SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S

Similar documents
SECTION PACKAGE BOOSTER PUMP STATIONS

BuildingName The Description of the Project P DOCUMENTS

PROflex* 60 Hz Reverse Osmosis Machines from 50 to 360 gpm

On-Site Sodium Hypochlorite Generation

INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series

DETAILED EQUIPMENT SPECIFICATION MFS SERIES FILTERS

SECTION SANITARY WASTE INTERCEPTORS

SUGGESTED SPECIFICATIONS Pump Frames through 64132

AQUAROBIC MINI-PLANT TM

OxiPRO Q2.0 Microbial Control Technology

SECTION INFLUENT EQUALIZATION TANK PUMPS

SECTION SLUDGE HOLDING TANK DECANTER PUMP

SECTION COOLING TOWER

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER

Series Sump and Sewage Systems

University of Houston Master Construction Specifications Insert Project Name SECTION WATER TREATMENT SYSTEMS PART 1 - GENERAL

B. System Design and Performance Requirements

SECTION MECHANICAL SPECIFICATION GRIT COLLECTION EQUIPMENT

BIOFILTRATION ODOR CONTROL SYSTEM PLANT EXPANSION PROJECT

ElectroChemTM Advanced EDR

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SCP Series Modular Reverse Osmosis System. January 2012 Version

recycle water reuse it save up to from showers & baths for flushing toilets 30% of water use

IOWA WASTEWATER FACILITIES DESIGN STANDARDS CHAPTER 20 DISINFECTION

CHAPTER 100 DISINFECTION

TECHNICAL SPECIFICATIONS DIVISION 16 - ELECTRICAL SECTION DETAIL SPECIFICATIONS FOR ELECTRICAL INSTALLATION

MASTER. Water Conditioning Corp. OPERATION MANUAL. PURO PRO 1200 SC Series Modular Reverse Osmosis System. January 2012 Version

SECTION A-A. Control Panel

Best Practices for Chemical Facility Design in Water Treatment. Sara N. Gibson, P.E.

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

REQUEST FOR PROPOSALS FOR SLUDGE DEWATERING EQUIPMENT HORTONVILLE WASTEWATER TREATMENT FACILITY VILLAGE OF HORTONVILLE.

Simplex Fiberglass Lift Station: Hard Piped

Rosemount 1152 Alphaline Nuclear Pressure Transmitter

SECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

SECTION MOTORS AND PUMPS FOR PLUMBING SYSTEMS

SECTION ROTARY SCREW WATER CHILLERS

Tempest polymer feed system

high efficiency ~ simple package ~ proven reliability ChromaPur Chromic Acid Purification Unit

The Culligan Hi-Flo 50 Series Industrial Water Filter System

Suggested Practices for Fluoride Design

Electricide HG Electrochemical Chlorine Generators

Reclaimed Water Treatment, Distribution, Pumping and Storage Engineering Report Form

SAFE-TANK DOUBLE WALL TANKS HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61)

HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61)

Rosemount 1154 Alphaline Nuclear Pressure Transmitter

W ARR A NTY FAIRBANKS NIJHUIS 1600 SERIES SINGLE STAGE END SUCTION PUMPS. Certified to NSF/ANSI 372.

PUMPS FOR INDUSTRY. The Vertical Pump Specialists CONTENTS: Introduction & User List. Product Overview. Vertical Process Pumps...

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

Cooling Tower Depot, Inc. 651 Corporate Circle, Suite 206 Golden, CO Phone (720) Fax: (720)

2000-SG STAINLESS STEEL SLIDE GATES

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

How to Choose a Water Softener. Brought to you by

SPECIFICATIONS - DETAILED PROVISIONS Section Horizontal Centrifugal Water Pumps C O N T E N T S

REACTION TANKS ADVANCED MEMBRANE FILTRATION

Stainless Steel Aeration Equipment Specification

A Green Solutions Company TM ENGINEERED PRODUCTS

TECHNOFORCE e-hvtm. VARIABLE SPEED BOOSTERS WITH VERTICAL MULTISTAGE e-sv PUMPS 60 HZ TECHNICAL BROCHURE D-608B

TYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps:

A. This Section includes exterior piping for vertical, direct-buried, ground-loop, heat-pump systems that operate between 23 and 104 deg F.

FAIRBANKS NIJHUIS SUBMERSIBLE SOLIDS HANDLING PUMPS.

SINGLE STAGE END SUCTION PUMPS AURORA Series. Distributed By: Model 3804

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

Electricide CDE Electrochemical Chlorine Dioxide Generators

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

Casing Gas Recovery Unit

1.07 SUPPLEMENTS PRODUCTS (NOT USED) EXECUTION (NOT USED) END OF SECTION

Unit Substation Transformer Construction Checklist (under 500 kva)

CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH

5.2 MW Solar Mobile Power Unit

OSEC B-Pak - Frequently Asked Questions

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

RB WEIR GATES MODEL GENERAL DESCRIPTION DESIGN CONSTRUCTION

SUGGESTED SPECIFICATIONS

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS

NRF CAPACITANCE LEVEL TRANSMITTER

Part Numbers. Kinetico Drinking Water Systems. Revised: 07/2016 Drinking Water Systems Parts Pages Section 7 Page 1

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

Engineering Design Center. Standard Drawings. 1st Edition -January 2016

American Filter Systems Inc. Phone : eptfe Membrane Filtration For The Chlor Alkali Industry

All service lines shall conform to the following requirements:

BALCLOR TM Ballast Water Treatment System. SunRui Corrosion and Fouling Control Company 3 December 2009, Shanghai China

Industrial Drum Transfer Pumps

CycleFlo Solenoid Pump Controllers

SEWER SYSTEM DESIGN GUIDELINES

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less)

Model 1159 Remote Diaphragm Seals

TYPICAL INSTALLATION INSTRUCTIONS

AUTOMATIC BALING PRESS MODEL: HRB-CENTURION 200HP; 13/9

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

SPECIFICATIONS - DETAILED PROVISIONS Section Welded Steel Tanks for Water Storage C O N T E N T S

Electric Diaphragm Pumps Electric Operated Double Diaphragm Pump

OAKDALE CHILLED WATER PLANT CAPACITY UPGRADES UI PROJECT INSTALL CHILLERS SECTION COMMISSIONING

50 GPM Skid Mounted Water Purification System

TABLE OF CONTENTS SCHEDULE 18 (TECHNICAL REQUIREMENTS) DBFO AGREEMENT SECTION 2 - WATER AND WASTEWATER SYSTEMS EXECUTION VERSION

Booster Pump Fundamentals. By: Bill Baglot

Handling Fluid Fertilizers Selecting the Right Equipment Components

Transcription:

SPECIFICATIONS - DETAILED PROVISIONS Section 11241 - Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S PART 1 - GENERAL... 1 1.01 Scope... 1 1.02 Scope of Work... 1 1.03 General Operational Description... 2 1.04 Submittals... 2 PART 2 - PRODUCTS... 2 2.01 General... 2 2.02 Sodium Hypochlorite Generator (Electrolyzer)... 3 2.03 Control Panel... 3 2.04 Rectifier... 4 2.05 Sodium Hypochlorite Storage Tank... 4 2.06 Brine Tank... 4 2.07 Water Softener... 4 2.08 Sodium Hypochlorite Dosing Pumps... 5 2.09 Circular Chart Recorder... 6 2.10 Equipment Anchorage... 7 2.11 Hydrogen Dilution and Flow Sensor... 7 PART 3 - EXECUTION... 7 3.01 General... 7 3.02 Instruction... 8 Rev: 10/03/02

Section 11241 1 SECTION 11241 CHLORINATION SYSTEM (ON-SITE SODIUM HYPOCHLORITE GENERATION SYSTEM) PART 1 - GENERAL 1.01 SCOPE Contractor shall furnish and install on-site chlorination system as specified herein. Chlorination system shall consist of on-site sodium hypochlorite generation system equipment as shown on the Drawings and as specified herein, including all accessories and controls necessary for a complete and operable chlorination system. The on-site chlorine generation system shall be as manufactured by Clor-Tec. 1.02 SCOPE OF WORK Work specified shall include manufacturing, furnishing, installing, startup, and testing of all equipment necessary to provide a complete on-site sodium hypochlorite generating system suitable for disinfection of potable water. Contractor shall provide the services of a qualified manufacturer's representative to install, inspect, startup, calibrate, and provide equipment and operator training to Owner's personnel. On-site sodium hypochlorite generation system equipment furnished and installed for this project shall include, but not be limited to, the following items: Quantity Equipment 1 Water softener system 1 Brine storage tank and appurtenances 1 Control Panel with Allen Bradley SLC 5/04 PLC 1 Sodium hypochlorite generator (Electrolyzer) 1 Rectifier 1 Sodium hypochlorite storage tank and appurtenances 1 Chlorine Analyzer 1 Circular Chart Recorder 2 Sodium hypochlorite dosing pumps with variable frequency drives

Section 11241 2 1.03 GENERAL OPERATIONAL DESCRIPTION The on-site sodium hypochlorite generator system shall be capable of a continuous production of sodium hypochlorite from salt, water and electricity. Supply water shall pass through the water softener and provide water for the salt saturator and make-up water for brine dilution. Saturated brine solution water shall mix with make-up water to form a brine solution which shall enter the Hydrochlorite generator (Electrolyzer) which shall convert the brine solution to a consistent 0.8% solution of sodium hypochlorite and hydrogen gas, with the addition of a DC current. Sodium hypochlorite solution shall be stored in the storage tank as shown on the Drawings. Dosing pumps shall draw off the storage tank and inject sodium hypochlorite into the well discharge piping water at the location shown on the Drawings. 1.04 SUBMITTALS A. General The Contractor shall prepare and submit complete and organized shop drawings as specified herein and as required by the General Conditions Section F, Special Conditions and shall include, but not be limited to the following: 1. Detailed specifications, fabrication, assembly, dimensions, materials of construction, performance characteristics, and installation instructions for all equipment provided. 2. On-site sodium hypochlorite generator system equipment drawings, specifications, wiring diagrams, conduit routing plans, and installation instructions. 3. Equipment Seismic Design, calculations (including equipment anchorage) for the water softener, chlorine solution storage tank, brine tank, rectifier, and sodium hypochlorite generator. 4. Operation and Maintenance Manuals for each item of equipment specified herein. PART 2 - PRODUCTS 2.01 GENERAL On-site sodium hypochlorite generator system equipment shall be furnished with all features and accessories necessary to provide sodium hypochlorite generating, metering, storage, injecting, and dosing as shown on the Drawings and specified herein.

Section 11241 3 2.02 SODIUM HYPOCHLORITE GENERATOR (ELECTROLYZER) Electrolyzer shall be capable of generating an equivalent of 50 lbs. of chlorine gas per day of sodium hypochlorite solution at 0.8% strength. Electrolyzer shall utilize only softened water, DC power, and brine solution. Electrolyzer brine proportioning system shall consist of fill controls, peristaltic pump, flow meters, mixing panel, calibration tube, and appurtenances to automatically deliver a consistent brine solution to the Electrolyzer. The Electrolyzer shall start and stop based on level in the sodium hypochlorite tank. Electrolyzer shall be suitable for floor mounting and shall not consume more than the following: Water 15.0 gallons per pound of equivalent chlorine Salt 3.5 lbs. per pound of equivalent chlorine Power 2.5 kw-hr DC per pound of equivalent chlorine 2.03 CONTROL PANEL The system control panel shall be fully capable of automatic control of the sodium hypochlorite generating system and be provided with an Allen Bradley Model SLC 5/04 programmable controller with operation interface. All controls shall be housed in a minimum NEMA 12 A304 stainless steel enclosure, suitable for wall mounting. Panel shall have alarms for high and low temperature, low cell level, and shall shut down generation system under these conditions and close a dry contact for "common alarm" to the telemetry panel. Control shall be capable of operating on 120/220 volts single phase power. Panel shall receive 4-20 MA signals from the following: A. Effluent chlorine residual analyzer B. Well discharge piping flow meter, total flow rate C. Sodium hypochlorite storage tank level The controls shall provide the following functions: A. Start/Stop of the chlorine generation system based on level in the chlorine solution tank. B. Start/Stop of chlorine dosing pumps and adjustment of speed based on preset residual set point for plant effluent and closed contact from the telemetry system for pump to system operation. Said contact shall open when well pump to waste operation thereby stopping dosing operations. C. Residual analyzer calibration and display with corrected/proportional output 4-20 MA signal.

Section 11241 4 D. Alarms with LCD displayed descriptions and output to the telemetry system: 1. Chlorine generator system fail 2. Low chlorine storage tank level 3. High chlorine residual 4. Low chlorine residual E. Level control of the brine tank. 2.04 RECTIFIER Rectifier shall be capable of receiving 460 volt, 3 phase, 60 HZ power and converting power to DC current with sufficient capacity to drive the conversion of brine solution to sodium hypochlorite and hydrogen gas. Unit shall be suitable for floor mounting and shall be controlled by the Control Panel. 2.05 SODIUM HYPOCHLORITE STORAGE TANK Sodium hypochlorite storage tank shall be constructed of high density cross linked polyethylene construction suitable for storage of sodium hypochlorite. Tank shall have a minimum capacity of 800 gallons, equipped with a 4" top mounted flanged outlet with 4" vent to the outside of the building. 4" top mounted flanged outlet with blind flange for future forced ventilation fan (located 180 from 4" vent outlet), 2" flanged outlet fill pipe at top of tank, 1" outlet at bottom of tank, 2" flanged top outlet for level transmitter, and any other connection necessary for a complete system. Tank shall be furnished with cables for seismic anchorage, complete with floor anchor system. 2.06 BRINE TANK The brine tank shall consist of a heavy-duty plastic tank (minimum 250 gallons, maximum 48" tall) with lid, screened manifold flanged 2" water inlet, 1/2" NpT outlet, overflow drain, and 1" drain tank. Tank shall be adequately secured to the floor to prevent movement during a seismic event and be provided with floor restraints. 2.07 WATER SOFTENER Water softener shall be of the twin tank design, provided to remove calcium, magnesium, iron, and manganese to acceptable levels for the softened water to be used in the system. Water softener shall be an ion exchange system, as manufactured by Eversoft.

Section 11241 5 Water softener shall be provided with two sets of earthquake restraint chains mounted to metal building framing. Said chains shall be provided and installed at 1/3 points of softener canisters. Chlorination equipment subcontractor shall coordinate with metal building manufacturer to provide adequate framing details for restraint chain mounting to building. 2.08 SODIUM HYPOCHLORITE DOSING PUMPS A. General The chemical metering pump(s) shall be positive displacement, hydraulic type pump, driven by an electrical motor with hydraulic actuation of the diaphragm. The pump shall self-prime with 10 feet of water suction lift. Stroke length adjustment shall be controlled manually by a micrometer type adjuster with a scale indicating 2.0% length adjustment increments. The motor shall be 1/2 HP, 230 volt, 3 phase, variable speed, single phase, constant speed, 175 to 1750 RPM, TEFC. The pump(s) shall be capable of operating against the maximum pressure of 150 psi. Once primed, the metering pump(s) shall operate with a minimum of 10 foot of water suction lift. Pump materials shall be PVDF with teflon diaphragm. Metering pump(s) and appurtenances shall be furnished by a single supplier to assure uniformity, compatibility and system responsibility. Chemical metering pump(s) shall be as manufactured by Alldos, Model KM254 and be suitable for the following: 1. Maximum discharge pressure = 150 psi 2. Liquid pumped = 1 percent sodium hypochlorite 3. ph = 8 9 4. Specific gravity = 1 to 1.3 5. Temperature range = 40 to 100 degrees F 6. Quantity = two, one duty and one standby 7. Flow rate = 32.2 gallons per hour, maximum output B. Appurtenances General

Section 11241 6 Contractor shall furnish appurtenances as specified herein or shown on the drawings, to provide a complete and operable system. Where materials of construction are not specified, the manufacturer shall furnish materials compatible with the intended service condition and shall submit supporting data as required. The following appurtenances shall be provided 1. Brine tank water fill automatic valve and level switch to be controlled by the Control Panel. 2. Flowline ultrasonic level transmitter to be mounted on the chlorine solution storage tank with power supply from control panel. 3. Back pressure valve for dosage pump as manufactured by Griffco Valve, Inc. as follows: Furnish backpressure valve on the discharge side of each pump to maintain a constant backpressure to aid in accurate metering of the pump. Valve shall be adjustable from 5 psig to 150 psig and set per the manufacturer's recommendation for the actual operating conditions of the system. 4. Effluent chlorine total residual analyzer and controller for pacing dosage pumps including 499ACL chlorine probes, 1054 BCL chlorine analyzer, and inline sensor housing, as manufactured by Rosemount Analytical. 5. Solution injector, Capital Controls, Model 111-1 with corp. stop for injection of chlorine into the discharge header and for effluent sample. 6. Variable Frequency Drives (VFD) (two) for dosage pumps rated 1/2 HP, 220 volt, single phase, 60 HZ, Model AF-300 Micro Saver II, G.E./Fuji Electric. Each VFD shall be provided with control to receive a 4-20 MA signal to vary output for variable speed control of the dosage pump. 2.09 CIRCULAR CHART RECORDER A. General Circular chart recorder shall be 10", two pen, seven day, recorder with repeatability of 0.25% and dead band of 0.20% of span. Recorder shall be surface mount type with standard door and operate at 120 VAC, 60 HZ. System shall use disposal cartridge type inking. Multiple pen recorders shall be provided with multiple colors. Recorder shall accept 4-20 ma DC signal input from the metering and analyzing system equipment. The recorder shall simultaneously record water flow rate (gpm) and total chlorine

Section 11241 7 residual (0-10 mg/l range). Recorder shall be ABB Instrumentation Commander 1900, Bristol Series 4330, Foxboro Series 40P, or equal. Recorders shall be calibrated to the transmitter range specified. 2.10 EQUIPMENT ANCHORAGE The Contractor shall provide Type 316 Stainless Steel Epoxy equipment anchorage in accordance with Equipment Seismic Design Calculations per Section 1.04, Submittals, herein. 2.11 HYDROGEN DILUTION AND FLOW SENSOR A. The hydrogen dilution system shall dilute the hydrogen concentration to below 25% of LEL or 1% by volume. B. The hydrogen dilution blowers shall generate a minimum flow of 80 SCFM. C. The hydrogen dilution system design shall incorporate the following safety features: 1. Blower current sensing 2. Air flow switch positioned in the dilution ductwork 3. Differential pressure switch positioned in the dilution ductwork vent stack 4. Software controlled safety interlocks to detect control system sequence failure Hydrogen dilution system shall be wall mounted adjacent to the chlorine storage tank and system ductwork shall be connected to the specified vent stack with PVC piping. PART 3 - EXECUTION 3.01 GENERAL The on-site sodium hypochlorite generator system equipment shall be installed and tested as shown on the Drawings and specified herein: A. The Contractor shall arrange to have the manufacturer/supplier of the equipment specified in this Section furnish the services of competent factory-trained personnel to provide the installation and start up of all equipment. Allowance for this service shall be included by the manufacturer in the price of his equipment. Installation and erection of all assemblies and components shall be in accordance with the details indicated on the Drawings, approved shop drawings, and the printed instruction of the manufacturer.

Section 11241 8 B. After installation, the systems shall be put through all operations in the presence of the Owner. Visual inspection will be made for proper installation, operation, alignment, and lubrication. Manufacturer shall provide a certificate stating installation is satisfactory. 3.02 INSTRUCTION After the equipment has been installed, tested, and adjusted, and placed in satisfactory operating condition, the equipment manufacturer shall provide classroom instruction to Owner's operating personnel in the use and maintenance of the equipment. Contractor shall give the Owner formal written notice of the proposed instruction period at least two weeks prior to commencement of the instruction period. Scheduled training shall be at a time mutually acceptable to the Owner and the manufacturer. During this instruction period, the manufacturer shall answer any questions from the operating personnel. The minimum instruction period shall be as specified in Section SC 21, Special Conditions - Special Provisions and as long as necessary to address details of operation, routine maintenance, repair, and special equipment features. END OF SECTION 11241