REQUEST FOR PROPOSAL Asphalt & Concrete Repair

Similar documents
Maps are enclosed of the larger areas to be included in the projects. The area in yellow are the proposed areas.

REQUEST FOR PROPOSAL Playground Surfacing Bonded Rubber

REQUEST FOR PROPOSAL Playground Surfacing Bonded Rubber

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

REQUEST FOR PROPOSAL NW Barry Road Kansas City, MO Flooring

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

Asphalt Parking Lots Restoration and Maintenance Retail Shopping Centers (See: 2009 Parking Lot Maintenance and Repair)

PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL Acoustic Ceiling Tiles

Attachment A Concrete Curb and Sidewalk Replacement Cambria County, Johnstown Driver s Exam Center Project# Building# 093DL01

City of Augusta SIDEWALK REPLACEMENT PROGRAM

Finance & Technology Administrator (815) ext 223

CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996.

SECTION ASPHALT CONCRETE

Addendum No. 3 page 1

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SECTION 503 TEMPORARY PAVEMENT RESTORATION

SECTION PORTLAND CEMENT CONCRETE

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans.

Attachment A Repair Knee Brace on High Arch Salt Building Fayette County, Mill Run Stockpile #24 Project # Building #PA

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel

STANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows:

ELLICOTTVILLE ENGINEERING DEPARTMENT 17 Mill St. Ellicottville, New York Phone: (716) Fax: (716) PROJECT SCOPE OF WORK

Request for Proposal: Due October 11, :00 pm

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

SECTION PAVING AND SURFACING

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

ASPHALTIC CONCRETE PAVING SECTION

REQUEST FOR BIDS For Asphalt Paving at Wastewater Facilities. Advertisement for Bids

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION ASPHALT PAVING AND SURFACING

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

SECTION CONCRETE PAVING

November 2, 2018 CITY OF BERKELEY FY 2018 MEASURE M STREET REHABILITATION SPECIFICATION NO C (Re-Issued) ADDENDUM NO. 1

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

BID FORM (LUMP SUM CONTRACT)

ADDENDUM NO.1. Ray Stoyer Water Recycling Facility Access Road and Site Paving Repair (IN )

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

ADDENDUM. DATE: 10/12/15 BROADWAY CROSSWALKS IMPROVEMENT PROJECT CONTRACT No: BID DATE: 10/27/15 ADDENDUM No: 1

ADDENDUM NO. 1. Date: July 6, Lot 3 Improvements Project Irvine Valley College. BID No South Orange County Community College District

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST

SPECIFICATIONS FOR BONDED WEARING COURSE

San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS.

Naperville Public Library. Parking Lot Work Naper Blvd. Library & 95 th St. Library

SECTION 12 INDEX CONCRETE CURBS AND GUTTERS

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

Overlay Applications. Overlays and Asphaltic Surfaces. Base Conditions. Subgrade. Existing PCC Pavement. Base Course 7/6/2010

SECTION FLEXIBLE PAVING

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL

729 - MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

CITY OF DE SOTO Miller Park Trail Extension and Picnic Table Pads

Asphalt Paving

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

Section 403. DRAINAGE STRUCTURES

SECTION BITUMINOUS CONCRETE PAVING AND ATHLETIC SURFACING. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

DOCUMENT ADDENDA AND MODIFICATIONS

SECTION SITE CONCRETE

COMMUNITY PLAZA WAY ASPHALT PAVEMENT OVERLAY ADDENDUM NO.1 UPPER SKAGIT INDIAN TRIBE PAGE 1

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION...7-1

ADDENDUM # 01. Date: 5/4/2018. Pickens Area Bus Office Repaving Project. IFB Number:

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS

Chapter 5: Designs for Recreational Uses 5-1 Asphalt Pavements for Non-Vehicular Use 5-1 Table 5-1: Thickness Design Chart: Bikeways, Paths, Trails

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

TOWN OF HOLLIS, NEW HAMPSHIRE

KU Medical Center 2018 PAVEMENT RESTORATION PROJECT Project No May 4, 2018

SECTION RIGID PAVEMENT

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

DIVISION 4100 SITEWORK

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

SECTION CAST-IN-PLACE CONCRETE

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA TMWA Capital Project No.: October 3, 2018

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION

Re: Concrete Installation/Demolition and Bollards Request for Proposal # R-RFP. Addendum 1 Clarifications to Request for Proposal

DIVISION 03 CONCRETE. Number CONCRETE

PERMIT TO EXCAVATE IN HIGHWAY CHESHIRE, CONNECTICUT

SECTION 2200 PAVING CITY OF BELTON, MISSOURI STANDARD SPECIFICATIONS

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL

NAME STREET ADDRESS CITY, STATE & ZIP CODE. GAS ELECTRIC TELEVISION TELECOMMUNICATION OTHER (check one) UNDERGROUND OVERHEAD BOTH (check one)

PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER

DIVISION 4.3 CITY OF SARNIA CONCRETE SIDEWALKS, CURBS AND DRIVEWAYS STANDARDS 2018

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990

INVITATION TO BID BID FORM

ESTIMATE OF QUANTITIES

SECTION 3200 CONCRETE CURB AND GUTTER

Bill of Quantity (BOQ)

REQUEST FOR PROPOSAL Ballistic Film

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment

Transcription:

REQUEST FOR PROPOSAL 2017 Asphalt & Concrete Repair English Landing Elementary School Union Chapel Elementary School Lakeview Middle School Park Hill High School Prairie Point Elementary School Congress Middle School Plaza Middle School Park Hill South High School Detailed Proposal Information is Available on District Website http://www.parkhill.k12.mo.us Bid Closing Date: March 16, 2017 Bid Closing Time: 8:30 am Asphalt Bid Closing Time: 9:00 am Concrete Park Hill School District reserves the right to reject any or all proposals and to waive informalities or irregularities in any proposal.

February 23, 2017 Dear Contractor: The Park Hill School District (District) is seeking proposals from qualified contractors (Contractor) for asphalt and concrete repairs for parking lots, curbs and sidewalks at various schools within the District. A mandatory pre-bid meeting and walk through of schools will start at Prairie Point Elementary School located at 8108 NW Belvidere Rd, Kansas City, MO 64152 on March 3, 2017 at 9:00 am. The school sites will be visited for clarification and measurements. Sealed proposals will be received by the Director of Operations at the Support Services office located at 8500 NW River Park Drive, Pillar 116, Parkville, MO 64152 on March 16, 2017 at 8:30am for asphalt and 9:00am for concrete. Proposals must be returned on the form(s) provided, with Bid Proposal Asphalt / Concrete clearly on the label. A proposal must consist of all pages of the proposal request including the signature page signed by an authorized representative of the firm. Non conformance with these instructions may be grounds for rejection of proposal. The District reserves the right to reject any and all proposals and to waive informalities. Sincerely, Jim Rich Director of Operations

General Notes Contractor will be responsible for measuring designated area. All disturbed areas must be backfilled to original elevations. Bids will be awarded by each Package. Some line items in each package may be deducted based on budget availability. Work at Lakeview Middle School may begin on May 30, 2017 and must be completed by August 1, 2017. Work at English Landing, Prairie Point, Union Chapel, Congress, Plaza, Park Hill and Park Hill South can begin on July 5, 2017 and must be completed by August 1, 2017. All work not completed by August 1, 2017 shall result in a $1,000.00 per diem penalty to be deducted by the District from final payment. The project is tax exempt. Prevailing Wages will apply. Missouri Division of Labor Standards, Wage and Hour Section, Annual Wage Order No. 23, Section 083, Platte County, or most current version will apply. Contractors who have not performed services for the District in the previous three years must submit a reference list including contact names and phone numbers. Recommendation(s) for award will go to the Park Hill School District Board of Education at the April 27, 2017 meeting. Recommended Contractor(s) will be notified as quickly as possible after the Board meeting in order to reserve a slot in contractor(s) schedule. The District reserves the right to accept or reject any or all bids. Contractor is responsible for any and all required permits.

NEW ASPHALT: Asphalt & Concrete Repair Specifications All new areas will follow same specifications as below with a 4-inch rock base, 4-inch of base asphalt and 2-inch top coat. Recycled content may be used. ASPHALT PATCHING: The areas to be removed and replaced shall be removed by first using a concrete saw or air hammer to cut neat edges. All materials will be removed from district property and disposed of by contractor. The edges of all cuts shall be primed with asphalt primer prior to the placement of any asphalt. This will include the edges of the excavation as well as curbs, walks, etc. Material shall be Type 3 asphaltic concrete and shall comply with APWA Standards for type and construction conditions during placement. The asphalt shall be the required bid depth. Asphaltic concrete shall have a temperature of at least 275 degrees Fahrenheit and be rolled with a power steel roller as required for a dense mass. All edges of areas repaired shall be level with the surrounding pavement. Rock Clause: If, after excavation, the sub-base is not suitable for asphalt installation, additional sub-base will be excavated and replaced with suitable base material. The additional cost incurred will be agreed upon and added to the final billing. Recycled content may be used.

ASPHALT OVERLAY: Prior to resurfacing, area will be thoroughly cleaned of loose debris, free of surface moisture and primed with SS1H Emulsion, or equivalent to ensure bond between existing surface and new asphalt overlay. Apply 2-inches of Type 3 asphaltic concrete and shall comply with APWA Standards for type and construction conditions during placement, working to a uniform surface, and rolled to a smooth and even finish with a power steel wheel roller. Any overlay next to concrete curbing or other asphalt will be edge milled. Recycled content may be used. MARKING: Lay out lines, as existing, prior to paving. Paint shall be applied with Kelly-Creswell Model C, airless striping machine, or equivalent. Lines shall be straight and four (4) inches in width. Paint shall meet Federal Specification TTP-1952B. Traffic markings and crosswalks will be Hot Applied Thermoplastic Pavement Markings and will be same color, unless specified differently on bid form. Handicap stalls will be marked per code. CURB BLOCKS: Remove and replace existing blocks, as necessary. Replace broken blocks with new standard pre-cast concrete. Anchor with minimum 5/8 x 12 rebar. CONCRETE REPLACEMENT: Demo, remove debris and replace with a 4-inches gravel base with 4-inches or 6-inches brushed finish concrete (depending on application, see bid forms) Concrete is to be 4,000-pound mix air entrained. Reinforce with #4 rebar tied every 4-feet on center or six ten welded wire mesh tied to reinforcement bars.

Package 1: Prairie Point Elementary School BID FORM ASPHALT Work to be completed on North and East parking lots: Mill entire lots Overlay 2-inches Remove and replace handicap signs with bollards and signs (signs must meet KCMO code) 4-inches diameter x 36-inches high $ Repaint striping on both lots See MARKING specification $ Total Package 1 $ This work is to be completed between July 5 and August 1, 2017. All work not completed by August 1, 2017 shall result in a $1,000.00 per diem penalty to be deducted by the District from final payment. Prices as bid on this form shall include total dollar amounts to cover work as specified, including labor, materials, overhead and profit. COMPANY ADDRESS PHONE FAX EMAIL PRINT NAME SIGNATURE Date:

BID FORM CONCRETE Package 2: Various English Landing Elementary School: Replace curbs on bus loop LF. $ Replace corner of bus loop 4-inch Replace entire apron at front entrance 6-inch Union Chapel Elementary School: Replace sidewalk at bus loop 4-inch Congress Middle School: Pour two 4-inch 15 x 15 pads north side of building Repaint front lot striping See MARKING specification $ *Lakeview Middle School Pour 6-inch pad north side of building to include ramp to sidewalk Pour 4-inch pad west side of building (size to be determined) Plaza Middle School: Pour 6-inch concrete pad in front of trash dumpsters Replace handicap ramp west side of building 4- inch Park Hill High School: Replace apron east lot, south entrance 6-inch Repaint west lot striping See MARKING specification $ Park Hill South High School: Replace sidewalk north of locker rooms 4-inch Replace curb north of wood shop LF. $ Replace sidewalk north of wood shop 4-inch Replace sidewalk north of auditorium 4-inch Pour concrete pad south of cafeteria Pour 6-inch pad front of trash dumpster north side of building Replace two sets of front entrance stairs $

Total Package 2 $ Work is to be completed at all buildings except Lakeview Middle School between July 5 and August 1, 2017. Work at Lakeview Middle School is to be completed between May 30 and August 1, 2017. All work not completed by August 1, 2017 shall result in a $1,000.00 per diem penalty to be deducted by the District from final payment. Prices as bid on this form shall include total dollar amounts to cover work as specified, including labor, materials, overhead and profit. COMPANY ADDRESS PHONE FAX EMAIL PRINT NAME SIGNATURE Date:

BID FORM COMBINATION Asphalt & Concrete To include Bid Package 1 and 2 Total $ Work is to be completed at all buildings except Lakeview Middle School between July 5 and August 1, 2017. Work at Lakeview Middle School is to be completed between May 30 and August 1, 2017. All work not completed by August 1, 2017 shall result in a $1,000.00 per diem penalty to be deducted by the District from final payment. Prices as bid on this form shall include total dollar amounts to cover work as specified, including labor, materials, overhead and profit. COMPANY ADDRESS PHONE FAX EMAIL PRINT NAME SIGNATURE Date: