Crossrail and our international tunnelling expertise

Similar documents
CROSSRAIL INFORMATION PAPER D8 TUNNEL CONSTRUCTON METHODOLOGY

CROSSRAIL INFORMATION PAPER D24 TUNNELLING DURATION AND CONSTRUCTION STRATEGY

MEDIA BRIEFING NOTE: CROSSRAIL TUNNEL CONTRACTS, TUNNELLING STRATEGY AND CROSSRAIL PROGRESS

HS1 Link The View from London

D7: TUNNEL CONSTRUCTION AND METHODOLOGY

London s sewerage system was designed by Sir Joseph Bazalgette in the 1850s, for a population of four million

CROSSRAIL INFORMATION PAPER D26 SURFACE RAILWAY NOISE AND VIBRATION

TAMING COMPLEXITY ON MAJOR RAIL PROJECTS WITH A COLLABORATIVE SYSTEMS ENGINEERING APPROACH

Hong Kong Market Review

3.6 Construction Methods

Performance review of a pipe jacking project in Hong Kong

EIC Annual Meeting. hosted by Dansk Byggeri. Svend Poulsen. Project Director, Atkins Chairman FIDIC Update Task Group.

TONBRIDGE & MALLING BOROUGH COUNCIL. PLANNING and TRANSPORTATION ADVISORY BOARD. 15 November 2016

Qube Holdings Limited. Presented to. Challenges & Efficiencies Presentation to AmCham May 2015 Maurice James Managing Director

Experts in tunneling with Tunnel Boring Machines

TfL Managing Adaptation to Climate Change

Delivering Sustainability Through Public Procurement: Crossrail Case Study

AGENDA. HS1 Overview. Construction ti & Engineering i Overview. Funding. Procurement & Delivery. Operating Railway

London Tideway Tunnels Modernising London s Sewerage System Rob Furniss

IMPACTS OF TUNNELS IN THE UK. Non-technical summary

Western Rail Link To Heathrow

Promoters. Presentation. Tunnel. Tim Smart Head of Engineering & Operations. 20 th October

Hastings District Council. Whakatu Arterial Link Traffic Management Plan

Excellence in tunnel engineering. Consulting, planning, realisation

HS1 HS2 Link and Camden

Collation between Underground and Elevated Metro System

Rehabilitation of Prater junction

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Middle East Delivering Expertise Since 1978

IPSWICH NORTHERN ROUTES STUDY. Stage 1 Progress

Shaping a better built and natural environment for people to live, work, learn and play

2012 Results Announcement

CTRL London Tunnels: an alternative approach to delivering a major tunnelling project

Liverpool City Region Candidate Major Schemes April 2013

Construction of the Superstructure of Major Sea Crossings

MWH AND THE FIJI ROADS AUTHORITY: A COLLABORATIVE APPROACH TO ASSET RENEWALS

PIPE JACKING. An introduction to pipe jacking prepared by the Pipe Jacking Association

How MBSE is used in Rail

Making the Journey A Manifesto for Transport

Hampton Roads Bridge-Tunnel Expansion Feasibility Study. Design Considerations

Passenger service for the Dudding Hill line: brief for feasibility study

Geothermal Tunnel Linings. Principles of Geothermal Tunnel Linings

Crossrail UK. Enabling Quality Asset Information. for maintenance reliability and asset management professionals. oct/nov 14. uptimemagazine.

KANMANTOO PUMPED HYDRO STEVE McCLARE IIIII CEO & MANAGING DIRECTOR PUMPED HYDRO ENERGY STORAGE CONFERENCE SYDNEY MARCH 2018

Evergreen Line Rapid Transit Project

5 simple rules for innovation in megaprojects

Lee Tunnel Flow Transfer System twin 2.4m diameter elevated steel gravity pipelines to transfer stormwater across Beckton STW

17 April To whom it may concern, Response to the consultation on the draft Strategic Transport Plan

E-Procurement on large tenders: advantages and disadvantages for European contractors. April 2015

Electronic Toll Collection: Project Management and Implementation. Presented by Terry O Neill, Mott MacDonald e-toll Slovakia 06

TBM Selection and Specification

THE GROUNDBREAKING TUNNEL

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

Spatial Strategies. Spatial Data Management at Metronet. Matthew Prosser Atkins Geospatial. Date: 1 st October 2008

Mondi Group Capital Markets Day 2017

Old Oak and Park Royal. Guided tour Briefing Pack

OPPORTUNITY KNOCKS. Delivering the UK s infrastructure pipeline CONTACT. Arcadis United Kingdom

This paper outlines the carbon footprint and greenhouse gas assessment for HS2 Phase One.

SAFE WORK METHOD STATEMENT

ROYAL ARSENAL Buildings 10, 11 and Royal Carriage Square Foul Sewage & Utilities Report

Appendix C Canadian Pacific Rail License of Entry Document

Mondi Group Capital Markets Day 2017

enabling rural development

Selection of Proprietary Shoring Equipment

Hamilton Rapid Transit Preliminary Design and Feasibility Study

Geotechnical control of a major railway project involving tunnel works in Hong Kong

Shatin to Central Link (SCL) Cross Harbour Section. Professional Forum II 4 th December 2009

What is core to being an Intelligent Customer?

LONG-TERM MONITORING AND SAFETY EVALUATION OF A METRO STATION DURING DEEP EXCAVATION

The UK Geospatial Market

All Drill and Blast Tunnelling Works for Shatin to Central Link Completed

A WONG Ove Arup and Partners Hong Kong Ltd & University of Cambridge 1

Valmet unique offering with process technology, automation and services. Investor Lunch March 17, 2016 Kari Saarinen, CFO

Developing carbon management systems

Mega Projects at WSDOT

The fresh approach to engineering and project management.» Rich in experience» Responsive & flexible» Delivery certainty

Concrete Pipe Jacking

PPP capability. global vision local knowledge

TRENDS IN TRANSPORT AND FUTURE INFRASTRUCTURE. September 2017

Twin Cities Regional Truck Corridors Study. MnDOT Metro Freight Studies Roundup

Geoguide 6 The New Guide to Reinforced Fill Structure and Slope Design in Hong Kong

SABI Code of Practice for On-farm Irrigation Design

Risk Management based Ground deformation monitoring during Queens Bored Tunnels project

TEXAS FREIGHT MOBILITY PLAN 2017

UNDERGROUND MINING. Cementation

ADAPTATION SYMPOSIUM Nicole Legault Environmental Policy Directorate Transport Canada

HS2. Beth West Commercial Director, HS2 Ltd

Leading the way towards a Smart Grid Capital Market Day London, December 5, 2013

Transport2025. Transport vision for a growing world city

construction solutions asia pacific

China Railway Construction Corporation Limited Annual Results

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

Rock Tunnel Engineering INTRODUCTION. Tunnel a hole in the ground to provide for desired movement or as mobility channel.

Who are we and what do we do?

concrete Precast car park The Avenue MSCP, Bracknell Sustainability by the sea Colwyn Bay seafront Clean water Treating hydro-demolition waste

Update On Our Investment in Glasgow Summer/Autumn 2015

Low Carbon Industrial Strategy: A vision

Daylighting Underground Assets

Mondi Group Capital Markets Day 2017

Transcription:

Crossrail and our international tunnelling expertise Analyst briefing Thursday 1 October 2015

Neil Thomas Managing director Water, Ground and Environment

Crossrail

Crossrail Crossrail has one purpose to change the way people travel in the capital We are increasing London s rail capacity by 10%, supporting regeneration and cutting journey times Bringing an extra 1.5 million people to within 45 minutes of central London and linking London s key employment, leisure and business districts An estimated 200 million annual customers will use Crossrail. 4

Crossrail route Reading to Shenfield and Abbey Wood 110km route length 29 surface stations (1 new) 40 Crossrail stations, 10 new stations 10,000 people working on it 90 million hours worked 5

Tunnelling alignment central section 6

Crossrail One of the most complex infrastructure projects in London, with more than 40 construction sites across its route 7

Atkins and Crossrail Atkins, in partnership with Arup, produced the detailed design of Crossrail s twin-bore tunnels Completion of 21km of twin bore (42km) tunnels Engineering and design of new stations Tottenham Court Road Custom House Woolwich Atkins is also undertaking the architectural components work package More active role of designers through the construction phase. 8

Tunnelling: asset protection 249 overground structures 3,284 buildings 669 heritage structures 370 underground structures 13,384 utilities 9

Tackling complex geology Royal Oak to Stepney Green Stepney Green to Victoria Dock Stepney Green to Pudding Mill Lane 10

Tunnelling Navigating existing infrastructure CAD visualisation of a typical section of the Crossrail route (in blue) showing the high geometrical constraints of tunnelling below central London. 11

Solving other technical challenges Ground engineering: complex range of ground strata along the route required different types of tunnel boring machines, from London clay in the west to the more permeable, weaker strata such as Thanet Sands in the east Safe application of excavation methods including station caverns to minimise surface footprints Control of ground movements with extensive assessment of the impact on the hydrogeological regime and surface settlement Optimise tunnelling logistics 3 million tonnes of excavated material was shipped to Wallasea Island in Essex to create a new 1,500 acre RSPB nature reserve. 12

Our use of technology Materials technology - tunnel linings advancing the state-of-the-art, fibre and polypropylene reinforced concrete Risk management - with the increasing complexity of large underground projects we have developed efficient ways of modelling ground movements and assessing the impact on surrounding assets. Predictive analytics - Quantum Black, Arup and Atkins developed AIM (adaptive instrumentation and monitoring), a web-based application using data with complex statistical analysis to understand spatial and time dependent correlation between monitoring points. 13

Simple web application Combines powerful analytics with visual interpretation 2013 Arup Atkins QuantumBlack 14

Crossrail summary One of the most complex infrastructure projects in London in which Atkins has been involved for ten years Crossrail has driven a step-change in the way tunnelled infrastructure is designed and delivered Our experience on the project demonstrates the Group s differentiated offering and has helped secure other major infrastructure opportunities across the world. 15

International tunnelling market

Demand drivers increasing Soaring urbanisation Increasing transport demand Rapidly rising land prices Congestion and limited space for construction Cost (underground land is cheap ), reduced disruption Growing need for innovative and complex underground infrastructure, be it: Railways high capacity metro systems combat congestion and spur economic development Roads Utilities, water and sewerage. 17

Attractive market characteristics High value consultancy work with significant technical barriers to entry Tunnel engineering capability is often the key to accessing a far greater scope of works Prestige of undertaking challenging projects of international significance Tunnel engineering is a key offering in design and build opportunities, allowing us to piggy-back with contractors into new markets. 18

Our global tunnels team Core group of experts in London, Dubai/Doha and Hong Kong Significant network of tunnels people (around 200), more than half being overseas We are located where our historic and current clients are based Appointment of Atkins Fellow in tunnelling and technical network to share expertise. 19

Our experience 20

Trend Type Our clients and their projects Clients Projects Atkins roles Project owners (eg MTR Corporation, CrossRail) International contractors (eg Samsung, CRCC, Obayashi, Vinci) Others (eg lenders, 3 rd parties) Metro Railway Water Utilities Highways Scheme design Design and supervision Contractor s detailed design Advisory services More than half of our global tunnel work is for contractors Long term relationships with international contractors are becoming more important. Increasing global tunnels need, particularly metro and water tunnels Project sizes increasing Increasing trend for more Design & Build engagement as lead designer to the contractor. 21

Dubai Metro Atkins provided full multidisciplinary design and management of the civil works on Dubai Metro which included geotechnical and site investigations, bored tunnels and viaducts and bridges. The first line of the Dubai Metro opened to the public in September 2009. It is the longest automated, driverless system in the world. 22

Riyadh Metro Atkins is the lead consultant for the detailed design for the FAST contracting consortium. Package 3 comprises lines 4,5 and 6. When complete, there will be approx. 26km of twin track tunnel about half of which will be driven by tunnel boring machines. 23

West Island Line, Hong Kong Atkins (in a joint venture) is the lead consultant for the detailed design of this 3km section of the extension to the MTRC West Island Line. There are two stations at Sai Ying Pun and University, both of which will be constructed in cavern. The scope involved tunnelling in soft ground under existing buildings in close proximity to their foundations. 24

Liantang Heung Yuen Wai boundary One of the largest TBM in the world (14 metre diameter) earth pressure balance tunnel boring machine and the largest in Hong Kong is on site at the Liantang-Heung Yuen Wai boundary crossing point. We are the designers for the contractor. 25

I-70 twin tunnels, Colorado Atkins provided construction management on the project to widen eastbound Interstate 70 to accommodate three traffic lanes, build a new bridge and 1.6 miles of retaining walls. I-70 is one of North America s major east -west transportation corridors. 26

Current and pipeline projects High Speed 2 Thames Tideway Tunnel London s Silvertown Tunnel Crossrail 2 EXPO 2020 extension to Dubai Metro Mecca Metro Jeddah Metro Our Crossrail experience has driven a step-change in the way tunnelled infrastructure is designed and delivered. 27

Summary

Summary There is a growing need for innovative and complex underground infrastructure Tunnelling projects offer high value consultancy work with significant technical barriers to entry The pipeline for future tunnelling work is strong With our global expertise (centred in London, Middle East and Asia Pacific) and experience we are well positioned in this market going forward. 29

Disclaimer The information in this presentation pack, which does not purport to be comprehensive, has been provided by Atkins and has not been independently verified. While this information has been prepared in good faith, no representation or warranty, express or implied, is or will be made and no responsibility or liability is or will be accepted by Atkins as to or in relation to the accuracy or completeness of this presentation pack or any other written or oral information made available as part of the presentation and any such liability is expressly disclaimed. Further, whilst Atkins may subsequently update the information made available in this presentation, we expressly disclaim any obligation to do so The presentation contains indications of likely future developments and other forward-looking statements that are subject to risk factors associated with, among other things, the economic and business circumstances occurring from time to time in the countries, sectors and business segments in which the Group operates. These and other factors could adversely affect the Group s results, strategy and prospects. Forward-looking statements involve risks, uncertainties and assumptions. They relate to events and/or depend on circumstances in the future which could cause actual results and outcomes to differ materially from those currently expected. No obligation is assumed to update any forwardlooking statements, whether as a result of new information, future events or otherwise. 30