Box Clever Consulting. Executive Summary Project Report. June Strand Plaza. Liverpool. for. Primesite Developments

Similar documents
Box Clever Consulting. Executive Summary Project Report. July Strand Plaza. Liverpool. for. Primesite Developments

Project Delivery Status Report Box Clever Consulting. Box Clever Consulting. Executive Summary Status Report. Author - Claire Ellam.

JK 1. RIBA stages JK START OF MAIN CONTRACT WORKS 1. DEFINITION 2. PURPOSE 3. PROCEDURE 3.1 PROJECT MANAGEMENT TEAM ROLE

The Application in-principle (AIP) was approved by the LSC on the 9 th May 2007 for the following buildings:

Structural Engineering & Civils Scope of Services

Architectural Design and Build Process. A Client Guide

STRUCTURAL ENGINEER S SERVICES SCOPE

Conception Design Construction Operation.

Decisions 1. To approve the enclosed planning performance agreement for execution.

P22 Managing Capital Projects

MECHANICAL & ELECTRICAL ENGINEER S SERVICES SCOPE

CDM FAQ Sheet

SCOPE OF WORK FOR PROFESSIONAL SERVICES: HET POSTHUYS ELECTRICAL UPGRADE

ANNEXURE A SCOPE OF WORK FOR PROFESSIONAL SERVICES: RESTORATION OF NON PAREILLE BUILDINGS. Principal Agent and Professional Architectural Services

The Application in-principle (AIP) was approved by the LSC on the 9 th May 2007 for the following buildings:

PROJECT DESIGN GUIDE D02 COMMUNICATION PLAN

ASBESTOS POLICY & MANAGEMENT PLAN UNIVERSITY OF ESSEX HUMAN RESOURCES / ESTATE MANAGEMENT SERVICE

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services

EMPLOYING PROFESSIONALS FOR CHURCH PROJECTS A GUIDANCE NOTE FOR PARISHES

CONSTRUCTION STAGE HEALTH AND SAFETY PLAN

Dŵr Cymru Welsh Water CHC Technical Services Forum

Annex I: Summary of duty holders

Building Standards Customer Journey

Company QESH Management Representative

PLANNING AND EVALUATION PRELIMINARY DESIGN

University of Birmingham

Professional Services Contract (PSC) for Consultants Selection Process for NHS Clients

PROCEDURE (Essex) / Linked SOP (Kent) Asbestos Management. Number: U 1005 Date Published: 22 July 2015

Moresecure Health & Safety

J&P OMAN COMPANY ORGANISATION P.110 PROCEDURE. Page: 1 of 16. Document Title: Issue Date: 13/04/2014. Revision Date: 06/06/2016 Revision No.

SENIOR PROJECT MANAGER

A CONSTRUCTION SERVICES COMPANY

State of Conservation of the World Heritage property Cornwall and West Devon Mining Landscape

REVIEW OF SCOTTISH PUBLIC SECTOR PROCUREMENT IN CONSTRUCTION

BREEAM Professionals A Guide to Understanding their Roles

Job Title Quantity Surveyor/Estimator (Capital Programme) Job Grade This post is graded at Grade 9 Reports to Head of Development Direct Reports

Ward Affected: All Wards ITEM 15 CABINET 9 NOVEMBER 2015

STATEMENTS OF QUALIFICATIONS ARE DUE NO LATER THAN 5:00 P.M. FRIDAY, JUNE 23, 2017

ISSUE CERTIFICATE OF PRACTICAL COMPLETION AND INITIATE HANDOVER TO UNIVERSITY

Pyrite Testing and Methodology for Remediation Works Key Aspects of I.S. 398 (Parts 1 and 2) Verification and Preparation for Remedial Works

Mace - Hertford Office. Programme Management

RENDALL & RITTNER LIMITED NEW DEVELOPMENT CONSULTANCY SERVICES

From Uncertainty to Certainty; How Clients can Improve their Experience of the Construction Process

28.00 Project Briefing & Procurement

RIBA Small Project Plan of Work

ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 30 June Planning Performance Agreement The Broadwalk Centre. Summary. Title

3,740. Demonstrating Competent Performance SIX EXPERIENCE AREAS. INTRODUCTION What is the Architectural Experience Program?

REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA

RURAL ELECTRIFICATION AGENCY ENERGY FOR RURAL TRANSFORMATION PHASE III. Credit No.: 5653, Project ID.: P133312

yuanda CNYD E U R O P E January 2009 sees the entry into the European cladding market of Yuanda Europe.

Management of Contractors Procedure

PROJECT DESIGN GUIDE D08 QUALITY CONFORMANCE

Dunstable Leisure Centre Redevelopment

SMS0045 Construction Health and Safety Policy and Procedures

APPENDIX 6a Risk Register

Brighton & Sussex University Hospital

REPUBLIC OF GHANA MINISTRY OF FINANCE. GHANA PUBLIC PRIVATE PARTNERSHIP PROJECT (Credit No.: IDA50970) INDIVIDUAL CONSULTANT SERVICES

CIC Guidelines Detailed Design

AB 14 ISSUE/REVISION LAST MODIFIED 15 November 2012 DATE PRINTED

MANAGEMENT OF DEMOLITION PROJECTS GUIDANCE FOR CLIENTS & ADMINISTRATORS CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2015

BUILDING ACTIVITY APPLICATION PACKAGE

Document B252TM 2007

21/01/2019 RIAI Advice Note - Types of Information 1

SAFETY, HEALTH & WELFARE AT WORK (CONSTRUCTION) REGULATIONS Briefing Note 1 for Clients, Designers and Project Supervisor Design Process

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM

Development Manager (New Build)

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

1.0 ABOUT THE NU GUIDELINES

Scottish House Builders Health and Safety Forum. Graeme McMinn HM Principal Inspector

Management of Health and Safety Files

Why Use an Architect?

REFURBISHMENT DEMOLITION

REQUEST FOR PROPOSALS (RFP) FOR ARCHITECTURAL SERVICES CLEARWATER PUBLIC SCHOOLS EWING PUBLIC SCHOOLS NELIGH-OAKDALE PUBLIC SCHOOLS

The Construction (Design and Management) Regulations 2007 Industry Guidance for

Management of sources of ionising radiation

Pre-Construction Meeting Minutes

2016 transit accessibility plan

RELIANCE HOUSE 20 WATER STREET LIVERPOOL L2 8UQ

SUSTAINABILITY FRAMEWORK FOR DEVELOPMENTS

Professional Experience and Development Quarterly Record Sheet PEDR 2011 Version

Process Map. Risk management Early contractor engagement. Collaboration Local growth Speed. Performance management. National Construction framework

Standard Form of Agreement Between Owner and Contractor where the basis

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

Exhibit C: Design Review & Document Approval Procedures

East Central College

General Objectives of Phase. Phase Task Checklist Integral Consulting Page 1 Schematic Design Checklist. Action

Office for Nuclear Regulation

Measurement Assurance and Certification Scotland

This application process is for the New Modernized Drive Clean Program that uses the new OBD II and/or TSI, and Heavy Duty test equipment.

277/06 - PRELIMINARY TERRE (P344) IMPLEMENTATION IN ADVANCE OF OFGEM DECISION

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

10.0 Environmental protection, follow-up and monitoring

CONTRACTOR WHS SYSTEM STANDARD RISK MANAGEMENT EXTERNAL USE ONLY

Conference and Administration Officer

HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE

Building Control (Amendment) Regulations MBCA Guidance Document

CONTENTS. Quality Policy Statement. Managing Invitations to Tender. Rev 9

checklist: selecting the right fit-out partner A guide to help you choose the right design and build fitout partner for you

CORPORATE STANDARD ROUTINE MINOR WORKS DEVELOPERS AND ACCREDITED SUPPLIERS

Transcription:

Box Clever Consulting Executive Summary Project Report June 2017 Strand Plaza Liverpool for Primesite Developments Author - Graham Flynn Issued - 06/07/17

Strand Plaza - Liverpool Status Report @ End of June 2017 Objective of this report To provide the Primesite Developments delivery team and Primesite Stakeholders with a monthly summary report capturing an independent assessment of all elements of project delivery for this office-to-residential refurbishment at Strand Plaza Liverpool. Typically, this report will comprise; Executive summary of the Contractor s monthly report, including outcomes from the monthly meeting with Impel Construction and their design team Key issues/project risks from site Status of key supply chain partners Project handover planning This report should be read in conjunction with the monthly report from Impel Construction. 1

Executive Summary June 2017 Mobilisation works have commenced on site with good progress being made with asbestos strip out, soft strip works and progression of the Marketing Suite fit-out. These works have been instructed via a series of Letters of Intent, whilst the Primesite project team continue to progress the alignment of the Contract Price with the Development Budget. This detailed exercise is subject to design development, optioneering and a series of package-by package market testing. At time of writing the Contract Sum and Contract Programme are not formally agreed, however both parties have a very clear understand and agreement in principle of the project and client expectations. 1.0 Programme at week 6 of 62 Programme start Date 22/05/17 Contract End date 30/07/18 Anticipated Completion Date 30/07/18 1.1 Construction Programme and Progress As of the end of June 2017 the contractor is indicating a 1 week delay to the Marketing Suite Fitout Programme which is currently targeted for early August 2017. The development of the marketing suite is however progressing well and the contractor is fully committed to the agreed programme. The delay is associated with the requirement for additional floor screeding works and structural infill works required following the completion of the strip out in the reception area. The asbestos removal works are ahead of programme by approximately 2 weeks, with soft-strip works progressing on programme. Primesite and their PM Box Clever have requested a detailed contract programme from the contractor which maps out the site activities in sufficient detail as to be agreed and included within the contract. 2.0 Key Project Risks Risk. Programme delay due to critical path activities not been agreed and instructed to suit the Construction Delivery programme Mitigation. Complete Contract Sum negotiations as soon as possible or consider additional precontract instructions to maintain programme 2

Risk. Façade optioneering exercise, as driven by project budget constraints, delays revised planning submission. Mitigation. Ensure contractor maintains focus and site mock-up samples and market testing to allow planning submission to be made in next reporting period. Risk. Shared access to adjacent courtyard areas not granted by building owner. Mitigation. Commence negotiation with adjacent landlord as soon as possible. Site wide risks. Project team to develop a site-wide risk register that will form part of the monthly meeting review process to ensure project risks are being monitored and mitigated where necessary. A workshop with the client will be called to ensure all stakeholders understand the project risks. It is expected that this meeting will be held within the next reporting period. 3.0 Safety No accidents or incidents have occurred on site to date. All minimum-standard Health and Safety documentation is in place including the F10 Notification and the Construction Phase Health and Safety Plan is being developed as required in line with the live works on site. Separation of all asbestos works are proceeding as expected. Key site risks include working adjacent existing openings, working at height and maintaining a secure perimeter to the building. 4.0 Third parties Fund Monitor. Initial discussions held with Funding Partner regarding payment protocols, programme and future site visits. Planning. Façade Options. Optioneering, costing and design development of an affordable façade solution is required prior to resubmission for approval. Vertical Extension to floors 9 and 10. Subject to façade solution noted above and a redrafting of Level 10 footprint and layout (following preapplication discussions with the LA planning team) the architect will issue a revised submission for approval. This is targeted in the next reporting period. Discharging current conditions. The Architect, BCA, is reporting that all necessary conditions required for submission at this stage have been made. 3

Building Control The Licensed Building Control Consultant is appointed with a detailed action tracker requested and site inspections occurring as required. Local Authority No issues reported. Hoarding licences not yet applied for. Insurers No issues reported. Considerate Contractors Scheme Registration to be confirmed. Neighbourly matters No issues raised at present. 5.0 Design Design is progressing on several fronts. BCA have been asked to develop a design release schedule aligned with the current master programme and recently issued Impel Procurement Schedule. Design Workshops and regular formal Design Team Meetings are being held with active engagement by all core team consultants. 6.0 Procurement The procurement of the key project packages as defined by the current programme is a critical driver for project success. Most major packages are still subject budget constraints, and consequently subject to detailed optioneering and market testing. The most significant sampling and cost data from the specialist supply chain is due to be tabled in the next reporting period. Whilst the Marketing Suite design and fit-out is developing at pace, there is a detailed exercise being carried out to drive best value for the wider project, whilst also maintaining the quality aspirations expected by the client. 7.0 Utilities Utilities quotations are currently being refreshed by KGA and dialogue with Scottish Power, regarding retaining and re-using the existing sub-station, is progressing well. 4

8.0 Contract and Commercial 8.1 Contract Contract Particulars have been returned commented by the contractor for review by the client s legal advisors. 8.2 Commercial As noted above, there is a detailed exercise in hand aligning the current Contract Sum offer by Impel with the fixed project budget. Significant progress in required and anticipated in the next reporting period. 8.3 Variations The contractor is currently working to a series of Letters of Intent that capture the scope and the upper-limit of project spend authorised at this stage. The contractor is progressing the works to maintain these agreed budgets, however there will be several points of client review and sign-off required as works proceed. There are elements of uninstructed works that need consideration which are not currently covered by the Works Orders to Impel and Myo Interiors. 9.0 Project handover planning The project team and the contractor are currently discussing the safety procedures, handover requirements and documentation required to Go-Live with the Marketing Suite in a secure area that will be operational within the wider on-going project building site. 10.0 Client Actions a) Instruction of outstanding Marketing Suite works b) Consideration of further pre-contract instructions to maintain construction programme as required c) Completion of Design Team appointment documentation d) Clients legal team to proceed with gathering contract documentation. e) External temporary building signage to be mobilised. f) Marketing Suite/Concierge team to be mobilised. g) Wi-Fi requirements be advised 5

Appendix 1. Progress Photographs 6 th June 2017 Fig 1-1st fix wall boards to perimeter of Show apartment Fig 2 - Reception area 1st fix MEP install 6

Fig 3 Progress to Show Apartment Kitchen and Lounge area Fig 4 Removal of existing floor coverings to upper floors 7

Specialist equipment employed to remove existing floor coverings and prepare existing slab for new finishes 8

END Always Box Clever 9