Implementation Status & Results Vietnam Second Transmission and Distribution Project (P084871)

Similar documents
Lessons Learned: NAMA development in Vietnam

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)

Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021)

UN-EU GUIDELINES FOR FINANCING OF LOCAL COSTS IN DEVELOPMENT CO-OPERATION WITH VIET NAM. Version 2013

Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project (P077175)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Implementation Status & Results Indonesia Barefoot Engineers III (P131387)

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021)

Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635)

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)

PPP in Vietnam- Current Status & Prospect VFCEA. Prof. Dr(sr). PHAM HONG GIANG Vietnam Federation of Civil Engineering Associations

Public Disclosure Copy. Public Disclosure Copy. The World Bank

Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929)

Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329)

Decentralized Trade Support Services for Strengthening the Competitiveness of Vietnamese SMEs

Integrated. Poverty Assessment for Livestock Policy. A Living from Livestock. FAO Seminar on HPAI FAO Resident Mission, Ha Noi 13 June 2006

University of Agriculture & Forestry - Hue University. Châu Thành court, Cai Lậy court & Sắc Tứ pagoda, Tiền Giang

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank AO-Market Oriented Smallholder Agriculture Project (P093699)

Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)

Implementation Status & Results Brazil Sustainable Cerrado Initiative (P091827)

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)

Infrastructure Roads At the end of 2008, Vietnam's road system was about 223,290 km long, 17,295 km of which were national roads at the best

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Implementation Status & Results Brazil Energy Sector Technical Assistance Project (P076977)

Overview of Water Environmental Pollution in Vietnam

INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT AND INTERNATIONAL DEVELOPMENT ASSOCIATION PROJECT PAPER ON A PROPOSED ADDITIONAL LOAN

Land use change and rice crop monitoring in the Mekong Delta, Vietnam

The World Bank KI: Telecommunications and ICT Development Project (P126324)

The actual situation of the port system in Vietnam

The World Bank. Key Dates. Project Development Objectives. Component(s) Public Disclosure Copy Overall Ratings

Briefing on Drought on Mekong Delta

LIST OF CONSTRUCTION MATERIALS COMPANIES IN VIETNAM

Vietnam Agriculture- Pillar of Economy

Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)

Newsletter. Banking & Finance Tokyo. ASEAN Infrafinance Legal Update (Vol. 5) The Latest Trend in Vietnamese PPP Framework

Implementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P086341)

Factors influencing the Vietnam Provincial Governance and Public Administration Performance Index (PAPI)

Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)

About GE. GE in Vietnam. At a Glance

About GE. GE in Vietnam. At a Glance

Meeting Vietnam s Energy Demands in a Sustainable Way

CURRICULUM VITAE NAME NGUYEN HAI HOA. Living address: House N0. 24B, Group I, Tan Xuan, Xuan Mai town, Chuong My

Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)

Vietnamese Real Estate - The potential market

Name Previous Rating Current Rating

VIETNAM HOSPITALITY INDUSTRY ON THE WAY OF SUSTAINABLE WATER USE

#24. Singapore 18 May Vietnam s Leadership Transition in 2016: A Preliminary Analysis. By Le Hong Hiep* EXECUTIVE SUMMARY

COLLECTION & USES OF RICE STRAW IN THE MEKONG RIVER DELTA, VIETNAM

REFORESTATION AND AFFORESTATION OF MANGROVES IN VIETNAM

KHÔNG NGỪNG VƯƠN CAO UNCEASING DEVELOPMENT ENHANCING MARKET POSITION BÁO CÁO THƯỜNG NIÊN 2016

The Current State of River Basins in Vietnam Pollution and Solution

Chapter6. Growth Pole in the Central Region of Viet Nam

Alstom in Nuclear Power Plants and Vietnam

THE STUDY ON NATIONAL POWER DEVELOPMENT PLAN FOR THE PERIOD OF , PERSPECTIVE UP TO 2025 IN VIETNAM

THÔNG TIN GIẢNG VIÊN

Your reliable investment location

JOBS AROUND THE WORLD

Impacts of FDI on Sustainable Development Objectives of Vietnam in International Economic Integration

Vietnamese Enterprise: Application of Stochastic Frontier Production Function

Legal news. Contents. Vision & Associates A TTORNEYS. PATENT & T RADEMARK A GENTS. I NVESTMENT & B USINESS C ONSULTANTS.

Rice crop monitoring using EO data in the Mekong Delta, Vietnam

POTENTIAL IMPACTS OF THE SUPER SEA DYKE (SSD) AT RACH GIA BAY ON THE VALUES OF MANGROVES IN KIEN GIANG PROVINCE - MEKONG DELTA, VIETNAM

CONSUMPTION OF FOODSTUFF FROM ANIMAL ORIGIN AND CONSUMERS UNDERSTANDING ON FOOD SAFETY: CASE STUDY IN RED RIVER DELTA

Adaptation to Sea Level Rise in the Vietnamese Mekong River Delta: Should a Sea Dike be Built? Vo Thanh Danh

Vietnam Export Woodchip Supply and Outlook. International Woodfiber Resource and Trade Conference

The matter of environmental pollution in domestic waterway transportation in Vietnam

MARKET INSIGHT HO CHI MINH CITY WEDNESDAY, 4 JANUARY 2017

LEVELED MOUNTAINS AND BROKEN FENCES: MEASURING AND ANALYSING DE FACTO DECENTRALISATION IN VIETNAM EDMUND MALESKY *

Da Nang, Vietnam. Dr. Dang Quang Vinh, Manager Da Nang Environmental Protection Agency

AGENT ORANGE/DIOXIN HOT SPOTS A LEGACY OF US MILITARY BASES IN SOUTHERN VIETNAM

The World Bank Sustainable Land Management Project (P133133)

THE OUTLOOK FOR FERTILIZER SUPPLY IN VIETNAM

G R O W I N G W I T H E F F E C T I V E D I S T R I B U T I O N E X PA N S I O N

SOME SOLUTIONS TO RESPOND CLIMATE CHANGE FOR THE MEKONG DELTA, VIET NAM

EFFECTS OF UPSTREAM HYDROPOWER DAMS AND WATER DIVERSION PROJECTS TO THE DROUGHT AND SALINE INTRUSION OF THE MEKONG RIVER DELTA IN VIETNAM

# Group STT COMPANY / ORGAN BUSINESS SCOPES / OBLIGATIONS. Vietnam Chamber of Commerce and Industry

Stefania Romano, Silvia Giuliani, Luca Giorgio Bellucci, Mauro Frignani

institutional framework in Vietnam

Industrial Estate Market Update A challenging 2012 & 2013 Outlook. Presented by: Hieu Le, Senior Manager, Industrial & Logistics Services March, 2013

Ecosystems and Their Services in Da Bac District, Hoa Binh Province

AN OVERVIEW OF THE DRINKING WATER SUPPLY SITUATION IN THE MEKONG RIVER DELTA, VIETNAM

MID TERM REPORT. Completion of Pilot Investment Project Improved Cook Stove Use in Viet Nam. Revision: 01. Submitted to: Landell Mills Ltd.

The World Bank Pernambuco Rural Economic Inclusion (P120139)

Vietnam Ham Thuan Da Mi Hydropower Project (1)(2)(3)(4)

Transcription:

losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam Second Transmission and Distribution Project (P084871) Operation Name: Second Transmission and Distribution Project (P084871) Project Stage: Implementation Seq.No: 10 Status: ARCHIVED Archive : 21-Jun-2014 Country: Vietnam Approval FY: 2006 Product Line: IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Specific Investment Loan Implementing Agency(ies): National Transmission Corporation Key s Board Approval 28-Jul-2005 Original Closing 31-Dec-2010 Planned Mid Term Review 30-Sep-2008 Last Archived ISR 02-Aug-2013 Effectiveness 31-May-2006 Revised Closing 30-Jun-2014 Actual Mid Term Review 31-May-2009 Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the project is the efficient development of Vietnam's transmission and distribution system. Has the Project Development Objective been changed since Board Approval of the Project? Yes Component(s) Component Name No Component Cost Transmission and distribution systems expansion and reinforcement 679.57 Electricity market and system operations modernization 22.80 Market transition support 2.15 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Moderate Moderate Implementation Status Overview The project is on track to meeting most of its development objectives of supporting the efficient development of Vietnam's transmission and distribution system. There is a high likelihood that the PDO will be achieved by the project closing date with significant contributions already made to improvements to the efficiency of the transmission and distribution system and with the accomplishment of the structural and institutional goals of unbundling and establishing the transmission business in a separate subsidiary. There will likely be some shortfalls in that the objective of replacing the SCADA system in NLDC which is intended to improve system dispatch efficiency will only be achieved when the related investments are completed after the project closing date and so will two transmission and distribution sub projects. The project finances a total of 24 sub-projects including the construction of power transmission and distribution lines and substations of 500kV, 220kV and 110kV. 22 sub-projects out of 24 sub-projects are either completed or will be Page 1 of 6

completed by June 30, 2014 and the remaining 2 sub-projects are in advanced stage of implementation, but will be completed only after the project has closed. Key performance indicators for the PDO remain relevant and useful in assessing progress towards achieving the PDO. The majority of the indicators have already been achieved and/or exceeded the targets. These confirm that the project has contributed to increasing the overall system efficiency and to improvement of reliability and quality of transmission and distribution service, as demonstrated by: (i) increased new generation capacity (2,250MW compared to target of 1,200MW) connected via 500kV transmission system links financed by the project; (iii) reduced number and duration of interruptions in 500kV, 220kV and 110kV - as of May 30, 2013, the number and duration of interruptions in 500kV and 220kV systems was reduced to 0.23 11.5 hours and 0.47 17.18 hours respectively compared to the target of 0.3 13.5 hours and 0.45 23.8 hours; and (iiii) stabilized actual peak hour minimum voltage measured at 220kV and 110kV system weak points. Locations Country First Administrative Division Location Planned Actual Vietnam Not Entered Xom My Xuan Vietnam Tinh Vinh Long Vinh Long Vietnam Tinh Tien Giang Tinh Tien Giang Vietnam Tinh Kon Tum Tinh Kon Tum Vietnam Thanh pho Ho Chi Minh Thanh pho Ho Chi Minh Vietnam Tinh Long An Tan An Vietnam Tinh Binh Dinh Tam Quan Vietnam Thanh Pho Hai Phong Song Mai Vietnam Tinh Quang Ninh Tinh Quang Ninh Vietnam Tinh An Giang Phu Lam Vietnam Tinh Can Tho O Mon Vietnam Thanh pho Ho Chi Minh Nha Be Vietnam Tinh Long An Tinh Long An Vietnam Tinh Tien Giang Long An Vietnam Tinh Quang Ninh Ha Long Vietnam Thanh pho Ho Chi Minh Thanh pho Ho Chi Minh Vietnam Tinh Can Tho Tinh Can Tho Vietnam Tinh Dong Thap Tinh Dong Thap Vietnam Tinh Quang Binh Dong Hoi Page 2 of 6

Country First Administrative Division Location Planned Actual Vietnam Not Entered Chu Lai Vietnam Tinh Tien Giang Cai Lay Vietnam Tinh Dac Lak Buon Ma Thuot Vietnam Tinh Thanh Hoa Binh Tan Vietnam Tinh Bac Giang Bac Giang Vietnam Tinh Tien Giang Huyen Cai Lay Vietnam Thanh pho Ho Chi Minh Huyen Nha Be Vietnam Tinh Can Tho Huyen O Mon Vietnam Thu Do Ha Noi Huyen Soc Son Vietnam Tinh Binh Duong Thi Xa Thu Dau Mot Vietnam Tinh Binh Duong Huyen Tan Uyen Vietnam Tinh Binh Duong Huyen Tan Uyen Vietnam Tinh Dong Nai Huyen Vinh Cuu Vietnam Tinh Dong Nai Huyen Thong Nhat Vietnam Tinh Dong Nai Huyen Long Thanh Vietnam Tinh Tien Giang Chau Thanh Vietnam Tinh Bac Giang Doc Soi 500KV Substation Vietnam Tinh Ba Ria-Vung Tau Cam My District Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Generation capacity connected to 500kV Text Value 0 2250 1200 MW by project close transmission system links financed by project. Page 3 of 6

Number and duration of interruptions in the 500kV and 220kV transmission system and 110kV distribution system Peak hour minimum voltages at system weak points Separate transmission and market system operators (TSO and MSO) capable of function within single buyer market Text Value Interruptions in system, per 100 circuit km: 500kV: number 0.33; duration 15.75 mins. 220kV: number 0.596; duration 21.2 mins. 110kV: number3.32; duration 28.8 mins Text Value Peak hour minimum voltage (kv): Bac Lieu - 205 Quy Nhon - 210 Soc Trang - 108 Trang Bang - 107 Quang Ngai - 109 Mong Cai - 108 Interruptions in system per 100 circuit km: 500kV: number 0.23; duration 11.5 mins. -200kV: number 0.47; duration 17.18 mins. -110kV: number 0.103; duration 8.164 mins Peak hour minimum voltage (kv): Bac Lieu-222; Quy Nhon-218: soc Trang-115; Trang Bang-115; Quang Ngai -115; Mong Cai-115 Interruptions in system, per 100 circuit km: - 500kV: number 0.3; duration 13.5 mins. - 220kV: number 0.45; duration 23.8 mins. - 110kV: number 3.166; duration 28.22 mins Peak hour minimum voltage (kv): Bac Lieu - 225 Quy Nhon - 225 Soc Trang - 115 Trang Bang - 115 Quang Ngai - 115 Mong Cai - 115 Text Value No separately identifiable Single buyer market TSO or MSO - functions established, TSO/MSO at mainly taken by NLDC arms length from generationand distribution, taking dispatch decisions based on market rules 28-Jul-2005 30-May-2013 30-Jun-2014 Intermediate Results Indicators Page 4 of 6

Indicator Name Core Unit of Measure Baseline Current End Target Additional transmission system assets created Text Value Circuit km tranmission and distribution lines: 500kV: 0 220kV: 0 110kV: 0 Transformer capacity MVA 500/220kV: 0 220/110kV: 0 110kV/MV:0 Commissioning of new market and transmission system information and control systems Separation of transmission and market operations from other EVN operations Transmission lines constructed or rehabilitated under the project Transmission lines constructed under the project Data on Financial Performance (as of 04-Jun-2014) Circuit km transmission and distribution lines: -500kV: 225km; -220kV: 152km: -110kV: 2676 transformer capacity MVA -500/220kV: 1,500; 220/110kV: 875; -110kV/MV: 216 Circuit km tranmission and distribution lines: - 500kV: 502 km; - 220kV: 180 km; Transformer capacity MVA: - 500/220kV: 2,550; - 220/110kV: 2,500; - 110kV/MV: 400; Text Value SCADA/EMS: not in place SCADA/EMS not in place, SCADA/EMS: in place Vietpool interim market Vietpool interim market Vietpool interim market system replacement: not in system replacement not in system replacement: in place place Telecommunications place, telecommunications Telecommunications backbone: not in place backbone not in place backbone: in place 28-Jul-2005 31-Mar-2014 30-Jun-2014 The new SCADA/EMS likely to be in place about nine months after project closing date Text Value Transmission is disaggregated among four companies, all 100% owned by EVN. No market operator in place Transmission system and market system operators are separated from other EVN operations preferably with separate ownership arrangements Transmission system and market system operators are separated from other EVN operations, preferably with separate ownership arrangements Kilometers Value 0.00 377.00 682.00 28-Jul-2005 31-Mar-2014 30-Jun-2014 Circuit of 500kV and 220kV Circuit km of 500kV and transmission lines 220kV transmission lines Kilometers Value 0.00 377.00 682.00 Sub Type 28-Jul-2005 30-May-2013 30-Jun-2014 Breakdown Financial Agreement(s) Key s Page 5 of 6

Project Ln/Cr/Tf Status Approval Signing Effectiveness Original Closing Revised Closing P084871 IBRD-80260 Effective 29-Mar-2011 31-May-2011 29-Aug-2011 30-Jun-2014 30-Jun-2014 P084871 IDA-41070 Effective 28-Jul-2005 16-Mar-2006 31-May-2006 31-Dec-2010 30-Jun-2014 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P084871 IBRD-80260 Effective USD 180.00 180.00 0.00 149.10 30.90 83.00 P084871 IDA-41070 Effective USD 200.00 200.00 0.00 196.56 15.11 98.00 Disbursement Graph Key Decisions Regarding Implementation There are no key decisions for disclosure at this time. Restructuring History Level two Approved on 19-Dec-2010 Related Projects P114875-Second Transmission and Distribution Project Additional Financing Page 6 of 6