W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

Similar documents
BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

OPERATION OF AN STP FOR RECYCLED WATER PRODUCTION PLANT. Iain Fairbairn. Iain Fairbairn, Plant Manager, Sydney Water

Evaluation of Conventional Activated Sludge Compared to Membrane Bioreactors

membrane bioreactor performance compared to conventional wastewater treatment

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

Polishing Ponds. Biosolids Storage. Ammonia Removal. Digesters. Thickeners. Pretreatment. Final Clarifiers. Primary Clarifiers.

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

- 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants. by Glenn Thesing

Lowering The Total Cost Of Operation

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic.

Sulaibiya world s largest membrane water reuse project

Tour of Regional Water Reclamation Facility

Current Treatment Approaches and Planning for the Future A Panel Discussion

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Aqua MSBR MODIFIED SEQUENCING BATCH REACTOR

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview

Tour of Altamonte Springs Regional Water Reclamation Facility

Membrane Systems. Featuring Aqua MultiBore Membranes

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017

WASTEWATER TREATMENT

TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT

WASTEWATER TREATMENT SYSTEM

Closing the Gap Reaching for Energy Independence in Water Reclamation

Your Guide to the. Budd Inlet Treatment Plant

Separations Overview TDRL Seminar

Dr Martin Peter *, Joachim Scholz & Victor Ferre. Contents

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION

Reclamation of Sand Filter Backwash Effluent using HYDRAcap LD Capillary UF Membrane Technology

Carbon Canyon Water Recycling Facility Title 22 Engineering Report

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

International Joint Commission Water & Wastewater Treatment Best Management Practices Forum Monday, March 26, 2012 Wayne State University, Detroit MI

OPERATIONS OVERVIEW TABLE 1-1 ANTICIPATED FLOW RATES. Design Flows (mgd)

Case History: Anaerobic and Aerobic Treatment of Textile Wastes at South Carolina Textile Plants. Introduction

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant

CEDAR CREEK Wastewater Treatment Facility

Nutrient Removal Processes MARK GEHRING TECHNICAL SALES MGR., BIOLOGICAL TREATMENT

American Water College 2010

Ellis Creek Water Recycling Facility, City of Petaluma

Can MBR Eliminate Additional Disinfection? A Case Study. Ufuk Erdal, PhD, PE, CH2M Jonathan Vorheis, PE, CH2M July 17, 2015

FAYOUM CITY SEWAGE TREATMENT PLANT, DEVELOPMENT STAGES, CASE STUDY

East Coast P Removal Technology Performance Summary

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT

WWTF Capacity Assessment Project

Need-to-Know Criteria Wastewater Treatment Operator Class III

Advantages & Applications of MBBR Technologies

Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest

Unit Treatment Processes in Water and Wastewater Engineering

Conceptual Design for a Future Wastewater Treatment Plant

Application of the AGF (Anoxic Gas Flotation) Process

NEW BIOLOGICAL PHOSPHORUS REMOVAL CONCEPT SUCCESSFULLY APPLIED IN A T-DITCH PROCESS WASTEWATER TREATMENT PLANT

Closed Loop Reactor (CLR) Process. Innovative Technology, Flexible Orientation and Energy Saving Designs

Operation of a small scale MBR system for wastewater reuse

Lagoons Operation and Management in New Brunswick

by M k h GROVER Degremont

Comparison of Water Quality Parameters

Preparing for Nutrient Removal at Your Treatment Plant

APPENDIX E: EXISTING FACILITIES DESCRIPTIONS AND DESIGN CRITERIA

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng

Wastewater Treatment Processes

WESTDALE WWTP AUGMENTATION AND REUSE FARM. Stephen Sullivan and Jamie Hunt. Tamworth Regional Council

New York State Department of Environmental Conservation

Case Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia.

Coupling Trickling Filter or RBC s with Activated Sludge

AMMONIA REMOVAL USING MLE PROCESS EXPERIENCES AT BALLARAT NORTH. David Reyne. Central Highlands Water Authority

Choices to Address Filamentous Growth

A REGULATORY GUIDE TO SEQUENCING BATCH REACTORS

Ultrafiltration Technical Manual

BioWin 3. New Developments in BioWin. Created by process engineers.. for process engineers

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati

Module 20: Trickling Filters Answer Key

Use of Biowin for Process Troubleshooting / Design for a Unique Wastewater

EVALUATION OF CERAMNIC MBR TECHNOLOGY FOR WATER REUSE. Abstract. Introduction

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

General Information on Nitrogen

JEDDAH INDUSTRIAL CITY

Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013

Produced Water Treatment to Enhance Oil Recovery. Siemens Oil & Gas Water Technologies

Ovivo Carrousel Systems

Sanitary and Environmental Engineering I (4 th Year Civil)

Tampa Bay Water (TBW) is a regional

Nutrient Removal Enhancement Using Process Automation at Holly Hill

MARPAK modular biomedia WASTEWATER TREATMENT

COMPARISON OF PROCESS ALTERNATIVES FOR ENHANCED NUTRIENT REMOVAL: PERSPECTIVES ON ENERGY REQUIREMENTS AND COSTS

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY

Advanced Wastewater Treatment Plant Plant Profile

Inland Empire Utilities Agency CH2M HILL

Module 22 : Sludge Management

Wastewater Treatment Technology and Applications in Industrial Facilities

TOM COOKE MEMORIAL WASTEWATER TREATMENT PLANT

COMPARISON STUDY BETWEEN INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS), MEMBRANE BIOREACTOR (MBR) AND CONVENTIONAL ACTIVATED SLUDGE (AS) PROCESSES

Liquid Stream Fundamentals: Grit Removal

Chapter 11. Secondary Clarifiers

NPDES COMPLIANCE OF COOLING TOWERS BLOWDOWN AT POWER PLANTS WITH RECLAIMED WATER AS SOURCE WATER

CTB3365x Introduction to Water Treatment

POTW s As An Emergency Option For Dairy Manure Disposal

21 st Century Biofilm Reactors TREATING FOR TROUT. Northport/Leelanau Township Wastewater Treatment Facility. Presented by: Rich Grant, PE

Ballasted Activated Sludge Demonstration Study SEPTEMBER 30, 2016

AquaNereda Aerobic Granular Sludge Technology

Transcription:

Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF consists of primary, advanced biological secondary and tertiary treatment to obtain Total Nitrogen (TN) of less than 6 mg/l. The current capacity of the facility is 6.67 mgd, with expansion to 8.0 mgd. The Tertiary process, MF/UV (Microfiltration/Ultraviolet disinfection) was selected to meet the coliform removal and turbidity requirements of Title 22 for reclaimed water. Once the reclaimed water reservoir and the reclaimed piping are put into operation, non-potable water from the facility will be used in the system. Currently the plant effluent is overflowing into the San Timoteo Creek. Figure 1: View of Upper Half of Wochholz Facility A schematic of the facility and components is provided at the end of this document. The Wochholz facility was originally placed into service in 1986 with an initial capacity of 3.0 mgd. The facility was originally designed with trickling filters and small aeration basins in order to provide treatment of wastewater. The facility was upgraded and expanded in 1992 to 4.5 mgd, at which time dentirifcation filters were incorporated in order to reduce Total Nitrogen to less than 10 mg/l. 1

Facility Elements A summary listing of primary components contained in the WRWRF is as follows: Headworks. Primary Treatment Secondary Treatment Solids processing Microfiltration System UV Storage and pumping Process residuals treatment Headworks Influent to the facility undergoes ¼ screening, flow measurement and grit removal before it is discharged to the primary treatment basins. Solids collected from the bar screens and grit chamber are washed, compacted and disposed. The facility is designed to operate at a peak influent flow of 26.5 mgd. The system contains 2 bar screens and a single grit removal chamber that can be by-passed for maintenance purposes. Primary Sedimentation Basins Figure 2: Bar Screens and Grit Removal Effluent from the headwork passes through the three primary sedimentation basins to remove coarse solids and floatable scum. Chain and flight sludge collectors are used to move solids and scum to the appropriate collection point. The solids and scum are sent to digestion for additional treatment. The primary sedimentation basins remove about 50 percent of the solids from the influent wastewater. Figure 3: Primary Sedimentation Basin 2

Primary Equalization Basin One of the unique features of the WRWRF is the primary equalization basin that is used to stabilize the diurnal flow through the facility. Flow from the primary sedimentation basin can be diverted to a primary equalization basin for processing during off peak times. An adjustable weir gate is used to determine the amount of flow that is diverted to the primary equalization basin. The primary equalization Figure 4: Primary Equalization Basin basin contains 5 mixers to keep solids in suspension during the time which is it stored. Flow from the Primary equalization basin is returned once the incoming flow drops off below an operator established plant setpoint. Return flow is varied with a VFD to maintain the target plant flow setpoint on the HMI. The mixers are turned off automatically as the level falls below the minimum level in the primary equalization basin. Secondary Treatment Splitter Boxes There are 2 splitter boxes that provide flow to the secondary system. The primary effluent splitter box contains the effluent from the primary sedimentation basins. The new mixed liquor splitter box contains flow from the following sources: MLR Pumps RAS Pumps Primary Equalization Pumps Anoxic Basins Flow from the splitter boxes flows into the anoxic basins. There are 2 anoxic basins that operate in parallel. The anoxic basins operate in a depleted oxygen environment in order to reduce the level of nitrogen in the feed. The basins are divided into 4 quadrants and each quadrant is mixed in order to Figure 5: Anoxic Basins 3

maintain the biological environment. The configuration of the Anoxic basins is somewhat unique. At one time these basins were operated as trickling filters, but were converted to Anoxic basins. Aeration Basins - AnoxKaldness IFAS Biological process Flow from the anoxic basins is aerated in order to convert to achieve nitrification and conversion of ammonia to nitrite-nitrate. There are four aeration basins at the Wochholz facility. Aeration and microorganisms in the mixed liquor converts soluble BOD and nutrients into biomass and increases the level of suspended solids. The system is designed to run in Automatic control based on dissolved oxygen in the aeration basins. During periods of low flow the system blowers run down to the minimum setpoint. There are 2 zones of treatment in the AnoxKalness process. The Figure 6: Aeration Basins first oxic zone operates at a higher level of dissolved oxygen, and the second zone operates at a lower concentration of dissolved oxygen. Each zone of treatment contains AnoxKaldness media. The media is used to increase the level of treatment available within the aeration basin by allowing attachment of biosolids to the media structure. After aeration, the majority of mixed liquor is recirculated to the anoxic basins while a smaller portion undergoes a post anoxic treatment. In this zone the oxygen in the mixed liquor is depleted and denitrification will occur. Methanol can be added to the post anoxic zone to enhance denitrification. Figure 7: AnoxKaldness Media that is required to maintain the media in suspension. The primary purpose for the selection of the Anox Kaldness process was associated with the space limitations of the facility. As originally constructed, the Wochhoz facility had limited aeration basins. Expansion of the facility within the available footprint was limited. The AnoxKaldness allowed the District to add the additional treatment within the available constraints of the facility, at a slight cost of additional energy 4

Secondary Clarification Secondary Clarifiers are manually controlled. Mixed Liquor enters a center collector and forced downward where the solids begin to settle. In each of the four clarifiers, solids settle to the bottom of the clarifier to form Return Activated Sludge. Each clarifier has a rotating sludge rake which is used to move solids to a collection sump. The sludge rake is designed operate continuously. In the sump, Return activated sludge (RAS) is drawn off. Figure 8: Secondary Clarifier Secondary clarified effluent is formed when the incoming mixed liquor passes through the solids collected on the bottom and flows outward and upward to the periphery of the clarifier. Clarified water is typically in the range of 2-10 ntu. Waste activated sludge can be taken from the effluent channel of the aeration basins, or from the RAS line. Operation of the WAS pumps reduces the concentration and mass of biosolids in the mixed liquor. WAS is pumped to the existing DAF system. Figure 9: View of Lower Half of Wochholz Facility 5

Tertiary Treatment The lower half of the Wochholz Facility contains the secondary equalization basins, MF/UV treatment equipment, filter press, and storage reservoir. The large pond in the middle is a storm water retention basin. Secondary Equalization Basin Water from the secondary clarifiers flows into the secondary equalization basin proportional to incoming flow. The level in the secondary equalization basin is designed to fluctuate and follow the diurnal curve of the plant incoming flow. Originally this basin was used to equalize flow to the denitrification filters, but was retained for the expansion to provide additional equalization. Pall Microfiltration System The facility plant construction incorporates six Pall MF units. The Microfiltration produces filtered water of less than 0.2 ntu, and is generally around 0.03 ntu. The system is designed to utilize the secondary equalization basin to maintain a relatively steady output from the plant while trying to minimize the time the MF system is running at full capacity. The system has a nominal capacity of 6.67 mgd, with a maximum one day treatment capacity of 10.0 mgd. Each MF unit has 95 membrane modules. In the future, the use of MF will allow the District to add Reverse Osmosis for the reduction of Total Dissolved Solids in the effluent. Figure 11: Pall Membrane Unit Figure 10: Pall Membrane Filtration System The complete Pall treatment system will normally be run with all systems operating. Of course system capacity is reduced with each MF unit out of service and it is not recommended to have the units out of service for more than 24 hours because of bacteriological growth and possible corrosion issues without preserving the membrane in a slight chlorine residual solution. The microfiltration system is designed to operate with flow generated by the six MF feed pumps provided in the feed wet well of the microfiltration system. Each feed pump is designed to deliver a maximum flow of 2.0 mgd, at a pressure of 35 psi. 6

Once necessary operating parameters are provided, the operator initiates an automated sequence which successively starts the designated MF Units. The MF system is designed to produce a maximum of 10.0 mgd. Reverse Flush System Backwashing of the individual MF Units will commence automatically as required to maintain membrane flux as will periodic enhanced membrane cleaning. Backwashing is accomplished through the use of an Air Scour (AS) and Reverse Filtration (RF) process by which process air and filtrate is used to dislodge particulate matter that have accumulated on the membrane surface. The MF Filtrate storage tank contains sufficient volume to accommodate the temporary interruption from the individual Membrane Unit flow during these operations. The AS/RF (backwash) water from the MF system is discharged to the Backwash Recovery Basin. Figure 12: Reverse Filtration (Backwash) Pumps EFM and CIP systems Particulate matter that is not removed by backwashing can be removed by chemical cleaning. The Pall membrane system uses 2 types of cleaning processes. The first process is termed Enhanced Flux Maintenance (EFM). EFM involves the recirculation of a chlorine solution through the membrane unit for a short period (20 to 30 minutes) of time. EFM solution is drained and flushed from the system before it is returned to service. EFM s are scheduled once every 24-72 hours during the low flow period of the diurnal curve. The other type of chemical cleaning is termed Clean In Place (CIP). In this process citric acid (to remove inorganic contaminants) is heated and recirculated through the membrane unit and then drained and flushed from the system. CIP is initiated when the TMP of the unit reaches 35 psi. The citric acid CIP is generally followed by a heated solution of caustic and chlorine CIP to remove organic Figure 13: EFM and CIP System contaminants. The CIP process takes approximately 4 to 6 hours to complete. Because the EFM and CIP processes utilize a common pump and piping, the EFM process cannot occur during the CIP process. 7

Ultraviolet Disinfection System UV Supply Basin Filtrate from the MF system flows to the UV Supply Basin. An overflow weir from the tank provides gravity flow to the UV system. There is a control valve located at the effluent of the MF filtrate tank that is designed to maintain a relatively constant flow to the UV system. The UV Supply Basin contains sufficient volume to accommodate the temporary interruption from the individual Membrane Unit flow from a backwash operation. UV System The UV system is designed to disinfect the MF Filtrate treated waste water. The UV system consists of two UV channels that expose the microfiltered water to UV light. Based on the transmisstivity and flow of water in the UV channels the UV system will automatically determine the UV dose, the number of channels to run and the number of light banks to utilize. Typically the UV system will maintain a minimum level of water in the UV channels to keep the lamps covered. The outlet gates on the UV channels are modulated to maintain the appropriate level in the UV channels. Flow is calculated from the difference between the water level in the channel and the position of the weir gate. Effluents Storage and Pumping Figure 14: UV System The intention of the facility is to send the effluent water from the UV system to the Reclaimed Water Reservoir prior to nonpotable water distribution. Currently the piping has not been completed for the non-potable water system and therefore the plant effluent overflows into the existing outfall to the San Timoteo Creek. In the future, when the Non-potable water piping is complete the effluent will be dosed with sodium hypochlorite to provide a chlorine residual before being sent out the to the non potable distribution system. Figure 15: Not Potable Reservoir 8

Solids Processing DAF System The DAF system receives sludge from the WAS pumps. The DAF system uses air to lift and concentrate suspended solids that is sent to the digesters. The system pumps sludge to the digesters when a sufficient level has accumulated in the DAF sludge collection basin. Anaerobic Digesters The Anaerobic Digesters receive sludge from the primary sedimentation basins and the dissolved air flotation (DAF) system. Influent valves are controlled automatically from the existing DAF. Each digester has a recirculation pump and heater used to mix and heat the solids in the digester. Methane gas is released and flared, or used as a fuel to heat the solids. Belt Filter Press Solids dewatering from the digester flows to a holding tank outside of the belt filter press building. A polymer is added to the solids and belt filter presses are used to dewater the solids. Water that is removed from the Belt filter press is sent to the return water pump station. Solids are conveyed to a truck and taken to a local recycler for additional treatment. 9