SABAL TRAIL PROJECT. RESOURCE REPORT 12 PCB Contamination. FERC Docket No. CP

Similar documents
The PennEast Pipeline Project. Delaware Township, New Jersey September 29, 2014

FLORIDA SOUTHEAST CONNECTION PROJECT. RESOURCE REPORT 12 PCB Contamination

FLORIDA SOUTHEAST CONNECTION PROJECT. RESOURCE REPORT 12 PCB Contamination. FERC Docket No. PF

Southwestern Region 3 Carson National Forest Jicarilla Ranger District

Facilities Study Report

In 1961 a new Lift Station was constructed, the trickling filter was repaired and some minor modifications were made to the treatment plant.

In recent months, customers in Wonthaggi, Inverloch and Cape Paterson may have noticed a gradual change in the taste and smell of their water.

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report

NORTH GILA IMPERIAL VALLEY #2

Manual 11: Energy & Ancillary Services Market Operations Revision History

Section 7: INTERGOVERNMENTAL COOPERATION

Commonwealth ofmassachusetts Executive Office of Energy and Environmental Affairs Massachusetts Environmental Policy Act (MEPA) Office

Decision Memo. USDA Forest Service, Southwestern Region Jicarilla Ranger District, Carson National. Forest Rio Arriba County, New Mexico

Office for Capital Facilities

3. Direct the Engineer to prepare a feasibility study that complies with the requirements of the USACE and BCWMC criteria.

JOINT REPORT ON THE CASE FOR A SECOND NORTH SOUTH INTERCONNECTOR

Instructions for Conducting Sampling During Underground Storage Tank Closure

III. CORRECTIONS AND ADDITIONS TO THE DRAFT EIR

Appendix 5a. Mining Work Programme (R.11)

TG 19 SOUTH AUSTRALIAN WATER CORPORATION

154 FERC 61,080 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ISSUING CERTIFICATES AND APPROVING ABANDONMENT

ROXBORO STEAM ELECTRIC PLANT RISK CLASSIFICATION

o Mitigation measures are required to be identified. Soil

FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP

Curdridge Reading Room Invitation to tender for renewable energy feasibility study

May 10, Nathaniel N. Strosberg Town Planner/Director of Community Development Town of Ashland 101 Main Street Ashland, Massachusetts 01721

STATE OF VERMONT AGENCY OF AGRICULTURE, FOOD & MARKETS

PJM Manual 14A: New Services Request Process Revision: 22 Effective Date: April 26, Prepared by Interconnection Planning Department

Co Generation Plant at McMaster University Implementation and Lessons Learned

Balcony drainage for a multi-level apartment building at 5 O Reily Avenue, Wellington

CITY OF MIAMI ENVIRONMENTAL RESOURCES Tree Permit Process and Checklist

Jemena Pipelines. NSW Pipeline Infrastructure. the current picture; future needs for future supplies; challenges & opportunities for development.

VEHICLE MILES TRAVELED (VMT)

2.0 STUDY OVERVIEW. 2.1 Description of the I-20 East Transit Initiative. 2.2 Project Background and History

GET{ERAL RATB F'ILING

FLOOD HAZARD ZONE DEVELOPMENT PERMIT

Energy Storage Ontario Submission to the Standing Committee on General Government Bill 172, Climate Change Mitigation and Low-Carbon Economy Act

MIAMI-DADE COUNTY DEPARTMENT OF PLANNING AND ZONING PLANNING DIVISION

City of Surrey ADDITIONAL PLANNING COMMENTS File: Rezoning from A-1 to CD (based on A-1) Housing Agreement

SA Happy Island Water World

RE: ELLIOT LAKE Wastewater Treatment Plant Annual Performance Report

Project Selection and Prioritization

Production of Biomass Fuel for Resource Recovery: Trash Recycling in Dade County, Florida

Chapter 2. Public Guide

Pollution Prevention in Enforcement POLLUTION PREVENTION SUPPLEMENTAL ENVIRONMENTAL PROJECTS (P2 SEPs) -Information for companies-

Request for Analysis of Ballot Initiative Entitled Water and Environment Plan for November 6, 2012 Election

Gainesville Regional Transit System Rapid Transit Study. Public Involvement Plan

DRAFT. Southern Rail Corridor

Revised: To: Gabe Sevigny El Paso County Project Planner I

County Road 106 (271 st Street) Road & Utility Improvements HDR, all rights reserved.

Generation and Transmission Interconnection Facility Construction

Manitoba-Minnesota Transmission Project Pre-Application Project Description

5.2 RPM Auction Timeline

5.2 RPM Auction Timeline

Generation and Transmission Interconnection Facility Construction

Efficient access to offshore wind resources

KIDSTON PUMPED STORAGE HYDRO TECHNICAL FEASIBILITY STUDY OPTIMISATION

Nuclear Power in the WAPP

VI. ALTERNATIVES TO THE MASTER PLAN A. INTRODUCTION

Several recent studies have identified tremendous growth potential in the tens of thousands of megawatts of clean, renewable hydropower capacity.

PJM Manual 14C: Generation and Transmission Interconnection Facility Construction Revision: 12 Effective Date: June 22, 2017

TEAM INTRODUCTIONS ODOT

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

Draft Hazardous Substances and Spill Management Plan

STAFF REPORT. Peter Zielsdorf

3. Direct the Engineer to prepare a feasibility study that complies with the requirements of the USACE and BCWMC criteria.

The Core Team Process: Making Risk-Informed Decisions for On-site Monitoring at the SRS

Cadiz Valley Water Conservation, Recovery and Storage Project. OVERVIEW & UPDATE August 2011

Commercial Tax Abatement

Citizen s Advisory Panel Meeting Minutes Lakeview Reservoir (Res 113) Two Zone System Madison Water Utility October 30, 2013, 6:00 PM

Monitoring Report SD-7: Environmental Stewardship

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report

Analysis of GHG Emissions from the Proposed Pilgrim Pipeline. For Pilgrim Pipeline Holdings, LLP. Prepared by Environmental Resources Management

MS4 REQUIREMENTS TABLE INSTRUCTIONS

Hardin Interconnection. Facilities Study

RunnerStone, LLC. Page1 M E M O R A N D U M

THREATENED AND ENDANGERED SPECIES IN THE MARINE REALM

LOCAL COASTAL PLAN UPDATE. March 14, 2018 ADAPTATION STRATEGY RESULTS CONCEPTUAL SEA LEVEL RISE & ADAPTATION POLICIES

Ministere des Transports

Resource Tracker User Guide

SABAL TRAIL PROJECT. DRAFT RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. PF

TEAM INTRODUCTIONS GARVER. Kirsten McCullough AICP, RPA Environmental Lead. Jenny Sallee, PE Project Manager Roadway Lead. Nick Braddy, PE Roadway

LOCATION AND DESIGN DIVISION

Dr. J. Lee Hutchins, Jr. AECOM. San Diego, California. February 20-21, 2014

Strategy 1 Strategy 2A Strategy 2B Strategy 2C Strategy 2D Strategy 3

PS ACID SULPHATE MATERIALS

M. Conner Name: A 1/60 scale model truss bridge is to be designed and built using standard file folders.

LONG ISLAND LONG ISLAND

From: Christopher Tomlinson, GRTA Executive Director

Disaster Recovery Planning Guide

O c t o b e r 1 0 th,

BCSE-NASEO Views on Disaster Response and Preparedness

BCSE-NASEO Views on Disaster Response and Preparedness

Re: Correction of Road Permit located at Seg. 1 from d-7-b, 93-M-12 to b-7-b, 93- M-12 Seg. 2 from b-17-b, 93-M-12 to c-7-b, 93-M-12

Stakeholder Advisory Group Meeting #2

Center for Energy Research at UNLV. Hydrogen Filling Station and related renewable energy projects

Dear Interested Party: Background

CASE STUDY ON THE IMPLEMENTATION OF A PIMS SYSTEM FOR AN OFFSHORE ASSET FROM ENGINEERING TO SOFTWARE

Transcription:

SABAL TRAIL PROJECT RESOURCE REPORT 12 PCB Cntaminatin FERC Dcket N. CP15- -000 Nvember 2014

TABLE OF CONTENTS 12.0 RESOURCE REPORT 12 PCB CONTAMINATION... 12-1 12.1 INTRODUCTION... 12-1 Resurce Reprt 12 PCB Cntaminatin i SABAL TRAIL PROJECT

RESOURCE REPORT 12 PCB CONTAMINATION Filing Requirement Fr prjects invlving the replacement r abandnment f facilities determined t have PCBs, prvide a statement that activities wuld cmply with an apprved EPA dispsal permit r with the requirements f the TSCA. ( 380.12(n)(1)) Fr cmpressr statin mdificatins n sites that have been determined t have sils cntaminated with PCBs, describe the status f remediatin effrts cmpleted t date. ( 380.12(n)(2)) Lcatin in Envirnmental Reprt Nt Applicable Nt Applicable Resurce Reprt 12 PCB Cntaminatin ii SABAL TRAIL PROJECT

ACRONYMS AND ABBREVIATIONS Dth/day FERC FGT FSC Gulfstream M&R MLV MP PCB Prject Sabal Trail Transc dekatherms per day Federal Energy Regulatry Cmmissin Flrida Gas Transmissin Cmpany, LLC Flrida Sutheast Cnnectin, LLC Gulfstream Natural Gas System, LLC metering and regulating mainline valve milepst Ply-chlrinated biphenyl Sabal Trail Prject Sabal Trail Transmissin, LLC Transcntinental Gas Pipe Line Cmpany, LLC Resurce Reprt 12 PCB Cntaminatin iii SABAL TRAIL PROJECT

12.0 RESOURCE REPORT 12 PCB CONTAMINATION 12.1 Intrductin Sabal Trail Transmissin, LLC ( Sabal Trail ), a jint venture between affiliates f Spectra Energy Partners, LP and NextEra Energy, Inc. ( NextEra ), is seeking a Certificate f Public Cnvenience and Necessity ( Certificate ) frm the Federal Energy Regulatry Cmmissin ( FERC ) pursuant t Sectin 7 (c) f the Natural Gas Act authrizing the cnstructin and peratin f the Sabal Trail Prject ( Prject ). The Prject is a new natural gas transmissin pipeline cmprised f a cmbinatin f lease capacity and new greenfield pipeline cnstructin that will prvide apprximately 1,075,000 dekatherms per day ( Dth/d ) f new firm natural gas transprtatin capacity. Sabal Trail will acquire the capacity created by Transcntinental Gas Pipe Line Cmpany, LLC s ( Transc ) Hillabee Expansin Prject (FERC Dcket Ns. PF14-6-000 and CP15-16-000) pursuant t a capacity lease, which extends frm Transc s Cmpressr Statin 85 in Chctaw Cunty, Alabama t an intercnnectin with the new greenfield pipeline in Tallapsa Cunty, Alabama. Sabal Trail will cnstruct, wn and perate the greenfield pipeline, which will extend frm Tallapsa Cunty, Alabama t a new intercnnectin hub ( the Central Flrida Hub ) in Oscela Cunty, Flrida. At the Central Flrida Hub, the Prject will cnnect with the Flrida Sutheast Cnnectin Pipeline Prject, currently being prpsed by Flrida Sutheast Cnnectin, LLC ( FSC ) (FERC Dcket N. PF14-2-000 and CP14-554-000). In additin, at r near the Central Flrida Hub, the Prject will intercnnect with Gulfstream Natural Gas System, LLC ( Gulfstream ) and Flrida Gas Transmissin Cmpany, LLC ( FGT ). The greenfield prtin f the Prject will have an initial capacity f 830,000 Dth/day with a prpsed in-service date f May 1, 2017. Thrugh a series f phased cmpressr statin expansins t meet the future capacity needs f Sabal Trail s custmers, the Prject capacity will increase t apprximately 999,000 Dth/day by 2020 and 1,075,000 Dth/day by 2021. Pipeline Facilities The Prject includes cnstructin f apprximately 474.4 miles f new 36-inch diameter natural gas transmissin pipeline (the Mainline Rute ), apprximately 13.1 miles f new 36-inch diameter natural gas pipeline (the Hunters Creek Line ), and apprximately 21.4 miles f new 24-inch diameter natural gas pipeline (the Citrus Cunty Line ). A summary f the Prject pipeline facilities is prvided in Table 1.1-1 f Resurce Reprt 1 (see Tables sectin). A lcatin map f the Prject pipeline facilities is prvided as Figure 1.1-1 f Resurce Reprt 1 (see Figures sectin). Mainline Rute Originates in Tallapsa Cunty, Alabama near Transc milepst ( MP ) 944 and ends at an intercnnectin with the Flrida Sutheast Cnnectin Pipeline Prject at the Central Flrida Hub in Oscela Cunty, Flrida; Hunters Creek Line Cnnects at the prpsed Reunin Cmpressr Statin lcated at apprximately MP 474.4 t FGT s existing 24-inch diameter mainline natural gas pipeline in Orange Cunty, Flrida; and Citrus Cunty Line Lcated in Marin and Citrus Cunties, Flrida, extending frm Sabal Trail s facilities at apprximately MP 389.8 t a new electric generatin plant prpsed by Duke Energy Flrida, Inc. ( DEF ) t be lcated in Citrus Cunty, Flrida. Abvegrund Facilities Five new cmpressr statins are prpsed t be cnstructed alng the Mainline Rute. Three cmpressr statins (Alexander City, Hildreth, and Reunin) wuld have a 2017 in-service date, fllwed by tw additinal cmpressr statins (Dunnelln and Albany) with a 2020 in-service date. Expansin wrk (i.e., additinal cmpressin) at tw f these five new cmpressr statins (Hildreth and Albany) wuld then be cmpleted with an in-service date f 2021. Natural gas will be the prpsed fuel surce fr the facilities Resurce Reprt 12 PCB Cntaminatin 12-1 SABAL TRAIL PROJECT

within each cmpressr statin. A summary f the Prject abvegrund facilities is prvided in Table 1.1-2. Abvegrund facility plt plans are prvided in Appendix 1A, Vlume II-B f Resurce Reprt 1. United States ( U.S. ) Gelgical Survey ( USGS ) tpgraphic lcatin excerpts and aerial phtgraphy are prvided as Figures 1.1-2 and 1.1-3 f Resurce Reprt 1. Cmpressr Statins Alexander City Cmpressr Statin (apprximate MP 0.0) In service 2017. Cnstructin f a new cmpressr statin near Alexander City in Tallapsa Cunty, Alabama. The cmpressr statin will include tw Slar Titan 130 and ne Slar Titan 250 cmpressr units; Albany Cmpressr Statin (apprximate MP 159.3) In service 2020. Cnstructin f a new cmpressr statin near Albany in Dugherty Cunty, Gergia after the initial Prject in-service date. The cmpressr statin will include ne Slar Titan 130 cmpressr unit. An additinal Slar Titan 130 cmpressr unit will be cnstructed in a later phase f the Prject with an in-service date f 2021; Hildreth Cmpressr Statin (apprximate MP 296.3) In service 2017. Cnstructin f a new cmpressr statin near Lake City in Suwannee Cunty, Flrida, cnsisting f ne Slar Titan 130 cmpressr unit. An additinal Slar Titan 130 cmpressr unit will be cnstructed in a later phase f the Prject with an in-service date f 2021; Dunnelln Cmpressr Statin (apprximate MP 389.8) In service 2020. Cnstructin f a new cmpressr statin near Ocala in Marin Cunty, Flrida after the initial inservice date. The cmpressr statin will include ne Slar Titan 130 cmpressr unit; and Reunin Cmpressr Statin (apprximate MP 474.4) In service 2017. Cnstructin f a new cmpressr statin near Intercessin City in Oscela Cunty, Flrida, cnsisting f ne Titan 130 cmpressr unit and ne Slar Mars 100 cmpressr unit. In additin, six meter and regulating ( M&R ) statins are prpsed fr the Prject. M&R Statins Mainline Rute M&R Statins Transc Hillabee M&R Statin in Tallapsa Cunty, Alabama (MP 0.0) FGT Suwannee M&R Statin in Suwannee Cunty, Flrida (MP 299.7) FSC M&R Statin in Oscela Cunty, Flrida (MP 474.4) Gulfstream M&R Statin in Oscela Cunty, Flrida (MP 474.4) Hunters Creek Line M&R Statin FGT Hunters Creek M&R Statin in Orange Cunty, Flrida (MP 13.1) Citrus Cunty Line M&R Statin DEF Citrus Cunty M&R Statin in Citrus Cunty, Flrida (MP 21.4) A ttal f 39 mainline valves ( MLVs ), five pig launcher, and five pig receiver facilities are als prpsed fr the Prject. Thirty-three MLVs wuld be lcated alng the Mainline Rute, fur f which wuld be lcated within the site f prpsed cmpressr statins. Three MLVs wuld be lcated alng the Hunters Creek Line, ne f which wuld be lcated within the Reunin Cmpressr Statin (MP 0.0 n the Hunters Creek Line) and ne within the FGT Hunters Creek M&R Statin (MP 13.1 n the Hunters Creek Resurce Reprt 12 PCB Cntaminatin 12-2 SABAL TRAIL PROJECT

Line). Three MLVs wuld be lcated alng the Citrus Cunty Line, ne f which wuld be lcated within the Dunnelln Cmpressr Statin (MP 0.0 n the Citrus Cunty Line) and ne within the DEF Citrus Cunty M&R Statin (MP 21.4 n the Citrus Cunty Line). All MLVs will have blw dwn capabilities, hwever fur MLVs alng the Mainline Rute (MLVs 2, 18, 23, and 24) will be equipped with remte blw dwn facilities where the right-f-way ( ROW ) is lcated next t an electric transmissin line crridr. The lcatins f prpsed MLV sites are listed in Table 1.1-2 and shwn n the aerial-based alignment sheets in Appendix 1A, Vlume II-B f Resurce Reprt 1. Prpsed Mainline Capacity Lease Transc Lease Mainline capacity lease n Transc s existing pipeline facilities extending frm Transc s Zne 4 Pl and Transc s intercnnectins with Midcntinent Express Pipeline, LLC and Gulf Suth Pipeline Cmpany, LP, all lcated at Transc Cmpressr Statin 85 near Transc MP 784 in Chctaw Cunty, Alabama t the pint f intercnnectin with the prpsed Sabal Trail facilities t be lcated near Transc MP 944 in Tallapsa Cunty, Alabama. The facilities assciated with the Transc Lease will be addressed in a separate certificate applicatin filed by Transc. Refer t Resurce Reprt 1, Appendix 1A fr the Sabal Trail Prject drawings, maps, alignment sheets, and aerials. Accrding t Sectin 380.12 (n)(1,2) 1, this Resurce Reprt 12 is nt required because the Sabal Trail Prject des nt invlve: the replacement, abandnment by remval, r abandnment in place f pipeline facilities determined t have plychlrinated biphenyls in excess f 50 ppm in pipeline liquids; r cmpressr statin mdificatins. Therefre, n further discussin is prvided. 1 Title 18: Cnservatin f Pwer and Water Resurces, Part 380-Regulatins Implementing the NEPA; 380.12 Envirnmental reprts fr Natural Gas Act applicatins, Resurce Reprt 12 PCB Cntaminatin 12-3 SABAL TRAIL PROJECT