Pattullo Bridge Replacement Project. Cost Report

Similar documents
Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Re: EX8.12 F.G. Gardiner Expressway Strategic Rehabilitation Plan Procurement Strategy

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

Lesner Bridge Replacement

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

Ironton Russell Bridge Project

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT

Ironton Russell Bridge Project

I-91 Viaduct Public Information Briefing

SCHEDULE THREE TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS

MIDAS Training Series

Ironton Russell Bridge Project

ATHABASCA RIVER BRIDGE REHABILITATION PROJECT

Project Reference Catalogue

Whittier Bridge/I-95 Improvement Project. Public Information Meeting

Design studies of the Castle Bridge over Wislok River in Rzeszow with application of CAD System

Grade-Separated Trail Crossings How Do We Get Over There?

I-91 Viaduct Public Information Briefing

Carpinteria Avenue Bridge Replacement Project Description Introduction

Maine Turnpike Authority FINAL 4-year Capital Investment Plan ( )

Construction of the Superstructure of Major Sea Crossings

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

extent feasible. Per the and low constructability,

Exposition Light Rail Transit Project

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

Ironton Russell Bridge Project

SPECIFICATION FOR THE ERECTION AND MAINTENANCE OF TRAFFIC SIGNS, CHEVRONS, MARKERS AND SIGHT RAILS

Design and Rating of Steel Bridges

We have engaged Beacon Construction Consultants to act as the price estimate reviewer.

REQUEST FOR CONSTRUCTION BIDS May 23, 2017

Bonner Bridge Replacement Update:

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Rehabilitation of Prater junction

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT

Solicitation HH-89. Design/Build for Rehabilitation of Skewbacks, Viaduct Piers and Lower Level North Abutment at the Henry Hudson Bridge

Get In, Get Out, Stay Out!

Bridge articulation No. 1.04

ELANA D. FREEDMAN, P.E. Structural Engineer

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

2016 TEAM Conference. Waverly Road Progressive Design Build Project Owner: City of Edgerton, KS. March 10, HDR, all rights reserved.

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

Accelerated and Innovative Bridge Construction In Washington State

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

STATE AID GUIDE FOR: Updated: December 16, 2005

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

NCDOT s Performance Based Contracting Experience in Charlotte. Jennifer Brandenburg, PE State Road Maintenance Engineer July 21, 2009

4 Construction of the Project

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

I-94/I-69 Interchange Bridge Construction

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

Glenmore Causeway Upgrades Project. Calvin T. McClary, P. Eng., Manager, Transportation Engineering, ISL Engineering and Land Services Ltd.

Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood

Public Projects Manual. For Projects Which May Impact

APPENDIX F: CALTRANS COST ESTIMATE TEMPLATE (included in Appendix AA of the CALTRANS Project Development Procedures Manual)

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

Implementation of this Special Provision requires a complete understanding of the following documents:

REQUEST FOR PROPOSALS

The designer shall also submit additional information required by the University as described and underlined below.

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

S.P TH 65 (3rd Avenue Bridge) Industry Informational Meeting October 31, 2017

Geoguide 6 The New Guide to Reinforced Fill Structure and Slope Design in Hong Kong

Interchange Workshop Report (August 2004)

District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016

State Route 8 Bridge Replacement Project

Equipment Design Heavy Lifting

DESIGN OF FLYOVER TRANSVERSE VERTICALLY BY USING HYDRAULIC JACK

SCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS

RESILIENT INFRASTRUCTURE June 1 4, 2016

Boeing North Bridge in Washington State

BELLOWS FALLS HISTORICAL SOCIETY, INC. Post Office Box 466 Bellows Falls, VT I fax

JAPANESE CONCRETE BRIDGES. Alan Burden 1

OMAHA BASEBALL STADIUM. May 21, 2009 Report No. 2

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

Civil Engineering and Architecture Detailed and Performance Objective Outline

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

Preferred Elevated Tank Site

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction

Seismic Analysis of Truss Bridges with Tall Piers

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Bridge Design. II. Bridge Types. Praveen Chompreda. Substructure. Superstructure. which support the roadway. Pier (Column) Abutment.

Title Page: Modeling & Load Rating of Two Bridges Designed with AASHTO and Florida I-Beam Girders

Behavior of a multiple spans cable-stayed bridge

DECEMBER 2017 LRFD BRIDGE DESIGN 2-1

Annual CSAH Needs Update for 2017

SCRRA GRADE SEPARATION GUIDELINES

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

AASHTOWare BrD 6.8 Substructure Tutorial Solid Shaft Pier Example

Eska Creek Preliminary Feasibility Analysis

THE EUROPE BRIDGE, IN PORTUGAL: THE CONCEPT AND STRUCTURAL DESIGN

Guideline for Bridge Safety Management February 2012

THE KOSCIUSZKO BRIDGE PROJECT. The New York State Department of Transportation. Page 1

Transcription:

Pattullo Bridge Replacement Project Cost Report January 2018

Cost Report Page i TABLE OF CONTENTS 1 PURPOSE... 1 2 BASIS FOR THE ESTIMATE... 2 2.1 Scope of the Works... 2 2.2 Scope of Capital Costs... 2 2.3 Due Diligence Review of the Estimate... 2 3 PROCESS AND METHODOLOGY... 3 3.1 Key Assumptions... 3 3.2 Project Elements... 3 4 CAPITAL COST ESTIMATE... 8

Cost Report Page 1 1 PURPOSE This document details the preliminary cost estimate for the Pattullo Bridge Replacement Project (the Project). The purpose of the estimate is to provide input to the Project business case, including risk quantification, value for money analysis, funding and procurement analyses.

Cost Report Page 2 2 BASIS FOR THE ESTIMATE 2.1 SCOPE OF THE WORKS The capital cost estimate for the Project is based on a scope of work that comprises replacement of the existing bridge with a new four lane bridge up-stream of the existing bridge, which meets current Ministry of Transportation and Infrastructure (Ministry) standards,. In addition, the work includes street modifications in New Westminster to provide improved access to and from the new bridge, improvements to multi-use trails, tie-ins to roadworks in Surrey, a direct connection from the new bridge to Highway 17 and a grade separation between Highway 17 and Old Yale Road. The new bridge design will not preclude a potential expansion to a six-lane bridge in the future, if required. 2.2 SCOPE OF CAPITAL COSTS The estimate includes both the owner s and the constructor s costs necessary to implement the project. The estimate assumes that all the work is carried out as one single project, delivered using a Design, Build, Finance (DBF) procurement model, and covers Project costs including: Project management; Preliminary design and technical investigations; Engagement and consultation; Procurement; Detailed design; Construction; Risk and contingencies; Interest during construction; and Existing bridge removal. 2.3 DUE DILIGENCE REVIEW OF THE ESTIMATE A due diligence review of the capital cost estimate was conducted, which confirmed that the budget currently carried is reasonable to design and construct the replacement bridge with its associated roads and structures, including the removal of the existing structure.

Cost Report Page 3 3 PROCESS AND METHODOLOGY 3.1 KEY ASSUMPTIONS The capital cost estimate was developed based on preliminary sketches, analysis and reports, as well as input and assumptions from subject-matter experts across multiple disciplines. The estimate has been prepared with the use of unit rates calculated from anticipated construction methods required to carry out the work, historical knowledge of similar projects and current market conditions. The estimate covers all costs associated with the implementation of the Project from January 2018 until the existing bridge is demolished and removed, following the new bridge, bridge approaches, and associated roadworks being open to traffic. The construction, design and management costs included in the estimate assume a Project schedule as follows: Issue RFQ spring 2018; Issue RFP summer 2018; Financial Close summer 2019; Replacement bridge and associated network connections complete and open in 2023; and Existing bridge removal 2023/24. Risk values and timing, retained by the owner and transferred to the contractor, are calculated as set out in the Risk Report. Risk values are reflected as a portion of overall contingencies. Therefore, Project contingency values, apportioned to each of the contractor and the owner, are risk-adjusted values. The contractor s estimated interest during construction (IDC) is calculated as (1) the interest accrued on the amount of private financing amount calculated using an annual interest rate of 3.56%, plus (2) the upfront arrangement fee, minus (3) interest earned on the drawn but unspent private financing. The owner s IDC is estimated by the Ministry. 3.2 PROJECT ELEMENTS The Project components are assumed to include the elements detailed below. 3.2.1 New Bridge River Crossing The new bridge is assumed to be a lifeline (vital to regional transportation network integrity in accordance with bridge design standards), four-lane bridge with multi-use paths constructed to Ministry design

Cost Report Page 4 standards. The bridge will be designed in a manner so as not to preclude potential future expansion to six lanes and two multi-use paths. The bridge construction cost estimate is assumed to include the following: Construction of temporary access to facilitate the works; Ground improvement and densification; Deep foundations installed in the glacial till underlying the site; Allowances for working around railway operations, including flagging and management; Scour protection; Reinforced concrete abutments; Reinforced concrete columns and pylons; A supported deck of structural steel and concrete or precast concrete segmental construction, the final choice being the most cost effective and structurally suitable for the proposed design; Steel reinforcement; Erection gantries; Fendering protection of pylons; Deck surface; Median and edge barriers, and pedestrian deck railing; Deck expansion joints, shock transmission devices, and seismic bearings; Maintenance gantries, access elevators, lighting, drainage, and line marking; and Snow and ice management system. Approach Spans Approach spans in New Westminster and Surrey will be constructed to provide access to the river crossing. Approach spans include the following: Superstructures similar to, and compatible with the main span; Concrete piers; Pile caps and deep foundations; Ground improvement as required; Multi-use paths;

Cost Report Page 5 Median and edge barriers, and pedestrian deck railing; Expansion joints at abutments and bearings; and Lighting, drainage, and line marking. 3.2.2 Ramps The following single lane bridge ramps are included: Northbound bridge to eastbound Columbia Street; Westbound Columbia Street to southbound bridge; and Southbound bridge to westbound Highway 17. Ramp structures consist of the following: Girder-type structures similar to, and compatible with, the main span and approaches; Girders supported on columns with pile caps and deep foundations; Multi-use paths; Edge barriers, and pedestrian deck railing; Expansion joints at abutments and bearings Lighting, drainage, and line marking. It is assumed that the southbound bridge to westbound Highway 17 ramp will be completed very shortly after bridge opening, with the last span installed after the existing bridge is closed. 3.2.3 Road works and multiuse trails in City of New Westminster & Surrey Roadworks are assumed to be constructed to Ministry and TAC standards. The cost estimate includes costs for signage, gantries and associated lighting. 3.2.4 Landscaping Allowance Landscaping will be carried out as part of the Project. 3.2.5 Removal The existing Pattullo Bridge will be removed after the new bridge is opened to traffic. 3.2.6 Utilities Utilities affected by the Project will be relocated and/or protected.

Cost Report Page 6 3.2.7 Traffic Management Traffic management activities will involve temporary signage, temporary diversions, and traffic management crew necessary to carry out the work. 3.2.8 Communications Communications, engagement and community relations activities will be carried out throughout the Project. 3.2.9 Site Management and Establishment The Contractor s management of the design, engineering, and construction of the Project includes general management by the contractor s staff and consultants for the duration of the Project construction. This will include overall management, planning, procurement, cost and schedule control, commercial management, estimating, quality assurance, environmental control, safety monitoring and control, environmental monitoring, general administration, and offices for site based Project staff. The estimate is based on the current construction schedule 3.2.10 Contractor s Design and Engineering The estimate includes design of the new bridge, its approaches and roadworks, and associated work carried out by the Contractor necessary to complete the Project, including engineering, architectural, and civil works. 3.2.11 Bonding and Insurance The estimate includes overall Project insurance and bonding covering all construction and professional liability insurance together with bonding. 3.2.12 Head Office Overhead Contribution and Profit The estimate includes the general contractor s head office overhead contribution and profit. Subcontractor s overhead and profit allowances are also included. 3.2.13 Owner s Management and Engineering Project management services for the Project include the general management by Project staff and consultants for the Project from January 2018 to completion of the bridge and removal of the existing bridge. This will include overall management, planning, procurement, systems integration, cost and schedule control, estimating, quality assurance, environmental control, offices, and operational costs. Initial planning costs incurred prior to January 2018 are not included. 3.2.14 Procurement The estimate includes procurement and legal work necessary to procure the Project as a DBF. 3.2.15 Pile Tests The estimate includes pile tests following contract award by the Contractor to assist the pile design for the Project.

Cost Report Page 7 3.2.16 Environmental, Archaeology, and First Nations The estimate includes environmental work necessary to obtain the environmental certificates, and the monitoring during construction required to ensure all environmental requirements are met. 3.2.17 Independent Engineer The services of an independent engineer are required to monitor and certify payment to the contractor, and to certify Project completion. 3.2.18 Public Consultation Community relations include public notifications, public information events and open houses, press liaison, and publications. 3.2.19 Property Cost for property purchase requirements is included. 3.2.20 Contingencies An allowance for specific contingencies has been set against each element of work dependent upon design development and risk to cover risks and contingency events, associated with alignment refinement, design development, unforeseen ground conditions, utilities, co-ordination with third parties, commercial risk, procurement and tendering risk, contract reserve during construction, and schedule risk.

Cost Report Page 9 reconciled toward the end of the construction period. This presentation is consistent with experience on prior projects. Transferred and retained risk values are also summarized.