Pilot Testing a High-Speed Turbo Blower at the City of Plano, Illinois Water Reclamation Facility"

Similar documents
Aeration System Optimization Can Offer the Greatest Long-term Savings

JEDDAH INDUSTRIAL CITY

Integrated real-time SRT and aeration control in the city of Grand Rapids

November 28, Dear Mr. Bechtold:

Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT

Case Study. BiOWiSH Aqua has Positive Long-Term Effects. Biological Help for the Human Race

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

Ballasted Activated Sludge Demonstration Study SEPTEMBER 30, 2016

Tour of Regional Water Reclamation Facility

Biosolids Monthly Report

Tour of Altamonte Springs Regional Water Reclamation Facility

Aeration University Advanced Concepts in Energy Efficiency

Innovative Use of Dissolved Air Flotation with Biosorption as Primary Treatment to Approach Energy Neutrality in WWTPs

6 WASTEWATER. 6.1 Overview. 6.2 Darvill Wastewater Works

Technical Memorandum. 201 N. Civic Drive, #115 Walnut Creek, CA Tel: Fax:

Calculating Aeration Flow and Pressure Requirements

Kansas Case Study Kanopolis Reservoir and Salina, KS

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works

Decentralised Wastewater Management. A sustainable strategy for wastewater management

The OWASA UNC Reclaimed Water System: A Progress Review

Ellis Creek Water Recycling Facility, City of Petaluma

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng

Sanitary Sewer Systems. Sewage Collection System. Types of Sewage 10/12/2016. General Overview

Nutrient Removal Processes MARK GEHRING TECHNICAL SALES MGR., BIOLOGICAL TREATMENT

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

Electric Forward Market Report

Outline. Introduction Case Studies. Anoxic Zone Mixing Channel Mixing. Theory and Criteria. Mixing Theory Design Criteria.

APPENDIX E: EXISTING FACILITIES DESCRIPTIONS AND DESIGN CRITERIA

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

Current Treatment Approaches and Planning for the Future A Panel Discussion

East Coast P Removal Technology Performance Summary

CEDAR CREEK Wastewater Treatment Facility

Combined Sewer Overflows July 2012-December 2013

COMPARISON OF PROCESS ALTERNATIVES FOR ENHANCED NUTRIENT REMOVAL: PERSPECTIVES ON ENERGY REQUIREMENTS AND COSTS

ENVIRONMENTAL VISITATION CENTER ALEGRIA WWTP

Benlouali Hajar*, Redouane Choukr-Allah, Harrouni Moulay Cherif, Aziz Hirich, Mohamed Fallah

NUTRIENT REMOVAL PROCESSES IN WASTEWATER TREATMENT. We re Glad You re Here!

Anaerobic Digester Optimization with Bio-Organic Catalyst. NYWEA 81 st Annual Meeting February 3, 2009 One Year Study November 07 - November 08

WWTF Capacity Assessment Project

Administration Division Public Works Department Anchorage: Performance. Value. Results.

International Joint Commission Water & Wastewater Treatment Best Management Practices Forum Monday, March 26, 2012 Wayne State University, Detroit MI

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant

Energy Efficiency in Wastewater Treatment

Your Guide to the. Budd Inlet Treatment Plant

Need-to-Know Criteria Wastewater Treatment Operator Class III

Energy Conservation Measures for Municipal Wastewater Treatment Plants Case Studies of Innovative Technologies and Practices

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic.

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

Sewage Treatment Plant Performance Report

New York State Department of Environmental Conservation

CIE4485 Wastewater Treatment

BEFORE THE PENNSYLVANIA PUBLIC UTILITY COMMISSION : : : : : : : : : : : : : : : DIRECT TESTIMONY MICHAEL J. GUNTRUM, P.E.

Pilot Testing El Paso s Advanced Water Purification Facility

Hillsdale Wastewater Treatment Plant

Optimizing Effluent and Sludge Treatment for Kraft Pulp Mills with regards to Energy Production, Consumption and Carbon Footprint.

Sulaibiya world s largest membrane water reuse project

Performance evaluation and modeling of the activated sludge system used in Riqqa, Kuwait

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed?

Lessons Learned from CM-at-Risk and Design Build Projects at Water and Wastewater Treatment Plants. Lawrence H. Hentz Jr., P.E.

Condenser Water Heat Recovery"

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION

WESTDALE WWTP AUGMENTATION AND REUSE FARM. Stephen Sullivan and Jamie Hunt. Tamworth Regional Council

WWETCO FlexFilter and Bio-FlexFilter

Modeling the Middle and Lower Cape Fear River using the Soil and Water Assessment Tool Sam Sarkar Civil Engineer

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT

THE NEW DUBBO SEWAGE TREATMENT PLANT UPGRADE. Glenn Clifford. Dubbo City Council

Aqua MSBR MODIFIED SEQUENCING BATCH REACTOR

SLUDGE SETTLEABILITY CONTROL AT ELANORA WWTP RAS CHLORINATION TRIAL. Martin Hindmarsh. Allconnex Water

Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project

- 1 - Retrofitting IFAS Systems In Existing Activated Sludge Plants. by Glenn Thesing

Pulp and Paper Mill Southeastern United States

BOD/COD a Measure of Dairy Waste Treatment Efficiency- A Case Study

A COMPARISON OF ODOR AND HYDROGEN SULFIDE EMISSIONS FROM TWO METROPOLITAN WASTEWATER TREATMENT PLANTS

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Activated Sludge Process Control: Nitrification

Prepared by the Operation of Municipal Wastewater Treatment Plants Task Force of the Water Environment Federation

Climate Change & Urbanization Have Changed River Flows in Ontario

TWO YEAR CASE STUDY OF INTEGRATED FIXED FILM ACTIVATED SLUDGE (IFAS) AT BROOMFIELD, CO WWTP West 124th Street Broomfield, CO 80020

Facilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station

Rule Estimated Retrofit Costs to Achieve Proposed Biogas Limits

Renovation of secondary treatment facility into the Step-feed Biological Nitrogen Removal Process by the effective use of the existing structure

THE USE OF PROCESS MODELING SOFTWARE IN INDUSTRIAL WASTEWATER TREATMENT - CASE STUDIES THAT ADDRESS AIR EMISSION, METALS REMOVAL AND WATER REUSE

Heating the University of Glasgow with river sourced heat pumps. Adam McConkey Andrew Poon-King Zhibin Yu

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA

Minnesota Pollution Control Agency

Startup and Performance of the World s first Large Scale Primary Dissolved Air Floatation Clarifier ABSTRACT KEYWORDS INTRODUCTION

General Information on Nitrogen

Alternative Filter Media for Potable Water Treatment

OPERATIONS OVERVIEW TABLE 1-1 ANTICIPATED FLOW RATES. Design Flows (mgd)

. ARUSHA URBAN WATER SUPPLY AND SANITATION AUTHORITY (AUWSA)

Advanced Wastewater Treatment Plant Plant Profile

Developing a Sustainable Water Supply Strategy for the City of Plantation, Florida

ASA Analytics ChemScan Process Analyzers Reprint ASA Publication #194

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E.

Transcription:

Pilot Testing a High-Speed Turbo Blower at the City of Plano, Illinois Water Reclamation Facility" Presented by: Mark J. Halm, P.E. - Yokhana Alkass, LEED AP EEC, PC Darrin B. Boyer - City of Plano- Illinois

Presentation Outline Today s presentation will focus on: Plant Background Liquid Train Design Elements Solids Train Design Elements Existing Blowers Technology Results

Background The $13.6 million Improvements Project was completed in November 2006. Designed for Biological Nutrient Removal The design average flow capacity of the plant was increased from 0.95 MGD to 2.44 MGD.

Liquid Train Design Elements Preliminary Treatment Building houses: Raw sewage enters the building via gravity Two 6 mm bar screens, washers and compactors Two aerated grit tanks Three recessed impeller grit pumps Two grit classifiers Conveyor for compacted/washed screening and classified grit

Liquid Train Design Elements Secondary Treatment Control Building houses: The mixed liquor flow distribution valves to the final clarifiers, The non-potable water reuse pumps, The plant drainage/scum pumps, and The internal return pumps which pump mixed liquor at a rate up to 300% of the influent flow to the anoxic selectors for denitrification Series Selector Tanks for Biological Nutrient Removal

Liquid Train Design Elements Secondary Treatment, continued: Series Aeration Tanks Two 75 foot diameter Final Clarifiers New Blower Building and 1.2 MW Generator

Liquid Train Design Elements UV Disinfection Discharge to Cedar Dell Golf Course Irrigation Pond and Finally to Big Rock Creek and the Fox River SCADA Control System

Design Elements

Solids Train Design Elements WAS Holding Rotary Drum Thickening Aerobic Digestion Centrifuge Dewatering Sludge Storage and Land Application

Focus on Blowers Sizing of the Centrifugal Blowers (AOR): Average Month BOD5 Load of 3,750 lbs/d Average Month TKN Load of 562 lbs/d Max Month approximately 20% greater than average day Average Month AOR 7,354 lbs/d Oxygen Maximum Month AOR 8,825 lbs/d Oxygen

Focus on Blowers Sizing of the Centrifugal Blowers (SOR): Alpha 0.6 Beta 0.98 SOTE 30% Max Month SOR of 18,950 lbs/d at 20 degrees C Airflow Requirement of 2,527 scfm

1-Jan-11 1-Feb-11 1-Mar-11 1-Apr-11 1-May-11 1-Jun-11 1-Jul-11 1-Aug-11 1-Sep-11 1-Oct-11 1-Nov-11 1-Dec-11 FLOW, MGD Focus on Blowers 3.500 3.000 2.500 2.000 1.500 1.000 0.500 0.000

1-Jan-11 1-Feb-11 1-Mar-11 1-Apr-11 1-May-11 1-Jun-11 1-Jul-11 1-Aug-11 1-Sep-11 1-Oct-11 1-Nov-11 1-Dec-11 AOR, LBS/D Focus on Blowers 4,500 4,000 3,500 3,000 2,500 2,000 1,500 1,000 500 -

Total Load on Blower Focus on Blowers Aerobic Zones of BNR Process: Aerated Channels: Anoxic/Anaerobic Selectors: WAS Holding: TOTAL AIR LOAD: 2,527 scfm 900 scfm 866 scfm 1,250 scfm 5,543 scfm

Focus on Blower Spec 2004 SCFM is determined at 68 degrees F and 38% RH To Correctly Specify the Blower Need to Calculate ACFM SCFM to ACFM (adjust for temp., altitude, relative humidity) Three Blowers at 2,490 ACFM Capacity

1-Jan-11 1-Feb-11 1-Mar-11 1-Apr-11 1-May-11 1-Jun-11 1-Jul-11 1-Aug-11 1-Sep-11 1-Oct-11 1-Nov-11 1-Dec-11 SCFM REQ'D Focus on Blowers 1,400 1,200 1,000 800 600 400 200 -

Focus on Energy With the Rising Cost of Energy and the Environmental Impacts of Producing Power, Energy Conservation is Again in the Forefront EPA has Published a Compendium of Energy Saving Concepts for Wastewater Treatment Facilities in September of 2010 EPA 832-R-10-005 In WWTP s the largest demands for power are typically the blowers and raw sewage pumps

Focus on Energy The City s Water Reclamation Facility is Gravity Fed. The City elected to pilot test a turbo blower unit with the goal of evaluating the operational capabilities and potential energy savings APG-Neuros had a unit available of approximately the size required and was willing to pilot test

Focus on Turbo Blower Technology Turbo blowers operates at speeds of 20,000 rpm to more than 40,000 rpm Initial Pilot of a NX-100 Neuros Blower

Focus on Turbo Blower Technology Initial Pilot of a NX100 Revised Pilot with a NX75

Focus on Turbo Blower Technology

Focus on Turbo Blower Technology Differences in Technologies Bearing- Magnetic or Air Foil Impeller- Cast or Forged One Core-Dual Core There are a Number of Manufacturer s of Turbo Blowers: Neuros APG HIS ABS K-Turbo Atlas-Copco

Focus on Installation Blower building was designed for 4 centrifugal multistage blowers 3 are in service Therefore, there was a space for the pilot Normally only one blower required for process Therefore, plant staff was able to cannabalize piping and valves and make electrical connections using parts from one of the spare centrifugal blowers.

Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 kw-hr/d Focus on Results Monthly Average Power Demand 9,000 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1,000 -

Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 kw-hr/d Focus on Results Blower Power / Total Power 45% 40% 35% 30% 25% 20% 15% 10% 5% 0%

Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Focus on Results Monthly Power Cost for Activated Sludge Blowers $8,000 $7,000 $6,000 $5,000 $4,000 $3,000 $2,000 $1,000 $0

Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Dollars Focus on Results $120 Cost/ Day per 1,000 Pounds of AOR/Day $100 $80 $60 $40 $20 $-

Focus on Results Total Costs for Installation Approximately $185,000 Projected Annual Savings - $45,000 Simple Payback- Approximately 4 years NPV of Savings over 20 years - $675,000

Thank You to the City of Plano For Their Assistance in Preparing This Presentation