Feed-Water Repowering in Besat Power Plant: Technical and Costing Aspects

Similar documents
William C. Stenzel, P. E. SEPRIL Dale M. Sopocy, P. E. SEPRIL Stanley E. Pace SEPRIL

Consider a simple ideal Rankine cycle with fixed turbine inlet conditions. What is the effect of lowering the condenser pressure on

ENERGY RECOVERY IMPROVEMENT USING ORGANIC RANKINE CYCLE AT COVANTA S HAVERHILL FACILITY

Chapter 8. Vapor Power Systems

Efficient and Flexible AHAT Gas Turbine System

EFFECT OF AMBIENT TEMPERATURE, GAS TURBINE INLET TEMPERATURE AND COMPRESSOR PRESSURE RATIO ON PERFORMANCE OF COMBINED CYCLE POWER PLANT

Feedwater Heaters (FWH)

OPTIMIZATION OF PARAMETERS FOR HEAT RECOVERY STEAM GENERATOR (HRSG) IN COMBINED CYCLE PLANTS

Gas-fired efficiency in part-load and pulse operation

Combined cycle with detailed calculation of Cp in the HRSG

EXERGETIC ANALYSIS OF SOLAR AIDED COAL FIRED (210MW) THERMAL POWER PLANT

Efficiency improvement of steam power plants in Kuwait

2. TECHNICAL DESCRIPTION OF THE PROJECT

AUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS. Steag Energy Training Center EEC WORKSHOP to

COMBINED CYCLE OPPORTUNITIES FOR SMALL GAS TURBINES

REPOWERING OF THERMOELECTRICAL POWER PLANTS WITH CONVENTIONAL RANKINE CYCLE FOR COMBINED CYCLE USING HEAVY DUTY GAS TURBINES

OPERATING PARAMETERS Reliable Means to Continuously Monitor Facility Performance

Design Optimisation of the Graz Cycle Prototype Plant

Chapter Two. The Rankine cycle. Prepared by Dr. Shatha Ammourah

A Further Step Towards a Graz Cycle Power Plant for CO 2 Capture

MIT Carbon Sequestration Forum VII Pathways to Lower Capture Costs

The Zero Emission Power Plant Concept

OPTIMIZATION OF THE TRIPLE-PRESSURE COMBINED CYCLE POWER PLANT. Muammer ALUS and Milan V. PETROVI] *

Chapter 10 VAPOR AND COMBINED POWER CYCLES

TFLOW26 Update Letter, September 26, 2016

Kalex Kalina Cycle Power Systems For Use as a Bottoming Cycle for Combined Cycle Applications

Understand boiler performance characteristics. Use these suggestions when buying, designing or optimizing steam generators

5. Steam Turbine Performance

Module 2: Conventional Power Generation I

POST COMBUSTION CO 2 CAPTURE SCALE UP STUDY

Techno-Economic Assessment of Oxy-Combustion Turbine Power Plants with CO 2 Capture

AN EXERGY COST ANALYSIS OF A COGENERATION PLANT

BLUE OPTION White space is filled with one or more photos

Energy Analysis of Supercritical Water and Ammonia (Kalina) Power Cycle

PERFORMANCE TESTING OF HYBRID WET-DRY COOLING SYSTEMS: INSIGHTS FROM NUMERICAL MODELING

Packaged AHR (Advanced Heat Recovery) Systems for Engines, Gas Turbines, & Industrial Waste Heat. Tom Pierson

Optimal Design Technologies for Integration of Combined Cycle Gas Turbine Power Plant with CO 2 Capture

Pinch Analysis for Power Plant: A Novel Approach for Increase in Efficiency

THE NOVELEDGE IGCC REFERENCE PLANT: COST AND EMISSIONS REDUCTION POTENTIAL. Gasification Technologies 2004, Washington, DC, October 6, 2004

Dynamic Modeling of a Combined-Cycle Plant

MODIFICATIONS OF STEAM POWER PLANT INTO COMBINED CYCLE BY INTRODUCING LNG AS FUEL

Technical And Economical Aspects Of Thermal Efficiency Of Grate-Fired Waste-To- Energy Plants

Chapter Two { TC "Chapter Two " \l 1 } Detailed System Description


Development of Integrated Flexi-Burn Dual Oxidant CFB Power Plant

Supercritical CO2 Brayton Cycles and Their Application as a Bottoming Cycle. Grant Kimzey UTSR Intern Project Summary Webcast September 7, 2012

Challenges in Designing Fuel-Fired sco2 Heaters for Closed sco2 Brayton Cycle Power Plants

Ion Transport Membrane (ITM) Technology for Lower-Cost Oxygen Production

CASE STUDY WITH COMPARISON AND EVALUATION OF DIFFERENT ALTERNATIVES TO A COMBINED CYCLE POWER PLANT UPRATE

Gas Turbine Inlet Air Cooling System

Available online at ScienceDirect. Energy Procedia 114 (2017 )

Thermodynamics Optimization of GARRI (1) Combined Cycle Power Plant by Using ASPEN HYSYS Simulation

Equipment Design. Detailed Plant Conceptual Design. Version 9.0

High Duct Fired Gas Turbine Combined Heat & Power (DF-GT-CHP): a better steam raising system

EFFECT OF INLET AIR COOLING ON GAS TURBINE PERFORMANCE

TransPacific Energy Advantage: Case Studies

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

Full electrical LNG-plant: Highest availability and energy efficiency trough overall system design

Industrial Opportunities and New Cycles Gas turbine - Cogeneration

Application of an Integrally Geared Compander to an sco 2 Recompression Brayton Cycle

STUDY ON EFFECTIVE PARAMETER OF THE TRIPLE-PRESSURE REHEAT COMBINED CYCLE PERFORMANCE

High-efficiency low LCOE combined cycles for sour gas oxy-combustion with CO[subscript 2] capture

Combined Heat and Power

KEPCO KEPRI Kim eui hwan

Eng Thermodynamics I: Sample Final Exam Questions 1

Improving Flexibility of the Combined Cycle Power Plant Hamm Uentrop to Cover the Operational Profiles of the Future

Cost and Performance Baseline for Fossil Energy Plants

NTPC O&M Conference Performance and Optimization of Water Utilisation Increase of Existing Power Plants. Speaker Name; Tufani Ram 13-14/02/2013

Decentralized Biomass Power Production

Optimization of parameters for heat recovery steam generator (HRSG) in combined cycle power plants

The H-25/H-15 Gas Turbine A Product of Hitachi Quality

Course 0101 Combined Cycle Power Plant Fundamentals

Flexible steam turbine solutions for combined heat and power in combined cycle power plants

Thermodynamic analysis of a regenerative gas turbine cogeneration plant

FLEXI BURN CFB WP4: Boiler design and performance

Grand Composite Curve Module 04 Lecture 12

Impact of novel PCC solvents on existing and new Australian coal-fired power plants 1 st PCC Conference, Abu-Dhabi

Thermodynamic analysis on post combustion CO 2 capture of natural gas fired power plant

Syllabus Cogeneration: Definition, Need, Application, Advantages, Classification, Saving potentials

Conception of a Pulverized Coal Fired Power Plant with Carbon Capture around a Supercritical Carbon Dioxide Brayton Cycle

The H-25/H-15 Gas Turbine A Product of Hitachi Quality

Low temperature cogeneration using waste heat from research reactor as a source for heat pump

Refinery Residue Based IGCC Power Plants and Market Potential

Hitachi H-25 & H-80 Gas Turbine. Bucharest, Apr.23, 2013

OUTCOME 2 TUTORIAL 2 STEADY FLOW PLANT

Fundamental Investigation Of Whole-Life Power Plant Performance For Enhanced Geothermal Systems

MODELING AND SIMULATION OF THERMOELECTRIC PLANT OF COMBINED CYCLES AND ITS ENVIRONMENTAL IMPACT

CO 2 Capture Utilization and Sequestration (CCUS)

PowerEnergy

WASTE TO ENERGY IN POWER PLANTS; INCREASING THERMAL EFFICIENCY AND DECREASING ENVIRONMENT DEFECTS

ORC BOTTOMING OF A GAS TURBINE: AN INNOVATIVE SOLUTION FOR BIOMASS APPLICATIONS

Chapter 2.7: Cogeneration

Lecture No.3. The Ideal Reheat Rankine Cycle

Your partner for the right solution

Thermodynamic and Thermo Economic Optimization of Combined Cycle Power Plant

Heat Recovery. Integrated CHP Systems Corp.

Power Block Technology for CSP

Engineering Thermodynamics

How Much Does CCS Really Cost?

Combined Cycle Power Plants. Combined Cycle Power Plant Overview (Single- and Multi-Shaft) Training Module. ALSTOM (Switzerland) Ltd )*+,

Transcription:

Feed-Water Repowering in Besat Power Plant: Technical and Costing Aspects Ramin Haghighi Khoshkhoo Mohammad tanassan Assistant professor M.Sc. student Power and Water University of technology (PWUT) and R&D Manager R&D Expert Mechanical Engineer Monenco Iran Consulting Engineers Co Tehran, Iran khoshkhoo@pwut.ac.ir tanasan.mohamad@monenco.com Abstract: Repowering fossil fuel power plants has been considered to increase power output and reduce emissions at low cost and short outage periods. Besat is one of the oldest power plants in Iran which is located in south of Tehran. Besat net power output has been decreased about 19 percent, and its repowering is inevitable. As one of the most important parameters of repowering, size and type of the gas turbine is considered and Feedwater repowering schemes have been analyzed using thermodynamic simulations. The objective is evaluating the efficiency increase of the overall system, and also total power output. It seems that selection of gas turbine is directly dependent on the purpose of repowering. Results highlight the repowering as a suitable technology to reduce heat rate and increase total power output. It could help to increase power plant ability, in a short time and in a cost-effective manner. Key-Words: Repowering, Feed-water heaters, Power plant, Heat rate, Gas turbine 1. Introduction The country of Iran is experiencing in all fronts and areas and thus, consumption of electrical power is on the increase on a daily basis. Based on the everincreasing electrical energy consumption, changes in generating system load requirements, lower allowable plant emissions and changes in fuel availability, steam power plants repowering has been investigated much more as a method for energy conservation. Considering the increased electrical energy consumption and annual growth rate of 4.5 percent[1] and according to the end of existing steam power plants life in Iran(like Besat power plant), repowering could be used as an economical method for increasing the output power with less investment than building a new power plant. Repowering of steam power plant can be achieved in several ways. In a full repowering, several gas turbines (GT) and heat recovery steam generators (HRSG) are installed in a parallel arrangement dispensing with the conventional boiler. Live steam from HRSG is used in the original steam turbine. This is the best option to maximize the efficiency [3 6]. Repowered power plant efficiency could be 30 40% higher than the original and the power output could increase up to 200% [5, 7 10]. Hot wind box repowering implies a power plant redesign. GT exhaust gases are injected into the boiler and used as comburent [5, 8, and 11]. The reduction in oxygen content in the vitiated air, the elimination of air preheaters, and changes in flow patters inside the boiler limit the efficiency improvement. An efficiency increase around 5 15% and power output 30 40% are the advantages of this option [7 9, 12]. Feedwater repowering takes advantage of the exhaust heat from the gas turbine to increase the feedwater temperature instead of bleeding steam. The effect of repowering, in this case, depends on the quantity of steam extractions eliminated, but power output could increase 30 40% and efficiency around 5 10% [7 9]. With parallel repowering a HRSG is used to raise extra live or reheated steam and drive the steam turbine. This is a suitable option with low level of modifications in the steam cycle. As mentioned above, the steam mass flow yielded must be limited to avoid steam turbine redesign. It is possible to achieve a 20% of efficiency improvement and 20% of power output [4]. ISSN: 1792-4596 187 ISBN: 978-960-474-215-8

Considering the high cost of HRSG, many changes in existing power plant and also long outage period in different kinds of repowering, in this study only feedwater heater repowering has been investigated. 2. Case Study And Repowering Arrangements Case study is a 3*82.5MWe net power output power plant with water cooling with mechanical draft cooling tower. Steam cycle is composed of two high-pressure and two low-pressure feedwater heaters and five steam extraction to feedwater heaters and deaerator. Steam production is 198.3 lb/s of live steam (1214Psia/940 C) without reheat. Power plant net efficiency is 30.75% based on LHV. In order to avoid any change in steam turbine, condenser-cooling system or generator, constraints include a limitation of steam mass flow rate augmentation and power output. Total power output has been limited to 82.5MWe,for each unit. In repowering, Fig. 1, high and low-pressure water heaters are substituted by different heat exchangers and gas turbine exhaust gases are used as heaters in the low- and high-pressure section of the Rankine cycle. The energy transferred from flue gases to steam cycle usually reduces the bleedings mass flows and increase the power production at steam turbines between 4% and 6% for low-pressure feedwater heaters and 12 16% for high-pressure feedwater heaters [11]. Therefore, the main variable for this configuration is the flue gas energy distribution between the low and high-pressure section of the steam cycle. Nevertheless, deaerator pressure limits this distribution. 1. Turbine 4. Cooling tower 7. Deaerator 10. 2nd High-pressure heater 13. Inlet air 16. Gas turbine 19. Flue gas 2. Generator 5. 1st Low-pressure heater 8. Feed water pump 11. Steam generator 14. Inlet fuel 17.1st New heat exchanger 20. Inlet air 3. Condenser 6. 2nd Low-pressure heater 9. 1st High -pressure heater 12. Stack 15. Compressor 18. 2nd new heat exchanger 21. Inlet fuel Fig 1. Schematic of Feedwater Heater Repowering of Besat Power Plant ISSN: 1792-4596 188 ISBN: 978-960-474-215-8

3. system modeling The thermodynamic model is based on existing power plant and integration of heat rejected by the gas turbine. This energy is integrated into the original steam cycle. Feedwater repowering scheme presented above have been analyzed using Thermoflow simulation software, and heat exchangers are simulated with mass and energy balances and with a constant minimum temperature difference of 20 C for high and low-pressure heaters. Once the exhaust gas temperature at exit is higher than 120 C, the reduction in steam bleeding and the effect in steam turbine performance is calculated. Each component is simulated by thermodynamic relations, mass and energy balances. Heat rejected by the gas turbine is integrated in the original steam cycle reducing the existing boiler load and calculating the modified live steam mass flow and bleedings conditions. Condenser pressure has been considered constant in 1.228 Psia. 3.1. Site Condition In this study, the site conditions have been obtained by Tehran synoptic stations information. These conditions include: Ambient temperature: 18.1 C, altitude: 1100 m, Atmospheric pressure: 0.889 bar relative humidity: 41% [2]. 3.2. Gas Turbine Model In the 6 old combined cycle power plants in Iran that are known to 6C.C (combined cycle), gas turbine model GE 9171 E is used. Nominal capacity of them is 2 * 123.4 MW (gas turbine) and 100 MW (steam turbine). In the 22 new combined cycle power plants benefit from the Siemens V94.2, the Nominal capacity for most of them including 2*158.9 MW (gas turbine) and 130 MW (steam turbine). Therefore, this study model turbines GE 9171 E and V94.2 as a common units in Iran and Siemens SGT-900 turbine for adjusting gas and steam power output. Gas turbines simulation has been carried out with manufacturer data and GT are supplied in nominal power outputs. Correction carves for the various ambient and installations for the compressor and gas turbine behavior have been used to find the actual performance. 4. The Effect of Failure in Heaters on Efficiency and Net Output Power Plant Although several factors can reduce net power output and increase heat rate, but it seems one of the most important factors is feed water heaters failure and removing them from the circuit. In the following chart the effect of by-passing low and high pressure heaters has been investigated. In the right side of Fig. 2, effects of low pressure heater, and in the left side, effects of high pressure are given. As is noted, net power output reduction in the high pressure heater by-passing is significantly more than by-passing of low pressure heaters because of using steam in higher temperature. Fig 2. Net Power Output Drop Versus Different Amounts of Flow by-passing of Heaters ISSN: 1792-4596 189 ISBN: 978-960-474-215-8

Table 1. Results of Repowering with Different Gas Turbines Case No. GT type LPH 1 HPH 2 power Net ST output(kw) Net GT power output(kw) Heat rate HHV 4 LHV 5 SET 3 ( C) 1 V94.2-82500 140838 10970 9987 495.7 2 V94.2 82501 141693 10890 9923 470.1 3 GE 9171 E - 82501 105482 11127 10160 484.7 4 GE 9171 E 82500 105472 11072 10115 451.7 5 SGT-900 82500 31727 10446 9617 256.1 1 Low Pressure Heaters 2 High Pressure Heaters 3 Stack Exit Temperature 4 Higher Heating Value (BTU/kWh) 5 Lower Heating Value (BTU/kWh) 5. Results and Discussion In the Tab.1, the results of repowering with different gas turbines are shown and for every case, gas turbine power, steam turbine power, heat rate and gas turbine stack exit temperature are given. in the first case and the third only low pressure heaters have been replaced and in other cases we replaced all the low and highpressure heaters with new heat exchangers. For better comparison, total power output and heat rate of different cases are compared in the Fig.3 and Fig.4: scenarios of heat rate, significant differences will be determined by the fifth case, and heat rate about 10 percent will be reduced. Fig 4. Comparison of Heat Rate with Different Scenarios] Fig 3. Comparison of Site Net Power With Different Scenarios As in the Fig.3 is clear,in all cases, steam turbine has been reached the nominal output value and gas turbine exhaust is able to supply steam turbine in design conditions. If the priority of repowering is maximum power output increase, it seems repowering with gas turbine V94.2 will be more prominent. In comparison case 1 with 2 and 3 with 4 we find by-passing all heaters is more important than by-passing only high pressure heaters, because using more exhaust energy and reducing its temperature, overall cycle efficiency is increased. Comparing all the different 6.Economical Calculation Tehran province has 13% of the total nominal power in Iran but its electricity consumption is 19% of total electricity production and in 2008 has had 300000MWh electricity shortage so it seems logical that the highest amount of gas turbine power and the maximum working time be considered. Since the main purpose is to compare repowering cases and existing steam cycle is the same in all cases, similar costs have been removed (for example: the existing boiler fuel). The fuel used for the gas turbine is natural gas and the average heat value of the natural gas [1] is 39 MJ/m 3. In Iran natural gas and electricity prices are typically lower because of subsidies. Two cases are investigated: Iran prices (Natural gas price:1cent/m 3, Electricity price: 2.9cent/kWh)[1], international prices (Natural gas price:14.5cent/m 3 assuming oil ISSN: 1792-4596 190 ISBN: 978-960-474-215-8

price 50US$/barrel, Electricity price: 8cent/kWh)[13]. The costs of the project are divided into two categories: investment and annual costs. The income of the project is based solely on the sale of electrical energy. 6.1. Input-Assumptions The assumptions refer to the input data used in the Thermoflow software as well as the investments in the new equipment and gas turbine and economical assumption refer to central bank of Iran as the following table shows. Table 2. Input-Assumptions Project life in years 15 Operating hours per year (full-load 8000 equivalent) Straight line depreciation life in years 15 Depreciable percentage of total 80% investment Debt term in years 15 Debt percentage of total investment 50% Debt interest rate 9% Overall tax rate 70% Fixed O&M costs, USD per net kw of 20 capacity per year Variable O&M costs, USD per kwh 0.002 Annual inflation rate 5% The Themoflow software calculates the annual income and cost of the plant and this value is used as input in an Excel file to calculate the cumulative net cash flow and rate of return of the investments in the gas turbine. It should be mentioned that cases 2,4 and 5 referring to Tab. 1, with different prices have been investigated. In the Tab. 3, the economical results of repowering with different gas turbines are shown. Table 3. The Economical Result of Repowering *: include gas turbine,transmission and generating package, civil, engineering and plant start up, building, electrical assembly and wiring, mechanical and other equipment. **: Internal Rate of Return 7. Conclusions This paper analyses the concept for repowering of steam cycles with gas turbines. An optimization problem for feedwater repowering of existing power plant considering the effect of gas turbine on overall output and heat rate has been achieved. One of the main conclusions of this work is that repowering of the case study is necessary, and replacement of all heaters with new heat exchangers is more suitable for feedwater repowering. With considering the maximum output increase as the main goal, repowering with turbine V94.2 and for heat rate priority turbine SGT 900 is recommended. Also the capital cost of one kwe engine including installation and the additional equipment needed is between 463 to 763 USD and it is reduced for bigger engines. As the results especially ROR shows, repowering benefit with international prices of natural gas and electricity will be more prominent. It should be mentioned that repowering with turbine SGT-900 has no economic justification because its rate of return is under the interest rate. 8 References [1] Macro Programming Office of Power and Energy, 2008, Energy Balance Sheet of Iran, Power Ministry, Iran. [2] Meteorological Organization,2010, Statistics and Information of synoptic stations, Iran Meteorological Organization, Iran. [3] M. Frankle, 2006, Report, SRS: the standardized repowering solution for 300MWsteam power plants in Russia, Siemens Power Generation, Germany. [4] H. Thermuehlen, 2001, 100 Years of power plant development. ASME Press, New York. [5] G. Bauer, J. Joyce, 1996, Report, The benefits of parallel repowering existing steam turbines with gas turbines, Siemens AG Power Generation Group, Germany. [6] DL. Chase, 2001, Report, Combined-cycle development, Evolution and future, GE Power Systems. [7] W. Stenzel, D. Sopocy, S. Pace, 1997, Repowering existing fossil steam plants, Dallas, TX: Power-Gen International. [8] HG. Stoll, RW. Smith, LO. Tomlinson, 1994, Report, Performance and economic considerations ISSN: 1792-4596 191 ISBN: 978-960-474-215-8

of repowering steam power plants, GE Industrial & Power Systems. [9] DOE, 1999, Strategic plan and multi-year program plans. Coal Power Syst. [10] D. Watson, 2000, Feedwater repowering using high efficiency aeroderivates, Rolls-Royce Technical Paper Power Plant Refurbishment. [11] H. Brückner, D. Bergmann, H. Termuehlen, 1992, Various concepts for topping steam plants with gas turbines, In: Proceedings of the 54th annual meeting of the American power conference; p. 569 82. [12] T. Koike, Y. Noguchi, 1999, Repowering of thermal power plants as fully-fired combined cycle generating plants, Chubu Electric Power Co & Hitachi Ltd.Report. [13] Claude Mandil, 2006, Report, International Energy Outlook 2006, International Energy Agency. [14] Macro Programming Office, Report, 2008, Financial Balance Sheet, Central Bank of Iran. ISSN: 1792-4596 192 ISBN: 978-960-474-215-8