INCHEM Tokyo Current Status and Implementation Approach for Industrial Zones Wastewater Management In Yangon Region

Similar documents
Water and Waste Water Management in Yangon, Myanmar

JEDDAH INDUSTRIAL CITY

Water Quality Permitting Program Monitoring Matrix 1,2,3

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant

DECREE OF THE STATE MINISTER FOR POPULATION AND ENVIRONMENT NUMBER: KEP-03/MENKLH/II/1991 RE: EFFLUENT QUALITY STANDARDS FOR EXISTING OPERATIONS

FORM 26R CHEMICAL ANALYSIS OF RESIDUAL WASTE ANNUAL REPORT BY THE GENERATOR INSTRUCTIONS GENERAL INFORMATION

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana

Lagoons Operation and Management in New Brunswick

Proposal by Russia to delete hot spot 18.2

Removing Heavy Metals from Wastewater

Environment Laboratory, Central Mine Planning & Design Institute Limited, Regional Institute-IV, Kasturba Nagar, Jaripatka, Nagpur, Maharashtra

Notification of Department of Industrial Works

LABORATORY ACTIONS, DECISIONS & SAFETY WITHIN THE EUROPEAN UNION

QUESTIONNAIRE FOR THE TEXTILE AND PRINTING INDUSTRY (SECTOR-RELATED QUESTIONS)

Waste Discharge By-law

Case Study. BiOWiSH Aqua has Positive Long-Term Effects. Biological Help for the Human Race

Monitoring Industrial Wastewaters and their Effects on Wastewater Treatment Plants: Konya Example

Tolerance and Classification

Carbon Canyon Water Recycling Facility Title 22 Engineering Report

The Zero Discharge of Hazardous Chemicals Programme Chemical Management for the Textile Industry

LABORATORY TURNAROUND TIMES AND CHARGES

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT

Warm Mineral Springs Sampling by Sarasota County

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng

UV DISINFECTION OF LOW TRANSMITTANCE PHARMACEUTICAL WASTEWATER

2014 ASSINIBOINE RIVER MONITORING REPORT

Emission accounts. Julian Chow United Nations Statistics Division September 2016 Putrajaya, Malaysia

GENERAL PERMIT WMGR098 BENEFICIAL USE OF WASTE FOUNDRY SAND AND SAND SYSTEM DUSTS

Wastewater Reuse Regulations In Saudi Arabia

General Information on Nitrogen

RECYCLED WATER AT SYDNEY OLYMPIC PARK. Andrzej Listowski SYDNEY OLYMPIC PARK AUTHORITY

CONSULTING SERVICES : SEWERAGE SYSTEM IMPROVEMENT FOR GREATER TIRANA. 6/8/2012 Address: Rruga Dora D Istria 2/1, Apt 4/13, Tirane, Albania

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

HAZARDOUS WASTES (MANAGEMENT AND HANDLING) RULES, 1989

Case Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia.

CeraMem. Ceramic Membrane Technology. Advanced Heavy Metals Removal System WATER TECHNOLOGIES

Reasonable Potential Analysis & Impacts to Pretreatment Programs. Raj Kapur Clean Water Services

Questionnaire (Wood Processing)

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT

Midwest Analytical Services, Inc. "Where industry comes for answers." PRICE LIST 2009

DR 1900 PORTABLE SPECTROPHOTOMETER

Drinking Water Analyses

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

East Coast P Removal Technology Performance Summary

NATIONAL ENVIRONMENTAL PROTECTION (EFFLUENT LIMITATION) REGULATIONS. [S.I. 8 of 1991.] under section 40. [Commencement. ]

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

Startup and Performance of the World s first Large Scale Primary Dissolved Air Floatation Clarifier ABSTRACT KEYWORDS INTRODUCTION

WASTEWATER TREATMENT

Presented By: Kevin Bossy. The Supplier Perspective: Accelerating the Adoption of Innovative Solutions

Micro Methods Laboratory Quality Assurance Manual

TOWN OF HASTINGS, FLORIDA TOWN CODE. Chapter 18. Previous Page. Water and Sewer. Article II. Sewers -- Prohibited Discharges.

WASTEWATER DISCHARGE PERMIT APPLICATION SHORT FORM

Base Metal and Iron Ore Mining

Northern Michigan Operators Spring Seminar. Lab Issues

WHERE DO THE PRETREATMENT PERMIT LIMITS COME FROM??? Amy Varinoski City of Mebane

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017

ORGANICA MM2100 WWTP. Detailed Case Study. Bekasi Fajar, INDONESIA

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT

Module 20: Trickling Filters Answer Key

4 Angles. Pilot-scale Evaluation of AirPrex for Phosphorus Management. Innovation Program Phosphorus Initiative JTAC 4/22/2017

Water quality assessment of a wastewater treatment plant in a Ghanaian Beverage Industry

National Pollutant Discharge Elimination System (NPDES) Permit Program F A C T S H E E T

A Hybrid Constructed Wetland System for Decentralized Wastewater Treatment

WPL Diamond. Environmental Wastewater Solutions. EN approval Compact design No odours. Low visual impact Easy to install

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

Removal of High Ammonia Levels from Municipal Wastewater Using Humic Acid and Selective Bio-Augmentation

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES

Questionnaire (Steel Mills and Metal Smelting and Refining)

CLEAN WATER Clean Water PT Scheme Schedule Clean Water PT Scheme Schedule. Schedule subject to change see ERA s website at

Recycling And The New Virginia Stormwater Management Program Regulations VIRGINIA RECYCLING ASSOCIATION 2014 ANNUAL CONFERENCE

Flue Gas Desulphurization (FGD) plant 2 x 600 MW Coal based Thermal power plant Cuddalore, Tamil Nadu. By MK Parameswaran 23 rd Dec, 2016

Case Study: City of Brantford. Controlling Industrial Discharges to Improve Plant Performance

Mitchell L. Griffin Jean Bossart CH2M HILL Gainesville, Florida

Evaluation of Pollutants in Wastewater Generated by Mobile Car Washing Operations

Indian Health Service Sanitation Facilities Construction Program Wastewater Lagoon Operation & Maintenance

Ministerial Decision No: 159/2005 Promulgating the bylaws to discharge liquid waste in the marine environment

Public Notice. Issuance of Industrial Waste Discharge Permit

Benefits of On-line Monitoring of Carbon, Nitrogen and Phosphorus

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT

Scientific Evaluation of Contact Water from an Organics Compost Demonstration Site

Newmont Mining Corporation Water Management Standard

Use of Bio filter Reactors to Increase the Quality of Liquid Waste at Dr. Soetomo Hospital Surabaya in 2015

ENVIRONMENTAL AND HEALTH ASPECTS OF WATER TREATMENT AND SUPPLY Design of Water Treatment Facilities - Katsuyoshi Tomono, Yasumoto Magara

The Chemical Industry and Climate Change. A Snapshot from India

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati

POLLUTION LOAD IN INDUSTRIAL EFFLUENT AND GROUND WATER OF GADOON AMAZAI INDUATRIAL ESTATE (GAIE) SWABI, NWFP

WATER QUALITY REGULATIONS LICENCE APPLICATION AND RENEWAL AS PER LEGAL NOTICE 120

Landfills And The New Virginia Stormwater Management Program Regulations

Water Pollution. Objective: Name, describe, and cite examples of the eight major types of water pollution.

Hillsdale Wastewater Treatment Plant

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT

Conceptual Design for a Future Wastewater Treatment Plant

Advanced Wastewater Treatment Plant Plant Profile

Wastewater Treatment Processes

PRO. Safe, clean drinking water on tap anywhere, anytime with UF-PRO Ultrafiltration Units...

Field Trip Report to Indah Water Konsortium (IWK) Sdn. Bhd Due date : 25 / 11 / 2013 Lecturer s name : Ms. Sherina Binti Kamal

Adelere Ezekiel Adeniran, Ph.D., FNSE University of Lagos, Nigeria

Transcription:

INCHEM Tokyo 2017 Current Status and Implementation Approach for Industrial Zones Wastewater Management In Yangon Region Than Than Thwe Director, Ministry of Construction Joint Secretary-1, Thilawa SEZ Management Committee

Contents Introduction Location of Industrial Zones in Yangon Region Wastewater Pollution Control Activities by MONREC-ECD, YCDC, MOI Myanmar Industrial Wastewater Guidelines Current Systems Mingaladon Industrial Park Wastewater Treatment Plant Thilawa SEZ Wastewater Treatment Plant Implementation Approach Analysis and Implementation Approach for Industrial Zones Wastewater Treatment Plant in Yangon Region

Location of Industrial Zones in Myanmar Location of Industrial Zones in Yangon City MIP Industrial Zone Thilawa SEZ 29 Industrial Zones

Why we need Industrial Wastewater Treatment Plant? - Industrial wastewater usually includes hazardous substances or high concentration organic matters which directly discharge to public water bodies without treatment may cause damage to human health or pollution as surrounding environmental deterioration. - Institutions - (1) Environmental Conservation Department(Ministry of Natural Resources and Environmental Conservation-MONREC) - (2) Yangon City Development Committee-YCDC - (3) Department of Industrial Supervision and Inspection (Ministry of Industry) - Regulations for Water Pollution Control and Enforcement - National Environmental Quality (Emission) Guidelines (2015)

Regulations related Water Environmental Management National Environmental Policy (1994) Water Management and Myanmar Agenda 21, 1997 2008 Constitutions and Environmental Conservation Water Management and National Sustainable Development Strategy 2009 Environmental Conservation Law (2012) Environmental Conservation Rules (2014) Environmental Impact Assessment Procedure (2015) National Environmental Quality (Emission) Guidelines (2015)

Wastewater Parameters and Guideline Values of National Environmental Quality Parameter Unit Guideline Value 5 Days BOD mg/l 50 Ammonias mg/l 10 Arsenic mg/l 0.1 Cadmium mg/l 0.1 COD mg/l 250 Chlorine (Total Residual) mg/l 0.2 Chromium (hexavalent) mg/l 0.1 Chromium (total) mg/l 0.5 Copper mg/l 0.5 Cyanide (free) mg/l 0.1 Cyanide (Total) mg/l 1.0 Fluoride mg/l 20 Heavy Metals (Total) mg/l 10 Iron mg/l 3.5 Lead mg/l 0.1 Parameter Unit Guideline Value Mercury mg/l 0.01 Nickel mg/l 0.5 Oil and grease mg/l 10 ph SU 6-9 Phenols mg/l 0.5 Selenium mg/l 0.1 Silver mg/l 0.5 Sulphide mg/l 1 Temperature C <3 C Total Coliform bacteria 100m l 400 Total Phosphorus mg/l 2.0 TSS mg/l 50 Zinc mg/l 2.0

Current Systems

Mingaladon Industrial Park Wastewater Treatment System

Source: Mingaladon Industrial Park

Wastewater Quality Criteria to WWTP (Mingaladon Industrial Park) Parameter Unit Guideline Value 5 Days BOD mg/l 240 COD mg/l 500 Free Ammonia mg/l 0.5 Arsenic mg/l 0.05 Cadmium mg/l 0.01 Chloride mg/l 600 Chromium (hexavalent) mg/l 0.1 Chlorine mg/l 1.0 Copper mg/l 0.5 Cyanide (free) mg/l 0.02 Phosphate mg/l 1.0 Fluorine mg/l 1.5 Nitrate mg/l 10 Nitrite mg/l 1.0 Iron mg/l 5.0 Source: Mingaladon Industrial Park Parameter Unit Guideline Value ph SU 6-9 Temperature C 35 C Mercury mg/l 0.005 Nickel mg/l 0.1 Oil and grease mg/l 30 Phenols mg/l 0.002 Selenium mg/l 0.01 Sulphur mg/l 0.01 Sulphate mg/l 400 Detergent mg/l 0.5 Mineral Oil (H/C) mg/l 10.0 TDS mg/l 1000 TSS mg/l 200 Zinc mg/l 5.0 Lead mg/l 0.1

Thilawa Special Economic Zone Jointly Developed by Myanmar and Japan Developer: Myanmar Japan Thilawa Development Ltd., (MJTD)

Thilawa SEZ Wastewater Treatment Plant (4800 m 3 /day)

Wastewater Treatment in Thilawa SEZ

Thilawa SEZ Wastewater Treatment Plant Layout Plan Sludge Thickener Return Tank Hydration Room Sand Filtration Tank Settling Tank Aeration Tank Equalization Tank Grid Chamber Disinfection Tank Sand Filtration Blower Electrical Room Workers waiting Room (Raw)

Grid Chamber Equalization Tank Aeration Tank Settling Tank

Rapid Filtration Disinfection Tank Return Tank Sludge Thickener

Dehydration Room Blower Room

Applied Wastewater Standard in Thilawa SEZ ESIA for Zone A Development (April Oct 2013) Based on standard by Ministry of Industry 1995 Consideration Internal Regulations by MJTD Adding to some parameters (T-N, Color, etc) National Environment Quality (Emission) Guidelines (NEQG Dec 2015) Consideration Zone A Development (September 2015- June 2016) Consideration Revision of Internal Regulations by MJTD Many Stakeholders were involved Based on NEQG (adding to T-P, heavy metals etc.,) Combined with MOI and NEQG (apply stricter value, some parameters BOD, COD, oil & grease will be relived but compliance with NEQG

Thilawa SEZ Internal Rules and Regulations: (Standard of Wastewater Quality after Pre-wastewater treatment by the Locator) No Parameter Wastewater Standard Unit 1 BOD (5 days at 20 C) max 200 ppm 2 Suspended Solids (SS) max 200 ppm 3 Total Dissolved Solids max 2000 ppm 4 ph Value 6.5-8.5 5 COD min Permanganate value (Under Review) max 150 ppm 6 COD cr Dicromate Value max 300 ppm 7 Sulphide (as HS) max 1 ppm 8 Cyanide (as HCN) max 0.2 ppm 9 Oil and grease max 5 ppm 10 Total coliform bacteria max 400 MPN/100ml 11 Tar None - 12 Formaldehyde max 1 ppm 13 Phenols and cresols max 1 ppm 14 Free Chlorine max 1 ppm

No Parameter Wastewater Standard Unit 15 Zinc max 5 ppm 16 Chromium max 0.5 ppm 17 Arsenic max 0.25 ppm 18 Copper max 1.0 ppm 19 Mercury max 0.005 ppm 20 Cadmium max 0.03 ppm 21 Barium max 1.0 ppm 22 Selenium max 0.02 ppm 23 Lead max 0.2 ppm 24 Nickel max 0.2 ppm 25 Insecticides None - 26 Radioactive Materials None - 27 Temperature max 35 C 28 Color and Odor QCVN40: 2011/BTNMT QCVN13: 2008/BTNMT 150 (Co-Pt) 29 T-N 40 ppm

Key Points of Water Pollution Control Hazardous & Chemical Substances Management (High Risk Management) Checking Production Process Submission of raw material list with MSDS (Material Safety Data Sheet) Submission of plan for amount of chemical consumption and its monitoring Bi-annually self inspection and reporting results of inspection Guidance to install Proper Wastewater Treatment System Checking proper wastewater treatment system by referring to international standard Issuing notification of target parameters to be monitored to investors Water Quality Monitoring Treated wastewater by investor (every month) (to measure 7 Basic Parameters such as ph, BOD, COD, SS, Total-N, Total Coliform, Oil and Grease) Treated wastewater by MJTD wastewater treatment plant (daily, weekly, monthly, biannually) Surface water quality monitoring by MJTD (bi-annually)

Main Responsibilities of Environmental Section (OSSC) Before Construction Reviewing and Approval of Environmental Conservation and Prevention Plan (ECPP) Screening of necessary Environmental Impact Assessment (EIA) and Initial Environmental Examination (IEE) Reviewing and Appraisal of EIA and IEE During Construction Inspection to Construction site Checking Environmental Monitoring Reports Reviewing and Appraisal of EIA and IEE During Operation Inspection to investors Checking Environmental Monitoring Reports

Analysis and Implementation Approach Studied by: JICA, Kobelco Eco Solutions Co., Ltd., Supreme Water Doctor Co., Ltd.

Planning of Industrial Wastewater Treatment Plant 1. Comprehension of field Condition Factory water balance, wastewater quality survey, required discharge standard 2. Verification of field condition Confirmation of wastewater treatment volume, discharge, volume without treatment, treatment parameters 3. Examination of wastewater discharge reduction 4. Planning of Wastewater Treatment Plant 5. Options for Project Scheme Studies of wastewater volume at sources, concentration reduction, or reuse of wastewater in next process without treatment Determination of w/w volume, water quality (inlet/out let), treatment process, layout plan Government Owned Build Own Operate Build Own Transfer

Study Area: Hlaing Thar Yar Zone 4 Zone 3 Zone 2 Zone 1

Number of Factories and Occupied Area (Hlaing Tharyar Industrial Zones) Wastewater is discharged to Pan Hlaing river through Open Trench, Open Creek Source: Kobelco Eco Solutions Co., Ltd. Supreme Water Doctor Co., Ltd.

Options of Case Study Case 1: Zone (1) Option 1: Without rain water Option 2: With rain water Case 2: Zone (1,2,3 and 4) Option 1: Without rain water Option 2: With rain water Note: Study for installation of pre-wastewater treatment is not included. Because most of the factories may not be necessary to install pre-wastewater treatment by themselves except for factories discharging hazardous and chemical substance and concentration of BOD & COD levels from the factories can be treated by the central WWTP. 27

Setting target wastewater to be treated Wastewater characteristic Mainly have 7 kinds of wastewater line in this area with difference characteristic Type 1: Domestic wastewater Type 2: Garment Industrial wastewater Type 3: Dyeing industrial wastewater Type 4: Ice industrial wastewater Type 5: Chemical industrial wastewater Type 6: Paper factory industrial wastewater (with and without paper mill) Type 7: Food industrial wastewater 28

Zone 1 Wastewater Estimated Flow Rate Design Flow Rate = Calculated Flow Rate/0.8 (0.8 occupancy rate)

Zone 1+2+3+ 4 Wastewater Estimated Flow Rate Design Flow Rate = Calculated Flow Rate/0.8 (0.8 occupancy rate)

Setting wastewater treatment process Flow sheet without rain water case study M P M M M Clarifier 1 Clarifier 2 Discharge Coagulation Flocculation Pump pit Sludge storage tank 1 PRIMARY TREATMENT TO REMOVE SS, COD, BOD Parameter Unit COD BOD SS NH3-N TP Coliform mg/l mg/l mg/l mg/l mg/l MPN/100 ml Inlet 1 1780-1800 700-800 600-720 80-95 6.5-9 Aeration tank 2 Disinfection Sludge storage tank COD, BOD, NH3, TP, TN REMOVAL 3 4 REMOVE BACTERIAL Outlet 4 < 250 < 50 < 50 < 10 <2 < 400 Outlet Conform to Effluent levels for Wastewater Treatment Facilities in National Environmental Quality (emission) guidelines 22 Apr. 2015 31

Layout Plan for Zone 1 Wastewater Treatment Pant

Layout Plan for Zone 1+2+3+4 Wastewater Treatment Pant

Project Implementation Options Project Scheme : Government Owned (Case 1) (Case 2) Treatment Fee Payments Yangon Region Government EPC Contract Own and Operate Contractor Treatment Fee Payments Yangon Region Government EPC Contract O&M Own Contractor Operate Industrial Park Industrial Park Waste Water Treatment Plant Waste Water Treatment Plant

Project Implementation Options Project Scheme : Build Operate Transfer Investors Invest Treatment Fee Payments Yangon Region Government Service SPC Government guarantees waste water volume and "Own" quality and service fee (Originally) payment. Loan "Build" EPC Bank Industrial Park "Transfer" EPC Contractor Waste Water Treatment Plant SPC : Special Purpose Company

Project Implementation Options Project Scheme : Build Own- Operate Investors Invest Treatment Fee Payments Yangon Region Government Service Contract Government guarantees waste water volume and quality and service fee payment. SPC "Own" "Operate" Loan "Build" EPC Contract Bank Industrial Park EPC Contractor Waste Water Treatment Plant SPC : Special Purpose Company

Conclusion Issues due to the limited facilities and budget, lack of technologies, increasing population and industries International Best Practice and experiences to formulate the regulations for wastewater management Preventive Measures is needed for health and environmental deterioration Control Measures Monitoring /Coordination/ Regulations and Environmental Quality Standard/ Capacity Building / Persuasion/ Incentives (reward behavior that reduce pollution Implementation Options??? Development of Eco Industrial Zones Thilawa SEZ will meet Sustainable Development Goals (SDGs)

Than Than Thwe tt.than@gmail.com Thank You!

Comparison Arrangement of Funds - CAPEX - OPEX Payment by Government Government Owned Government (Yangon Region Government) - For Construction of Plant to EPC Contractor (Payment at the time of constrction) - For Operation and Maintenance (O&M) to Cotractor if it is outsourced. Private Company Owned BOO (Build-Own-Operate) BOT (Build-Operate-Transfer) SPC - For Waste Water Treatment Service to SPC (Payment over the period of Waste Water Treatment Service) Own fund for construction of Plant (= Tax revenue or Loan) Source of Fund for Payment by Government * Fund for construction of Plant and O&M will be collected from factories in the industrial zone (Tenants) over the period of plant operation. Fee collected from factories in the industrial zone (Tenants) * It is recommended to set the Government's fee charged to Tenants higher than the fee paid to SPC in order to cover expenses of Government. Ownership of Waste Water Treatment Plant Yangon Region Government SPC - Originally, SPC owns plant. - After reasonable return of investment has been obtained by Investors, ownership is transferred to Yangon Region Government. Summary of role of Government - Arrangement of fund - Operation and Maintenance of Plant - Colletion of fees from Tenants - Arrangement of land - Arrangement of resettlement (if required) - Payment of waste water treatment service fee - Guarantee of waste water volume and quality - Collection of fee from Tenants - Arrangement of land - Arrangement of resettlement (if required)