Rethinking Environmental Mitigation Costs

Similar documents
CALTRAIN S PTC SOLUTION FOR 2015 CBOSS

Kammy Horne, AICP. Austin, Texas

Project Overview. A Collaborative Effort

MEMORANDUM OF UNDERSTANDING Between UNITED STATES ARMY CORPS OF ENGINEERS And BNSF RAILWAY COMPANY

Project Planning area. King County Department of Transportation Road Services Division

RAIL-DOT INSTITUTIONAL MITIGATION STRATEGIES

California High-Speed Train Program FEIR/EIS

September Public Meetings. Developing a Blueprint for the Corridor

W. W. HAY SEMINAR SERIES. Tower 55 Multimodal Improvements NATIONAL UNIVERSITY RAIL CENTER UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN

Conservation and Renewable Energy Development in California. Jim Kenna, May 18, 2012 U.S. Bureau of Land Management

[Docket No. FRA ; Notice No. 1] [Draft Safety Advisory ] Draft Safety Advisory Related to Temporary Signal Suspensions

Stockton Freight & Passenger Rail Mobility Enhancement

Joliet Arsenal Redevelopment:

US Army Corps of Engineers

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation

Opportunities for Accelerating FTA Project Development Post MAP-21

White Paper April 23, 2018

LA 23 NOGC Railway Relocation PE/NEPA Project

Pacific Northwest High Speed Rail Corridor Amtrak Cascades Passenger Service Update

Regulatory Guidance Letter 93-02

Overview of the Project Development Process. Brian Blanchard, PE Assistant Secretary for Engineering and Operations

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need

Recommend to Board. Final Action

Transportation Project Delivery Process & Mitigation

CREATE Central Corridor

William W. Hay Railroad Engineering Seminar. #2 Capacity Allocation in Vertically Integrated Railway Systems: A Sequential Bargaining Game Approach

PLAN 2040 Regional Transportation Plan Update. Final Recommendations. Transportation and Air Quality Committee March 13, 2014

THE FUTURE OF FREIGHT RAILROADING. Joseph Schwieterman Professor, DePaul University

FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT MITIGATION MONITORING AND REPORTING PROGRAM

7 Disciplines of Engineering at Union Pacific Railroad

FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

Overview of City of Dallas and DART Interlocal Agreements

Grant Application Package

HELENA CHEMICAL COMPANY NELSON TERMINAL PROJECT USE PERMIT UP Butte County Board of Supervisors January 29, 2013

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

Concept of Operations. Disaster Cycle Services Program Essentials DCS WC OPS PE

ST. LOUIS REGIONAL FREIGHT STUDY EXECUTIVE SUMMARY

FedEx Corporation Investor Relations February 12, 2018

Chapter 9 Wetlands Park Study Team

North Metro Commuter Rail Line Conception to Implementation

NEPA Session 2 When to Start NEPA

Executive Steering Committee Meeting #1: Minutes

Management Excluded Job Description

Re: PCAOB Rulemaking Docket Matter No. 37

Joint Report of the Transportation and Management Committees For the Metropolitan Council meeting of March 21, 2018

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD

Project Delivery. Rodger Rochelle, PE Technical Services Administrator. Mike Holder, PE Chief Engineer

BioPharm. Smart Outsourcing: Strategic Alignment, Risk Management, and New Relationships

GKC CONSULTING COMPANY

PROGRAMMATIC AGREEMENT FOR APPROVAL OF CERTAIN CATEGORICAL EXCLUSIONS

MULTI-MODAL NEPA PEER

3.4 HISTORIC, ARCHEOLOGICAL, AND CULTURAL RESOURCES

Reason for Acceptance or Rejection

Using a Programmatic Agreement as a Bridge to the Future: Streamlining Historic Review Clearance for Hundreds of Wooden Trestle Bridges Presenters:

Wisconsin s Passenger Rail Development Program

Potential Effects of Tall Structures on Grouse Species. New Mexico Avian Protection Workshop February

SIXTH STREET VIADUCT REPLACEMENT PROJECT MONTHLY EXECUTIVE MEETING REPORT JULY 2013

Effective Date: January, 2007 Last Reviewed Date: September, 2016 Last Revised Date: October, 2016 Next Review Date: April 2018

EXHIBIT A. TRANSIT AND MULTIMODAL DEVELOPMENT SUPPORT CONTINUING SERVICES SCOPE OF SERVICES FM No

METRA UP-W LINE. Locally Preferred Alternative Report

PRIIA Section 305 Executive Committee 10/20/2010. Version 3

Cost Estimating Guideline February, 2017

SECTION 6: MITIGATION STRATEGY

Final Training Manual to Evaluate Habitat Quality of Vernal Pool Ecosystem Sites in Santa Rosa Plain

TIER II STANDARD FOR TECHNICAL COOPERATION ADMINISTRATORS INTRODUCTION

PORT OF VANCOUVER USA Strategic Plan

Preparing a Community Wildfire Protection Plan

TAPPI Shipping, Receiving & Warehousing Workshop

Successful Partnerships in Innovative Project Delivery

US-101 CORRIDOR ADVISOR S UPDATE

Request for Information (Transit Maintenance and Operation Services Silver Line Extension)

Attachment A FTA DCE Worksheet Section II, NEPA Class of Action

Variable Speed Warnings on DMS

APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1)

Are We Prepared for the Energy Movements? JEANNIE BECKETT THE BECKETT GROUP ENERGY EXPORT PERMITTING IN THE NW JUNE SEA-TAC CONFERENCE CENTER

USACE 404 Permits Proactive By Design. Our Company Commitment. Page 1

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY

A Clean, Green Remediation

INVENTORY STRATEGY INVENTORY PLANNING AND CONTROL

SECTION 6: MITIGATION STRATEGIES

Longaro & Clarke Consulting Engineers

Keefer Pasture Drift Fence Project. Challis-Yankee Fork Ranger District Salmon-Challis National Forest

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

Performance Management. Leadership Roundtable May 14, 2008

PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT)

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 7

Sunrise Project South I-205 Corridor Improvement Project

Running head: DEATH VALLEY NATIONAL PARK 1. The Impacts of Climatic Change on Death Valley National Park and Legal Protections

RESPONSIBLE CARE MANAGEMENT SYSTEM TECHNICAL SPECIFICATION

THE FIVE GOALS FOR SCDOT S STRATEGIC PLAN ARE: GOAL 1: Improve safety programs and outcomes in our high-risk areas.

CADIZ VALLEY WATER CONSERVATION, RECOVERY, AND STORAGE PROJECT Final Environmental Impact Report SCH#

City of Winter Haven Water Sustainability Program. Mike Britt, P.E., Natural Resources Division

MEMORANDUM OF UNDERSTANDING AMONG:

REPORT RAPPORT REGIONAL MUNICIPALITY OF OTTAWA CARLETON MUNICIPALITÉ RÉGIONALE D OTTAWA CARLETON. Our File/N/Réf Your File/V/Réf.

Regional Mobility Authorities in Texas

EXPLORATION & NIGERIAN EXPLORATION & PRODUCTION

The Florida Beaches Habitat Conservation Plan

Transcription:

November 2, 2016 Rethinking Environmental Mitigation Costs Achieving Cost Reduction and Meeting Environmental Challenges on Chicago s High-Speed Rail Project Presented by: Steve Cheney, P.E. - Union Pacific Railroad General Director M/W Environmental Jeff Frantz - CH2M Vice President Transportation Environmental Studies & Documentation 1

Presentation Outline UPRR s Chicago to St. Louis High-Speed Rail Program Original Permitting Process Resulting in Extensive Permitting Requirements,Time, and Costs UPRR Innovative Impact Assessment & Mitigation Program Approach Aligning Permitting and Mitigation with Site-specific Impacts and Special Technical Expertise Redefining Impacts and Minimizing Mitigation Costs Through BMPs versus Take Permits Right-of-way fencing installed within urban areas within Union Pacific Railroad ROW 2

Program of more than 20 projects 110 MPH high-speed rail from Chicago to St. Louis 285 miles of high-speed rail (250 miles are UPRR s) Track & tie replacement, critical sidings, replace aging structures, positive train control Tracks support both freight and passenger service Fast-track design, permitting, and construction schedule Construction start in 2010, end 2017 3

UPRR High-Speed Rail Project Among Most Extensive and Complex in Area History Funded by American Recovery and Reinvestment Act (ARRA) Combined effort of UPRR, IDOT, and FRA UPRR led design, construction, land acquisition, and permitting IDOT and FRA led NEPA, design review, and program management FRA tiered NEPA process Multiple regulatory permitting agencies Covers 11 counties, 3 Corps Districts, 3 USFWS regional offices 4

Original Permitting Process Based on Preliminary Design Data and NEPA-level Impacts Resulted in Mitigation and Permit Conditions not Reflective of Project Impacts Impact and permit decisions made early to expedite schedule, but resulted in overly conservative identification of impacts NEPA process favors linear decision-making to determine project impacts and mitigations Permits require site-specific impacts and iterative analysis to determine site-specific permit conditions Original permits identified solely on basis of NEPA review using 30% preliminary design Basing impact levels on early NEPA review captured general regional impacts, not advanced-design & site-specific impacts Resulted in overstatement of impacts and mitigation commitments for state-listed species formalized in Incidental Take Authorizations (ITAs) ITAs based on NEPA-level review early design did not account for micrositing for avoidance ITAs imposed conditions for species impacts not reflected by advanced design, resulting in extensive construction impacts and mitigation commitment costs for multiple years. 5

Original Mitigation Concepts Initial Mitigation Based on Preliminary Design Information Mitigation was broad, reflecting larger assumed impacts Based on 30% design impacts Agreements made early in project development Sometimes costly, restrictive, or better suited for other entities to undertake Construction work restrictions in large areas UPRR property acquisition for non-railroad purposes Environmental management of long-term mitigation commitments 6

UPRR Iterative Approach Achieves Environmental Stewardship and Manages for Appropriate Mitigation Costs Right-Sized Impact Assessment & Mitigation Approach UPRR applies iterative approach to assessing environmental impacts and developing cost-effective and appropriate species mitigation Determine mitigation based on understanding of environmental impacts at 60% design or greater Agency coordination occurs throughout project development to ensure species protection and regulatory compliance Emphasis on avoidance and minimization, which reduces costs. Continuity of project leadership from design through construction provides understanding of and follow-through on commitments 7

UPRR Right-Sized Mitigation Informed by Detailed Impacts and Agency Collaboration Revisiting of Impacts and Mitigation Reduced Costs Additional design detail and iterative collaboration with design, environmental, and construction staff created opportunities Reduced impacts lowers mitigation needs BMPs reduce risk UPRR coordinated with resource agencies to modify and right size mitigation Emphasized avoidance and minimization Involved UPRR design, construction, and permitting staff Reduced UPRR s permit ad mitigation costs and long-term monitoring commitments Achieved agency s objectives of protecting sensitive species 8

Aligning Mitigation with Special Expertise Original Species Assessment Followed Normal Agency Approach Host plant (rattlesnake master) for protected moth species identified along the project corridor Only known habitat for state-protected species Initial Incidental Take Authorization Permit required UPRR to: Identify and collect rattlesnake master for transplanting Acquire new property to establish habitat Maintain habitat over multi-year period Conduct multi-year surveys on existing UPRR ROW Estimated cost to UPRR for original permit approach > $1,000,000 Photo source: Illinois Natural History Survey Rattlesnake Master Host Plant for Erygium Stem Borer 9

UPRR s Interagency & Site-Specific Approach Protects Species and Reduces Costs Eryngium Stem Borer Moth UPRR invited Illinois Department of Natural Resources to collaborate on revising ITA approach with mutual benefits ITA modifications included: IDNR responsibility for identifying suitable parcel for mitigation IDNR provides long-term maintenance and monitoring UPRR supports funding for effort UPRR to provide monitoring on its ROW for 4 years Typical Distribution of Rattlesnake Master Host Plants 10

Benefits Achieved for Multiple Stakeholders (Including the Moth!) Eryngium Stem Borer Moth Benefits of revised permit approach Agency with special expertise manages mitigation Funding contribution is directed toward existing IDNR needs Research adds directly to state's knowledge about species Completes UPRR s obligations sooner Absolves UPRR of maintaining a property for non-railroad use Cost of revised approach $350,000 Savings to UPRR > $650,000 Photo source: Illinois Natural History Survey 11

Redefining Impacts and Minimizing Mitigation Costs Through Use of BMPs Franklin s Ground Squirrel Habitat identified in 6 locations along UPRR corridor Species known to live along railroad ROWs and burrow and occupy disturbed soils (soil piles) Agency determined during NEPA process that Incidental Take Authorization required ITA processing Source: requirements www.webcat.fhsu.edu of 6-plus months put construction schedule at risk Species trapped by agency staff in 1 of the 6 locations; presence in other locations uncertain Uncertainty of presence led to abundance of caution by permitting agency Original permit costs: $300,000 or more 12

Understanding Work Activities Key to Avoiding Impacts Franklin s Ground Squirrel UPRR initiated agency meetings to review advanced project design UPRR proposed and agencies accepted close coordination during construction to avoid take permit and minimize species impacts Minor design changes showed that ground-disturbing activities could be avoided or limited in 5 of 6 possible locations for species areas Access to work areas could be limited Heavy equipment access could be limited Construction could be completed on consecutive days to limit FGS reoccupation of site Exclusionary fencing could be installed to limit construction and FGS access Source: Illinois Natural History Survey 13

UPRR s Additional BMPs Further Reduced Risk of Species Impact Franklin s Ground Squirrel UPRR conducted worker environmental awareness training Deployed onsite biological monitor during required construction activities Conduct preconstruction survey Guide installation of exclusionary fence Monitor for species during construction Conduct site visits outside of these time frames to limit inadvertent construction activities in FGS habitat 14

UPRR s Iterative Process and Construction Coordination Protected Species and Reduced Compliance Costs Franklin s Ground Squirrel UPRR coordinated revisions to FGS management and work restrictions with IDNR IDNR concurred with UPRR s proposed BMPs instead of requesting an ITA Avoided permit issuance Avoided construction delays - Saved 6 months to 1 year of schedule Provided required species protection Reduced or eliminated UPRR s permit and mitigation costs of >$300,000 Worker Training Materials for Species BMPs 15

UPRR Right-Sized Approach Achieved Cost Reduction while Integrating Stewardship Maximizing Opportunities in Design Close coordination with design and construction staff clarifies work scope and construction methods Ongoing agency coordination through design (not just NEPA) reduces surprises Collaborative negotiations with regulatory agencies benefits species, agencies, railroad Including regulatory commitments in construction documents clarifies expectations Considering alternative partners for completing mitigation lowers costs and aids agency missions 16

UPRR Right-Sized Approach Achieves Cost Reduction while Integrating Stewardship And in Construction Discussing commitments at pre-bid and preconstruction meetings raises awareness and allows for discussion Conducting worker environmental awareness training (WEAT) informs staff at all levels Maintaining communication with construction team facilitates change management Periodic site visits to observe environmental commitments ensures compliance Using biological monitors when habitat for listed species is present, but presence of species is uncertain minimizes risk 17

Project Successes in Summary Chicago s High Speed Rail Project Original Approach Original permits identified solely on basis of NEPA review using 30% preliminary design Resulted in overstatement of impacts and mitigation commitments Did not account for micro siting for avoidance Over-estimated construction impacts and mitigation commitment costs for multiple years. Adjusted UPRR Approach Permitting based on 60% or greater design Emphasis on avoidance and minimization Permitting and mitigation based on real construction impacts, not theoretical worst case impacts Continuity through construction to be sure commitments are met Overall reduction in permitting and mitigation costs estimated at more than $2M 18