COMMISSION MEETING. June 21, Engineering and Construction Team. Piscataway WWTP Bio-Energy Commissioners Status Briefing

Similar documents
Why THP Made Sense for TRA

Update on Biosolids Regulatory & Market Trends. Michael D. Moore HDR Engineering, Inc.

Problem Statement WWTP. Biosolids Management. Biosolids 2 5/14/2013. Anaerobic Co-Digestion of FOG: Pilot Demonstration at BCUA

Co-Digestion of food wastes at wastewater treatment plants. Alice Varkey, PEng Senior Engineer Mike Muffels, MSc PEng Senior Engineer June 2016

Biosolids Monthly Report

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E.

Closing the Gap Reaching for Energy Independence in Water Reclamation

Solids Treatment and Management in a Changing Environment! Biosolids and Renewable Energy Specialty Workshop! May 12-13, 2015!

Defining the Benefits of Harvesting Phosphorus from Dewatering Filtrate

Opportunity: Methane gas recovery Problem: Where to market the power generated?

Transitioning to a Thermal Drying Program at DWSD. March 3, 2015

Carbon Heat Energy Assessment and. (CHEApet) Tutorials: Carbon Footprint Primer

WSSC Feasibility Study For Generating Combined Heat & Power from WSSC's Wastewater Biosolids (Converting a Waste Into a Resource)

Leveraging An Agency s Assets. Anaerobic Co-Digestion FOG, Food Waste and More

30 W E & T w w w. w e f. o r g / m a g a z i n e 2009 Water Environment & Technology All rights reserved

AMMONIA REMOVAL FROM DIGESTED SLUDGE SUPERNATANT

Municipal wastewater treatment in Latin-America:

Application of the AGF (Anoxic Gas Flotation) Process

What Can Biosolids Do for You? Shifting towards Solids as an Energy Resource

Pinellas County Utilities (PCU) operates

Bergen biogassanlegg. Kristine Akervold. disipline manager wastewater treatment Water & Sewerage Works CLEAN WATER TO PEOPLE AND FJORDS

Kenosha Wastewater Treatment Plant - Energy Optimized Resource Recovery Project

7624 Riverview Road Cleveland, Ohio

Latest Technologies for Processing Organics

Ashbridges Bay Treatment Plant Biogas Cogeneration Proposal from Toronto Hydro Energy Services

Your Problem. Current Practices. Survey about Storage. Thinking about Cost. Mixed waste {Your truck} Your Resources Options Future

Adopted by Water Environment Federation (WEF) Board of Trustees: October 14, 2011

Thermophilic anaerobic digestion for increased biogas production and pathogen control

STUMP City of Columbus Solids Treatment and Utilization Master Plan. OWEA Presentation September 27, 2012

Never Give Up! Strategies for Overcoming Project Delivery Challenges and Roadblocks

Wastewater: Moving Towards Low Carbon and Energy-generating Technologies. Jingmin Huang Senior Urban Development Specialist RSAS

Advanced Aerobic Digestion. ThermAer. Autothermal Thermophilic Aerobic Digestion. Biosolids Treatment. Thermal Process Systems ThermAer Process

PHOSPHORUS RECOVERY FROM SEWAGE SLUDGE USING THE AQUACRITOX SUPERCRITICAL WATER OXIDATION PROCESS

A Roadmap for Smarter Nutrient Management in a Carbon and Energy Constrained World. Samuel Jeyanayagam, PhD, PE, BCEE

The Use of Magnesium Hydroxide Slurry as a Safe and Cost Effective Solution for H 2 S Odor, Corrosion, and FOG in Sanitary Sewer Systems

Presented by: USA Biogas

How EPA s Waste Reduction Model (WARM) Quantifies the Greenhouse Gas Impacts of Organics Management

Biogas Opportunities: From Fuel to Flame

Efforts for use of methane gas in wastewater treatment of Japan

CALL FOR ABSTRACTS. September 27 October 1 New Orleans, Louisiana DEADLINES

Quantification Protocol for Aerobic Composting

Operations Division Budget

Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013

chapter vi Summary and Economic Analyses

Canadian Biogas Metrics Study: Quantifying the Economic, Environmental and Social Benefits of Biogas Energy in Canada

CHEMICAL FREE PHOSPHOROUS ELIMINSTION P-UPTAKE PROCESS

Current Treatment Approaches and Planning for the Future A Panel Discussion

The Biosolids Odor Reduction Roadmap (BORR): A Decision Tool to Reduce Cake Odors

STARTUP OF ANAEROBIC MESOPHILIC DIGESTERS

Biogas Cogeneration System Sizing and Payback Based on Weekly Patterns of Anaerobic Digestion and Biosolids Dryer Operation

Volatile Solids Reduction (VSR): Considerations for Accurate Measurement and Reporting

WEF Residuals and Biosolids Conference 2017

CHAPTER 5 WASTEWATER FLOWS

CEDAR CREEK Wastewater Treatment Facility

Carbon Redirection and its Role in Energy Optimization at Water Resource Recovery Facilities

SWOLF Overview and Illustrative Analyses. Jim Levis, PhD Research Assistant Professor Department of Civil, Construction, and Environmental Engineering

Sulaibiya world s largest membrane water reuse project

Optimization of Anaerobic Digestion with Bio- Organic Catalyst Compositions (BOCs)

EXECUTIVE SUMMARY OVERVIEW OF THE ENERGY WATER NEXUS

Food Waste Elimination Solutions At The Source

How Nutrient Trading Can Help Restore the Chesapeake Bay

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT

Prepared by the Operation of Municipal Wastewater Treatment Plants Task Force of the Water Environment Federation

ACHIEVING 75% RECYCLING Building a Sustainable Solid Waste Program. UF Bioenergy Summer Internship Program Gainesville, Florida July 12, 2012

Chriwa Group page 2-7 Working fields page 8-10 Excursion Germany page South Africa page Waste-to-Energy. page Summary.

Case Study: Biogas generation from

Anaerobic Digestion- opportunities to optimize the process

Welcome to the Web Conference U.S. Dairy Industry s Report National Market Value of Anaerobic Digester Products April 11, 2013

PANEL: Making a resource into the right source

OVERVIEW CAPACITY & CONDITION

final report Water quality improvement strategy for a processing site

BMP Element 7 Roles and Responsibilities City of Richmond Public Utilities Wastewater Treatment

Utilizing Anaerobic Digester Capacity to Process Source Separated Organics: Two Case Studies

OPPORTUNITIES FOR MITIGATION OF METHANE EMISSIONS IN CHINA

Emerging Technologies in Sludge Minimization

E1/92. D.C. Water & Sewer Authority Series 2017 A Senior Lien Revenue Bonds. Green Evaluation. Transaction Overview. Green Evaluation Overview

Chapter 9: Alternative Analysis

High-Rate Anaerobic Digester Systems for Industrial Wastewater Treatment and Renewable Energy Generation

Proposal by Russia to delete hot sub-spot Hot sub-spot name South-West Wastewater Treatment Plant

WWETCO FlexFilter and Bio-FlexFilter

Digester Gas Utilization at SWRP Where Should the Biogas Go?

HISTORY

Waste-to-Energy Potentials in Grenada

The Energy and Carbon Footprint of Water Reclamation and Water Management in Greater Chicago

THERMAL HYDROLYSIS AND ENERGY REDUCTION IN BIOSOLIDS PROCESSING

Julian Sandino, PhD, PE, BCEE IWA & WEF Fellow

CHAPTER 2 BIOMASS SOURCES

>> TRENDS IN INDUSTRIAL WASTE MANAGEMENT:

Circular economy in the region of Amsterdam. Edwin de Buijzer KWR Watercycle Research Institute. 3 November 2015

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

HELIOSOLIDS FLUIDIZED BED INCINERATOR

[Speaker: Judy Zavadil, DSRSD Engineering Services Manager and District Engineer.]

Biosolids Rules Ohio Administrative Code

Re: Comments on the Short-Lived Climate Pollutant Reduction Strategy Concept Paper.

First things first.. A Brief Overview of the PTI Program. Why offer training? PTI Survey Results. Today s Main Topics:

THE COST BENEFITS OF COMPOST USE

Proven Process Performance. JMS Key Strengths. Application Engineering

Biosolids Quality. Enhancement Plan. For more information, visit keyword: Biosolids.

Anaerobic Digestion of Wastewater Treatment Plant Biosolids (Sludge)

Transcription:

COMMISSION MEETING June 21, 2017 Engineering and Construction Team Piscataway WWTP Bio-Energy Commissioners Status Briefing Item Number: Table of Contents 1. Commission Summary P.1 2. Presentation P. 2-24 Total Number of Pages 24 (without this cover sheet)

WASHINGTON SUBURBAN SANITARY COMMISSION COMMISSION SUMMARY AGENDA CATEGORY: Engineering and Construction Team ITEM NUMBER: DATE: June 21, 2017 SUBJECT SUMMARY Piscataway WWTP Bio-Energy Commissioners Status Briefing The Bio-Energy Project will result in a regional approach and supporting facilities to process and handle wastewater biosolids beneficially and cost effectively. The Project will create the path to a much-improved biosolids product which is pathogen-free (Class A) and has better aesthetic characteristics. The Project will also maximize energy recovery from the methane produced anaerobic digestion. The regional processing facility will be located at the Piscataway WWTP and will include thermal processing, anaerobic digestion, and energy recovery. SPECIAL COMMENTS CONTRACT NO. / REFERENCE NO. COSTS CD5901A15 N/A AMENDMENT/ CHANGE ORDER NO. MBE PARTICIPATION N/A N/A PRIOR STAFF/ COMMITTEE REVIEW RECOMMENDATION TO COMMISSION COMMISSION ACTION Chief Engineer, General Manager/CEO N/A N/A 1

Goals and objectives Existing biosolids management practices Proposed biosolids management plan Proposed project delivery Budget and business case Schedule

Total transformation of WSSC biosolids practices Save rate payer dollars through reduced operating costs Minimize the quantity of biosolids material Develop Class A (pathogen-free) biosolids material Maximize return on investment and energy recovery from biosolids, fats, oils and grease Reduce greenhouse gas emissions Improve power reliability Reduce nutrient loads to Chesapeake Bay

Individual handling at 5 WSSC Treatment Plants Class B land application Meet EPA requirements Land sites in VA Incineration Western Branch Fats, Oils and Grease By gravity sewer to DC Water

Increased regulations will lead to higher costs for Class B disposal Fewer restrictions on more highly treated Class A biosolids (better product) Reduce quantity of biosolids to be land applied Recover energy (resource) during the process

Biosolids (sludge) will be screened and dewatered at each plant Haul biosolids from four treatment plants to Piscataway WWTP

Existing Piscataway Facility

Proposed Concept of Piscataway Bio-Energy Program

Thermal Hydrolysis Pressure cooker - breaks down cells to improve downstream treatment Anaerobic Digestion Digests solids, reducing quantity and creating methane gas Combined Heat and Power Recovers energy from gas created Provides heat for thermal hydrolysis process

Reduces volume of biosolids for disposal Mitigates risks with future product use and regulations Very low odor and highly-stable product Eliminates use of lime Generates 2.7 MW of efficient natural gas power with steam recovery Reduces WSSC greenhouse gas emissions by 15%

1. Quality 2. Owner input 3. Price certainty 4. Maintenance of plant operations and commissioning 5. Long-term operations 6. Proper risk allocation 7. Schedule 8. Permits WSSC Selected Progressive Design-Build to foster and encourage collaboration and innovation.

Advantages Collaborative design Schedule/cost Single source accountability Risk allocation 2-Step Process Request for Qualifications Statements of Qualifications submitted May 19 Request for Proposals from shortlisted firms One contract (in development) with one amendment Original contract early construction, main design Amendment finalize design and construction Guaranteed Maximum Price at 60-80% design

$248.7 million CIP budget Progressive Design-Build Contract initial approval Design/early construction - $21 million Contract amendment with Guaranteed Maximum Price second approval Complete design/construction - $184 million Separate contract for construction at remote facilities - $6 million

Evaluate Net Present Costs (NPC) and simple payback of WSSC biosolids management alternatives Baseline scenario (current practice) Continue existing biosolids management practices Upgrade existing facilities (old equipment) Efficiency improvements Other improvements required at Piscataway ~ $90 million in construction Risks with current practices remain Bio-energy scenario (new facility at Piscataway)

Shortlist from Statement of Qualifications June 2017 Issue Request for Proposals July/August 2017 Select Design-Build Team October 2017 Commission approval early 2018 Design and early start of construction Spring 2018 Amend contract with Guaranteed Maximum Price early 2019 Complete construction and commissioning through 2021