Dams. & Hydropower. Australia, New Zealand and the Pacific

Similar documents
Hydropower & Dams Services

ENGINEERING AND ENVIRONMENTAL SERVICES NAM THEUN 2, LAOS 1,074 MW. Down to Earth. Up to the Challenge.

Down to Earth. Up to the Challenge. Engineering, Geoscience and Environmental Services TAILINGS BEACH, BC, CANADA

Hydropower and Water Resources

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013

Backwater reservoir SEPA. Guidance on SEPA s reservoir registration process Reservoirs (Scotland) Act 2011

consulting engineers hydropower

LAURIE RIVER #1 GENERATING STATION SHORT-TERM EXTENSION LICENCE APPLICATION

Campbell River System. Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

consulting engineers hydraulic steel structures

PROJECT BRIEF for the John Hart Generating Station Replacement Project

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

BOARD BRIEFING DAM SAFETY QUARTERLY REPORT

FERC DAM SAFETY PROGRAM

Mining, Tailings and Dam Safety: the Mt. Polley Disaster and Next Steps. Dr. Andrea Kennedy, Ph.D. Bridgeway Consulting for Adams Lake Indian Band

TVA Colbert Fossil Facility Ash Disposal Pond 4

Power & Energy. Solutions for a better world

PANAMA CANAL BORINQUEN DAMS AND THIRD SET OF LOCKS OPERATIONS AND MAINTENANCE STRATEGY

United States Army Corps of Engineers. Addicks and Barker Dam Safety Update

Pipelines and Penstocks Avoiding operational issues throughout the life of your project

Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District. Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas

Dam Safety Regulations & National Dam Safety Program

Silvan Dam and Revisions to Adapt for Latest Developments in High CFRD Design and Construction

Watershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan)

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

Some aspects of the sediment transit on the Mekong river in relation with hydropower development

APPENDIX E: West Creek Hydro Technical Review

Water Balance Assessment of the Roseires Reservoir

APPENDIX A. Project Scoping

THAI-AUSTRALIAN NORTHEAST VILLAGE WATER RESOURCE PROJECT

Types of Hydropower Facilities

Keywords: Fish ladder, Investigation of Upstream Migration, Sweetfish, Fish Straying Prevention Device, Sodium Lamp Lighting

Position Description

Western Power Company Ltd. Ngonye Falls Hydroelectric Project October 2014

JOBS AROUND THE WORLD

By: Bernardo González, Project Director December 5, 2011

TRANSMISSION TO ENABLE RENEWABLES POTENTIAL NZ HYDRO SCHEMES INTERIM DRAFT REPORT

Revision Nalcor Doc. No. MFA-SN-CD-0000-GT-DC C1 Date Page SLI Doc. No EC Dec-2013 ii DESIGN CRITERIA - GEOTECHNICAL

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

The West East Link Main is a 125 million pipeline project that will carry water across the North West of England

EARTHQUAKE- PRONE BUILDINGS POLICY

Long Lake Small Hydro Project

NOTICE OF PREPARATION

Regulation No July Engineering and Design REPORTING EARTHQUAKE EFFECTS TABLE OF CONTENTS

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Technical Memorandum No. 3 Source Storage and Supply

Honeysuckle Reservoir decommissioning

Performance improvement of headworks: a case of Kalignadaki A Hydropweor Project through physical hydraulic modelling

SEISMIC DESIGN CRITERIA FOR SAN FRACISCO WATER SYSTEM IMPROVEMENT PROGRAM

Three Gorges Project. A Project with Tremendous Benefits and in Favour of Environmental Improvement. By Cao Guangjing May 22, 2004

Designing of the Third Set of Locks

PUMPED STORAGE PLANTS

Environmental and social impacts of smallscale. Issues and Challenges. Glenn Morgan (LCSEN) World Bank Water Week February 18, 2009

Criteria for Siting Dams

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

Nashville District October 2011 Update

Design-Build Capital Infrastructure Project

E7. Taking, using, damming and diversion of water and drilling

South Florida Water Management District Future Directions. Melissa Meeker, Executive Director

EMERGENCY STORAGE PROJECT

PROTECTING WATER RESOURCES

Automotive Industry. Capability Statement

Tailings System Safety Review for the Quirke Tailings Management Area in Elliot Lake

A Practical Guide to Assessment and Implementation of Small Hydropower. Group Manager Hydropower & Major Projects

Mr. Paul Dunlap, California Department of Water Resources

Hoover Dam Hydropower and River Operations Electric Market Forecasting Conference. Mark Cook, PE Manager, Hoover Dam

IMPULSA CONSULTORES, S.L.U. Company Profile

Careers List Professional Careers in Construction

Evaluation of New Concrete Shrinkage Reducing Additive for Glen Elder Dam Spillway Inlet Slab Repair

APPENDIX A EARTHEN EMBANKMENT. VERSION 1.0 March 1, 2011

June 22, Francis E. Borcalli, P.E.

DAM AND CANAL SAFETY GUIDELINES

Introduction. General Description

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam

Presentation Outline. Review of CEATI Background Conventional Hydro Program Update

SOUTH FORK AMERICAN RIVER (CHILI BAR), CALIFORNIA

Fast Tracking Hydro Infrastructure Build in Developing Economies. BJ Rochecouste Collet Technical Director Aurecon South Africa


DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Seismic Retrofit of Crane Valley Dam

SITE VISITS REPORT: EXISTING

Coal Combustion Facility Assessment Report. October 20, 2010

Frequently Asked Questions Updated July 17, 2015

Ground Improvement for Mitigation of Failure Risks to Existing Embankment Dams

SUEZ. committed together to water a source of life

Design, Construction and Operation of a Large Centerline Tailing Storage Facility with High Rate of Rise

Appraisal of the Safety of the Tiga and Challawa Gorge dams, Nigeria APPRAISAL OF THE SAFETY OF THE TIGA AND CHALLAWA GORGE DAMS, NIGERIA.

Lower Mattagami River Project

DAM SAFETY INSPECTION REPORT GLENWOOD LAKE DAM CLASS B, INTERMEDIATE HAZARD DAM

THE USE OF 400 MM RCC LIFTS IN THE ENLARGED COTTER DAM

Water Balance and Regulation Alternative Analysis for Kajakai Reservoir using HEC-ResSim

John Hart Generating Station Replacement Project. January 2018 Community Construction Update Report #55

New innovative technique for strengthening old buttress dams and multiple arch dams

Dam Safety Inspection Checklist

Transcription:

Dams & Hydropower Australia, New Zealand and the Pacific

World class dam expertise We see a community s interaction with water as part of a holistic system, not a series of independent connections. Now combined with MWH, our expertise in designing, rehabilitating and enhancing hundreds of dams and hydropower schemes around the world is second to none. Sustainable and economic solutions minimise the impact of dam facilities on the environment and surrounding communities while providing owners with safe and reliable long-term performance. Stantec delivers dam and hydropower projects around the world. Our services Consents and approvals Cost estimating and asset valuation Dam design - all types Dam raising and strengthening Dam safety management and risk assessment Hydropower powerhouses, transmission, pumped storage, refurbishment, retrofit Mining dams - water supply, tailings, brine Operation and maintenance Peer review/technical advisor River works and structures Site investigations Spillways Tendering and construction management Water conveyance systems Water intakes, outlets and water diversion

Our services span the life of a project, from early planning and design through to decommissioning. Dam design all types Our reputation for innovative, quality engineering extends to all forms of dam design, including: New dams earthfill, earth core/rockfill, concrete faced rockfill, rollercompacted concrete, concrete arch, gravity and excavated storages Raising and strengthening existing dams, upgrading (including spillway capacity) and remedial works Feasibility studies, site investigations, concept and detail design, cost estimating, economic optimisation and asset valuation studies. Dam safety management and risk assessment Our dam engineers perform safety inspections in accordance with the local dam safety regulations, and help dam owners to prepare dam safety emergency plans and operation manuals. Services provided include safety evaluation and quantitative risk assessment: seismic and hydrological risk, gate reliability, stability and structural analysis, and public safety risk. Water intakes, outlets and water diversion Our team of engineers design integral, free standing and multilevel withdrawal intakes for dam and hydropower projects. We meet seismic design criteria, provide selective reservoir elevation withdrawal and help regulate downstream water temperatures. Water conveyance systems Whether it is reducing head losses or increasing power generation, our water conveyance expertise can meet all project goals with demonstrated experience. Our team has designed canals, pipelines and tunnels in a full range of capacity for the smallest to largest systems using a variety of construction materials and applications. Operation and maintenance Our team of engineers offers consulting to help sustain operations over the life of a dam or hydropower facility, producing optimal performance and efficiency. We are available for emergency, quick response needs, as well as support through planned outages and maintenance activities. River works and structures Cover image: Warragamba Dam, NSW This Image: Shasta Lake Dam, USA We investigate and design a wide range of weirs, regulators, fishways, channels, enlargements, water savings works, environmental enhancements, river bank stabilisation and erosion and flood control levees.

Australia Pacific LNG Ponds Design Origin Energy, Australia Australia Pacific LNG one of the largest producers of natural gas in eastern Australia is converting brackish (salty) waste water into a resource useable for industrial, construction, and irrigation purposes. The design scope for this project included earthen ponds for storage, raw feed, brine reject, and brine concentrate water ponds from advanced water treatment facilities. The result increases water recovery and lessens waste volumes for communities surrounding the Surat Basin. Our team designed more than 25 earthen ponds, ranging in capacity up to 900ML and 12ha area. The ponds have typical embankment heights up to 8m and embankment lengths of up to 1.5km. The ponds are lined with geomembrane, with an underlying leak detection system. In addition to the design of all pond elements, we provided construction oversight. CHW Dam Safety Advisor Central Highlands Water (CHW), Australia Our engineers undertake comprehensive surveillance inspections and annual intermediate safety inspections of CHW s dams, and assist in prioritising dam upgrades using a risk management approach. In addition, the detailed design has been completed for safety upgrade works for Wilsons Dam and Beales Dam involving the provision of retrofitted filter zones and construction of weighting berms. We were also commissioned in the role of Superintendent for the construction of safety upgrade works at Musical Gully Dam.

Our experience is based on wide ranging global and local projects large and small. Clyde and Roxburgh Dam Engineering Support Services Contact Energy, New Zealand Since 2003, our team has been assisting Contact Energy with its safety management plan for Clyde Dam. It is the largest concrete gravity dam in NZ, with a dam height of approximately 100m and a dam volume of over 1 million cubic metres. It has an installed generation capacity of 432MW. Services include conducting performance reporting, dam inspections, technical support on operational rules and engineering advice on works associated with the review of seismic motions for the dam from updated studies of faulting on the Dunstan fault. We also perform similar services for the 1950s constructed Roxburgh Dam, a 75m high concrete gravity dam, with an installed generation capacity of 320MW. In addition we provided technical witnesses to support Contact Energy s application for resource consents to operate its dams and reservoirs. Opuha Dam Downstream Weir Enhancement Opuha Water Limited, New Zealand Our experts were engaged on the detailed design, construction documents and construction inspection for the lowering of the crest of an existing concrete spillway and installation of a 1.8m high Obermeyer Gate. We were also responsible for obtaining building consents and construction completion documentation from the regulatory authority.

Warragamba Dam Raising Stage 2 Study Infrastructure NSW, (insw) Australia Infrastructure NSW engaged our team to explore the feasibility of raising the dam by 14 metres, and to investigate alternatives for building a new dam to replace the existing one. We leveraged our dam experts in Australia, the USA and New Zealand to form a team with local knowledge of the key issues and global experience in raising dam wall heights. The team worked closely with insw as well as stakeholders from Water NSW and the Department of Commerce (NSW Public Works) to assess all options and deliver a solution that protects the surrounding community. EGW Dam Safety Advisor East Gippsland Water (EGW), Australia Our experts have been working on Comprehensive Surveillance Inspections and yearly Intermediate Safety Inspections for EGW s16 water storage facilities, many within residential areas. We have also completed a detailed safety review of Nicholson Dam which included both deterministic stability analysis and probabilistic stability analysis, hydrological and dam break modelling, and detailed quantitative risk assessment. We have also undertaken various levels of design work for safety upgrades to the water storage facilities. This includes the design of embankment filter buttresses, embankment conduit upgrades (filter diaphragms) and spillway improvements. Nadarivatu Hydropower Scheme Fiji Electricity Authority The 42MW Nadarivatu Hydropower Station was recently constructed in the remote central area of Viti Levu in Fiji. The project was complex and consisted of a concrete gravity buttress weir, tunnel, penstock and surface powerhouse. As the owner s engineer, we provided full design services covering all aspects of the project from geotechnical and materials investigations, hydrology and flood assessment, mechanical, electrical, transmission line and switchyard, communications, controls through to civil, structural, construction supervision and commissioning. This Image: Warragamba Dam, NSW

Oroville Dam Service Spillway Repairs California Water Authority, USA Our experts are involved with the hydraulic analysis, red-design and construction of repairs to the main spillway at the Oroville Dam following the February 2017 floods that caused significant damage to the both the main and emergency spillways and prompted the evacuation of more than 188,000 residents from the area. At 770 feet in height, the Oroville Dam is the nation s tallest earthen dam and impounds 3.5M acre-feet of water making it the second largest man-made lake in California. Panama Canal Embankment Dam, Locks Design and Construction Grupo Unidos Por el Canal (GUPC), Panama Our services were engaged by the GUPC as the lead design firm for the Panama Canal Third Set of Locks project. Our lock design specialists delivered a system that enables high throughput, efficient operation and maintenance, with minimal water consumption, all within the stringent technical requirements and specifications. The $3.12 billion Third Set of Locks effectively doubles the capacity of the Canal, providing significant benefits to the local, regional and global economies.

San Vicente Dam Raise San Diego County Water Authority, USA We provided final design and engineering services for the largest raise of a concrete dam in the U.S. and the first major raise of a concrete dam using roller-compacted concrete (RCC) in the world. The project raised the existing dam by 35 metres and added enough water storage to address the region s need for both emergency water storage and use during extended periods of drought, as part of the San Diego County Water Authority s Emergency Water Storage Project.

GRANT GILLESPIE Asia-Pacific Water Resources Director Grant.Gillespie@stantec.com ANDREW BIRD Hydro & Dam Sector Leader, Asia-Pacific Andrew.Bird@stantec.com MARK CORDELL Principal Dams Engineer Mark.Cordell@stantec.com DENE JAMIESON Principal Dams Engineer Dene.Jamieson@stantec.com PETER FOSTER Principal Dams Engineer Peter.Foster@stantec.com MATT SHORE Principal Engineering Geologist Matt.Shore@stantec.com MAZ MAHZARI Principal Structural Engineer Maz.Mahzari@stantec.com NATHAN FLETCHER Dam Safety Engineer Nathan.Fletcher@stantec.com TOM KIRK Principal Hydro Mechanical Engineer Tom.Kirk@stantec.com THEO GERRITSEN Principal Geotechnical Engineer, Global Tailings Group Theo.Gerritsen@stantec.com

This Image: Douglas Dam, USA Our expertise is significant and is readily leveraged across projects in the Asia-Pacific region.

Working together We re active members of the communities we serve. That s why at Stantec, we always design with community in mind. With the acquisition of MWH, the Stantec community unites approximately 22,000 employees working in over 400 locations across six continents. Our work from initial project concept and planning through design, construction, and commissioning begins at the intersection of community, creativity, and client relationships. With a longterm commitment to the people and places we serve, Stantec has the unique ability to connect to projects on a personal level and advance the quality of life in communities across the globe. Stantec Australia offices: Australian offices are located in: Adelaide, Brisbane, Gold Coast, Melbourne, Perth, Rockhampton, Sydney Australia: +61 2 9493 9700 Stantec New Zealand offices: Alexandra, Auckland, Balclutha, Christchurch, Dunedin, Greymouth, Hamilton, Hastings, Invercargill, Nelson, Palmerston North, Queenstown, Wellington, Whangarei. New Zealand: + 64 9 580 4500 www.stantec.com