Profiles of 12 proposed Mainstream developments in the LMB

Similar documents
MRC SEA FOR HYDROPOWER ON THE MEKONG MAINSTREAM INCEPTION REPORT VOL II MAINSTREAM PROJECT PROFILE SUMMARIES 23 OCTOBER 2009

Equitable and Low-Carbon Society: Aspiration and Strategies for Southeast Asia

FINAL REPORT SUMMARY OF THE. Prepared for the Mekong River Commission STRATEGIC ENVIRONMENTAL ASSESSMENT OF HYDROPOWER ON THE MEKONG MAINSTREAM

Study on the Impacts of Mainstream Hydropower on the Mekong River

Some aspects of the sediment transit on the Mekong river in relation with hydropower development

MEKONG SITE VISIT TO LAOS FIRST TWO MAINSTREAM DAM PROJECTS. Letters from the EXECUTIVE SUMMARY OF THE SECOND LETTERS FROM THE MEKONG ISSUE BRIEF

EFFECTS OF UPSTREAM HYDROPOWER DAMS AND WATER DIVERSION PROJECTS TO THE DROUGHT AND SALINE INTRUSION OF THE MEKONG RIVER DELTA IN VIETNAM

CK Power Public Company Limited (CKP) Stable Income, Diversified Portfolio and High Growth Company

Presentation on current status of or plan for nuclear HRD programs Country: Lao PDR

VIETNAM ENGAGEMENT IN TRANSBOUNDARY WATER COOPERATION IN MEKONG RIVER BASIN

Discharge and Sediment Monitoring Project Regional meeting 14 January 2009 Presented by Ms. Iwona Conlan

The First Mekong River Commission Summit 2010

RIVER HEALTH, ENVIRONMENTAL FLOWS AND CASCADE MANAGEMENT IN LAO PDR

Report of the Mekong River Commission **

The Flow of the Mekong

Benefit sharing in hydropower development. Initiative on Sustainable Hydropower

THE FIRST MEKONG RIVER COMMISSION SUMMIT Hua Hin, Thailand

NATIONAL INDICATIVE PLAN

Coupling SWAT with land cover and hydropower models for sustainable development in the Mekong Basin

Contents Overview of Laos Current energy policy and Measure Energy demand and Supply in Laos Energy outlook in Laos Difficulties and bottlenecks in fo

Comparison of climate change impacts and development effects on future Mekong flow regime

REFERENCES. 1. Acres International, RSW and Hydro Quebec, Nam Tha 1 Hydropower Project, Report to SPB Hydro-Power Co. Ltd., November 1997.

Mekong Climate Change and Adaptation Initiative of the Mekong River Commission

Xayaburi Dam: How Laos Violated the 1995 Mekong Agreement

STATUS ON DRY PORTS DEVELOPMENT IN LAO PDR

The Mekong River Report Card on Water Quality ( )

Thai-Lao Hydro Projects Should Meet International Standards

Water Resources Development in the Lancang River : Cooperation, Benefits and Opportunities

ADB in Vietnam. ADB s Climate Change Related Interventions in Vietnam. ADB in Vietnam. Outline

Mekong River Basin Water Resources Assessment: Impacts of Climate Change

Transboundary Water Resources Management Issues

Commercial Transportation on the Mekong River By Timothy Hamlin

Environmental and Social Impact Assessment for Rogun Hydro Power Plant

IMPACT OF UPSTREAM DEVELOPMENT SCENARIOS ON FLOW REGIMES, ENVIRONMENTAL QUALITY, AND SOCIO-ECONOMIC DEVELOPMENT IN THE MEKONG DELTA OF VIETNAM

Laos Country Report on Environmental Management in the Lao PDR Mining Sector. International Conference A Greater Mekong?

Sediment management of hydropower cascade: example of CNR run-of-river developments, French Rhone River, France

Western Power Company Ltd. Ngonye Falls Hydroelectric Project October 2014

CEPF Final Project Completion Report. Protecting the Mekong River s Critical Ecosystem and Biodiversity from Hydropower Development

Meeting Vietnam s Energy Demands in a Sustainable Way

By Bot Sosani HAPUA Secretarat. Sustainable Energy Training, Bangkok 25 th November 2013

Building network of local demonstration projects and potential benefits to the Mekong River Basin

JOBS AROUND THE WORLD

ASEAN Initiatives: Enhancing Energy Security and the Sustainable Use of Energy

Update MRC s Preliminary Design Guidance (PDG)

3. Future Assistance to the Mekong Region in the Infrastructure Sector

Chapter 4. Cambodia Country Report. September 2016

Geographic context. Hydropower developments on the upper Rhone River

9.1 Floods in combination with key drivers Droughts in combination with key drivers Current and future hotspots regarding floods

Lao PDR Country Paper Current Status of Agriculture Mechanization and Marketing

Session: For more information:

Contemporary Issues on the Mekong River

Briefing Summary. Board Meeting on Nam Theun 2 Project: November 22, 2010

Cambodia Power Sector

vre Grid Integration in ASEAN

ASIAN DEVELOPMENT BANK Independent Evaluation Department

Water Quality Monitoring and Management in Lao PDR: The Case Study of Nam Ngum River Basin

Developing a Regional Roadmap on Energy Connectivity. China Electric Power Planning & Engineering Institute Bangkok

ASSESSMENT OF SALINITY INTRUSION IN THE RED RIVER UNDER THE EFFECT OF CLIMATE CHANGE

Hà Nội, ngày 09 tháng 10 năm 2009

Solar PV in ASEAN Challenges and Opportunities. Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water

GEO-DRI Drought Monitoring Workshop, May 10-11, 2010, Winnipeg, Manitoba Drought in Southeast Asia

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Renewable Energy Development in Sri Lanka Opportunities and Challenges. Ministry of Power and Energy Sri Lanka 01/12/2014 1

CATCHMENT HYDROLOGY AND ITS MODELING

The Council Study. Sustainable Management and Development of the Mekong River Including Impacts of Mainstream Hydropower Projects

Hydropower and sustainable development: a case study of Lao PDR

5. HYDROLOGICAL CONDITIONS IN THE MEKONG DELTA. 5.1 Key International Monitoring Stations in the Mekong Delta

Perceptions, data, and river management: Lessons from the Mekong River

Summary of the Preliminary Study for Grant Aid Project

Trans-boundary Flood Issue in Lower Mekong River Basin

Country presentation: Food Insecurity Assessment In Thailand

Readings on Water ======================= Managing a finite resource for an exploding population

2013 LOWER MEKONG REGIONAL WATER QUALITY MONITORING REPORT

Update of Recommendations for Hydropower and the Environment. BRIEFING DOCUMENT October 2010

THE NEWSLETTER OF THE MEKONG RIVER COMMISSION

Ex-Ante Evaluation (for Japanese ODA Loan)

Enhancing Paperless Trade for SME Exports

Thailand Power Development Plan (PDP 2007)

Rural Electrification by Renewable Energy in Cambodia

For. The Preparatory Study. The Master Plan Study on Hydropower Development in. Cambodia

Guiding Principles on Sustainable Hydropower Development in the Danube River Basin

Chinese Dams and the Great Mekong Floods of 2008

WWF and the Dams of Southeast Europe

The Chinese Dams on Yarlung Tsampo (Brahmaputra) The Real Issues

Water Balance Assessment of the Roseires Reservoir

CH2356 Energy Engineering Hydro Power. Dr. M. Subramanian

CHINA'S INVOLVEMENT IN COAL-FIRED POWER PROJECTS ALONG THE BELT AND ROAD. Ren Peng, Liu Chang and Zhang Liwen GLOBAL ENVIRONMENTAL INSTITUTE MAY 2017

The linkages of energy, water, and land use in Southeast Asia

ACKNOWLEDGEMENTS the 4th Regional Stakeholder Forum on the Mekong Basin Development Strategy

Energy sector in Mongolia. Contents Brief of energy sector Energy sector policy Future trend

Zambezi River Basin Challenges and Issues

Mekong Water Dialogues

The Environmental and Economic Impacts of the Nam Theun 2 Hydroelectric Project on Communities Living in the Xe Bang Fai River Basin 16 March 2004

Briefing on Drought on Mekong Delta

Drought Situations and Management in Vietnam

Vietnam Renewable Energy development project to 2030 with outlook to 2050

Vietnam Baseline Perspective. Key issues and trends in the Mekong Delta

FLOOD CONTROL CHALLENGES FOR LARGE HYDRO- ELECTRIC RESERVOIRS

Transcription:

Profiles of 12 proposed Mainstream developments in the LMB MRC SEA of Mekong mainstream hydropower REGIONAL IMPACTS ASSESSMENT WORKSHOP Vientiane, April 2010 Presentation by Peter-John Meynell & Lawrence J.M. Haas SEA TEAM Initiative on Sustainable Hydropower (ISH)

Dams on the mainstream Mekong Upper Mekong 8 existing or planned Lower Mekong 12 proposed Dams on Mekong Tributaries Existing and planned 94 (only hydro dams does not include irrigation dams 2 ICEM and MRC - SEA of hydropower on mainstream Mekong River

Potential Markets for Mainstream Dams Installed Capacities (MW) subject to change Myanmar - PRC No mainstream projects proposed 8 in operation, under construction and planned, total 16,460 MW Viet Nam 1,410 MW 1,230 MW 1,260 MW Luang Prabang Sambor Stung Treng 1,320 MW 1,200 MW Thailand Pak Beng Xayaburi Pak Lay Sanakham Ban Khoum Lat Sua Don Sahong 1,230 MW 1,260 MW 1,300 MW 1,200 MW 1,827 MW 800 MW 360 MW 1,872 MW 800 MW 1,410 MW 2,600 MW 800 MW Lao & Cambodia 360 MW 980 MW 2,600 MW - A proportion of generation for domestic power expansion Units from schemes, subject to agreements

Where is accelerated interest in LMB hydropower coming from? Expanding the role of electricity in Mekong society & the economy: Meeting high electricity demand growth: e.g. for underpinning and boosting growth, diversifying the economy, population expansion, urbanization trend and energy poverty Recognition demand-side management is critical, but supplyside expansion is needed Power sector role in regional economic integration, crossborder power trade to reduce investment and operating costs overall 4

Where is accelerated interest in hydropower coming from? Cont. Optimizing the role of hydropower in development nationally and the GMS region: Maximizing indigenous, renewable resource (at different scales) Importing countries: supply diversity e.g. conventional hydrocarbons (natural gas, coal and oil) are finite and international energy market prices are volatile Exporting Countries - Foreign investment (FDI) upwards of $US 24 Billion and revenue generation opportunities 5

Where is accelerated interest in hydropower coming from? Cont. C. Other Factors Net Exporting countries: Current policies and regulatory frameworks to attract FDI to power sector Private sector / investor response to date (high) Net Importing countries: Avoiding hydrocarbon (gas, coal and oil) generation, reduce operating costs (fuel) GHG emission reduction (reducing fossil fuel use) Capacity benefit and power system operation benefits unique to hydropower (voltage stability, ancillary benefits) All countries: Realizing opportunities for development synergies in other sectors, e.g. irrigation and navigation Concerns of future electricity price stability 6

Where is accelerated interest in hydropower coming from? Cont. D. Upstream reservoir development in China Engineering / Hydrology: Higher low season flow improving power generation in dry season in proposed LMB mainstream schemes Impact of tributary storage releases (dry season to a lesser extent) Improving project economics 7

Wider regional energy picture (GMS) Source: Building a sustainable energy future the GMS, ADB 2009

Developers of Proposed LMB Projects Dam Developer Country Pak Beng Datang International Power Generation China Luang Prabang Petro Vietnam Power Corporation Vietnam Xayaburi SEAN & Ch. Karnchang Public Co Ltd Thailand Pak Lay CEIEC and Sino-Hydro China Sanakham Datang International Power Generation China Pak Chom Feasibility study jointly funded by Ministries of Energy from Thailand and Laos Thailand/Laos Ban Koum Italian Thai Asia Corp. Holdings Thailand Latsua Charoen Energy and Water Asia Co Ltd Thailand Don Sahong Mega First Malaysia Thakho CNR (Compagnie Nationale du Rhône) and EDL France Stung Treng Song Da Co. Vietnam Sambor China Southern Power Grid China

Status of Proposed LMB Projects in National Regulatory Systems (commissioning dates in MOUs do not reflect current situation) Dam Status Environmental study status Commission date (in MOUs) Pak Beng MoU, feasibility IEE submitted 2016 Luang Prabang MoU, feasibility Feasibility study, 2016 Xayaburi MoU, feasibility Feasibility and full ESIA submitted 2016 Pak Lay MoU, feasibility IEE submitted 2016 Sanakham MoU, feasibility IEE in preparation 2016 Pakchom Feasibility in prep. Not yet 2017 Ban Koum MoU, feasibility Not yet 2017 Latsua MoU, pre-feasibility Not yet 2018 Thakho MOU ESIA in preparation 2014 Don Sahong PDA. detailed planning Full EIA submitted, Additional studies requested Stung Treng MoU, pre-feasibility Not yet N/a Sambor MoU, pre-feasibility Pre-feasibility submitted 2020 2016

Statistics: Of Proposed LMB dams (Upper 5 Lao dams revised based on Lao PDR optimization study) Project Name Full Supply Level mamsl Low Supply Level mamsl Live Storage mcm Reservoir area sq km Pakbeng 340 334 442 87 Luang Prabang 310 308 734 90 Xayaburi 275 270 225 49 Paklay 245 242 384 108 Sanakham 220 215 106 94 Pak Chom 192 190 12 80.3 Ban Kum 115 115 n/a 132.5 Latsua 97.5 90 n/a 13 Thakho diversion 71 62 na na Don Sahong 75 72 115 290 ha Stung Treng 55 50 70 211 Sambor 40 39 465 620 TOTAL 1367

Statistics: Of proposed LMB dams Project Rated Head m Plant Design Discharg e m3/s Installed Capacity MW Peaking Capability MW Mean Annual Energy GWh Firm Annual Energy GWh Pak Beng 31 7,250 1,230 1,230 5,517 4,073 Luang Prabang 40 3,812 1,410 1,412 5,437 4,205 Xayaburi 24 6,018 1,260 1,260 6,035 5,139 Paklay 26 4,500 1,320 1,320 6,460 4,252 Sanakham 16 5,918 700 700 5,015 3,210 Pak Chom 22 5,720 1,079 1,079 5,318 5,052 Ban Koum 19 11,700 1,872 1,872 8,434 8,012 Latsua 10 9,600 800 800 3,504 2,452 Thakho 15 380 50-60 Cont. 360 Don Sahong 17 2,400 240 240 2,375 1,989 Stung Treng 15 18,493 980 591 4,870 2,937 Sambor 33 17,668 2,600 2,030 11,740 9,150 TOTAL 14,111 64,706 51,239

Dimensions (details change as design proceeds) Project Length of dam (m) Height (m) Foundation to crest Reservoir area (sq.km) Pak Beng 943 76 87 Luang Prabang 1,106 68 90 Xayaburi 810 32 49 Pak Lay 630 35 108 Sanakham 1,144 38 94 Pak Chom 1,200 55 80.3 Ban Koum 780 53 132.5 Latsua 1,300 22 13 Thakho No dam 0 0 Don Sahong 1820-720-2730 10.6-8.2-8.3 290 ha Stung Treng 10,884 22 211 Sambor 18,002 56 620

People to be resettled Comparison shows how optimization could reduce numbers of people to be resettled No estimates yet of downstream affected people * Proposed to move Latsua dam downstream to eliminate / reduce resettlement with 1m head loss Dam Original estimates Lao PDR Optimization study Pak Beng 6,694 4,250 Luang Prabang 17,700 5,920 Xayaburi 2,151 2,440 Pak Lay* 18,000 5,010 Sanakham 12,950 1,890 Pakchom 575 Ban Koum 2,570 935 Latsua Thakho None? NA Don Sahong 66 66 Stung Treng 9,160 9,160 Sambor 19,034 19,034 TOTAL 88,325 49,276

Illustration of the influence of Yunnan dams on the lower mainstream Pak Beng example Minimum dry season flow increase by about 58% from 950 m 3 /sec March/April to 1,750 m 3 /sec Wet season peaks delayed by about one month from July/August to August/September Mean wet season peaks reduced by about 1,000 m 3 /sec

Quick profiles 12 proposed hydropower developments in the LMB

Pak Beng (1,230 MW) As shown on the cover of developers feasibility study: Developer: Datang International Power Generation, China Upper most dam in proposed LMB cascade Dam in Lao PDR Reservoir in Lao PDR

Original Pak Beng design FSL = 345 masl MDL = 339 masl Area = 86.51 Length = 130 145 km Operating 8 12 hrs/day Now revised design FSL at 340 masl to avoid backwater in Thailand Core sampling at the dam site

Luang Prabang (1,410 MW) Developer: Petro Vietnam Power Corporation Dam in Lao PDR Reservoir in Lao PDR

Xayaburi (1,260 MW) Developer: SEAN & Ch. Karnchang Public Co Ltd, Thailand Dam in Lao PDR Reservoir in Lao PDR FSL = 275 masl MDL = 270 masl Area = 49 sq.km Extends 150km to Luang Prabang Continuous operation, (no peaking)

Xayaburi Spillway Configuration Similar to most proposed designs

Proposed Xayaburi dam site Looking upstream

Pak Lay (3,320 MW) Developer: CEIEC and Sino- Hydro China Dam in Lao PDR Reservoir in Lao PDR

Proposed Pak Lay dam site looking upstream

Sanakham (700 MW) Developer: Datang International Power Generation, China Dam in Lao PDR Reservoir in Lao PDR

Developer: Joint feasibility study: Pak Chom (1,079 MW) Commissioned by Ministry of Energy in Thailand and Ministry of Mines and Energy in Lao PDR Panya consultants Dam in Lao PDR and Thailand

VILLAGES ALONGSIDE STORAGE LEVEL OF PAK CHOM BARRAGE Villages affected 1 Laos 37 households 1 Thailand 70 households

Other water resources development aspects 11 pumping irrigation projects with a total area of 2,944 hectare and irrigation area of 2,706.4 hectare

Fish Ladder of Pak Chom and Ban Koum Change level Aquatic plants (native) along the fish ladder alignment Aquatic plants (native) along the fish ladder alignment Change level Change level

Ban Koum ( 1,872 MW) Developer: Charoen Energy & Waters Asia Co. Ltd Dam: Thai-Lao Reservoir: Thai-Lao

VILLAGES ALONGSIDE STORAGE LEVEL OF BAN KOUM BARRAGE Reservoir 133 km 2 Villages affected Thailand - 1 29 households Laos - 3 158 households

Other water resources development aspects of Ban Koum Irrigation 22 lift irrigation projects 11,006.4 hectare irrigation area of 7,870 hectare

Latsua (686 MW) Developer: Italian Thai Asia Corp. Holdings (Thailand) Dam in Lao PDR Reservoir in Lao PDR

Ban Koum and Latsua 1 Latsua recently moved downstream Site 1 Reservoir 13 sq km Possible flooding villages in Thailand and impacts on Pak Mun dam

Latsua recently moved downstream Site 2-10 km south of Pakse Latsua site 2 Avoids flooding villages in Thailand and impacts on Pak Mun dam But possibility of flooding impacts upon Pakse Irrigation of 7,300 ha

Don Sahong (240 MW) Developer: Mega First, Malaysia Has PDP Dam in Lao PDR Reservoir in Lao PDR

Don Sahong dam site

Thakho Diversion (50-60 MW) Developer is CNR, France) Run of river, diversion scheme No dam involved Diversion of 380 m3/s through canal around Khone Phapheng Falls With the Chinese dams, dry season flows increased increased diversion of 470 m3/sec, Increased power generated to 450 GWh/year

Thakho and Don Sahong

Stung Treng (980 MW) Developer: Song Da Co, Vietnam Dam and Reservoir In Cambodia

Sambor(2,600 MW) Developer: China Southern Power Grid Dam and Reservoir in Cambodia

Proposed site of Sambor dam FSL = 40 masl MDL = 39 masl Area = 880 sq km Population affected 19,034

Reservoirs of proposed dams in Cambodia Stung Treng Dam + Embankments 10 km 22 m high (15 m head) Reservoir 211 sq km Sambor Dam + Embankments 18 km 56 m high (33 m head) Reservoir 620 sq km