CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT

OPERATION OF AN STP FOR RECYCLED WATER PRODUCTION PLANT. Iain Fairbairn. Iain Fairbairn, Plant Manager, Sydney Water

JEDDAH INDUSTRIAL CITY

SLUDGE SETTLEABILITY CONTROL AT ELANORA WWTP RAS CHLORINATION TRIAL. Martin Hindmarsh. Allconnex Water

Case Study. BiOWiSH Aqua has Positive Long-Term Effects. Biological Help for the Human Race

Water Pollution. Objective: Name, describe, and cite examples of the eight major types of water pollution.

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic.

Wastewater Treatment Processes

Operation of a small scale MBR system for wastewater reuse

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

WASTEWATER TREATMENT

WASTEWATER TREATMENT SYSTEM

Decentralised Wastewater Management. A sustainable strategy for wastewater management

Comparison of Water Quality Parameters

Hydrology and Water Quality. Water. Water 9/13/2016. Molecular Water a great solvent. Molecular Water

EUTROPHICATION. Student Lab Workbook

Case Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia.

RECYCLED WATER AT SYDNEY OLYMPIC PARK. Andrzej Listowski SYDNEY OLYMPIC PARK AUTHORITY

by M k h GROVER Degremont

Alexandria Sewage Lagoon Treatment Facility Municipal Class C Environmental Assessment Public Information Centre #2 Welcome!

Factsheet: Town of Deep River Water Quality and Stormwater Summary

final report Water quality improvement strategy for a processing site

2014 ASSINIBOINE RIVER MONITORING REPORT

Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest

Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Water Specialists for the Food & Beverage Sector creating value in water through innovation, creativity and expertise. ovivowater.

Pilot Studies on Performance of Membrane Bio-Reactor in Treating Hong Kong Freshwater and Saline Sewage and Its Virus Rejection Ability and Mechanism

NUTRIENT REMOVAL PROCESSES IN WASTEWATER TREATMENT. We re Glad You re Here!

Ballasted Activated Sludge Demonstration Study SEPTEMBER 30, 2016

Nutrient Removal Processes MARK GEHRING TECHNICAL SALES MGR., BIOLOGICAL TREATMENT

East Coast P Removal Technology Performance Summary

Physicochemical and microbiological quality of water from a pilot domestic rainwater harvesting facility in Ireland.

WASTEWATER TREATMENT. Nelson Environmental Inc. Nelson Environmental Inc.

Effects of high-strength faecal sludge in wastewater stabilization ponds: Port-au-Prince, Haiti

Preparing for Nutrient Removal at Your Treatment Plant

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012

Water quality monitoring and assessment: general principles and fitness for purpose

WATER QUALITY ASSESSMENT REPORT 2013 SAGINAW CHIPPEWA INDIAN TRIBE. Clean Water Act Section 106 October 1, 2012 September 31, 2013 Grant #: I 00E57603

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati

Performance of Sewage Oxidation Pond in USM Engineering Campus

Integrated real-time SRT and aeration control in the city of Grand Rapids

Tour of Regional Water Reclamation Facility

Arkansas Water Resources Center

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview

Decentralized WW Management: Issues for Small-Scale WWTPs. Mike Stephens MWEA Local Sections Committee Frankenmuth, MI

STREAMING CURRENT MONITOR FOR COAGULANT OPTIMIZATION IN WATER TREATMENT PLANTS - LAP EXPERIENCE

for South East Queensland December 2013

Advanced Wastewater Treatment Plant Plant Profile

INVESTIGATION INTO REUSE OF DECOMMISSIONED STP INFRASTRUCTURE, IMPROVING TREATMENT OUTCOMES. Liz Millan & Aleisha Myles

New York State Department of Environmental Conservation

Your Guide to the. Budd Inlet Treatment Plant

CHEMICAL FREE PHOSPHOROUS ELIMINSTION P-UPTAKE PROCESS

Sulaibiya world s largest membrane water reuse project

International Joint Commission Water & Wastewater Treatment Best Management Practices Forum Monday, March 26, 2012 Wayne State University, Detroit MI

Proposal by Russia to delete hot spot 18.2

A H. Marcela Velázquez-Carrillo Consultant to Mountain Systems Inc. on the application of Proficy for Water Treatment

STRUCTURAL AND OPERATIONAL STUDY OF 339 MLD SEWAGE TREATMENT PLANT AT AMBERPET

EC TYPE EXAMINATION (MODULE B) CERTIFICATE

Water Solutions for Tourism and Leisure

MURPHY DRAIN CATCHMENT

AquaNereda Aerobic Granular Sludge Technology

Water quality assessment of a wastewater treatment plant in a Ghanaian Beverage Industry

The Myakka River. Presented to the Myakka River Management Coordinating Council January 9, 2009

6. Pollutant Sources in

Startup and Performance of the World s first Large Scale Primary Dissolved Air Floatation Clarifier ABSTRACT KEYWORDS INTRODUCTION

Analysis of Residential Subsurface. SF constructed wetlands. Performance in Northern Alabama

A Hybrid Constructed Wetland System for Decentralized Wastewater Treatment

General Information on Nitrogen

Appendix 5. Fox River Study Group Interim Monitoring Evaluation

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng

Aqua MSBR MODIFIED SEQUENCING BATCH REACTOR

Water Pollution & Quality. Dr. Deniz AKGÜL Marmara University Department of Environmental Engineering

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT

Water Quality Study In the Streams of Flint Creek and Flint River Watersheds For TMDL Development

6 WASTEWATER. 6.1 Overview. 6.2 Darvill Wastewater Works

The OWASA UNC Reclaimed Water System: A Progress Review

Benefits of On-line Monitoring of Carbon, Nitrogen and Phosphorus

PERFORMANCE EVALUATION OF 9 MLD SEWAGE TREATMENT PLANT AT GURGAON AND COST EFFECTIVE MEASURES IN TREATMENT PROCESS

Water Quality: The Basics

Advanced Onsite Wastewater Treatment Overview

Hydranautics Nitto DESIGN SOFTWARE and SUPPORTING TOOL

Conceptual Design for a Future Wastewater Treatment Plant

I/I Analysis & Water Balance Modelling. Presented by Paul Edwards

BOD/COD a Measure of Dairy Waste Treatment Efficiency- A Case Study

Optimizing Nutrient Removal With Instrumentation. John Rutledge Hach RSM-Wastewater in NC & SC

MARPAK modular biomedia WASTEWATER TREATMENT

Emission accounts. Julian Chow United Nations Statistics Division September 2016 Putrajaya, Malaysia

Warm Mineral Springs Sampling by Sarasota County

City of Paso Robles Uses Online Monitor to Detect Low-Level of THMs in Treated Wastewater

Session 2 Biodiversity Conservation

The Fate of Ammonia in Facultative Lagoon Sludge Treatment Processes: An Investigation of Methods for Reducing Ammonia in Recycle Streams:

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017

Effectiveness of Coanda Screens for Removal of Sediment, Nutrients, and Metals from Urban Runoff

Operations Report. September 10, 2015

SWAT INPUT DATA: SEPTWQ.DAT CHAPTER 34

ASA Analytics ChemScan Process Analyzers Reprint ASA Publication #194

Aquaculture Effluents and the Environment. CS Tucker, Mississippi State University

Transcription:

Sewage Treatment Plant Performance Report 2016-17

2

Sewage Treatment Plant Performance Report 2016-17 Message from the CEO I am pleased to share with you our Sewage Treatment Plant Performance Report for 2016-17. This report provides information about the individual and collective performance of the 17 sewage treatment plants (STPs) that we operate across our service area. I am proud to announce that ywater achieved overall STP compliance of 99.1% this financial year. We are licensed by the Department of Environment and Heritage Protection (DEHP) to collect and treat sewage to meet a range of quality standards and compliance targets. We consistently achieve overall compliance because we take our responsibility for safe, sustainable sewage treatment seriously. We embrace the highest operating standards and we have effective governance in place to manage risks and remain sensitive to the environment. Our 17 sewage treatment plants (STPs) collected and treated 50,680 million litres of sewage in 2016-17. This report details performance and compliance for each STP and also explains the few occasions where we exceeded compliance targets. Over the next five years, we will invest $188 million in our treatment plant infrastructure to improve reliability, continuously improve our operations and meet the demands of our growing communities. Ever mindful of the residents living near our STPs, we have also invested almost $3 million in odour reduction at our Maroochydore plant. We are developing our workforce to enable STP staff to operate multiple plants and improving after-hours STP monitoring. We are also fast approaching operational excellence thanks to the power of some innovative industry technologies. Some of our focus areas over the next few years include: converting waste into energy, recovering valuable resources such as phosphorus for fertiliser and using real-time data to drive efficient operations and rapid decision making (this is known as ywater s Smart STP initiative). These innovations will allow us to continue delivering on our key purpose keeping communities healthy. If you have any questions or feedback on the content of this report, please do not hesitate to call our Customer Contact Centre on 1300 086 489. George Theo Chief Executive Officer 3

4

Sewage Treatment Plant Performance Report 2016-17 Contents 1.Introduction...9 1.1. Quick Statistics July 2016 - June 2017...9 2. Effluent Quality Summary...10 3. Performance in Detail (July 2016 June 2017)...11 3.1. Brendale Sewage Treatment Plant...11 3.2. Bribie Island Sewage Treatment Plant...13 3.3. Burpengary East Sewage Treatment Plant...15 3.4. Coolum Sewage Treatment Plant...16 3.5. Cooroy Sewage Treatment Plant...18 3.6. Dayboro Sewage Treatment Plant...19 3.7. Kawana-Landsborough Sewage Treatment Plants...20 3.8. Kenilworth Sewage Treatment Plant...22 3.9. Maleny Sewage Treatment Plant...23 3.10. Maroochydore Sewage Treatment Plant...24 3.11. Murrumba Downs Sewage Treatment Plant...26 3.12. Nambour Sewage Treatment Plant...28 3.13. Noosa Sewage Treatment Plant...29 3.14. Redcliffe Sewage Treatment Plant...30 3.15. South Caboolture Sewage Treatment Plant...31 3.16. Woodford Sewage Treatment Plant...32 4. Odour Reduction...33 5. Definitions and Legend...34 5

List of Tables Table 1 Effluent Quality Compliance... 10 Table 2 Brendale STP Release Targets... 11 Table 3 Brendale STP Mass Limits... 11 Table 4 Bribie Island STP Release Targets... 13 Table 5 Burpengary East STP Release Targets... 15 Table 6 Burpengary STP Mass Limits... 15 Table 7 Coolum STP Release Targets... 16 Table 8 Coolum STP Mass Limits... 17 Table 9 Cooroy STP Release Targets... 18 Table 10 Cooroy STP Mass Limits... 18 Table 11 Dayboro STP Release Targets... 19 Table 12 Kawana-Landsborough STP Release Targets^... 20 Table 13 Kenilworth STP Release Targets ^... 22 Table 14 Maleny STP Release Targets to Constructed Wetlands... 23 Table 15 Maleny STP Release Targets to Forest Irrigation... 23 Table 16 Maroochydore STP Release Targets... 24 Table 17 Maroochydore STP Mass Limits... 24 Table 18 Murrumba Downs STP Release Targets... 26 Table 19 Murrumba Downs STP Volumetric Limits... 27 Table 20 Murrumba Downs STP Mass Limits... 27 Table 21 Nambour STP Release Targets... 28 Table 22 Noosa STP Release Targets... 29 Table 23 Noosa STP Mass Limits... 29 Table 24 Redcliffe STP Release Targets... 30 Table 25 Redcliffe STP Mass Limits... 30 Table 26 South Caboolture STP Release Targets... 31 Table 27 South Caboolture STP Mass Limits... 31 Table 28 Woodford STP Release Targets... 32 Table 29 Woodford STP Mass Limits... 32 Table 30 Odour Reduction... 33 Table 31 Acronyms and Definitions... 34 Table 32 Definition of s... 35 Table 33 Legend... 35 6

Sewage Treatment Plant Performance Report 2016-17 List of Figures Figure 1 Brendale STP TSS Short Term 80th Percentile... 12 Figure 2 Brendale STP Faecal Coliform - Median... 12 Figure 3 Bribie Island STP Total Nitrogen Short Term 50th Percentile... 14 Figure 4 Bribie Island STP Total Nitrogen Maximum... 14 Figure 5 Burpengary East STP Free Chlorine Residual Maximum... 16 Figure 6 Coolum STP Free Chlorine Residual Maximum... 17 Figure 7 Dayboro STP E.Coli Median... 19 Figure 8 Kawana-Landsborough STP Free Chlorine Residual Maximum... 21 Figure 9 Kawana-Landsborough STP Faecal Coliforms 80th Percentile... 21 Figure 10 Maroochydore STP Faecal Coliforms Median... 24 Figure 11 Maroochydore STP Faecal Coliforms Maximum (80th percentile)... 25 Figure 12 Maroochydore STP Nitrogen Mass Load Maximum... 25 Figure 13 Murrumba Downs STP Faecal Coliforms Median... 27 Figure 14 Murrumba Downs STP Faecal Coliforms 80th Percentile... 28 Figure 15 Nambour STP Faecal Coliform Median... 29 7

Cooroy Noosa Corporate Offices Service Centres Gympie region Coolum Sewage Treatment Plants Kenilworth Nambour Maroochydore Maroochydore Kawana Maleny Landsborough Woodford Bribie Island Caboolture Somerset region Dayboro Caboolture South Burpengary East Murrumba Downs Redcliffe Moreton Bay Brendale Brisbane City 8

Sewage Treatment Plant Performance Report 2016-17 1. Introduction ywater supplies more than 755,609 people across 5223 square kilometres with sewerage and water services. We monitor effluent quality from each sewage treatment plant to assess compliance with conditions specified under the licence granted by the Department of Environment and Heritage Protection (DEHP). We hold the following DEHP registration and approval: a. A single Registration Certificate, authorising ywater to operate sewage treatment plants; and b. A single Environmental Authority (Environmental Licence) for the following sewage treatment plants: Brendale Kawana Nambour Burpengary East Kenilworth Noosa Bribie Island Landsborough Redcliffe Coolum Maleny South Caboolture Cooroy Maroochydore Suncoast (decommissioned) Dayboro Murrumba Downs Woodford Should we not meet our obligations as set out in the licence, penalties may apply in accordance with the Sustainable Planning Act 2009 and Environmental Protection Act 1994. This report is published to provide you with information about effluent quality and some licence compliance statistics from our sewage treatment plants. By meeting licence conditions, we ensure high quality service, minimising impacts on waterways in our local communities. 1.1 Quick Statistics July 2016 - June 2017 sewerage connections 281,015 Kilometres of sewer main pipes 5,708 km sewage pump stations 781 sewage treatment plants 17 Volume of sewage collected and treated 50,680 ML 1 1. Does not include 2092 ML diverted to Queensland Urban Utilities (QUU) via the Kedron Brook Sewerage Scheme. This sewage would be treated to meet QUU s licence requirements. 9

2. Effluent Quality Summary The Department of Environment and Heritage Protection (DEHP) requires that our sewage treatment plants discharge effluent that meets quality and quantity conditions to minimise impacts on the health of waterways in Queensland. We report on concentrations of contaminants such as organic matter, suspended solids, chlorine and pathogens. Release volumes and mass loads are also evaluated to compare with limits specified by DEHP. In the 2016-17 financial year, we achieved over 99% compliance in overall effluent quality discharged from our sewage treatment plants. DEHP allows fluctuations in effluent quality parameters (DEHP, 2014) which means the plants performed within the overall quality standards set by the Environmental Licence. The table below provides a summary of where treated effluent is discharged and overall effluent quality compliance in the 2016-17 financial year. Table 1 Effluent Quality Compliance Sewage Treatment Plant Catchment Equivalent Population Treatment Process Freshwater Body Discharge to: Ocean Irrigation, wetlands or groundwater Effluent Quality Compliance Brendale 35,797 BNR 1 99.2% Biological nitrogen removal Bribie Island 22,316 and chemical phosphorus removal 99.9% Burpengary East 42,636 BNR 99.9% Coolum 25,763 BNR 99.8% Cooroy 9452 BNR 100% Dayboro 1015 Biological nitrogen removal 99.5% 2 Kawana 102,391 Biological nitrogen removal 99.0% Kenilworth 290 Oxidation Pond 100% Landsborough 3 12,577 BNR Biological nitrogen removal Maleny 2412 and chemical phosphorus 100% removal Maroochydore 116,020 BNR 96.9% Murrumba Downs 124,395 BNR 99.5% Nambour 42,673 BNR 100% Noosa 46,833 BNR 100% Redcliffe 59,296 BNR 100% South Caboolture Woodford 1939 54,731 Biological nitrogen removal and chemical phosphorus removal 100% Biological nitrogen removal and chemical phosphorus 100% removal Overall Compliance 99.1% 4 Notes: 1. Biological Nutrient Reduction (BNR) Reduces nitrogen and phosphorus biologically. 2. Because Dayboro STP discharges to restricted land (not a waterway) and therefore poses no risk to human health, the plant is licensed to disinfect by natural sunlight. The effectiveness is therefore impacted by weather conditions (i.e. disinfection is less effective on rainy days). 3. A separate Performance in Detail table is not provided for Landsborough Sewage Treatment Plant as effluent from this facility is combined with Kawana Sewage Treatment Plant effluent before being released to the outfall. 4. Effluent quality met stringent quality standards 991 out of every 1000 times (well within the quality standards set by the Environmental Licence). Overall compliance is calculated on a flow-weighted basis in accordance with the National Performance Report.

Sewage Treatment Plant Performance Report 2016-17 3. Performance in Detail (JULY 2016 JUNE 2017) Each of our plants has different release parameters due to the nature of the discharge point (e.g. waterway or land) or when the plant was issued DEHP approval to operate. An example of this is Brendale STP which has mass load limits and Bribie Island STP which does not. When reading the following tables, please refer to the Definitions and Legend on page 25 for further explanation of the acronyms and units of measurement. 3.1 Brendale Sewage Treatment Plant Table 2 Brendale STP Release Targets Target Type BOD5 mg/l 53 TSS mg/l 53 * ph ph units 53 range DO mg/l 53 minimum Free Chlorine Residual mg/l 53 Faecal Coliforms cfu/ 100 ml 265 median ** 80th percentile * TSS target was exceeded five times in the 2016-17 financial year. Please refer to the next page for further details. ** Median Faecal Coliforms target was exceeded once in the 2016-17 financial year. Please refer to the next page for further details. Table 3 Brendale STP Mass Limits Days Limit Type Average Annual Flow ML/yr 365 Nitrogen Mass Load kg/yr - Phosphorus Mass Load kg/yr - 11

Exceedances Total Suspended Solids The Total Suspended Solids target was exceeded five times in 2016. This was caused by ferric chloride dosing trials as a coagulant aid in the dewatering process. Total Suspended Solids was brought under control and has achieved full compliance. An overall short term Total Suspended Solids target of 89.8% was achieved. Figure 1 Brendale STP TSS Short Term 80th Percentile 30 25 Maximum = 23 mg/l TSS (mg/l) 20 15 10 5 0 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Faecal Coliforms The median Faecal Coliforms target was exceeded once in early 2017. This was caused by a malfunction of the automated chlorine dosing system. We elected to change the frequency of chlorine dosing equipment servicing from eight weeks to four weeks. This ensures that all automatic control of the chlorine dosing system operates effectively. Compliance for median Faecal Coliforms of 98.1% was achieved. Figure 2 Brendale STP Faecal Coliform - Median 1,400 Faecal Coliforms (cfu/ 100mL) 1,200 1,000 800 600 400 200 Maximum = 1,000 cfu/100 ml 0 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Date 12

Sewage Treatment Plant Performance Report 2016-17 3.2 Bribie Island Sewage Treatment Plant Table 4 Bribie Island STP Release Targets Target Type BOD5 mg/l 53 TSS mg/l 53 ph ph units 53 range DO mg/l 53 minimum long term 50th percentile TN mg/l 53 short term 50th percentile * ** TP mg/l 53 long term 50th percentile short term 50th percentile * Short term 50th percentile Total Nitrogen was exceeded twice in the 2016-17 financial year. Please refer to the next page for further details. ** Maximum Total Nitrogen was exceeded once in the 2016-17 financial year. Please refer to the next page for further details. Exceedances Total Nitrogen The short term 50th percentile Total Nitrogen target was exceeded twice and the Total Nitrogen target was exceeded once. Ex-Tropical Cyclone Debbie caused wet weather flow conditions which caused the short term exceedance. The Total Nitrogen exceedance was caused by a power failure which changed the operation of the aeration blowers to its default parameters. We modified the plant control system modified to prevent a recurrence of a similar event and subsequent samples have successfully met compliance. Overall 96.2% and 98.1% compliance in short term and Total Nitrogen targets was achieved respectively. 13

Figure 3 Bribie Island STP Total Nitrogen Short Term 50th Percentile 18 16 14 Maximum = 12.5 mg/l 12 TN (mg/l) 10 8 6 4 2 0 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Figure 4 Bribie Island STP Total Nitrogen Maximum 30 TN (mg/l) 25 20 15 10 Maximum = 20 mg/l 5 0 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Date 14

Sewage Treatment Plant Performance Report 2016-17 3.3 Burpengary East Sewage Treatment Plant Table 5 Burpengary East STP Release Targets Target Type BOD5 mg/l 53 TSS mg/l 53 ph ph units 53 range DO mg/l 53 minimum Free Chlorine Residual mg/l 53 * Faecal Coliforms cfu/ 100 ml 265 median 80th percentile * Maximum Free Chlorine Residual was exceeded once in the 2016-17 financial year. Please refer to the next page for further details. Table 6 Burpengary East STP Mass Limits Days Limit Type Average Annual Flow ML/yr 365 Nitrogen Mass Load kg/yr - Phosphorus Mass Load kg/yr - Exceedances Free Chlorine Residual The Free Chlorine Residual target was exceeded once. The single spike is attributed to the required algal cleaning of a chlorine contact tank using liquid chlorine. Our facility has since met full compliance. The overall Free Chlorine Residual performance achieved 98.1% compliance. 15

Figure 5 Burpengary East STP Free Chlorine Residual Maximum 0.9 Free Chlorine Residual (mg/l) 0.8 Maximum = 0.7 mg/l 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 3.4 Coolum Sewage Treatment Plant Table 7 Coolum STP Release Targets Target Type BOD5 mg/l 53 TSS mg/l 53 ph ph units 53 range DO mg/l 53 minimum NH3-N mg/l 53 long term 50th percentile Free Chlorine Residual mg/l 53 * Faecal Coliforms cfu/ 100 ml 53 median 80th percentile * Maximum Free Chlorine Residual was exceeded once in the 2016-17 financial year. Please refer to the next page for further details. 16

Sewage Treatment Plant Performance Report 2016-17 Table 8 Coolum STP Mass Limits Days Limit Type Average Annual Flow ML/yr 365 Nitrogen Mass Load kg/yr - Phosphorus Mass Load kg/yr - Exceedances Free Chlorine Residual The Free Chlorine Residual target was exceeded once in early 2017. A follow-up test by our staff on the same day resulted in a Free Chlorine Residual of 0.1 mg/l (less than the <0.7 mg/l ), indicating a potential testing error. Compliance for Free Chlorine Residual of 98.1% was achieved. Figure 6 Coolum STP Free Chlorine Residual Maximum 1 Free residual chlorine (mg/l) 0.9 0.8 0.7 Maximum = 0.7 mg/l 0.6 0.5 0.4 0.3 0.2 0.1 0 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Date 17

3.5 Cooroy Sewage Treatment Plant Table 9 Cooroy STP Release Targets Target Type TSS mg/l 53 ph ph units 53 range DO mg/l 53 minimum TN mg/l 53 TP mg/l 53 Intestinal Enterococci mg/l 159 long term 50th percentile long term 50th percentile long term 50th percentile Table 10 Cooroy STP Mass Limits Limit Type Nitrogen Mass Load kg/yr Phosphorus Mass Load kg/yr 18

Sewage Treatment Plant Performance Report 2016-17 3.6 Dayboro Sewage Treatment Plant Table 11 Dayboro STP Release Targets BOD5 mg/l 12 TSS mg/l 12 Target Type 80th percentile 80th percentile ph ph units 12 range NH3-N mg/l 12 50th percentile E.coli mg/l 60 median * 80th percentile * Median E.coli was exceeded once in the 2016-17 financial year. Please refer to the next page for further details Exceedances E.coli The median E.coli level was exceeded once in June 2017. This is the only facility that relies on sunlight to disinfect effluent, as this small plant discharges to land onsite and poses no risk to the environment or the community. The single exceedance was caused by algae growth and rainy weather conditions. Overall, 91.7% compliance in median E.coli was achieved. Figure 7 Dayboro STP E.coli Median 1400 Faecal Coliforms (cfu/100 ml) 1200 1000 800 600 400 200 Maximum = 1,000 cfu/100 ml 0 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 19

3.7 Kawana-Landsborough Sewage Treatment Plants Table 12 Kawana-Landsborough STP Release Targets^ Target Type BOD5 mg/l 53 TSS mg/l 53 ph ph units 53 range DO mg/l 53 minimum NH3-N mg/l 53 long term 50th percentile Free Chlorine Residual mg/l 53 * Faecal Coliforms cfu/ 100 ml 53 median 80th percentile ** ^ Note that effluent to the main outfall contains flow from both Kawana and Landsborough Sewage Treatment Plants. * Free Chlorine Residual was exceeded six times in the 2016-17 financial year. Please refer to the next page for further details. ** 80th percentile Faecal Coliforms was exceeded once in the 2016-17 financial year. Please refer to the next page for further details. 20

Sewage Treatment Plant Performance Report 2016-17 Exceedances Free Chlorine Residual The Free Chlorine Residual target was exceeded six times. As part of the current upgrade works we are installing a new chlorination system to improve reliability. Overall, 88.7% compliance in Free Chlorine Residual was achieved. Figure 8 Kawana-Landsborough STP Free Chlorine Residual Maximum 1.2 Free Clhorine Residual (mg/l) 1 0.8 0.6 0.4 0.2 Maximum = 0.7 mg/l 0 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Faecal Coliforms The 80th percentile Faecal Coliforms target was exceeded once in early 2017. Reliability will be improved when we install a new chlorination system. Overall, 98.1% compliance for 80th percentile Faecal Coliforms was achieved. Figure 9 Kawana-Landsborough STP Faecal Coliforms 80th Percentile 1200 Faecal Coliforms (cfu/ 100 ml) 1000 800 600 400 200 Maximum = 600 cfu/100 ml 0 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 21

3.8 Kenilworth Sewage Treatment Plant Table 13 Kenilworth STP Release Targets^ Target Type BOD5 mg/l 52 TSS mg/l 52 ph ph units 52 range DO mg/l 52 minimum Faecal Coliforms cfu/ 100 ml 52 median 80th percentile ^ Note that no discharge to the nearby creek was released from Kenilworth Sewage Treatment Plant (i.e. treated effluent was released to the disposal area). Therefore 100% compliance was attained. 22

Sewage Treatment Plant Performance Report 2016-17 3.9 Maleny Sewage Treatment Plant Table 14 Maleny STP Release Targets to Constructed Wetlands ^ TSS mg/l 53 Target Type ph ph units 53 range DO mg/l 53 minimum TN mg/l 53 long term 50th percentile TP mg/l 53 long term 50th percentile E. Coli cfu/ 100 ml 53 median Table 15 Maleny STP Release Targets to Forest Irrigation ^ Limit Type ph ph units 53 range Electrical Conductivity TN TP µs/cm mg/l mg/l 53 53 53 E. Coli cfu/ 100 ml 53 median ^ Total number of samples of effluent. Note that effluent released to the constructed wetlands and forest irrigation is sampled from the same location, however flow is diverted to either, but not both, outfalls on any one day. 23

3.10 Maroochydore Sewage Treatment Plant Table 16 Maroochydore STP Release Targets Faecal Coliforms cfu/ 100 ml 53 Target Type median * 80th percentile * Table 17 Maroochydore STP Mass Limits Average Annual Flow ML/yr 365 Nitrogen Mass Load kg/yr - ** Phosphorus Mass Load kg/yr - * Median Faecal Coliforms was exceeded five times while 80th percentile Faecal Coliforms was exceeded once in the 2016-17 financial year. Please refer to the next page for further details. ** Nitrogen Mass Load was exceeded three times in the 2016-17 financial year. Please refer to the next page for further details. Exceedances Faecal Coliforms The median Faecal Coliforms target was exceeded five times, while (80th percentile) Faecal Coliforms was exceeded once. This was due to several reasons, including a faulty level modulating valve in the ultraviolet (UV) channel which is used to ensure bacteria reduction. Overall, 89.8% and 98.0% compliance in median and Faecal Coliforms respectively were achieved. Additional spare parts to improve valve reliability are currently being sourced. Figure 10 Maroochydore STP Faecal Coliforms Median 1200 Faecal Coliform (cfu/ 100 ml) 1000 800 600 400 200 Maximum = 150 cfu/100 ml 0 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 24

Sewage Treatment Plant Performance Report 2016-17 Figure 11 Maroochydore STP Faecal Coliforms Maximum (80th percentile) 1200 Faecal Coliform (mg/l) 1000 800 600 400 200 Maximum = 600 cfu/100 ml 0 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Nitrogen Mass Load The rolling Nitrogen Mass Load target was exceeded three times due to maintenance activities. After we completed maintenance work, the plant effluent returned to below the Nitrogen Mass Load limit in August 2017. Overall, compliance of 94.3% was achieved. Figure 12 Maroochydore STP Nitrogen Mass Load Maximum 50,000 45,000 40,000 35,000 30,000 Maximum = 44,700 kg/yr 25,000 20,000 15,000 10,000 5,000 0 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Total Nitrogen Mass Load (kg/yr) 25

3.11 Murrumba Downs Sewage Treatment Plant Table 18 Murrumba Downs STP Release Targets Target Type BOD5 mg/l 53 TSS mg/l 53 ph ph units 53 range DO mg/l 53 minimum Ammonia Nitrogen mg/l 53 TN mg/l 53 long term 50th percentile short term 50th percentile long term 50th percentile TP mg/l 53 short term 50th percentile * Faecal Coliforms cfu/ 100 ml 265 median ** 80th percentile ** * Total Phosphorous exceeded its short term 50th percentile four times in the 2016-17 financial year. There was no effluent quality non-compliance however, as Total Phosphorus mass load was well below the licence limit. ** Median and 80th percentile Faecal Coliforms were both exceeded twice in the 2016-17 financial year. Please refer to the next page for further details. 26

Sewage Treatment Plant Performance Report 2016-17 Table 19 Murrumba Downs STP Volumetric Limits Dry Weather Flow ML/d 290 average Limit Type Volumetric Release ML/d 365 on any one day Table 20 Murrumba Downs STP Mass Limits BOD5 TN TP Limit Type kg/yr annual load 53 kg/d 50th percentile load kg/yr annual load 53 kg/d 50th percentile load kg/yr annual load 53 kg/d 50th percentile load Exceedances Faecal Coliforms The Faecal Coliforms target was exceeded four times. This was attributed to the performance of the UV disinfection unit. The issues included electrical faults which were promptly repaired and high flow through the UV disinfection system. Overall, 96.2% compliance was attained for both median Faecal Coliforms and 80th percentile Faecal Coliforms. Figure 13 Murrumba Downs STP Faecal Coliforms Median 1000 Faecal Coliforms (cfu/100ml) 900 800 700 600 500 400 300 Maximum = 150 cfu/100 ml 200 100 0 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 27

Figure 14 Murrumba Downs STP Faecal Coliforms 80th Percentile 1400 Faecal Coliforms (cfu/100 ml) Maximum = 600 cfu/100 ml 1200 1000 800 600 400 200 0 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 3.12 Nambour Sewage Treatment Plant Table 21 Nambour STP Release Targets Target Type TSS mg/l 53 ph ph units 53 range DO mg/l 53 minimum NH3-N mg/l 53 long term 50th percentile TN mg/l 53 long term 50th percentile TP mg/l 53 long term 50th percentile Faecal Coliforms cfu/ 100 ml 51 median * 80th percentile * Faecal Coliforms was exceeded twice in the 2016-17 financial year. Please refer to the next page for further details. 28

Sewage Treatment Plant Performance Report 2016-17 Exceedances Faecal Coliforms The median Faecal Coliforms target was exceeded twice in late 2016 due to normal wear and tear of filtration membranes, which was isolated and repaired. Membranes normally ensure that pathogen levels such as Faecal Coliforms are fully removed from the effluent water. The median Faecal Coliform levels met 96.1% compliance throughout. Figure 15 Nambour STP Faecal Coliforms Median 450 Faecal Coliforms (cfu/100 ml) 400 350 300 250 200 Maximum = 150 cfu/100 ml 150 100 50 0 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 3.13 Noosa Sewage Treatment Plant Table 22 Noosa STP Release Targets Faecal Coliforms cfu/ 100 ml 54 median 80th percentile Target Type Table 23 Noosa STP Mass Limits Table 22 Noosa STP Mass Limits Limit Type Average Annual Flow ML/yr 365 Nitrogen Mass Load kg/yr - Phosphorus Mass Load kg/yr - 29

3.14 Redcliffe Sewage Treatment Plant Table 24 Redcliffe STP Release Targets BOD5 mg/l 53 TSS mg/l 53 Target Type ph ph units 53 range DO mg/l 53 minimum Free Chlorine Residual mg/l 53 Faecal Coliforms cfu/ 100 ml 260 median 80th percentile Table 25 Redcliffe STP Mass Limits Limit Type Average Annual Flow ML/yr 365 Nitrogen Mass Load kg/yr - Phosphorus Mass Load kg/yr - 30

Sewage Treatment Plant Performance Report 2016-17 3.15 South Caboolture Sewage Treatment Plant Table 26 South Caboolture STP Release Targets Number of BOD5 mg/l 53 TSS mg/l 53 Target Type ph ph units 53 range DO mg/l 53 minimum Free Chlorine Residual mg/l 53 Faecal Coliforms cfu/ 100 ml 265 median 80th percentile Table 27 South Caboolture STP Mass Limits Limit Type Average Annual Flow ML/yr 366 Nitrogen Mass Load kg/yr - Phosphorus Mass Load kg/yr - 31

3.16 Woodford Sewage Treatment Plant Table 28 Woodford STP Release Targets Target Type BOD5 mg/l 53 TSS mg/l 53 ph ph units 53 range DO mg/l 53 minimum Free Chlorine Residual mg/l 53 Faecal Coliforms cfu/ 100 ml 265 median 80th percentile Table 29 Woodford STP Mass Limits Limit Type Average Annual Flow ML/yr 365 Nitrogen Mass Load kg/yr - Phosphorus Mass Load kg/yr - 32

Sewage Treatment Plant Performance Report 2016-17 4. Odour Reduction Table 30 Odour Reduction STP Brendale Bribie Island Burpengary East Coolum Cooroy Dayboro Kawana Kenilworth Landsborough Maleny Maroochydore Murrumba Downs Nambour Noosa Redcliffe South Caboolture Woodford No major odour issues We have been taking steps to address the odour issues impacting on our local community around the Maroochydore STP. To reduce these issues, we have implemented a number of initiatives including installing a new odour control unit, reinstalling the digester flare, a ferrous chloride dosing system and a solar dryer bypass, as well as commissioning a new biosolids conveyor. 33

5. Definitions and Legend Definitions of acronyms, units of measurement and legends used throughout this performance report are defined below. Table 31 Acronyms and Definitions Acronym Term Definition BOD5 BNR DEHP DO E.coli IDEA NH3 N SBR TN TP TSS UV ph Biochemical Oxygen Demand after 5 day test Biological Nutrient Removal Department of Environment and Heritage Protection Dissolved Oxygen Escherichia coli Intermittent Decanted Extended Aeration Ammonia nitrogen Sequential Batch Reactors Total Nitrogen Total Phosphorus Total Suspended Solids Ultraviolet Faecal Coliform Potential Hydrogen The amount of dissolved oxygen needed by aerobic organisms to break down organic material. A process used for nitrogen and phosphorous removal from sewage. Gaseous oxygen that is mixed in water and is available to aquatic organisms for respiration. Used as an indicator of pathogenic organisms that may cause diseases. A three stage wastewater treatment process that involves aeration, settling and decanting. A chemical compound that is removed in order to maintain the health of waterways. High levels can cause environmental issues such as eutrophication. A draw-and-fill biological treatment process that uses aerobic microorganisms to break down and treat wastewater. The sum of nitrate, nitrite and ammonia that is removed in order to maintain the health of waterways and prevent environmental issues such as eutrophication. The sum of phosphorus compounds that is removed in order to maintain the health of waterways and prevent environmental issues such as eutrophication. Total amount of small solid particles that remain suspended within the wastewater. A technology using radiation that disinfects wastewater. Used as an indicator of pathogenic organisms that may cause diseases. A figure expressing the acidity or alkalinity of the water 34

Sewage Treatment Plant Performance Report 2016-17 Table 32 Definition of s Table 31 Definition of s s Definition µs/cm cfu/ 100 ml kg/yr mg/l ML ML/yr NTU micro-siemens per centimetre colony forming units per 100 millilitre kilogram per year milligrams per litre megalitres megalitres per year Nephelometric Turbidity s Table 33 Legend Symbol Compliancy value > 90% 80% - 90% < 80% 35

ABN: 89 791 717 472 Head Office Ground Floor, 33 King Street, Caboolture, QLD PO Box 953, Caboolture QLD 4510 1300 0 UNITY (1300 086 489) www.unitywater.com ywater has certification to: OH&S ISO 4801:2001 Reg No 4260 Environmental ISO 14001:2004 Reg No 4259 Quality Systems ISO 9001:2008 Reg No 4258 Food Safety Management ISO 22000 0722-01