Statewide Model Application Using the Texas SAM

Similar documents
TEXAS FREIGHT MOBILITY PLAN 2017

STATEWIDE ANALYSIS MODEL (SAM-V3) June 5, 2014 Janie Temple

Modeling Applications for Freight Tennessee DOT Freight Planning

TEXAS FREIGHT MOBILITY PLAN. Greater Houston Freight Committee Kick-Off Meeting

Trans-Texas Corridor-35 Update

GIS-based Modeling for Statewide and Corridor Freight Planning

INTERSTATE CORRIDOR PLANNING

IOWA DEPARTMENT OF TRANSPORTATION. Request for Proposal

Forecast and Capacity Planning for Nogales Ports of Entry

TEXAS FREIGHT MOBILITY PLAN

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA

TEXAS FREIGHT MOBILITY PLAN: FACILITATING TEXAS ECONOMIC GROWTH AND GLOBAL COMPETIVENESS

summary report West Texas Rail Feasibility Study Texas Department of Transportation Cambridge Systematics, Inc. HNTB August 2011

TEXAS MEXICO TRANSPORTATION BORDER MASTER PLAN UPDATE

TRANS-TEXAS CORRIDOR-35 CURRENT ISSUES

AN INTEGRATED TRANSPORTATION PLANNING AND OPERATIONS MODEL FOR MEMPHIS, TENNESSEE

TEXAS FREIGHT MOBILITY PLAN IMPLEMENTATION. AAMPO Technical Advisory Committee (TAC)

MAP 21 Freight Provisions and Seaports

LATTS II - Freight Investment Decision Principles

PLANES, TRAINS & SEMIS South Carolina s Statewide Freight Plan

Florida Freight Supplychain Intermodal Model

TEXAS-OKLAHOMA PASSENGER RAIL STUDY. TPP Planning Conference 2014

Chapter 10 Goals, Objectives + Policies

TEXAS FREIGHT MOBILITY PLAN: PRIORITIZING FREIGHT TRANSPORTATION INVESTMENTS

Chapter 2 Performance Measures

TRANS-TEXAS CORRIDOR-35 REGIONAL/STATE UPDATE

Sunrise Project South I-205 Corridor Improvement Project

PRICING STRATEGIES PRESENTED BY JEFFREY D. ENSOR MALAYSIA TRANSPORT RESEARCH GROUP TO THE NOVEMBER 25, 2003

Consideration of Shale Oil and Gas Development in Long-Range Transportation Planning

FREIGHT PLAN UPDATE/CRITICAL FREIGHT CORRIDORS. Association of Texas MPOs 2017 Summer Meeting

I-66 Corridor Improvements Outside the Capital Beltway in Northern Virginia, USA

North Carolina Statewide Freight Plan

Methods for Improving Consistency between Statewide and Regional Planning Models

Regional Mobility Authorities in Texas

Technical Memorandum MULTIMODAL NEEDS. Prepared for: Oklahoma Department of Transportation. Prepared by:

Chapter 1 Introduction

Governor Baldacci s Transportation Bond Proposal

APPENDIX H: TRAVEL DEMAND MODEL VALIDATION AND ANALYSIS

NATIONAL COOPERATIVE FREIGHT RESEARCH PROGRAM Current and Completed Projects

Incorporating TMS into Planning. Jianming Ma, Ph.D., P.E.

2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012

2016 Mid-Continent Transportation Research Symposium, October 24-25, Donna Brown-Martin, Director Bureau of Planning and Economic Development

Chapter 4: Developing the Recommendations

Blacklands Corridor Feasibility Study

Some network flow problems in urban road networks. Michael Zhang Civil and Environmental Engineering University of California Davis

MONITORING IMPLEMENTATION AND PERFORMANCE

Current Trends in Traffic Congestion Mitigation

GUIDING PRINCIPLES MEMORANDUM

Central Minnesota. Regional Freight Profile

GNC Coalition Update. Washington Public Ports Association Trade and Transportation Committee November 18, 2015

MULTIMODAL NEEDS ASSESSMENT

Twin Cities Regional Truck Corridors Study. MnDOT Metro Freight Studies Roundup

Transit Demand Analysis

Envisioning the Future: A History of Regional Planning Initiatives, Studies, and Plans

I-35 Corridor Segment Committee NW Loop 410 San Antonio, Texas. March 11, :00 AM to Noon

Stockton Freight & Passenger Rail Mobility Enhancement

CALIBRATION OF THE GRAVITY MODEL FOR TRUCK FREIGHT FLOW DISTRIBUTION

2 Purpose and Need. 2.1 Study Area. I-81 Corridor Improvement Study Tier 1 Draft Environmental Impact Statement

KAW CONNECTS EXECUTIVE SUMMARY

FINAL REPORT A METHODOLOGY FOR STATEWIDE INTERMODAL FREIGHT TRANSPORTATION PLANNING. Christopher J. Eatough Graduate Research Assistant

Fairfax County Countywide Transit Network Study

Caitlin Hughes Rayman Director, FHWA Office of Freight Management and Operations May 2013

The STREETWISE Project - Addressing Traffic Information Needs of the Freight Industry

THE TRANSSHIPMENT PROBLEM IN TRAVEL FORECASTING: TOUR STRUCTURES FROM THE ONTARIO COMMERCIAL VEHICLE SURVEY

New York State Freight Transportation Plan. NYSAMPO Meeting. NYSAMPO Meeting June 21, 2017

Rail Freight Service Review. Submission of the New Brunswick Department of Transportation

Evolutionary Development of Revolutionary Models. Presentation Overview

Agency Scoping Meeting

Building Interstate 69 As A Series of Upgrade Projects

CHAPTER 1: INTRODUCTION/ GOALS AND OBJECTIVES

September Public Meetings. Developing a Blueprint for the Corridor

NATMEC June 30, 2014 Anita Vandervalk, PE, PMP

PPTA Project Pipeline

Project Overview. A Collaborative Effort

Mobility and System Reliability Goal

O & D Data. Results. Traffic Increase. Heavier Payloads. Total and Average Value of Freight Payload for Selected Highways

Texas Urban Mobility Plan: Breaking the Gridlock

AGENDA COMMITTEE OF THE WHOLE COUNTY OF KANE

UK Road Pricing Feasibility Study: Modelling the Impacts Elizabeth Cox 1 UK

Final Regional 2035 Transportation Plan Adopted: January 21, 2010

APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT

This plan document is available at: Oklahoma Department of Transportation Planning and Research Division 200 NE 21 st Street Oklahoma City, OK 73105

Geometric Design: Past, Present, and Future

TEXAS TRANSPORTATION PLAN

4-Step Commodity Model Freight Forecasting

A Canadian Commodity Flow Survey

TRANSPORTATION PLAN Donald Vary

PRACTITIONER S HANDBOOK

APPENDIX G FG/FTG MODELS RELATIONAL DATABASE MANUAL: SUPPLEMENTAL MATERIAL - PUBLICATIONS

CASE STUDY 5. Extension of the Adriatic-Ionian ferry corridor from Peloponnese to Crete" University of the Aegean Dpt. Shipping, Trade & Transport

New Jersey Pilot Study

EXHIBIT A. TRANSIT AND MULTIMODAL DEVELOPMENT SUPPORT CONTINUING SERVICES SCOPE OF SERVICES FM No

WORKFORCE DEVELOPMENT DIVISION Workforce Policy and Service Delivery Branch Technical Assistance Bulletin 178, Change 2

Roadway Traffic Assignment (Last Edit August 26, 2005)

- FACT SHEET - THE GUIDING PRINCIPLES

TCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm

Technical Report Documentation Page 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-14/

Niagara s Transportation Strategy 1. Introduction:

Energy Savings by replacing old facility o Energy savings o Emissions

GUIDELINES FOR SELECTING TRAVEL FORECASTING METHODS AND TECHNIQUES

Transcription:

Statewide Model Application Using the Texas SAM Presented by: William Smithson Wilbur Smith Associates September 2008

Texas Statewide Analysis Model Application Presentation Outline Brief Model Description Study Objective Project Description Model Application

Texas Statewide Analysis Model Application Model Description TransCAD Software Completed in 2003 by TxDOT 1998 Base Year/2025 Forecast Year Freight Demand based on 1998 Reebie Transearch Data (Global Insights) Passenger Demand (by trip purpose) utilizes an in-house trip generation program based on HH stratification curves adopted from Texas MPO models. Trip distribution based on in-house model (similar to gravity model) using trip length frequency curves from urban models and national HH surveys. Mode Choice (passenger and freight) Traffic Assignment is a User Equilibrium MMMC

Texas Statewide Analysis Model Application Study Objective Identify Improvements for I-35 Identify Opportunities for PPP s

Texas Statewide Analysis Model Application Project Description Deliver EIS with Reasonable Corridor Alternative Evaluate Private Sector Concept

Texas Statewide Analysis Model Application Model Application Identify Study Area Identify and Evaluate Preliminary Corridor Alternatives (~10 miles wide) Identify Reasonable Corridor Alternative for NEPA Evaluate Private Sector Concept Develop Corridor Demand Tool for evaluation of modal and route alignment alternatives to support NEPA.

Texas Statewide Analysis Model Application The Study Area

Texas Statewide Analysis Model Application Preliminary & Reasonable Corridor Alternatives

Texas Statewide Analysis Model Application Evaluation of Private Sector Concept Developed Sketch Level Toll Diversion Component Used to evaluate traffic and revenue potential, and Identify cross finance opportunities.

Texas Statewide Analysis Model Application TTC-35 SWM Applications IH-35 Corridor Model IH-35 Origin-Destination Survey IH-35 Freight Corridor Study IH-35 Freight Transport Survey

Origin-Destination Survey Specific to I-35 Corridor Travel Included Car and Truck Surveys Types of Surveys: Roadside Interviews Mailout/Mailback Survey License Plate Matching Completed in July 2008

Origin-Destination Surveys

Origin-Destination Survey Survey data will support a variety of needs for TxDOT: Tier II Need and Purpose Updates to Private Sector Concept Corridor Model Development Freight Corridor Study MPOs gain better understanding of the characteristics of through traffic.

IH-35 Corridor Model Focus Along the IH-35 Corridor Model System Overview Incorporates existing MPO models in urban areas Supplemented with SAM model in rural areas Interaction between urban and rural areas calibrated / validated with OD Survey Model Links Mileage Zones Statewide Analysis Model 43,084 77,893 4,742 IH-35 Corridor Model 64,326 89,939 6,960

IH-35 Corridor Model

IH-35 Corridor Model

IH-35 Corridor Model

IH-35 Corridor Model

IH-35 Corridor Model

IH-35 Corridor Model

IH-35 Corridor Model

IH-35 Corridor Model

IH-35 Corridor Model

IH-35 Freight Users Survey Focus Along the IH-35 Corridor Survey Overview Understand how shippers make transport decisions Develop Revealed and Stated Preference Questionnaires Conduct Focus Groups and Interviews Report Findings Anticipated Completion in February 2009

IH-35 Freight Corridor Study Analysis of Freight Modal Options Identification and Evaluation of: Preliminary Corridors Preliminary Modal Options Modal Options Cost/Benefit of Modal Options Freight User Survey Preferred Corridor and Modal Options will be identified Anticipated Completion Date of May 2009

TTC-35 Planning Initiatives Summary Planning Decisions

Discussion Question and Answer Session Need More Information? Will Smithson 512-334-3809 wsmithson@wilbursmith.com