LIVING QUARTERS module building principles General Features

Similar documents
A60 ACCOMMODATION MODULES

Prefabricated Wet Units WET UNITS 88

SIMULATED OFFICE PROJECT 2008 TECHNICAL REPORT

2.3.6 Design Development

MSC Guidelines for Review of Ventilation System Plans

Sheltering your value. Pre-fabricated Building

Lecture 3-1: Hull production - Product hierarchy and block division

SECTION B PLAN SUBMITTAL

Marine & Offshore Fire Divisions. bulkhead, deck & floor systems

Interiors TNF. by INEXA. Wet Units. Craftsmen to the world s finest ships

Company Presentation. Accommodating Excellence

Village of Glen Ellyn Basement Remodeling Project Guidelines

DEVELOPMENTS IN FIRE PROTECTION OF FRP COMPOSITE VESSELS

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

SECTION AIR DISTRIBUTION

YKN2open A R C 032 A B

March BCA 2014 Section J Amendments

Container City I & II Trinity Bouy Wharf London England

AKASH ENTERPRISE INTRODUCTION: COMPANY PROFILE: PRODUCT ACKNOWLEDGEMENT:

City of Westerville Guide to Commercial Inspections

Building Permit Application

ADDENDUM 2 - JULY 14, 2015

A/E Design Deliverable Checklist

CONSTRUCTION DOCUMENTS NECESSARY FOR PLAN REVIEW

ACCOMMODATIONS CONSTRUCTION REFURBISHMENT AUXILIARY EQUIPMENT

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

Controlling noise on offshore installation during design and commissioning West Elara case

MINIMIZATION OF EXPANSION ANCHORS FOR DESIGN SIMPLICITY AND CONSTRUCTABILITY

PORTABLE ACCOMMODATION MODULES

Fire Protection and Applications

Engineering Specifications for the CXI Room of the FEH LUSI Document # ESD SP

ROXTEC PIPE SEALS. NSRP Joint Panel Meeting Biloxi 10 May Roxtec International AB

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

To eliminate. Our services. Insulation Hot & Cold. Acoustic Insulation. Asbestos Solutions. Access & Scaffolding. Rope Access the energy waste

New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16

Interiors by INEXA TNF. Partition and Lining. Craftsmen to the world s finest ships

MODULAR COLD STORAGE SPACE. USS John Stennis DESIGN CONSTRUCTION HARDWARE FEATURES OPTIONS

MultiProof -design compliance with Building Code clauses

ArcelorMittal Europe - Long Products Sections and Merchant Bars. Office Building ArcelorMittal in Esch Alzette

ENGINEERED RELOCATABLE BUILDINGS

Borough of Doylestown Building and Zoning Department

B. RESIDENTIAL MASTER PLUMBER $ $ $

Senior Researcher, Korea Institute of Civil Engineering and Building Technology, Korea

Providing Engineered Concrete Solutions. Precast and Mission Critical Facilities A Natural Fit

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II

NSWLC Shipyard Modernization Project. Bob Hillstrom, SMP Project Manager October 16, 2014

Rapid deployment structures. Military Buildings

STEEL DECK INSTITUTE Industry Standard Terms & Definitions

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY

Blast Damper HV PROTECTIVE SHIELD. Features. Protection and Airflow. V00129, D

TURNING VISIONS INTO REALITY. AAKP 11 Jan 2018 Ove Dimmen, Ulstein Design

Industry Standard Terms & Definitions Of The Steel Deck Institute

GS-Hydro Non-Welded Piping Solutions for Offshore

Structural Breadth Study

CLCF Climate Changer for comfort applications. Next generation air handling performance from Trane

MSP Modular Building System

.1 American Institute of Steel Construction (AISC) Specifications for Steel Buildings AISC

Zoned Comfort Control

SH GROUP FACILITIES. Kuopiovej Svendborg. Denmark

Locrete Building System: the Technology Handbook

Modular Systems in Shipbuilding

Solutions for Marine Insulation

Knowledge Objectives (3 of 3)

NOTE: For construction other than new commercial or additions (renovations), only those areas below describing the scope of work will be applicable.

Division 00 Procurement and Contracting Requirements

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Company Presentation. Accommodating Excellence

INC Pre-Assembled Structures

DALAL FLAT PACK MODULAR UNITS

SOUND BARRIER WALLS. Specializing in Acoustics, Noise & Vibration Control. Phone Fax Penn Street Westfield, IN 46074

We manage thermal expansion and insulate against heat or cold so our customers' businesses can be even more profitable, safe and energy-efficient.

AISC Steel & Timber Research for High-Rise Residential Buildings

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

SECTION The specification section is organized by placing information in three standard parts:

ELECTRON BEAM DUMP - ROOM DATA SHEET

Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications

MARCEGAGLIA. steel building the world

Modular Wood Framing Goes Vertical

STATEMENT OF SPECIAL INSPECTION FORM

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING

Industries. Modular Acoustical Panels (sound barrier panels) Acoustical Modular Panels, provide a cost-effective solution to most

Building Program Example. Eric Anderson

Corporate Presentation

SECTION AIR-TO-AIR ENERGY RECOVERY EQUIPMENT

Construction Technology Revision Guide

Statement of Special Inspections

Structural Technical Report #2 By Robert Whitaker

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

PAROC FIRE PROTECTION SOLUTIONS FOR PIPE PENETRATIONS

Modularity. Flexibility is maximized with basic modular components that combine to create many configurations.

VOLUME 4 DIVISION SPECIFICATIONS

PREPARING RESIDENTIAL PROPERTY FORTHE HOUSING HABITABILITY INSPECTION

City of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist

Thule Prototype BIM Manual for Dormitories. February 5, 2010

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

Transcription:

LIVING QUARTERS module building principles General Features Emtunga builds both customer specified Living Quarters and LQ s according to our own preferred design. The design and fabrication is based on Emtunga s Modular Section Principle. The standard Living Quarter Module contains all rooms and areas which are necessary in a typical Living Quarters Module.

Modular Sections Principle For the last 35 years Emtunga has been one of the leading Living Quarters Module suppliers worldwide. Our design and fabrication principle is based on a so-called Modular Section Principle where the Living Quarters Module is divided into a number of smaller module sections, stacked side-by-side or on top of each other. This fabrication method has a number of advantages over traditional building methods. The most important being: Efficient production ensures excellent cost and time control Inherent module structural strength enables low overall weight Excellent control of production quality on all levels The fabrication of the Living Quarters Module can be divided into three phases: 1. Fabrication Phase: Fabrication of module sections, where each module section is welded, insulated and outfitted with all necessary utilities and services at indoor workshops in Sweden. 2. Assembly Phase: Module sections are erected to form a complete Living Quarter Module at a West Swedish port or at customer sites anywhere in the world. The module sections are installed on a pre-levelled base frame which is part of the overall Living Quarter Module structure. The baseframe will be dimensioned as part of the load bearing structure to comply with the elevation and installation requirements of the customer. When all module sections are fully positioned on the base frame the final welding between the module sections and also between the module section and the base frame is performed. Other activities, such as interior installation and hook-up of ducts, pipe spools and cables between the module sections, can be done in parallel with the outside welding. 3. MC and Commissioning Phase: The Mechanical Completion check is completed discipline by discipline and the subsequent commissioning of each system takes over once all parts of a system are mechanically complete. The final MC and commissioning is performed in Sweden or on site.

Technical Description STRUCTURAL Once the welding between the modular sections is complete, the main structural elements are the outer bulkheads, top and bottom deck plates and some of the internal walls of the finished Living Quarters Module. Each bulkhead will act as a beam with a high web plate and flanges formed by top and bottom beams. The web of this composite beam will have a profiled plate construction and theories of Stressed-skin analysis will be used when analyzing the overall structure. The complete Living Quarters Module can be lifted either from four padeyes on the top or four trunions provided on the base frame. The Living Quarters Module requires a minimum of four support points, where the location of these points are very flexible and dependent mainly on the platform deck structure. Top-lift requires additional steel reinforcements to be integrated into the building, bottom-lift is thus more weight efficient. The external bulkheads and decks can also be designed for various accidental loads, such as blast overpressure and dropped objects. The Living Quarters Module has enough structural capacity for a standard helideck to be installed on the top deck. PAINTING Due to the modular section system, each module will be blasted and painted indoors in heated surface treatment workshops. This gives each module section and the Living Quarters a durable long lasting surface covering. ARCHITECTURAL The Living Quarters Module is delivered complete with all necessary equipment and furniture. The material selection criteria is always based on safety, working environment, Life Cycle Cost (LCC) and the availability of spare parts in the region where the Living Quarters Module will be operating.

Safety and Working Environment The following factors are considered in the Living Quarters Module layout and design in accordance with regulations and safety studies: Segregation of certain areas such as clean/dirty areas, noisy/quiet areas etc. Escape route philosophy. Passive Fire Protection. A-60 decks and bulkheads will be provided for external decks and bulkheads in accordance with regulations. Other fire ratings such as H-rated decks and bulkhead can be provided if required by the project. Active Fire detection system. Fire fighting system (internal hose reels). The use of sprinkler system is not a standard requirement any more as all internal equipment and material is flameretadant or non-combustible. However sprinkler can be provided if required by the project. Fire suppression system in the galley hood. Reduction of internal noise levels and sound transmission from room to room. Internal air quality and number of air changes for various areas. Reduction of vibration transmission to the internal areas of the Living Quarter Module from adjacent equipment on the platform.

HVAC A central HVAC unit is installed on the Living Quarters Module roof (can be integrated at other levels if required), providing internal ventilation and temperature control for personal safety and comfort. We can design according to: Max outdoor climate for design: 35 C, 50% R.H. Min outdoor climate for design: -35 C, 50% R.H. Design indoor climate: 22 C ± 2 C. Max 60% R.H. Min outdoor airflow to the Living Quarters Module will normally be designed. for 8 l/s (30 m³/h or 48 CFM) per person. Air changes (including return air) in any area will be according to regulations. The supply and extract units will provide 2x50% capacity with 60% redundancy. The airflow is adjusted to obtain a slight overpressure in the Living Quarters Module. The room temperature in each room can be adjusted separately by means of a duct heaters and a thermostat. All penetration through A-rated bulkheads and decks are provided with a fire damper. Other design conditions can be adopted in order to fulfil project requirements. EIT The Living Quarters Module is provided with all necessary electrical, Fire & Gas and telecom system as per regulations and normal praxis. Such as: Internal lighting including emergency lighting. Electrical outlets and switches. Internal sub distribution boards. Addressable gas and smoke detectors and alarm bells, excluding central unit. PA alarm system (double zone A&B), excluding central unit. Telephone, data and entertainment outlets in common area. HVAC control system. The Living Quarters Module will be designed for incoming power supplies which are compatible with the rest of the platform. The standard design is based on IEC (International Electro-technical Commission) standard, however NEC standards (National Electric Code) can also be adopted.

Piping The Living Quarters Module has all necessary piping systems required for the operation. These are: Cold and hot potable water system. Seawater flushing system. Black and grey sewage systems (separate piping). Fire Water for hose reels. The quality and standard of the selected materials is in accordance with normal offshore standards and regulations. Tie-in Points The Living Quarters Module is designed to minimise the integration and hook-up work when it is installed on the platform. We endeavour to concentrate all tie-in points in one location under the Living Quarters, with a single connection for each system. The final location of each tie-in point is rather flexible and will be coordinated with the platform system to ease the integration and final hook-up of the Living Quarters Module. Helideck As an option, a helideck (aluminium or steel) can be installed on the Living Quarters Module top deck. In this case the helideck will be provided with all necessary fire fighting, lighting and safety systems as per regulations. Weight Our stressed skin design will provide a robust but very light steel structure compared to a conventional steel fabrication method. There are several ways to reduce this weight if lowest possible weight is required by the project. Regulations The standard Living Quarters Module is designed and fabricated in accordance with following rules and regulations: SOLAS MODU/IMO code ILO Other rules and recommendations such as NORSOK, ABS, USCG, DNV and LRS can also be adopted.

Delivery Alternatives There are two delivery alternatives: SINGLE LIFT In this alternative the entire Living Quarters Module will be shipped in one piece for final installation on the platform or vessel. Once the module is positioned on its final location the hook-up connection between the Living Quarters Module and the platform can commence. Normally a period of two to three weeks should be allowed for this operation before the Living Quarters Module can be used for habitation. MODULAR SECTION DELIVERY In this alternative the Living Quarters Module will be shipped in smaller modular sections and installed on the platform one by one instead of one single lift unit as described above. The advantage with this alternative is: Cheaper load-out and off-loading. Cheaper and faster shipping. Lower overall weight. Cheaper lifting operation, as a heavy lift crane is not required and the lifting can be done either by platform crane or the available cranes at the platform fabrication site. Shorter project period, as the hook-up between the Living Quarters Module and the platform can be performed at the same time as the connections between the module sections are performed. The normal strategy for a Modular Section Delivery alternative is that the internal hook-up between the modular sections is performed by the local labour available at the platform fabrication site with Emtunga supervision. Flexibility As described earlier, our design and fabrication method is based on our modular section principle. This means that additional rooms (for instance cabins or offices) can be added if required. This also means that the Living Quarters Module can be built completely according to the clients choice and requirements. Or, to be able to offer our best price and performance, be built according to our standard modular sections of type 4, 5 or 6.

APPLY EMTUNGA AB Apply Emtunga AB is the fastest steel Living Quarters supplier in the world. Emtunga, now part of the APPLY group, has delivered offshore Living Quarters since 1974. The company is located in Vara, Sweden. a product from apply emtunga ab Ekvägen 26, 534 91 Vara, Sweden www.emtunga.com