TARIFF EFFECTIVE FROM 01.03.2017 S.No. Job Description 20 Container 40 Container I-A A. IMPORT HANDLING General / Scrap - Import / Granite & Others Cargo: (Terminal Handling with Movement charges) (other than, ODC, Flat-track, Open Top Containers, Heavy Lift and Hazardous, etc.) (i) Transport of Laden Container from CCTL to off dock CFS, Lift off 6,600.00 8,500.00 Laden, Inspection, Lift On Laden, delivery (Load out Basis) (ii) Transport of Laden Container from CCTL to off dock CFS, Lift off 8,000.00 9,800.00 Laden, Inspection, Destuffing, (Forklift / Manual) Loading of cargo, Lift On Empty container (Crane Handling Extra) (iii) For destuffing above 25% of cargo for examination purpose and 1,800.00 2,400.00 restuffing I-B ODC, Flat-track, Open Top Containers, Heavy Lift - Terminal Handling, Escort & Movement charges Moved on normal trailer. (i) Transport of Laden Container from CCTL to off dock CFS, Lift off 11,275.00 13,900.00 Laden, Inspection, Lift On Laden, delivery (Load out Basis) (ii) Transport of Laden Container from CCTL to off dock CFS, Lift off 14,500.00 17,000.00 Laden, Inspection, Destuffing, (Forklift / Manual) Loading of cargo, Lift On Empty container (Crane Handling Extra) (iii) For destuffing above 25% of cargo for examination purpose and 1,800.00 2,400.00 restuffing I-C ODC, Flat-track, Open Top Containers, Heavy Lift - - Moved on Low / Semi-bed trailer. A Terminal Handling, (i) Lift off Laden, Inspection, Lift On Laden, delivery (Load out 11,275.00 13,900.00 Basis) (ii) Lift off Laden, Inspection, Destuffing, (Forklift / Manual) 14,500.00 17,000.00 Loading of cargo, Lift On Empty container (Crane Handling Extra) Page 1 of 6
: 2 : B Movement charges: OOG containers from CCT inclusive of PNR Processing & PO Escort (Low / Semi bed Trailer a) Height upto 3.5 feet above gauge and width upto 1 feet out 15,800.00 21,300.00 of gauge (upto 25 MT) b) Height between 3.5 feet and 5 feet out of gauge and width 19,500.00 23,500.00 between 1 feet and 2 feet out of gauge (upto 40 MT) c) Height between 5 feet and 6 feet out of gauge and width 23,000.00 28,000.00 between 2 feet and 2.5 feet out of gauge (upto 40 MT) STORAGE II-A Import Containers/Cargo Storage (other than ODC, Flat- per day per day track, Open Top Containers, Heavy Lift and Hazardous.) First 3 days Free Free 4 th to 7th day Per Day 500.00 1,000.00 8 th to 12th day Per Day 750.00 1,500.00 13 th to 20 th day - Per Day 1,000.00 2,000.00 21 st to 30 th day Per Day 1,500.00 3,000.00 31 st to 60 th day per Day 1,750.00 3,500.00 61 st to 90 th day per Day 2,000.00 4,000.00 91 st to 120 th day per Day 2,500.00 5,000.00 121 st day onwards per Day 5,000.00 8,000.00 II-B ON TRANSPORT CHARGES Equalization charges 495 (20 ) and 990 (40 ) Increase in Movement charges 1575 (20 ) and 2700 (40 ) II-C ON OTHER HANDLING CHARGES Energy Surcharge 900 (20 ) 1575 (40 ) Weighment charges 150/- per container. Reefer Plugging & Monitoring Charges (for 8 hours) 1550 (20 ) 2550 (40 ) For Tankers containers 20 or 40 25% extra on Handling and Storage charges of GP Containers. For all Hazardous & Reefer Cargo: 25% extra on Handling and Storage tariff. For all 45 containers: 25% extra on 40 Handling and Storage tariff. For all other cargoes, charges will be on a case-to-case basis. Crane charges, if required, will be charged extra. For all OOG / ODC consignments:100% extra on storage charges on II-A. Insurance charges 90.00/Teu (Insurance covered @ 3 lakhs/teu, as per working given by Customs). Seal charges (OTL) 25/- per container. Service tax and other statutory charges as applicable will be extra Page 2 of 6
TARIFF S.No. Job Description 20 Container 40 Container III-A III-B III-C LCL IMPORT TARIFF Unloading charges (Terminal Handling Charges): Lift off Laden / Destuffing / Inspection / Repacking 8,000.00 9,800.00 / Lift on Laden. Load Container Storage Charges (Imports) First 3 days Free Free 4 th to 7th day Per Day 500.00 1,000.00 8 th to 12th day Per Day 750.00 1,500.00 13 th to 20 th day - Per Day 1,000.00 2,000.00 21 st to 30 th day Per Day 1,500.00 3,000.00 31 st to 60 th day per Day 1,750.00 3,500.00 61 st to 90 th day per Day 2,000.00 4,000.00 91 st day onwards per Day 2,500.00 5,000.00 121 st day onwards per Day 5,000.00 8,000.00 The free days would count from the day the container is moved to the CFS. Cargo Storage Charges: ( / day) Cargo Storage 360 /- per 4 CBM per Week or part thereof Minimum one week III-D Delivery Charges 85/- per MT per B/E (Subject to a minimum of 350 per Delivery) III-E Documentation 300 / B/E. III-F Aggregation 30 / MT / CBM a) ON TRANSPORT CHARGES:.\ Equalization charges 495 (20 ) and 990 (40 ) Increase in Movement Charges 1575 (20 ) and 2,700 (40 ) b) ON OTHER HANDLING CHARGES: Energy Surcharge 900 (20 ) 1575 (40 ) Weighment charges 150/- per container. Reefer Plugging & Monitoring Charges (for 8 hours) 1550 (20 ) 2550 (40 ) For all Hazardous & Reefer Cargo: 25% extra on Handling and Storage tariff. For all 45 containers: 25% extra on 40 Handling and Storage tariff. For all other cargoes, charges will be on a case-to-case basis. Crane charges, if required, will be charged extra. For all OOG consignments: 100% extra on storage charges on II-A. Insurance charges 90.00/Teu (Insurance covered @ 3 lakhs/teu, as per working given by Customs). Seal charges (OTL) 25/- per container. Service tax and other statutory charges as applicable will be extra Page 3 of 6
TARIFF S.No. Job Description 20 Container 40 Container IV-A GENERAL CARGO: Stuffing: B. EXPORT a) On Wheel Manual 2,500.00 3,600.00 On Wheel Mechanical (for 3 Ton Forklift only) 2,750.00 4,200.00 (Crane, if required, will be charged extra) b) Unloading from truck stacking in Open yard stuffing into Container Manual 3,000.00 4,500.00 c) Mechanical Stuffing (Crane if any Extra) 3,600.00 5,200.00 IV-B Additional charges for Special type of cargo like, Coconut Fibre / Coconut Pith / Cotton Bales 1,000.00 2,000.00 Storage Charges: a. Covered Warehouse: First 5 days Free Free 6 th to 10 th day - per Day 250.00 500.00 From 11 th day onwards - per Day 350.00 700.00 On Stuffed container 500.00 per Week Open Warehouse b. 15 per MT per week or part thereof IV-C GRANITE: 1 Unloading, Stacking Stuffing 4,000.00 2 Storage Charges: IV-D a. On Granite Block received and stored at yard for stuffing into container: First 7 days Free Free 8th to 15th day Per Day 250.00 500.00 From 16th day onwards - Per Day 350.00 700.00 b. Open Yard Break Bulk Shipment (on cargo not stuffed/shut-out/removed without stuffing: 5 per MT / per week. For heavy cargoes like Machines etc. and high value cargo, charges will be extra IV-E a) Shut Out Cargo (In and Out) 85/ MT / Operation (subject to a minium of 225) Storage Charges (no Free days) 30 / MT / day b) Self Sealing & Central Excise Containers. i) On Wheel Inspection 750.00 1500.00 ii) Ground Inspection 1200.00 1700.00 iii) Storage (per day): 1 st to 5 th day Free Free 6 th to 10 th day 125.00 250.00 11 th to 30 th day 250.00 500.00 31 st day onwards 500.00 1000.00 Service tax and other statutory charges, as applicable, will be extra Page 4 of 6
GENERAL TARIFF Empty Container Pick-up / Drop within Manali/Ennore belt 1500/20 3000/40 Empty to SATTVA Empty Plot after destuffing at SATTVA CFS 1000 /20 1500/40 Shifting within CFS Laden Containers : 600/20 1000/40 Container Tracking charges RFID 50 per Teu Empty container storage charges(from the date of De-Stuffing) First 3 Days Free Free 4 th to 30 th day 100/20 200/40 31 st day on wards 200/20 300/40 Lift Off / Lift On Charges (per Move) Laden Containers 750.00/20 1000.00 /40 Empty Containers 200.00/20 350.00/40 Auction Cargo : Handling Charges and Delivery Expenses 7500/- per container. Valuation and NOC Charges 5000/- per container Conditions: 1 Local Transport, Additional Handling shall be charged extra 2 The above rates are subject to the following condition: In case any increase in fuel, spare parts, tyres, insurance and TOA rates, our rates will be increased on Pro rata basis as per industrial norms. 3 Rates subject to change without prior intimation. 4 The rates quoted above are considering normal destuffing only (using forklift). Any odd shape/heavy items cargoes/ Open top containers which requires additional handling equipment like crane etc. will be charged extra. 5 Volume Discount will be given based on the Turnover. 6 Additional charges will be levied for cargo requiring special services like dunnage, lashing, materials etc. 7 Shipping line / CHA will be requiring to pay Customs Overtimes, if any required work done at CFS. 8 All cheques / DD to be drawn in favour of Sattva CFS and Logistics Pvt Ltd Payable at par at all branches. Cash payments only against Cash Receipts. 9 PD account system is availed for the clients for ease of transactions. 10 It is presumed that all consignments (Import/Export) being received at CFS are adequately insured against possible risk during transportaion & storage & the company assumes no liability in this respect. Incase if the insurance is not covered by consignee/shipper they have inform us in advance to cover insurance by us for which charges will be recover from consignee / shipper. 11 Prior gate in of Cargo/Container, all CFS dues should be paid upfront. 12 Service tax & other government levies shall be applicable at the prevailing rates at the time of billing. 13 All charges are in Indian Rupees (INR) 14 Service tax and other statutory charges as applicable will be extra Page 5 of 6
PUBLIC BONDED WAREHOUSE Tariff at Bonded Warehouse CONTAINER CARGO: 20 40 (per Container) (per Container) Unloading / Loading (per Operation) (a) Manual 1,500.00 2,000.00 (b) FLT Mechanical (upto 3MT) - (Crane hire extra) 2,000.00 3,000.00 BREAK BULK CARGO: Covered Space Open Yard Insurance Charges 60/- per Sq.Mtr./Week or part thereof (Minimum four weeks) 50/- per Sq.Mtr./Week or part thereof (Minimum four weeks) @ 15 Paise per 1000 Rupees per Week or part thereof (Minimum four weeks from the Bond No. date) Part Delivery Charges MANUAL - 750/- per delivery (Minimum) MECHANICAL 1000/- per delivery (Minimum) LCL Cargo 750/- Minimum upto 3 MT 1000/- Minimum for FLT Section 49 Handling Charges Manual 1,500.00 Manual 2,000.00 Mechanical 2, 000.00 Mechanical 3,000.00 Section 49 Storage Charges / per day 500.00. 1000.00 Shifting of Containers at CFS after Customs Inspection 600.00. 1000.00 INTO BOND: Four weeks storage charges + unloading charges for the entire Bond consignment and Service Tax as applicable. EX-BOND: (IF FIRST DELIVERY IS WITHIN 4 WEEKS) Insurance charges Minimum 4 weeks + loading charges for the entire bond consignment + Miscellaneous charges + Service Tax as applicable. SUBSEQUENT DELIVERIES: Total ONE delivery for a 20 Ft. container and TWO deliveries for a 40 Ft. container is FREE after full bond consignment billing at the time of first delivery. After above FREE deliveries 300 + Service Tax as applicable Per Vehicle / Per Delivery. Space Allocation: Minimum allocation is 5 Sq. Mtr. Service tax and other statutory charges as applicable will be extra Bonded Space Available certificate will be issued at Corporate Office: High Gate Level 4, No.153, (Old No.82) Santhome High Road, Raja Annamalaipuram, Chennai 600 028. Ph: 044-2461 2829, Fax: 044-2461 3245 E Mail: sattvacorporate@sattva.in Page 6 of 6