SECTION STORM DRAIN

Similar documents
ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

***************************************************************************************************************

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

C. Foundation stabilization for pipe and utility structures.

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

***************************************************************************************************************

SECTION TRENCHING & BACKFILLING

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

SECTION FACILITY SANITARY SEWERS

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

D. Removal of existing storm sewerage pipe and drainage structures.

Summary of the 2011 Changes

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SECTION UTILITY MANHOLES AND STRUCTURES

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

DIVISION 4 SANITARY SEWERS AND STORM DRAINS

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

CHAPTER 6. Sanitary Sewer

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

Construction Inspection Checklists

901 - PIPE SEWERS COMPLETE IN PLACE

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

Concrete Pipe Joints Your Best Choice

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

BAYFILTER SPECIFICATIONS

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

ITEM 464 REINFORCED CONCRETE PIPE

CONCRETE PIPE JOINTS, YOUR BEST CHOICE

ONE PIPE LENGTH MAX (REFER TO 1/4"/FT SLOPE (MIN) 5'-0" (MIN) OR 4" LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4"x6" REFER TO TYPICAL EXCAVATION,

SECTION GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

STANDARDS RESOLUTION NO ADOPTED JANUARY 17, 1995

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION A1 EXCAVATION AND BACKFILL GENERAL

MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE

Fabrication and Installation Table of Contents

A. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated.

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY PHASE II

SANITARY SEWERAGE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) AMERICAN RAILWAY ENGINEERING ASSOCIATION (AREA)

SECTION FOUNDATION DRAINAGE

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE

Subject: Use of Plastic Pipe for Storm Sewer and Culverts on Trunk Highways

TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SECTION XXXX POLYMER CONCRETE PUMP STATIONS

SECTION STORM DRAINAGE

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO)

Construction Specification for Concrete Unit Pavers

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000

SANITARY SEWER SYSTEM CONSTRUCTION STANDARD SPECIFICATIONS SECTION 130 SANITARY SEWER SYSTEM CONSTRUCTION

SECTION WATER DISTRIBUTION

TRENCH EXCAVATION AND BACKFILL

PERMEABLE INTERLOCKING PAVERS

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

STANDARD CONSTRUCTION SPECIFICATIONS FOR SANITARY SEWERS DIVISION 50 INDEX

SECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

Construction Specification for Utility Adjustments

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

SECTION TRENCHLESS INSTALLATION

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

Special Provision No. 405F03 March 2005

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES

2.1 Backfill - General

San Antonio Water System Standard Specifications for Construction ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1

CHAPTER 300 SANITARY SEWER CONSTRUCTION STANDARDS

PRECAST CONCRETE ON-SITE WASTEWATER TANKS

SANITARY GRAVITY SEWER LINES. A. Sanitary sewer lines, manholes, fittings, accessories, and bedding

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)

WASTEWATER SYSTEM STANDARDS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

GENERAL CONSTRUCTION

Transcription:

PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract General Conditions. B. Section 01 50 00 Temporary Facilities. C. Section 31 11 00 Clearing and Demoloition. D. Section 31 14 00 Soil Materials. E. Section 31 23 00 Trench Excavation and Backfilling. F. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specifications sections, apply to the work of this section. 1-03 REFERENCES A. ANSI/ASTM C76 Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe. B. ANSI/ASTM C443 Joints for Circular Concrete Sewer and Culvert Pipe, using rubber gaskets. C. ANSI/ASTM C478 Precast Reinforced Concrete Manhole Sections. D. California Test Method No. 216 (Dry Method). 1-04 SUBMITTALS A. Submit under provisions of Division 00 Contract General Conditions. B. Certificates of compliance for material. C. Product Data: Provide data indicating pipe, accessories, and associated equipment to be furnished. D. Manufacturer s Installation Instructions: Indicate special procedures required to install products supplied. 1-05 COORDINATION A. Coordinate work with Owner personnel. B. Verify that the location of existing utilities have been indicated at work site by utility authorities and Owner personnel. CHILDREN S WATER PLAY AREA 33 40 00 PAGE 1

AGE IMPROVEMENTS 1-06 EXISTING UTILITIES A. The Engineer has indicated on the plans the location of all known existing utility facilities within the work area. The location of said facilities shall be considered approximate only, until exposed by the Contractor. B. Service laterals have been shown where information was available. The location of said facilities shall be considered approximate only, until exposed by the Contractor. C. Contractor shall verify all utilities within the work area, including using hand method. Contractor shall protect all existing utilities not designated to be removed. D. Maintain all existing utility mains and service lines in constant service during construction of the work. 1-07 PROJECT RECORD DOCUMENTS: A. Submit under provisions of Section 01 70 00. B. Accurately record actual locations of utilities encountered. PART 2 - PRODUCTS 2-01 MATERIALS A. Reinforced Concrete Pipe for pipe larger than 12 : ANSI/ASTM C76, Class 4, with rubber gasket joints per ANSI/ASTM C443. B. Storm drainage sewer pipeline shall by polyvinyl chloride (PVC) pipe for storm sewer conforming to ASTM designation 3034, SDR 35 for pipe 12 or less. C. Storm drain manhole, frame and cover shall be as per detail drawing. D. Cast in Place Concrete: Per Section 03 30 00. E. Mortar: Composed of one part, by weight, Portland cement (Type II low alkali per ASTM C150), 2 parts, by weight, sand, and water. F. Storm drain inlets shall be Dura Drain P-6, or approved equal. G. Soil Fill for Concrete Pipe Bedding Envelope: Type B or C per Section 31 14 00. H. Cleanout shall be constructed as per detail drawing. IMPROVEMENTS CHILDREN S WATER PLAY AREA SUMMARY OF WORK 33 40 00 PAGE 2 09/12/14

PART 3 - EXECUTION 3-01 EXAMINATION A. Verify site conditions. Locate, identify, and protect existing above and below grade utilities from damage. 3-02 PREPARATION A. Protect all improvements not authorized for removal. B. Employ equipment and methods appropriate to the work site. C. Identify location of proposed storm drainage facilities to be constructed. Expose connection points to existing system. D. Protect excavated areas from drainage inflow, and provide drainage to all excavated areas. Dewater as necessary. E. Comply with safety requirements as they pertain to excavations, per Section 31 23 00/3-01C. 3-03 EXCAVATION A. Excavate soil required to locate existing utilities and install the work, use hand method as necessary in congested area. B. Employ equipment and methods appropriate to the work site. C. Cut trenches just wide enough to enable installation and proper backfill and do not interfere with 45 degree bearing splay of foundations. When excavating through tree roots, cut roots by hand. D. Excavate trenches to provide the minimum cover required. E. Excavate trenches, pits, or holes bottoming in hardpan to a minimum of 6 inches below the grade for the bottom of the pipe and any couplings. F. In all trenches or excavation sites where a firm foundation is not encountered, such as soft, spongy, or otherwise unsuitable material, remove the material to a minimum of 12 inches, or to a depth determined by the Engineer, below the bottom of the proposed pipe or structure. G. Stockpile excavated material to be returned to trench adjacent thereto in location, which will not be detrimental to existing improvements, or pedestrian or vehicular traffic. Remove unsuitable or excess materials not being used, from site. 3-04 INSTALLATION AND BEDDING OF PIPE A. Install the pipe and fittings to the lines and grades shown on the construction plans. B. Install pipe and fittings in accordance with the manufacturer s recommendations. CHILDREN S WATER PLAY AREA 33 40 00 PAGE 3

AGE IMPROVEMENTS C. Lay all pipe with bell end of pipe upgrade from structure to structure. D. Excavate suitable bell holes in the bedding material, so that the bells do not bear on the subgrade or bedding. E. Ensure that all joints are watertight. F. Bed concrete pipe in Type B or C soil envelope, and compact to a minimum of 85 percent relative compaction. Place and compact the bedding material under, around and over the pipe, filling the trench cavity and extending from the bottom of the trench (4 inches below the outside bottom of the pipe barrel) to a level 12 inches above the outside top of the pipe barrel. 3-05 INSTALLATION OF AGE STRUCTURES AND APPURTENANCES A. Install storm drainage structures as indicated on the construction plans, in accordance with the manufacturer s recommendations, and as specified herein. B. Construct cast-in-place concrete per Section 03 30 00. C. Key top of poured-in-place concrete bases for structures to receive the tongue of precast riser sections. D. Joint precast manhole and structure riser sections with a minimum thickness of ½ inch of mortar per Section 33 40 00/2-01G to make a watertight joint. Neatly point the inside and outside of the joint. Set sections plumb. E. Construct cleanout per detail drawing. 3-06 BACKFILLING TO FINISH GRADE AND FINISH GRADING A. Backfill from bottom of the trench to pipe grade with Type B and C soil. B. After installation of pipes and appurtenances and backfill of pipe bedding material. C. Backfill trenches above pipe bedding material and to within 6 inches of finish subgrade with Type A, B, & C soils. Compact all soil backfill not exceeding 8 inches in uncompacted thickness. Maintain optimum moisture content of fill materials. D. Backfill final 6 inch thickness to finish subgrade in areas to receive concrete, asphaltconcrete, aggregate base, or other non-vegetative surface improvement, with Type B or C soils. E. Backfill final 6 inch thickness to finish subgrade in areas to receive sod, other vegetation, or bare soil with Type A soil. F. Obtain 85 percent relative compaction of backfill from bottom of backfill to a level of 2 feet below finish subgrade, and obtain minimum of 95 percent relative compaction of backfill in top 2 feet below finish subgrade, in areas to receive concrete, asphalt-concrete, aggregate base, or other non-vegetative surface improvement. G. Obtain minimum of 85 percent relative compaction of backfill in areas to receive sod, other vegetation, or bare soil. IMPROVEMENTS CHILDREN S WATER PLAY AREA SUMMARY OF WORK 33 40 00 PAGE 4 09/12/14

3-07 TOLERANCES A. Pipe laying tolerances: 1. Above grade: Not to exceed 1/4 inch above planned grade. 2. Below grade: Not to exceed ½ inch below planned grade. 3. Alignment: Not to exceed 2 inches from planned alignment, if gradual and regular over a distance of 20 feet. B. Structure finish grade tolerance: Within ¼ inch of planned grade, but must match adjacent improvements. 3-08 FIELD QUALITY CONTROL A. Field inspection and testing will be performed as per Section 01 40 00. B. Compaction testing of bedding and backfill will be performed in accordance with ASTM D 1557. C. If tests indicate work does not meet specified requirements, re-compact, or remove and replace, and retest. END OF SECTION CHILDREN S WATER PLAY AREA 33 40 00 PAGE 5