PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC SEPTEMBER 19, 2012

Similar documents
PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013

LAURIE RIVER #1 GENERATING STATION SHORT-TERM EXTENSION LICENCE APPLICATION

WATER CONTROL MANUAL

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

Mark Twain Lake Water Control Manual Update

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall

ND Detention Project Development Update

United States Army Corps of Engineers. Addicks and Barker Dam Safety Update

APPENDIX E: West Creek Hydro Technical Review

RED RIVER FLOODWAY OPERATION REPORT SPRING Manitoba Infrastructure

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

Freight Street Development Strategy

OSAGE RIVER BASIN OPERATIONS WATER MANAGEMENT

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA

DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety

Campbell River System. Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights

Water Quality Monitoring During Turbine Venting Tests at the Iron Gate Powerhouse, Klamath Hydroelectric Project

John Hart Generating Station Replacement Project. January 2018 Community Construction Update Report #55

Impoundment Fluctuation, Assessment of Littoral Zone Habitat, Mapping of Wild Rice Beds, and Assessment of River Shoreline Erosion

Water Balance Assessment of the Roseires Reservoir

SUMMARY OF 2010 WATER QUALITY MONITORING RESULTS WITHIN THE PRIEST RAPIDS HYDROELECTRIC PROJECT

Introduction. General Description

SOUTH FORK AMERICAN RIVER (CHILI BAR), CALIFORNIA

EXHIBIT B PROJECT OPERATION AND RESOURCE UTILIZATION

Eska Creek Preliminary Feasibility Analysis

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis

Types of Hydropower Facilities

KANAWHA RIVER, WEST VIRGINIA

2.0 Scope of Work. 3.0 Stream Discharge Measurements. Technical Memorandum City of Farmers Branch Page 2

Performance improvement of headworks: a case of Kalignadaki A Hydropweor Project through physical hydraulic modelling

Some aspects of the sediment transit on the Mekong river in relation with hydropower development

Alouette Project Water Use Plan (April 15, 2009) Revised for Acceptance for the Comptroller of Water Rights

Hydropower Project License Summary PIT RIVER, CA PIT 1 HYDROELECTRIC PROJECT (P-2687) Pit River below Pit 1 Powerhouse

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed?

Phase II Report on Hydrology, Hydraulics, and Low Water Dams

HEC-RAS 2D Modeling in Support of Ascension Parish Levee Certification

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

Pipelines and Penstocks Avoiding operational issues throughout the life of your project

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

SEIRP Technical Conference

Appendix B. Storm Drain System Data

Hydropower & Dams Services

The Sustainability of Floods Pond

Bridge River Power Development Water Use Plan. Revised for Acceptance for the Comptroller of Water Rights

DAM SAFETY INSPECTION REPORT GLENWOOD LAKE DAM CLASS B, INTERMEDIATE HAZARD DAM

CHAPTER 7 POWER PRODUCTION AND ENERGY CONSUMPTION

ANNEXURE-III SALIENT FEATURES OF DUGAR HYDRO ELECTRIC PROJECT. Himachal Pradesh. Latitude. Longitude Nearest Railhead; Udhampur (J&K)

Stormwater Local Design Manual For Houston County, Georgia

Fargo-Moorhead Metropolitan Area Flood Risk Management Project

Presentation Outline. Review of CEATI Background Conventional Hydro Program Update

Water Balance and Regulation Alternative Analysis for Kajakai Reservoir using HEC-ResSim

WELLS HYDROELECTRIC PROJECT FERC NO FINAL REPORT REQUIRED BY FERC. September Prepared by: WEST Consultants, Inc. Bellevue, Washington

BOARD BRIEFING DAM SAFETY QUARTERLY REPORT

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

OPERATION PLAN PERFORMANCE PLAN TEN MILE CREEK WATER PRESERVE AREA

Instream Flow Study for the Proposed Lower Bois d Arc Creek Reservoir, Texas

VICTORY HALL 401 VALLEY STREET SCOTTSVILLE, VIRGINIA TELEPHONE: (434) FACSIMILE: (434)

Assessment of cracks using percolation dye tests in. Rihand concrete dam, Uttar Pradesh, India

4.0 FLOOD MITIGATION OPTIONS

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp

December 7, Dr. Christine Pomeroy University of Utah Civil and Environmental Engineering MCE Salt Lake City, UT. Dear Dr.

CITY OF KIMBERLEY HYDROLOGICAL & HYDRAULIC ASSESSMENT

The Dalles East Fish Ladder Auxiliary Water System Emergency Operation Backup System Alternatives Columbia River, Oregon-Washington

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

TVA Colbert Fossil Facility Ash Disposal Pond 4

POND CONSTRUCTION. Woodland Steward Series

Settlement Agreement Report

ENVIRONMENTAL ENGINEERING LAND SURVEYING

EAGLE MOUNTAIN Hydro Electric Pumped Storage Project

MODEL Stormwater Local Design Manual. City of Centerville

Hydropower in Minnesota's Future

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water

BC Hydro Contact: Vancouver Island Community Relations Phone:

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006

SURFACE WATER PUMPS TO IMPROVE DISSOLVED OXYGEN CONTENT OF HYDROPOWER RELEASES

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

October 27, RE: Request for Qualifications for the Puu Opae Project. To Whom It May Concern,

EFFECT OF UPSTREAM DEVELOPMENT ON THE CLEAR CREEK AREA

Prepared for Urban Drainage and Flood Control District

Review Plan U.S. Army Corps of Engineers Northwestern Division Kansas City District. Tuttle Creek Stilling Basin Wall Drain Repair Manhattan, Kansas

ANNUAL PLATTE RIVER SURFACE WATER FLOW SUMMARY

Outlet Structure Modeling

Information for File # PRH

MEMORANDUM. The general findings of the assessment are as follows:

Lake Houston Dam Comprehensive Evaluation of an Ambursen Dam

2016 ANNUAL DAM AND DIKE INSPECTION REPORT

APPENDIX C: Infrastructure Assessment

TURBINE VENTING FOR DISSOLVED OXYGEN IMPROVEMENTS AT BULL SHOALS, NORFORK, AND TABLE ROCK DAMS

Spring Forecast Based Operations, Folsom Dam, California

Subject: October and November Fish Kill Incidents, Article 406

A STUDY OF WATER SUPPLY FOR ISLAMABAD / RAWALPINDI

Revision Nalcor Doc. No. MFA-SN-CD-0000-GT-DC C1 Date Page SLI Doc. No EC Dec-2013 ii DESIGN CRITERIA - GEOTECHNICAL

Keywords: Fish ladder, Investigation of Upstream Migration, Sweetfish, Fish Straying Prevention Device, Sodium Lamp Lighting

134 FERC 61,195 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Hydropower as Flexibility Provider: Modeling Approaches and Numerical Analysis

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Transcription:

PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC SEPTEMBER 19, 2012

PARR AND FAIRFIELD LOCATIONS Lockhart Neal Shoals Monticello Reservoir Parr Columbia Hydro

PARR AND FAIRFIELD LOCATIONS FFPS PARR

PARR, FAIRFIELD, & VICINITY SC Rte 215 Lake Monticello V. C. Summer Nuclear Station SC Rte. 213 Parr Hydro- Electric Plant Fairfield Pumped Storage Broad River

FAIRFIELD PUMPED STORAGE FACILITY FERC PROJECT No. 1894 Aerial

PARR HYDRO PLANT

PARR HYDROELECTRIC PLANT Parr Dam concrete gravity spillway, 37 ft. high, 2000 ft. long Earthen embankment on west end The concrete overflow section (wing wall) on west end approx. 35 ft high (10) Bottom hinged bascule crest gates, each 200 ft. long and 9 ft. high added 1974-1977 Powerhouse: Steel-framed brick building containing six vertical turbines with generators Non-overflow section on the east end Hydraulic crest gates can spill excess inflow.

PARR HYDROELECTRIC PLANT FERC PROJECT No. 1894

PARR HYDROELECTRIC PLANT FERC PROJECT No. 1894

PARR HYDROELECTRIC PLANT FERC PROJECT No. 1894

PARR HYDROELECTRIC PLANT FERC PROJECT No. 1894

FAIRFIELD PS DEVELOPMENT Dam A Monticello Reservoir Dam B Dam C Dam D Parr Reservoir

FAIRFIELD PUMPED STORAGE FACILITY Four earthen dams (A, B, C, and D) Earthen Dam Construction: random fill shells (u/s and d/s) central impervious core upstream impervious blanket Riprap slope protection on upstream slopes Downstream slopes are grassed Dam B: main dam across Frees Creek

FAIRFIELD PUMPED STORAGE FACILITY (cont d) Intake structure for plant integrated into abutment of Dam B Four steel penstocks lead from the intake structure to the powerhouse

FAIRFIELD PUMPED STORAGE FACILITY FERC PROJECT No. 1894

FAIRFIELD PUMPED STORAGE FACILITY FERC PROJECT No. 1894 Dam A

FAIRFIELD PUMPED STORAGE FACILITY FERC PROJECT No. 1894 Dam B

FAIRFIELD PUMPED STORAGE FACILITY FERC PROJECT No. 1894 Dam B

FAIRFIELD PUMPED STORAGE FACILITY FERC PROJECT No. 1894 Dam C

FAIRFIELD PUMPED STORAGE FACILITY FERC PROJECT No. 1894 Dam D

FAIRFIELD PUMPED STORAGE FACILITY FERC PROJECT No. 1894 Powerhouse

PARR HYDROELECTRIC PROJECT HYDROLOGIC DATA Parr Reservoir (full) 4,400 acres 13 miles long Storage capacity directly affected by FFPS Ops Total storage at full pool 32,000 ac-ft Active storage - 29,000 ac-ft in 10 ft. operating range Reservoir Range: 256 266 (top of Crest Gates) Drainage area 4,750 sq. miles 31 river miles downstream of Neal Shoals 24 river miles upstream of Columbia diversion dam

PARR HYDROELECTRIC PROJECT HYDROLOGIC DATA Monticello Reservoir (full) 6,800 acres Total volume of water available approx. ~9.5 billion gallons of water (29,000 acre-ft) Affects Fairfield Pumped Storage Facility only Total storage at full pool 400,000 ac-ft Active storage - 29,000 ac-ft in 4.5 ft. operating range Reservoir Range: 420.5 425 Drainage area 9,400 sq. miles

PARR HYDROELECTRIC PROJECT OPERATIONS Parr Development primarily used for base load licensed capacity 14.9 MW; hydraulic capacity ~6,000 CFS (6 units). Parr Hydro operates in modified run-of-river mode. March May: 1,000 CFS minimum flow, or average daily natural inflow to Parr Reservoir (less evaporative loss from Parr and Monticello Reservoirs).

PARR HYDROELECTRIC PROJECT OPERATIONS Parr Development Remainder of year: 800 CFS daily average flow and 150 CFS minimum flow, or average daily natural inflow (less evaporative loss from Parr and Monticello Reservoirs) This means that when inflow minus evaporation falls below 800 CFS (1,000 CFS March May), we do not get to keep any water what comes in must go out.

Parr Hydro Inflow Inflow to Parr Reservoir is the sum of flows at 3 USGS gauge sites: Broad River near Carlisle (02156500, 5 miles below Neal Shoals) Tyger River near Delta (02160105) Enoree River at Whitmire (02160700) New USGS gage installed at Hwy. 34 bridge on Parr Reservoir Broad River at Blair, SC (02160750) 26

Parr Hydro Evaporation Evaporation is estimated based on SC State Climatologist Office data, and surface areas of Parr and Monticello Reservoirs. Increased evaporation from VCSNS was provided by plant staff. 27

Parr & FFPS USGS Gage Locations USGS 02160700 ENOREE RIVER AT WHITMIRE,SC USGS 02160105 TYGER RIVER NEAR DELTA, SC USGS 02156500 BROAD RIVER NEAR CARLISLE, S. C. USGS 02160990 PARR SHOALS RESERVOIR AT PARR, SC. USGS 02160750 BROAD RIVER AT BLAIR,SC USGS 02161000 BROAD RIVER AT ALSTON, SC Image from: http://waterwatch.usgs.gov/uvmap/ 28

PARR HYDROELECTRIC PROJECT OPERATIONS Fairfield Development Primarily used for peaking, reserve generation when Saluda not available, and off-peak power usage (pumping to store water for generation) Fairfield Pumped Storage licensed capacity 511.2 MW; hydraulic capacity 50,400 CFS generating & 41,800 CFS pumping (8 units).

PARR HYDROELECTRIC PROJECT OPERATIONS Operate project so that releases from lower reservoir during flood flows shall be no greater than flows which would have occurred in the absence of the project. Based on USGS flood study from 1970s, Fairfield should stop generating and Parr s crest gates should be completely lowered when Broad River flow reaches 40,000 CFS. Measured by adding discharge from three USGS gauges upstream of Parr Reservoir. 30

Parr Reservoir Operations

Parr Reservoir Operations

Monticello Reservoir Operations 426 Typical Monticello Reservoir Level Fluctuation Reservoir Level (feet NGVD29) 425 424 423 422 421 420 09/11/11 09/12/11 09/13/11 09/14/11 09/15/11 09/16/11

Safety Sirens at plant activate when Parr Crest Gates lower to release water into the Broad River Both Developments have Emergency Action Plans to notify the public if a dam failure is imminent or has occurred Both Developments have Public Safety Plans to identify where warning signs are located

Public Safety Plan

Questions?