PipeLine. Increasing Sewer Capacity. January 2015, Issue 72

Similar documents
The first ever Hobas pressure pipe

Sliplining 36-in. PCCP with Fusible PVC - DC Water's Long-Term Control Plan 'Division E'

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Appendix A EXAMPLE COLLECTION SYSTEM PERFORMANCE INDICATOR DATA COLLECTION FORM

The Complete HOBAS Guide. Centrifugally Cast, Fiberglass-Reinforced, Polymer Mortar Pipe

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings

UNDERGROUND CONSTRUCTION ISSUE TRAUTWEIN TACKLES NEWHOPE PLACENTIA TRUNK SEWER REPLACEMENT PROJECT CONSTRUCTION, INC. PG. 6

Pam Iorio, Mayor 306 E. Jackson St * Tampa, FL Wastewater Department. Overflow Report

DESIGN OF SEWER SYSTEMS

An introduction to. pipe jacking

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal

Pipe-Bursting Success with AC Pipe

Sclairpipe VERSATILE HIGH DENSITY POLYETHYLENE PIPE

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

PIPE BURSTING SUCCESS

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

TAMDID PIPES GRP MANHOLE BROCHURE

PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE

INLINER LAY_InLiner Brochure_FA_ indd 1

Storm Water and Sanitary Sewer

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)

INDUSTRIAL PIPE FITTINGS, LLC

h Sewer Pipe Systems

WEKO-SEAL Internal Joint Sealing. internal pipe-joint sealing

Concrete Pressure Pipe

PROCESSING COMBINED LASER, SONAR AND HD IMAGING FOR BETTER EVALUATION DECISIONS

North American Society for Trenchless Technology (NASTT) NASTT s 2016 No-Dig Show. Dallas, Texas March 20-24, 2016

SEWER SYSTEM DESIGN GUIDELINES

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

A-2000 PVC Pipe for Storm Sewers and Drainage

Infrastructure Point Repair System Technical Specifications

Built to Last Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA September 30, 2014

Protecting Existing PCCP Subject to External Transient Loads. 200, Fort Worth, Texas 76109; phone (817) ;

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

Milwaukee Metropolitan Sewerage District Conveyance and Treatment System. MACRO made available by

SECTION XXXXX CHEMICAL GROUTING

Inland Pipe Rehabilitation. August 17 OAWWA Canton, OH

C900/RJ. CertainTeed. PVC Pipe. with CertainTeed s proven Certa-Lok restrained joint system. Directional Drilling

SANITARY SEWER CHEMICAL GROUTING

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

LATEST ADVANCES IN PIPELINE RENOVATION WITH FIBER REINFORCED POLYMER (FRP)

SECTION FACILITY SANITARY SEWERS

Knowing Your Pipe Trenchless Technology Pipe Selection Guide. By Leanne Butkovic

Protective Coatings for Underground Utility Concrete Structures. By: John E. Davis Inside Sales & Marketing Specialist: Sauereisen, Inc.

Wastewater Master Facility Report. (Project Name) (Project Basin Location)

Section V - Pipelines and Appurtenances

LANE ENTERPRISES, INC. STANDARDS & SPECIFICATIONS

Triple Wall and Double Wall Polypropylene Pipe-Joint Infiltration Tests

Large Diameter Pipe Bursting

STANDARD SPECIFICATIONS SECTION JACKED CASING

2.0 PROJ ECT D ESCRI PTION

RULES AND REGULATIONS FOR WATER AND WASTEWATER SERVICE APPENDIX B WATER AND WASTEWATER SERVICE CONSTRUCTION SPECIFICATIONS

AMERON PRESTRESSED CONCRETE CYLINDER PIPE

Moncton Watermain Relocation Moncton, New Brunswick. TRS 2010 Dr Mark Knight University of Waterloo

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

Chapter 8 Addressing I/I Issues and High Flows

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1

STANDARD SPECIFICATIONS SECTION PIPE BURSTING SYSTEM

PIPE USERS GROUP (PUG) July 11, Michelle Beason, PE Regional Manager National Plant Services, Inc., a Carylon Company

Special Research Study. Comparison of Water Pipe Installation Lengths and Costs in Michigan: Port Huron, Grand Rapids, Monroe, and Livonia

Figure 2 shows the monthly SSO Volumes within the system from 2007 through 2008 reported in million gallons (MG).

Structural Testing of Geopolymer Pipe & Culvert Mortar Lining System

SPECIFICATION : BORING AND JACKING

PERFORMANCE PIPE DRISCOPLEX 4000/4100 Pipe Water and Wastewater Piping Systems

STANDARD SPECIFICATIONS SECTION TUNNELING. A. Section includes requirements for constructing tunnels 48-inch and larger diameter.

MUNICIPAL PRODUCTS OVERVIEW MAKE THE CONNECTION

Section VI - Trenchless Installations and Rehabilitation

Financial Impact of Asbestos Cement Pipe Replacement in the Wellington Region

HUDSON TUNNEL PROJECT

Residential Sewer Backup Prevention Program

SPECIFICATION for ISCO HDPE DUAL CONTAINMENT PIPE

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

10:00 AM, Wednesday, April 8, 2015

SECTION FOUNTAINS

TECHNICAL PROCEDURE TABLE OF CONTENTS

WRF Research Efforts on Large Diameter Pipes

GREEN THREAD Piping Systems

17/03/2017 CONTENTS. Real Cases Studies in the Region for Pipelines Inspection & Rehabilitation. Introduction CONTENTS. Introduction / Cont.

Trenchless Technology

STREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy.

This policy will generally explain the following in regards to the City sewerage collection systems:

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

City of Denton. Water and Wastewater Criteria Manual

No Dig renovation and installation of systems using polyolefin pipes

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Concrete Pipe Joints Your Best Choice

Module 2 : System of Sanitation. Lecture 2 : System of Sanitation

THE KANSAS CITY SOUTHERN RAILWAY COMPANY 427 West 12 th Street Kansas City, Missouri

Rural Servicing Guidelines

Transcription:

January 2015, Issue 72 PipeLine Contents 1 I Increasing Sewer Capacity 4 I HOBAS Pipe Chosen for Large Diameter Force Main 6 I 26 Year Old Force Main Still Performing Well 8 I HOBAS Pipe Expands Field Service Support BELOW The trenchless sections were designed as a two pass system with 42-inch HOBAS carrier pipe installed in a 54-inch steel casing. Increasing Sewer Capacity Denver and Aurora are the principal cities of the Denver Metropolitan Area in Colorado. Aurora, with a growing population of over 300,000 residents, is home to a vibrant business environment. It includes major industries such as aerospace, military, renewable energy, high-tech, biotechnology and health care, distribution and manufacturing. The majority of the wastewater generated in Aurora is conveyed through the Tollgate Creek Interceptor to the Metro Wastewater Reclamation District s Robert W. Hite Wastewater Treatment Facility. The interceptor begins in the southern portion of the city and runs north along the banks of the Tollgate Creek to the treatment plant. Design Considerations Installed in the 1980s, the Tollgate Creek Interceptor consists of reinforced concrete pipe and varies in diameter from 30 to 42 inches. Based on future planning, the City of Aurora identified the need for additional capacity in the Tollgate system. Another consideration was the poor condition of the existing interceptor. Pipe samples from the existing Tollgate Interceptor line indicated significant deterioration. In order to handle future flows, the city embarked on a multi-year capital Continued on page 2

h PipeLine January 2015 Page 02 Continued from page 1 BELOW Five thousand, five hundred feet of CCFRPM pipe was installed in open areas by direct bury. OPPOSITE Lightweight HOBAS pipe was easily lowered into the trench. improvement program to design and construct a new interceptor parallel to the existing Tollgate Creek Interceptor. The new system was designed to divert all sanitary flows into the new interceptor, which would allow the existing interceptor to be inspected and rehabilitated before both would be required to be in service. The city requested that the new interceptor be designed to transport all flow for ten years after completion of construction, stated Swirvine Nyirenda,P.E., senior project manager for Aurora Water. The project was divided into two separate projects, Tollgate Creek Interceptor North and Tollgate Creek Interceptor South. Tollgate Creek Interceptor South was completed in January 2011 and was installed by direct bury and trenchless methods. Product Confidence Construction on Tollgate Creek Interceptor North began in December 2010 and was installed by BT Construction, Inc. of Henderson, Colorado. Ten thousand feet of 42inch centrifugally cast, fiberglass reinforced, polymer mortar (CCFRPM) pipe was supplied by HOBAS Pipe USA. Pipe materials allowed on the project were FRP, HDPE and polymer concrete. BT Construction bid the project using CCFRPM. We were comfortable with the product as we had used HOBAS before and had a good relationship with the company, explained Brenden Tippets, project manager, BT Construction. Trenchless methods were used for 4,500 feet of the project because of its urban location. The project area included creek and road crossings, transportation projects and existing utilities. Five thousand, five hundred feet was direct buried in the open areas that allowed access. The pipe was designed and manufactured with a stiffness class of 46 and 72 psi. PL_Jan2015.indd 2 12/15/14 2:30 PM

h PipeLine January 2015 Page 03 Since the alignment of the pipeline followed Tollgate Creek and had major road crossings, it was decided early in the design process to incorporate trenchless installation methods. The thought was that trenchless installations would minimize the risk to public safety, private property and the environment. In the end, microtunneling with a TBM combined with the appropriate ground modifications where necessary and direct bury were all considered as acceptable pipe installation methods. Each of these was coupled with allowable pipeline materials, stated Swirvine. Because of the close proximity to Tollgate Creek, microtunneling was less likely to cause embankment failures. resistance was important since the line was gravity flow and had to be resistant to acid attack. Because the pipe was joined in the tunnel, it was manufactured with FWC couplings attached to one end. The FWC coupling is a structural filament-wound sleeve overwrapped and mechanically locked to an internal full-face elastomeric membrane. Deep Installation There were many challenges associated with this project. It was a deep pipeline and very wet, with a high table of groundwater. We were working in small easements and in areas less than 20 feet wide laying pipe in wet conditions and at depths greater than 20 feet. Soil conditions varied on every tunnel segment, which created a lot of thinking on our feet to adjust to the new condition, explained Tippets. In addition, many utility conflicts had to be resolved over months of planning. We addressed these challenges by being able to adjust on the fly with our diversity in construction and different installation methods. The pipe was installed within runs between manholes, with 21 manholes located along the interceptor. The installation method depended on soil conditions between manholes, explained Tippets. The drives averaged between 500 and 700 feet. Some portions of the interceptor exceeded 35 feet in depth. The trenchless sections were designed as a two-pass system with the HOBAS carrier pipe installed in 54-inch steel casing. The steel pipe was jacked in behind a TBM and then the carrier pipe was installed in the tunnel. In the next step, the annular space between the liner and carrier pipe was grouted. Corrosion Year of construction 2010-2011 Total length of pipe 10,000 feet Diameter 42-inch Stiffness class 46 & 72 psi Installation method Microtunneling & Direct Bury Application Sanitary Sewer Client City of Aurora Installer BT Construction Advantages Various installation methods, corrosion resistance

h PipeLine January 2015 Page 04 Year of construction 2012 Total length of pipe 2,300 feet Diameter 72-inch Stiffness class 46 psi Pressure Class 100 psi Installation method Direct Bury Application Sanitary Sewer Client The Greater Lawrence Sanitary District Installer Methuen Construction Company Advantages Various burial depths, fittings, corrosion resistance HOBAS Pipe Chosen for Large Diameter Force Main The Greater Lawrence Sanitary District (GLSD) serves the Massachusetts member communities of Lawrence, Methuen, Andover, North Andover, Dracut as well as Salem, N.H. The GLSD was established by Chapter 750 of the Massachusetts Acts of 1968 for the purpose of building, maintaining and operating a system of sewage collection and disposal. The establishment occurred after a series of investigations called for the cleaning up the Merrimack River, which had been plagued by pollution, not only from sanitary sewage but industrial contributors dating back to the late 1800 s. GLSD s most recent challenge was to determine the best course of action to repair or replace an existing prestressed concrete cylinder pipe (PCCP) force main, which was installed in the mid 1970 s. The PCCP was manufactured with reinforcing wire, which was brittle leading to pipe failures. Studies included condition assessment and structural evaluation of the PCCP and acoustic monitoring for real-time recording of wire breaks. GLSD learned in 2002 that pipe supplied in 1974 was similar to pipelines experiencing a high rate of catastrophic failures throughout the United States. The district began an assessment program PL_Jan2015.indd 4 to determine the structural condition of the line. This evaluation found one pipe section was in a state of imminent failure and required emergency repairs to advert a catastrophic failure that would have significant financial and environmental implications. GLSD ultimately chose to replace the existing pipeline as part of their combined sewer overflow (CSO) control and its implementation into the future. Their design considerations for the new line were long range while they were mindful of the short term effects of construction. They wanted to meet the increase in wet weather flows of 167 million gallons per day, select a replacement line that would last for many years, and to reduce the disruption during construction by limiting bypass pumping and minimizing the effect of construction on Riverview Street. GLSD ultimately evaluated two scenarios. The first was to slipline the existing force main with a 54-inch diameter pipe and install an adjacent 54inch diameter line. Although this option provided the district with 95 percent redundancy of flow and operational flexibility, it also had drawbacks. The capital, operational and maintenance costs were greater by 15 percent and the construction 12/15/14 2:30 PM

h PipeLine January 2015 Page 05 TOP LEFT HOBAS pipe was inspected before installation. After installation the pipe remained leak-free after an hour with a 95 psi hydrostatic test. CENTER HOBAS supplied 2,300 linear feet of 72-inch diameter CCFRPM to the project which ranged in depth from 3 to 18 feet and included a rail crossing at 17 feet of cover under a Massachusetts Bay Transit Authority (MBTA) line. LOWER RIGHT GLSD s design considerations for the new line were long range while they were mindful of the short term effects of construction. Chapter 30, Para 39M(b), the Owner, in the public interest, has stated in writing in the public records that the centrifugally-cast fiberglass reinforced polymer mortar pipe (CCFRPM) specified herein as sewer force main, as manufactured by HOBAS Pipe USA (HOBAS), Houston, Texas, will be solely allowed under this Contract. The General Laws of the State of Massachusetts referred to above, reads as follows: Specifications for such contracts, and specifications for contracts awarded pursuant to the provisions of said sections forty-four A to forty-four L of said chapter one hundred and forty-nine, shall be written to provide for full competition for each item of material to be furnished under the contract; except, however, that said specifications may be otherwise written for sound reasons in the public interest duration would be lengthened. The second option was to install a new 72-inch line capable of handling all of the flows. This is the option that offered the best results. The district evaluated several materials for the project including PCCP, steel, ductile iron, high density polyethylene and fiberglass. GLSD evaluated the materials based on several criteria including availability, resistance to scour and corrosion, suitability for trenchless installation as well as fabrication time and cost. After a thorough evaluation, they decided that only HOBAS Pipe USA would be allowed as a material supplier on this critical project. The project specifications stated, In accordance with Massachusetts General Laws, PL_Jan2015.indd 5 HOBAS supplied 2,300 linear feet of CCFRPM to the project, which ranged in depth from three to 18 feet and included a rail crossing at 17 feet of cover under a Massachusetts Bay Transit Authority (MBTA) line. In addition to the depth and traffic crossings, the project had other challenges including its location in a residential area, the proximity to other utilities, and the need to maintain the pump station and force main without bypass pumping. HOBAS also custom manufactured a dozen one- and two-miter elbows that simply connected to the mainline with the standard couplings. The specifications also required pressure testing of each pipe joint (low pressure air) and a system hydrostatic test before the line could be placed in service. We successfully passed the hydrostatic test of the 72-inch force main. The line held 95 psi for one hour. The force main actually held the pressure over the course of last night, stated Jason Babbidge, assistant project manager, Methuen Construction Company, Inc. 12/15/14 2:30 PM

h PipeLine January 2015 Page 06 26 Year Old Force Main Still Performing Well Year of construction 2013 Total length of pipe 400 feet Diameter 36-inch Stiffness class 46 psi Pressure Class 150 psi Installation method Direct Bury Application Sanitary Sewer Client City of Houston Installer Reytec Construction Resources, Inc Advantages Versatile fittings, corrosion resistant In February of 2013, the City of Houston solicited bids for the Hendrick Force Main Crossing project, which included the demolition of an existing aerial force main, and construction of a new force main crossing under Buffalo Bayou. The force main includes over 1,200 feet of pipe. Installation by directional drilling was used for 700 feet of 42-inch HDPE under the bayou, and 400 feet of 36-inch HOBAS pipe was installed in the areas where open cut was an option. The new force main transitioned to an existing line that included 36-inch diameter pipe which is beyond the open cut portion of the project. To make the connection to the new 42-inch diameter section, HOBAS supplied a flanged connection which mated with the HDPE flanged connection. Reytec Construction Resources, Inc of Houston, Texas, a general contractor founded in 1996, was awarded the project. The 36-inch pipe supplied by HOBAS Pipe USA had a unique situation since it connected to the existing 36-inch diameter line that was a HOBAS installation completed in 1988. What made the project unique was not the HOBAS to HOBAS connection, but rather the age of the existing pipe. The original 36-inch diameter HOBAS line that Reytec was now connecting to was part of the Magnolia Street Force Main. This force main was the very first force main sewer installation using HOBAS pipe manufactured in the USA. The Magnolia Street Force Main was a 7,000 foot line constructed to redistribute sewerage flows as part of the East Side WWTP Relief Program. Versatile Fitting Manufacture The original line, constructed 26-years ago, includes over 20 elbows to follow the zig zag route through an existing residential neighborhood. Until we dug it up, we didn t exactly know what we were dealing with as far as the alignment and condition of the original line. We appreciated the responsiveness of HOBAS to deliver the necessary custom pieces. We added several mitered fittings to the order to assist us with making the connection between the existing pipe and the new line, said Tomas Garza, site supervisor, Reytec Construction Resources, Inc. The pipe material is rugged and user friendly and the couplings provide leak free connections.

h PipeLine January 2015 Page 07 TOP LEFT HOBAS manufactured several custom elbows to meet the necessary alignment changes. TOP RIGHT During construction of the Hendrick Force Main, work crews uncovered pipe installed in 1988 showing its still perfect condition. Quick Delivery Corrosion Concerns The design engineer for the original Magnolia Street Force Main was concerned about both internal and external corrosion of the line and also needed a high strength pipe with leak-free joints to withstand the 125 psi design pressure. Because of these requirements, only HOBAS PN 150 SN 46 (minimum 150 psi pressure rating and 46 psi stiffness rating) and cement lined class 52 Ductile Iron with polybags were specified. Year of construction 1988 Total length of pipe 7,000 feet Diameter 36-inch Stiffness class 46 psi Pressure Class 150 psi Installation method Direct Bury Application Sanitary Sewer Client City of Houston Installer BRH Garver Advantages Quick delivery, easy installation PL_Jan2015.indd 7 HOBAS pipes were chosen for the Magnolia Street Force Main project by BRH Garver of Houston due to their competitive price and quick delivery. At the time of the installation, the superintendent for BRH Garver said, The HOBAS pipe is a rugged product and is easy to lay. A quarter of a century later, the current installation contactor, Raytec, uncovered this pipe to take a look. When we uncovered the original HOBAS pipe that had been buried and in service for over 25 years, it looked like it could have been buried yesterday, it was still in perfect condition, said Garza. LOWER LEFT The original 36-inch line was constructed 26 years ago. LOWER RIGHT HOBAS Pipe USA supplied 400 feet of 36-inch CCFRPM pipe. 12/15/14 2:30 PM

Hobas Pipe USA 1413 E. Richey Road Houston, Texas 77073 Tel: (281) 821-2200 PRESORTED STANDARD U.S. POSTAGE PAID N. HOUSTON, TX PERMIT #280 ADDRESS SERVICE REQUESTED h PipeLine January 2015 Page 8 HOBAS Pipe Expands Field Service Support HOBAS Pipe USA is continuing the expansion of its field service group and now includes seven technicians located across the country. They have nearly 75 years of combined HOBAS experience. This is one of a variety of ways Hobas provides support for their customers. Randy Whiddon, HOBAS field service manager, explained, My department provides clients, contractors, and the HOBAS sales staff with a knowledgeable, useful and reliable resource in preventing, solving, and correcting problems, which may occur in the field. And they serve as a liaison between the field and the in-house technical staff. Installation of centrifugally cast, fiberglass reinforced, polymer mortar (CCFRPM) pipe is quick and easy with predictable, reliable pipe performance using many installation methods. Push-together joints are simple and fast to assemble and the lightweight pipes are safe and easy to handle. HOBAS field service technicians are available upon request to assist before, during and after the installation. The Field Service Department will establish ongoing communications with the installers of HOBAS pipe to discuss their particular project at any stage of the work. They will also observe and provide recommendations related to construction practices. This includes transporting, handling, storing and installation of HOBAS pipe.