

Building Inspection Report

Construction Project Briefing. November 14, 2018

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587

New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16

COMPREHENSIVE MONTHLY REPORT. September 2010

Ironton Russell Bridge Project

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

Christopher Glinski Construction Management. AE Senior Thesis Columbia Heights Community Center. Appendix B. Project Summary /Detailed Schedule

Project Budget and Schedule Status Report

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

Construction Look Ahead February 2018

Engineering & Construction -- Transit Status Report. Significant Issues

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #133 Douthit Hills Student Community, Clemson University Project Tony Greene

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

Capital Projects Update

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

3.10 Hydrology and Water Quality. Environmental Setting

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

Site Bldg Fiscal Yr System Sub-System. Verde Valley Site site 2014/15 Parking Paving. Verde Valley Site site 2014/15 Sidewalks

HILLVIEW ELEMENTARY ADDITIONS AND ALTERATIONS Grove City Area School District

Transcription:

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates November 29, 2017 Charles W. Stark Executive Project Director

Silver Line: Phase 2 Station Tour

Phase 1

Phase 1 Cost Summary Expenditures (May thru Oct 2017) Total Expenditures (Thru Oct 31, 2017) $ 12.7 Million $ 2.904 Billion Forecast at Completion $ 2.982 Billion

Phase 1 Update Closeout of VDOT Comprehensive Agreement There are two categories of work that must be performed: remediation of all remaining VDOT facility deficiency items and the Old Meadow Road intersection lane widening. Bechtel has agreed to perform a portion of the pipe remediation. MWAA will remediate the remainder of the deficiencies and recoup costs from Bechtel. Task Order Contract Status Task Orders with Notice To Proceed (NTP): 34 issued, including Old Meadow Road Design; 31 have been completed. Upcoming activities include: Americans with Disabilities Act sidewalk repair, storm drain remediation, manhole/structure repair, Chain Bridge Road drainage design, DCR Median Stormwater runoff repairs, and Dulles Connector Road left shoulder modification.

Old Meadow Road Schedule The final design is nearing completion for the realignment. 90% design is complete and responses to comments have been issued. VDOT has approved the curb radius design exception. Utility coordination (design) is required before completion of the 100% design. A modification for managing utility coordination was issued in October. Utility Issues: Numerous utility facilities require minor relocation work, but significant coordination and time effort for management, design and construction. 11 utility agencies/companies are involved. Plans Moving Forward: Start construction in early 2018, complete construction 2 nd quarter 2018.

Phase 2 Package A 74% Complete Package B 61% Complete

Phase 2 Cost Summary Expenditures (May thru Oct 2017) $ 338.5 Million Total Expenditures $ 1.482 Billion Total Budget $ 2.778 Billion Total Forecast $ 2.778 Billion

Current Guideway & Stations Design-Build Activities All Design Packages complete and issued for construction. 98 Identified Design and Field Changes in Progress: 32 to be submitted 12 in review process with MWAA 54 in response or IFC production process with CRC 23 reviewed/processed by MWAA last month 20 Permit Amendments issued for Design Revisions. 87 Supplier Submittals reviewed/processed last month.

Upcoming Guideway & Stations Design-Build Activities Electricians will continue receiving Traction Power Substation (TPSS) and Tie Breaker Station (TBS) buildings and connecting these facilities with power cables to the guideway and stations. Innovation/Herndon/Reston Stations Continue roofing, escalator installation, and electrical and plumbing; erect remaining pedestrian bridge spans and pour concrete pedestrian bridge decks. Dulles Station Continue mechanical and plumbing, elevator and escalator installation and continue the installation of the station canopy roof. Track Ballasted rail and switch installation continues on the east and west at-grade guideways, Aerial Direct Fix Track is being installed through the Dulles Station and continuing to the east from the station.

Installation of Pedestrian Bridge at Reston Station

Pedestrian Bridge at Reston Station

Herndon North Station Pedestrian Bridge Interface

Installation of Power Conduits at TPSS #12

Installation of Track Turnouts East of Innovation Station

Installation of Tie Extenders for Traction Power Rail in At-Grade Guideway

Relocation of Utilities along Sunrise Valley Drive at Herndon Garage Entrance

Preparation of Pedestrian Walkway Sections for Innovation North Pavilion Access

Reinstallation of Modified Moving Walkways In Airport Pedestrian Tunnel

Dulles Station Platform Canopy Roof Framing

Loudoun Gateway Station Structural Steel Roof Framing

Ashburn Station Precast Installation

Window Frame Installation Second Floor TB

Dulles International Airport Station Progress

Dulles International Airport Station Progress

Current WMATA Rail Yard & Maintenance Facility Design-Build Activities Final grading, paving and utility installation continues. Service and Inspection Building s (SIB) roofing and interior buildout continues. Maintenance of Way Building (MWB) roofing and interior buildout continues. Transportation Building (TB) interior buildout continues, roofing to start shortly. Train Wash Facility (TWF) structural steel underway. Rail welding progressing, 43 of 49 sections of special track work roughed in. Rail alignment/tamping/destressing ongoing.

WMATA Rail Yard & Maintenance Facility Design-Build Activities Ongoing SIB interior fit out, switchgear room buildout, machine shop equipment foundations and interior floors. Rail and special trackwork installation, tamping and aligning. Resolve open design and time extension changes. Review shop documents and construction submittals. Construction inspection and testing. Interface coordination with Package A.

Placing Concrete for TPSS# 21A Cable Pit Walls

Paving the Perimeter Road NW of the TB

Screeding Sidewalk Concrete Placement, Looking East TWF in Right Background

Placing Slab On Grade, SW Corner of TB

Installing Glazing in the South Wall of the SIB

Installing Concrete Masonry Walls in SIB

Installing Wall Stud Framing on the Second Floor of the TB

Welding Rebar for Stray Current Prevention in the SIB

DULLESMETRO.COM