State Road (S.R.) 12 (Florida Arts Trail PD&E)

Similar documents
SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

Concept, Feasibility & Mobility Studies. Southport Connector Expressway

Statewide Acceleration Transformation (SWAT)

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

NORTH I-75 MASTER PLAN Summary Report

PUBLIC HEARING LOOP 9

CRTPA Regional Mobility Plan Attachment 1 Agenda Item 4E Page 1 of 11

Northwest State Route 138 Corridor Improvement Project

Project Initiation Form

Attachment A FTA DCE Worksheet Section II, NEPA Class of Action

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014

APPENDIX A. NEPA Assessment Checklist

Final Design Guideline

POND SITING REPORT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY SECTION 1.0 INTRODUCTION SECTION 2.0 PROJECT DESCRIPTION

Currituck County Moyock Mega-Site Market Feasibility Study March 28, 2016

Dutchess County Soil and Water District

Suncoast Parkway 2/SR Toll 589 FPID: & 3, -4

County of Calaveras Department of Planning

FTBA 2018 Construction Conference Major Projects Update

FINDINGS OF FACT and CONCLUSIONS

Working with Transportation Concurrency Exception Areas

PINELLAS COUNTY MOBILITY PLAN SUMMARY REPORT

Categorical Exclusion (CE)

Categorical Exclusion (CE)

Background Study Goals and Objectives

Conventional vs. Sustainable: A Matrix for Decision Making. APWA National Sustainability Conference Pittsburg, PA June 26, 2012

Project Delivery. Rodger Rochelle, PE Technical Services Administrator. Mike Holder, PE Chief Engineer

Traffic Study Guidelines

October 19, 2017 Community Engagement Panel Meeting #4 Overview of Environmental Effects

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY Orange Hammock Ranch Conservation Fact Sheet

Environmental Information Worksheet

IX. STRATEGIC PLAN ELEMENT

Transportation Project Delivery Process & Mitigation

Rapid City Area Metropolitan Planning Organization OPERATIONS PLAN

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

Florida Department of Transportation STATE ENVIRONMENTAL IMPACT REPORT

Task Work Plan Deliverable 7 Agency Meeting Summaries

6.0 Indirect Effects and Cumulative Impacts

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE

TCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm

LAND USE POLICIES BY COMMUNITY DESIGNATION

SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES

# 14 ) ZN AMERICAN DIALYSIS CENTER OF NORTH LAS VEGAS M-2, GENERAL INDUSTRIAL DISTRICT TO M-1, BUSINESS PARK INDUSTRIAL DISTRICT PUBLIC HEARING

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

Vero Beach Vision Plan

Project Evaluation Criteria

PROGRAMMATIC AGREEMENT FOR APPROVAL OF CERTAIN CATEGORICAL EXCLUSIONS

Public Meeting. US Highways 18 & 281 and SD Highway 50 From Douglas County Line to SD46 Charles Mix County

MADISON COUNTY 2020 LAND USE AND RESOURCE MANAGEMENT PLAN

Abbreviated State Final Environmental Impact Statement

Funding for this guidebook was provided through the Genesee Transportation Council s Unified Planning Work Program

U.S. DEPARTMENT OF TRANSPORTATION Federal Highway Administration. RECORD OF DECISION June 2014

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.

Interstate 10 (SR 8)/ SR 200 (US 301) Interchange Interchange Modification Report. APPENDIX E Interchange Concepts Considered

Introduction Page I-1 INTRODUCTION

PLANNING COMMISSION STAFF REPORT. Utah Crew Rowing Dock Conditional Use 830 S. Delong Street September 8, 2010 Petition #PLNPCM

Draft Noise Study Report

The term Significant as used in NEPA is defined at 40 CFR and requires consideration of both context and intensity.

Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation

Wheaton PRELIMINARY RECOMMENDATIONS

U S H I G H W A Y 1 4 F I N A L E N V I R O N M E N T A L I M P A C T S T A T E M E N T ( F E I S

Stockton Freight & Passenger Rail Mobility Enhancement

HELENA CHEMICAL COMPANY NELSON TERMINAL PROJECT USE PERMIT UP Butte County Board of Supervisors January 29, 2013

The Miami Intermodal Center Chairman John Mica Visit - October 23, 2012

FERRY COUNTY COUNTY-WIDE PLANNING POLICIES

Tax Increment Financing (TIF) Public Information Meeting October 11, 2011

Pinellas County Metropolitan Planning Organization 2035 Long Range Transportation Plan Environmental Resource Evaluation Methodology

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

ARTICLE II THE GENERAL PLAN

ARTICLE 9 INDUSTRIAL

1. Introduction Noise Analysis Results Figures. List of Tables

Route 7 Corridor Improvements Project Reston Avenue to Jarrett Valley Drive Public Hearing

2 PROJECT DESCRIPTION

HORIZON 2030: Plan Projects November 2005

November 8, RE: Harrah s Station Square Casino Transportation Analysis Detailed Traffic Impact Study Review. Dear Mr. Rowe:

Green Line Extension EOT. Project Location. Project Purpose. Environmental Impact Report Public Scoping Session

BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE

Second Amendment to the Urban Renewal Plan for the Ingersoll-Grand Commercial Urban Renewal Area

CENTRAL FLORIDA EXPRESSWAY AUTHORITY. SR 408 Eastern Extension PD&E Study

PROJECT QUALITY CONTROL PLAN

Tax Increment Financing ( TIF ) Overview

Analysis of Alternatives

EXECUTIVE SUMMARY ES.1 BACKGROUND ES.2 PURPOSE AND NEED FOR THE PROPOSED PROJECT

URBAN CENTER COMMUNITY ROLE COUNCIL ROLE ALL COMMUNITIES URBAN CENTER

Oregon Theodore R. Kulongoski, Governor

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Chapter III Affected Environment and Impacts of the Proposed Action

Draft Environmental Impact Report for The Farm at Alamo Creek Specific Plan Project

ACTIVE TRANSPORTATION PROGRAMMING COMMITTEE Project Funding and Scoring Criteria

Syracuse General Redevelopment Plan Study Areas #1-3

Airport Master Plan Update June 14, 2017

Overview of the Project Development Process. Brian Blanchard, PE Assistant Secretary for Engineering and Operations

Chapter 18. Quality Assurance and Quality Control

TRANSPORTATION TRANSPORTATION 9-1

JOINT PUBLIC NOTICE SAM PAH U. S. ARMY CORPS OF ENGINEERS MISSISSIPPI DEPARTMENT OF ENVIRONMENTAL QUALITY OFFICE OF POLLUTION CONTROL

Mall Area Redevelopment TIF District Proposal

Regional Transportation Studies Regional Council

SH 35 Public Meeting

Transcription:

State Road (S.R.) 12 (Florida Arts Trail PD&E) from North Corry Street to S.R. 63 (U.S. 27) Gadsden County, Florida FPID Number: 433380-1-32-01 CRTPA Briefing September 2015

Today s Presentation Evolution of the project PD&E Study Public Comments and Concerns Next Steps

Gadsden County Bike- Ped Master Plan Completed August 2012 CRTPA Provided Funding to FDOT to Advance Project Late 2012 S.R. 12 PD&E Public Hearing May 2015 August 2012 Florida Arts Trail Feasibility Study Completed S.R. 12 (Florida Arts Trail) PD&E Study Began June 2013 Anticipated FHWA approval of the PD&E Late Fall 2015 Project Evolution

Purpose and Need Evaluate the options for constructing a multi-use connection between the cities of Quincy and Havana that follows the S.R. 12 corridor Designated as the Florida Arts Trail in 1997 by the Florida Legislature The facility would accommodate local bicyclists, pedestrians, and person with disabilities Provide a linkage to recreational, educational, and local economic centers in the area Lessens chances of conflict between the motorized and non-motorized users

Project Study Area

Proposed Typical Section Quincy Historic District

Proposed Typical Section Quincy Area (Outside Historic District)

Proposed Typical Section Between Quincy and Havana

Proposed Typical Section Havana Area

Alternatives Evaluation Matrix Environmental & Engineering Considerations Build Alternative No Build Land Use Change Potential Land Use Change Minimal None Potential Relocations Residential Relocations 0 0 Business Relocations 0 0 Total Potential Relocations 0 0 Community Services Number of community resources impacted 0 0 Farmlands Impacts to prime farmlands Minimal None Potential Right of Way Acquisition Residential Parcels Affected 31 0 Business Parcels Affected 2 0 Vacant Parcels Affected 3 0 Total Parcels Affected 36 0 Cultural Resources Impacts to NRHP Eligible Sites or Resources Groups? None None Wetlands Acres of Direct Wetland Impacts 0.11 0 Acres of Direct Surface Water Impacts 0.1 0 Total Impact Acres 0.21 0

Alternatives Evaluation Matrix (Con t) Environmental & Engineering Considerations Build Alternative No Build Water Quality Potential impacts to water quality Minimal None Floodplains Impacts to the 100 year floodplain Minimal None Wildlife and Habitat Affects to Federally listed species Minimal None Affects to State listed species Minimal None Potential for Encountering Contamination Potential involvement with adjacent "High" and "Medium" Ranked Sites 7 0 Number of "high" and "medium" ranked sites needed for ROW 0 0 Utilities and Railroads Potential impacts to Utilities and Railroads Minimal None Bicycles and Pedestrians Provides dedicated facilities for Bicyclists and Pedestrians Yes No Safety Potential reduction of motorized and non motorized user conflicts Yes No Project Cost Estimated Roadway ROW Cost (millions) $1.1M $0 Estimated Design/CEI/MOT Cost (millions) $1.3M $0 Estimated Construction Cost (millions) $6.6M $0 Total Estimated Cost $9.0M $0

Right-of-way Acquisition and Relocation On this project, it is anticipated that right-of-way will be needed from 36 parcels and totals 3.1 acres. No business or residential relocations are anticipated. Design is the next phase in the project development process, followed by right-of-way acquisition and construction.

Public Comments and Concerns Impacts to existing drainage systems and concern over additional runoff Impacts to private property access Right-of-way requirements Location of trail relative to structures Safety and crime concerns Environmental impacts Utility impacts Impacts to Quincy Historic District Impact to property values Cost to local tax payers vs. benefit

Finalizing the PD&E Type 2 CE submitted to Federal Highway Administration (FHWA): Early Fall 2015 FHWA Approval and Location Design Concept Acceptance: Late Fall 2015

PD&E Study Contacts April Williams, P.E. Project Development Engineer (888) 638-0250 ext. 1625 April.Williams@dot.state.fl.us Sherry Alaghemand, P.E. Project Manager (888) 638-0250 ext. 1510 Sherry.Alaghemand@dot.state.fl.us Ian Satter Public Information Director (888) 638-0250 ext. 1205 Ian.Satter@dot.state.fl.us