Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Similar documents
Public Disclosure Copy. Public Disclosure Copy. The World Bank

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414)

Implementation Status & Results Africa Central African Backbone - APL2 (P117652)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021)

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021)

Implementation Status & Results Indonesia Barefoot Engineers III (P131387)

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Implementation Status & Results Brazil Sustainable Cerrado Initiative (P091827)

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)

Implementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P086341)

The World Bank AO-Market Oriented Smallholder Agriculture Project (P093699)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329)

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)

Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635)

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project (P077175)

Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929)

Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145)

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)

Implementation Status & Results Brazil Energy Sector Technical Assistance Project (P076977)

Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)

Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)

Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)

Implementation Status & Results Vietnam Second Transmission and Distribution Project (P084871)

Name Previous Rating Current Rating

INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)

The World Bank Pernambuco Rural Economic Inclusion (P120139)

The World Bank. Key Dates. Project Development Objectives. Component(s) Public Disclosure Copy Overall Ratings

The World Bank Sustainable Land Management Project (P133133)

The World Bank KI: Telecommunications and ICT Development Project (P126324)

Ivana Dulic Markovic FROM M&Е RD TO М&Е ARD

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING SUSTAINABLE PROD. IN AREAS PREVIOUSLY CONVERTED TO AGRICULTURAL USE APPROVED ON JULY 18, 2014

Dominican Republic Mid-Term Report. Pedro García Brito Climate Change Director Focal Point for REDD+

The World Bank Ethiopia: Supporting Open Data Initiative (P156400)

MACEDONIA: AGRICULTURE STRENGTHENING

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE FOREST PROTECTION AND REFORESTATION PROJECT

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING INDIA - CAPACITY BUILDING FOR INDUSTRIAL POLLUTION MANAGEMENT APPROVED ON JUNE 3, 2010

Implementation Status & Results Report Coastal Watersheds Conservation in the Context of Climate Change Project (P131709)

The State of Sustainable Agriculture in the EU

2010 Annual Programme Twinning Fiche KS 10 IB AG 02 Veterinary and Food Safety

EUROPEAN LIVESTOCK AND MEAT TRADING UNION / EUROPÄISCHE VIEH- UND FLEISCHHANDELSUNION

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Lao PDR: Southeast Asia Disaster Risk Management Project Procurement Plan (As of November 15, 2017)

COMPANY PROFILE 2016

ANNUAL QUALITY REPORT

COUNTRY PROGRAMMING FRAMEWORK. in the REPUBLIC OF ALBANIA

NHS Highland Internal Audit Report Managing Sickness Absence August 2011

Technical and Vocational Education & Training (TVET) Reform Project. Phase 1 Workplan (Dec 2007 Dec 2009)

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

POLAND Agriculture Policies and programmes to achieve food security and sustainable agriculture

FARMER BUSINESS SCHOOL

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Session 3: Land consolidation and EU rural development policies - an overview

Mid-level Evaluation of Climate Services: Seasonal Forecasts in Kazakhstan

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country

ADB in Vietnam. ADB s Climate Change Related Interventions in Vietnam. ADB in Vietnam. Outline

Are you prepared to make the decisions that matter most? Decision making in banking & capital markets

The Brave New World of Measurement and Stability Periods

Learnings from Bihar, India An evolutionary process and the impact of a market development program to create a functioning sanitation market

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA IDA TF-56730) ON A CREDIT IN THE AMOUNT OF SDR 20.1 MILLION (US$29.2 MILLION EQUIVALENT)

REPUBLIC OF MACEDONIA MINISTRY FOR AGRICULTURE, FORESTRY AND WATER ECONOMY

PROJECT INFORMATION FORM Part A - General information

FOR OFFICIAL USE ONLY

Geoffrey Onen. Challenges and Benefits of International Guidelines, Standards and Regulations: The Uganda Case.

The 3 rd National Biodiversity Strategy and Action Plan. Ministry of the Environment, JAPAN

DIME Impact Evaluation Workshop

PROJECT INFORMATION FORM Part A - General information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Sep ,000, Original Commitment 550,000,

Approach Paper. Study Proposal. Sustainability of Water and Sanitation Interventions in Rural Areas

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action

TEEB processesin Europe in the contextof the EU Biodiversity Strategy to 2020

Monitoring and Evaluation Program in Somalia. Request for Proposal. CLEARINGHOUSE Development. October 18, 2013

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Nov ,493,000.00

Mainstreaming Environment for Poverty Reduction (RETA6422) Subproject Proposal

IMPLEMENTATION COMPLETION AND RESULTS REPORT (TF TF-14063) ON A TRUST FUND GRANT

New Higg.org Platform Training. Understanding and Navigating the new platform

Dragan Roganović. Kraljevo kajmak. Belgrade, Decembar 2008.

ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5416 Project Name

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-73590) ON A LOAN IN THE AMOUNT OF US$259.6 MILLION TO THE ARAB REPUBLIC OF EGYPT FOR A

A framework for the socio-economic analysis of the cultivation of GM crops: The first ESEB Reference Document

Capacity Building on Climate Finance

Evolution of SWIFT pricing. September 2015

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

QUICK START GUIDE. SQF Implementation. for.

Transcription:

Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473) Operation Name: Montenegro Institutional Development and Agriculture Project Stage: Implementation Seq.No: 6 Status: ARCHIVED Archive : 28-Dec-2012 Strengthening (MIDAS) (P107473) Country: Montenegro Approval FY: 2009 Product Line: IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key s Board Approval 21-Apr-2009 Original Closing 30-Jun-2014 Planned Mid Term Review 17-Sep-2012 Last Archived ISR 26-Jun-2012 Effectiveness 23-Jul-2009 Revised Closing 30-Jun-2014 Actual Mid Term Review 28-Nov-2012 Project Development Objectives Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473) Project Development Objective (from Project Appraisal Document) The Project Development Objective is to improve delivery of government assistance for sustainable agriculture and rural development in a manner consistent with the EU's pre-accession requirements. Has the Project Development Objective been changed since Board Approval of the Program? Yes No losure Authorized Public Disclosure Authorized Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P110602) Global Environmental Objective (from Project Appraisal Document) The Global Environment Objective is to mainstream sustainable land use and natural resource management into MAFWM's policies, programs and investments. These efforts will be particularly critical for the north of Montenegro, where there are sensitive mountain ecosystems of global importance, and where poor rural residents are largely dependent on the natural resource base for their livelihoods. Has the Global Environmental Objective been changed since Board Approval of the Program? Yes Component(s) No Component Name Component Cost Component 1: Strengthening MAFWM's rural development program 12.14 Component 2: Strengthening MAFWM's administrative and management capacity in accordance with 10.85 EU pre-accession requirements Component 3: Project Management, Administration and Monitoring 0.86 Overall Ratings Page 1 of 9

Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Progress towards achievement of GEO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Implementation Status Overview Low The PDO is to improve delivery of government assistance for sustainable agriculture and rural development in a manner consistent with the EU's pre-accession requirements. MIDAS has made significant progress in building capacity at Ministry of Agriculture and Rural Development (MARD), staffing MARD and the Paying Agency, progressing onto the third call for grant proposals, strengthening the capacity in the Extension Services to assist farmers in completing grant proposals, and in strengthening food safety and increasing the capacity of the Veterinary Laboratory in Podgorica (ahead of schedule with relation to accreditation) to maintain high testing capacity. The refurbishment of the Marine Biology Institute in Kotor is also completed. Areas that are progressing more slowly are the development of the Farm Register (FR), the solution for the safe disposal of animal by-products, and the Border Inspection Post in Bar. Locations Country First Administrative Division Location Planned Actual Montenegro Not Entered Zeta Montenegro Not Entered Podgorica Montenegro Not Entered national park Prokletije Montenegro Not Entered Moraca Montenegro Not Entered Kotor Montenegro Not Entered Nacionalni Park Durmitor Montenegro Not Entered Nacionalni Park Biogradska Gora Montenegro Not Entered Bar Montenegro Not Entered Cijevna river Montenegro Not Entered Lovcen National Park Montenegro Not Entered Tara Biosphere Reserve Results Project Development Objective Indicators Page 2 of 9

Indicator Name Core Unit of Measure Baseline Current End Target MAFWM capacity to disburse and track the use of rural development funds and to evaluate their impact in line with EU IPARD requirements. EU IPARD compatible rural development measures fully integrated in MAFWM support programs. Food safety system upgraded in EU compliant manner. Text Value Limited coverage of monitoring and verification. 15 employees in SfP and 5 in RDU (fulfilled one position for ME). MARD announced vacant posts for both sectors and ME positions. First call for grants in final phase, RDU involved in analyzing impacts through survey. Second call for grants GEF 2 agrienvironment measures: process of applications evaluation ongoing; Announced third call for grants, the same as the second call. Fully compliant monitoring and evaluation system, eligible for EU accreditation. Text Value No EU IPARD compatible 2 GEF agri-environment Rural development measures rural development measures measures initiated under the defined in EU IPARD program in MAFWM support programs second grants call and it is started with evaluation of applications. Third call ongoing. Text Value Reference Labs lacking equipment and/or facilities, BIPs and food processing est ablishments not meeting EU standards, animal by-products not safely disposed of Vet Diagnostic Laboratory activities finished. Reconstruction works and furnishing of MBI Kotor finished; Procurement of lab equipment is in evaluation phase. BIP still in final design phase. Proposal of feasibility study for disposal of animal byproducts submitted and its review by stakeholders is ongoing. Alternative solutions are discussed. Lab accreditation completed, supply of BIP equipment, full monitoring of water a nd aquaculture products, full disposal of animal byproducts, food establishments meeting EU standards for approval Page 3 of 9

Global Environmental Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Agri-environmental measures integrated into MAFWM's rural development program. Improved capacity of extension and advisory services to introduce agri-environmental measures. Text Value Limited integration of agrienvironmental measures in support programs; Rural De velopment Unit has no agrienvironmental staff. Initiated evaluation of applications under 2 GEF AE measures under the second call for proposals. A third call is currently open. RDU has received TA (from the RU) for policy development of AE measures. The RDU is involved in the M&E of the MIDAS Grants Program, incl. the AE measures. A studytour on AE policy is planned for the RDU for next year. Evaluation and analysis of applications for agrienvironmental measures continuing. Text Value Extension Service has no TA in AE work/measures has All Extension Officers training program for or staff been provided, and AE expert delivering comprehensive specialized in agri-envir submitted final report. The ES service for agri - onment. has a central function in the environmental measures. implementationof the AE measures under the Grants Program. Study tours on AE extension work are planned for 2013, followed by farmers training inthis field. Intermediate Results Indicators Page 4 of 9

Indicator Name Core Unit of Measure Baseline Current End Target Investments in agricultural competitiveness among beneficiaries. Adoption of agri-environmental measures among beneficiaries. Investments in non-farm activities among beneficiaries. EU IPARD compatible Rural Development Plan, including agri-environmental measures, approved and overseen by a Monitoring Committee. Text Value Number of commercial oriented farmers availing of market driven support measures approx 1200. 23-Mar-2009 Govt. provides investment support to 1200 farmers. Total number of farmers in country unknown. Baseline to be established in PY1 after Ag Census. Text Value Low awareness and use of agri-environmental measures among farmers, processors, and rural communities. 23-Mar-2009 Baseline to be established in PY 1 Text Value No support for income diversification available for farmers, processors, and rural communities. 23-Mar-2009 Baseline to be established in PY 1 Text Value No EU IPARD compatible Rural Development Unit or Plan. 326 Grant Agreements signed. 197 grants/ investments completed and paid. 30-Sep-2012 In the first call for grants 22 investments projects were paid from GEF funds. Two AE measures were developed and launched under the second and third GEF calls. 149 applications were submitted under Call 2 and currently in the evaluation process. Call 3 is open to Jan 15, 2013. 30-Sep-2012 Measures solely for non-farm investments not yet included under the Grants Program. Investments made in smallscale, on-farm processing under the first call. No info at this point on exact amount of investment. 30-Sep-2012 Final proposal of IPARD Program sent to the EC at the end of April 2012. It is still in the phase of adoption. Monitoring Committeeis being Increase in adoption of measures by 30% of farm households. 30-Jun-2014 The total number of farm households is unknown. This will be established after the Ag Census. Adoption of agrienvironmental measures by 20% of agricultural households. 30-Jun-2014 Adoption of non-farm activities by 20% of agricultural households. 30-Jun-2014 Beneficiary guidelines completed and Monitoring Committee reviews outcomes. Page 5 of 9

All agricultural and rural development payments executed through an EU IPARD compatible Proto-Paying Agency (as approved by the World Bank). Agricultural Census is implemented and results disseminated. established. RDU also closely involved in the M&E of the MIDAS Grants Program and using result in their own policy work. Preparation of the new ARD Strategy (2014-20) will be initiated shortly and provide the basis for the IPARD Program for 2014-20. Rural Development Unit will be established and Plan completed in PY2. The Guidelines are to be completed in PY3 and the Monitoring Committee should review outcomes from PY4. Text Value Non-compliant system. 15 staff currently work in the SfP, and MARD continues to recruit according to the Systematization Plan. Under the first call for proposals, the SfP administrated the applications while the TSU executed grants payments. Administration of the 2nd Call is currentlyon-going. The functions of the TSU related to the Grants Program are expected to move over the SfP for the 4th Call for Proposals. Proto-Paying Agency operational. Text Value No agricultural census data All activities completed.(see available. previous updates). Main agricultural census implemented. Statistical register established The main agricultural census should be implemented in PY1. The statistical register should be established by PY 3. Page 6 of 9

Integrated farm register and cadastres operational. Veterinary Diagnostic Laboratory in Podgorica ISO 17025 accredited. Marine Biology Institute in Kotor functioning as NRL in adequate facilities. Veterinary and phyto-sanitary border controls performed in EU-compliant facilities. Safe, traceable and accountable disposal of animal by-products. Text Value No farm register or cadastres in place. TS for hardware and software has been sent to the MITS on comments/approval. Division for Databases and Office for IT has compiled/unified the information from different databases/tables that should be entered into the FR. 70% of farms registered in farm register. Cadastres operational. Text Value No accreditation at present, Vet Diagnostic Laboratory Process for accreditation overlapping competence in activities finished. Due to finalized for 100% of tests and food safety system. changes in domestic methods. legislation, request was submitted for additional financing of equipment under MIDAS. Text Value No suitable facilities in place. No clearly defined role in food safety system, no routine testing performed. Reconstruction works and furnishing of MBI Kotor finished. Procurement of lab equipment is in delivery phase, contract signed. Full monitoring of sea and fresh waters and aquaculture products in line with EU requirements. Text Value No suitable facilities in place BIP in design phase, detailed Equipment procured and designs expected to be installed completed shortly. Text Value National, non-eu compliant system in place Proposal of feasibility study for disposal of animal byproducts submitted and is reviewed by the client. Alternative options are being discussed. 100% of specified risk materials and 75% of animal biproducts collected and disposed of Page 7 of 9

Food establishments classified and annual control plans implemented. Data on Financial Performance (as of 03-Oct-2012) Financial Agreement(s) Key s Text Value Check lists prepared. Initial screening in progress, to be completed by baseline date. New EU-like legislation being drafted. Activity is being initiated, first steps were agreed during the MTR. Monitoring/verification of progress; 100% of food processing plants meeting EU standards. Project Ln/Cr/Tf Status Approval Signing Effectiveness Original Closing Revised Closing P107473 IBRD-77160 Effective 21-Apr-2009 27-May-2009 23-Jul-2009 30-Jun-2014 30-Jun-2014 P110602 TF-93405 Effective 27-May-2009 27-May-2009 23-Jul-2009 30-Jun-2014 30-Jun-2014 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P107473 IBRD-77160 Effective USD 15.70 15.70 0.00 6.36 9.00 41.00 P110602 TF-93405 Effective USD 4.00 4.00 0.00 0.60 3.40 15.00 Disbursement Graph Page 8 of 9

Key Decisions Regarding Implementation The Bank team carried out the midterm review (MTR) on November 28-December 7, 2012, and discussed options for any restructuring and the reallocation of project funds as necessary. It was agreed that the Government would review the draft Aide Memoire and provide comments in the relevant areas. Restructuring History There has been no restructuring to date. Related Projects P110602-Montenegro Institutional Development and Agriculture Strengthening (MIDAS) Page 9 of 9