Construction Engineering and Inspection Services Pembroke Road from Dykes Road to Silver Shores Boulevard Broward County, FL

Similar documents
PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

CEI Services Transit Bus Stop Infrastructure

Introduction Who We Are

MEET THE AE TEAM YOUR CEI SOLUTION YOUR PARTNERS

NOVEMBER 13, 2017 S O L I C I T A T I O N N O. V P

Overview. Construction Engineering and Inspection Services for Wiles Road from Riverside Drive to Rock Island Road

Project Type: Drainage and Storm Systems

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

MAINTENANCE OF TRAFFIC NOTES

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

CITY OF SAFETY HARBOR ENGINEERING

Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

MEMORANDUM. DATE: December 12, Steve Joseph, P.E. J. Philip Cooke, P.E. Monique Durand, P.E. Wastewater Flow Projections

Exhibit A Scope of Work. 0.0 Separation of work Types and Cost Estimate

FTBA 2018 Construction Conference Major Projects Update

Forsyth County Procurement

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Constructability Guidelines

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

Final Estimates Level 2

The Gateway Expressway FTBA Conference. February 2-3, 2017

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

3.6 Construction Methods

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

ETS. Scripps Networks Expansion Knoxville, Tennessee. Services Provided: Subsurface Exploration - drilling geotechnical engineering

1/2017. Atkins North America, Inc W. Boy Scout Boulevard Tampa, FL 33607

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

Sandstone Curb Replacement Standards

CONSULTANT OF THE YEAR

TABLE OF CONTENTS SECTION

EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR. Project Description. US 41 (SR 45) From Winkler Avenue to SR 82

EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR. Project Description

City of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ)

Maintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

For Public Input Period

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012


South Carolina Department of Transportation. Engineering Directive

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2

TxDOT Houston District Permit Requirements (Information contained herein is subject to change)

2018 FTBA CONSTRUCTION CONFERENCE February 8-9, 2018 Hyatt Regency, Orlando FDOT WORK PROGRAM OVERVIEW

Design-Build. Authorization. Criteria Selection/Award Process. Design-Build Construction Engineering and Inspection

EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR. Project Description

APPENDIX H. Capital Improvement Program Detail Project Costs NORTH PERRY AIRPORT MASTER PLAN UPDATE APPENDICES

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

Carpinteria Avenue Bridge Replacement Project Description Introduction

EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR. Project Description

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ADVANCED INFORMATION LETTING JULY 17, 2014 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA

ASSOCIATED PENNSYLVANIA CONSTRUCTORS SUPPLEMENTAL ECMS ADVANCED INFORMATION LETTING MAY 24, 2018 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)


DOCUMENT CONTROL PANEL

Exposition Light Rail Transit Project

ENGINEERING SERVICES REPORT FOREST LAKES BOULEVARD PAVEMENT EVALUATION TAMPA ROAD TO COUNTY LINE FOR PINELLAS COUNTY, FL. May 21, 2010 URS CORPORATION

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

TRANSPORTATION ELEMENT

LIST OF STANDARD DRAWINGS H2-2 - SERIES 2: Grading

EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR. Project Description

PERMITTING AND CONSTRUCTION MANUAL

Douglas Woods Wind Farm

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

Greater Cleveland Regional Transit Authority

Providence Corner HOA Upper Providence Township, Pennsylvania

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

6 Preliminary Assessment of Construction Method and Constructability Issues

Maryland Transportation Authority (MDTA)

Florida Department of Transportation

Florida Department of Transportation Notice to Contractors / Consultants:

A T L A N T I C O C E A N

ENCROACHMENT/EXCAVATION PERMIT APPLICATION

June 19, 2015 Set 2. FROM: Anita Hoover, Procurement Specialist 3

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996.

City of San Angelo, Texas Capital Improvements Program. 50th Street Extension

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

Construction Inspection for the FUTURE. Presented By: Gary Angles, PE Lyle Flower, PE

1441 East 104 th Street, Suite 105 Kansas City, MO Tel (816) Fax (816)

STANDARDS FOR CONSTRUCTION AND USE OF PUBLIC RIGHTS-OF-WAY AND EASEMENTS

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

APPENDIX F: CALTRANS COST ESTIMATE TEMPLATE (included in Appendix AA of the CALTRANS Project Development Procedures Manual)

ADMS Installation MP Financial Project Number: Extinguish the Torch Summary Report

Route 7 Widening Project Project No , P101, R201, C501 UPC No January 15, a.m. NOVA District Building

I-64 Pavement Rehabilitation

TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

c h a p t e r 4 d e s i g n e x a m p l e s f o r s a n m a t e o c o u n t y A typical residential street intersection

Florida Department of Transportation

CITY OF LOS ANGELES Sidewalk Repair Program. Amber Elton, PE

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria

Hosted by: M Squared Engineering on behalf of the Illinois Department of Transportation Thursday, February 9, 2012 Eiger Lab, Rockford, IL

DIVISION 5 STORM DRAINAGE CRITERIA

Transcription:

Construction Engineering and Inspection Services to Silver Shores Boulevard Broward County, FL R L I N O. R 2 11 4 0 8 0 P 1

I. Experience and Qualifications with Roadway Construction a. Eisman & Russo b. Individual Team Members II. Construction Management Approach a. Scope b. Coordination c. Environmental III. Challenges and Solutions a. Access to Silver Shores Elementary b. Public Access c. Subsoil Excavation d. Utilities e. Perimeter Wall Installation f. Deep Drainage Installations g. Adjacent Projects

J. Scott Gombar, P.E. CEI Project Manager Principal with Eisman & Russo Over 22 Years in South East Florida Largest CEI Division of Eisman & Russo Extensive FDOT Roadway Construction Broward County Highway Engineering Municipal Roadway Construction

Similar Project Experience Pembroke Road from SW 145 th Avenue to Silver Shore Boulevard Javier Grass Sr. Inspector BROWARD COUNTY SR-7/US 441 Reconstruction from Fillmore Street to Stirling Road Jose Sotomayor, P.E. Project Engineer BROWARD COUNTY Hollywood Boulevard from US1 to Intracoastal Waterway Ido Shimony, P.E. Sr. Project Engineer BROWARD COUNTY Education Corridor Median Improvements, Coconut Creek Ido Shimony, P.E. Sr. Project Engineer BROWARD COUNTY

Team Experience Organization Chart QA/QC Team J. Scott Gombar, P. E. Leonardo Offredi, P. E. Chris Charvat Broward County HCED Project Manager Nirmal Datta, P.E. CEI Project Manager J. Scott Gombar, P. E. Senior Project Engineer Ido R. Shimony, P. E. Testing Lab GCES Engineering Services (CBE) Survey Aylward Engineering & Survey (CBE) Aerial Photograph Smith Aerial Photograph Inspector Mark Zuniga Project Engineer Jose Sotomayor, P.E. Senior Inspectors Michael Babcock Javier Grass Contract Compliance/Administrative Assistant Marielena Gombar

Team Member s Experience Qualifications & Certifications CTQP Final Estimates 1 CTQP Final Estimates 2 CTQP Asphalt Paving Level 1 CTQP Asphalt Paving Level 2 CTQP Earthwork Level 1 CTQP Earthwork Level 2 Nuclear Radiation Safety CTQP Concrete / ACI Level 1 CTQP Drilled Shaft Inspection CTQP QC Manager FDOT Critical Structures NPDES Florida Advanced MOT IMSA Traffic Signal Technician 1 IMSA Traffic Signal Inspector Eisman & Russo, Inc. FDOT Prequalification 10.1 Roadway Construction Engineering Inspection Position CEI Staff Project Manager J. Scott Gombar, P. E. Senior Project Engineer Ido R. Shimony, P. E. Project Engineer Jose Sotomayor, P.E. Senior Roadway Inspectors Michael Babcock S S Javier Grass S S Roadway Inspector Mark Zuniga S = Scheduled

Team Member s Experience Ido R. Shimony, P.E. Senior Project Engineer 20 years experience in design/construction of bridges and roadways Leadership role on similar scope projects Experience working with FPL, Broward County Traffic, SBDD, SFWMD Experience with Perimeter Noise Wall Construction Experience with Complete Streets Takes Ownership of Project Establish Project Specific Goals Manage Schedule and Budget

Team Member s Experience Similar Projects Ido Shimony, P.E. Roadway Construction Experience Drainage Earthwork Asphalt Signalization Lighting Landscaping and Irrigation Eller Drive and ICTF Overpass X X X X X X I-75 Segment D and Sheridan Street Interchange Hollywood Boulevard from US1 to Intracoastal Waterway West Hallandale Beach Boulevard from Lakeshore Dr. to Dixie Highway X X X X X X X X X X X X X X X X X X

Team Member s Experience Jose Sotomayor, P.E. Project Engineer 10+ years of experience as Contractor and CEI on bridge and roadway projects CEI Project Engineer for SR 7/US 441 Project Established trust with Contractor Has worked on construction projects with costs from $32 $86 M Experience working with FPL, Broward County Traffic, SBDD, SFWMD Experience in Scheduling Review Monthly Pay Requisitions

Team Member s Experience Similar Projects Jose Sotomayor, P.E. Roadway Construction Experience SR-7/US-441 From Filmore to Stirling Road Bear Cut Bridge and West Bridge Rehabilitation Project Golden Beach Bridge Replacements SR 823 Red Road from Okeechobee Rd to West 23 rd Street Drainage Earthwork Asphalt Signalization Lighting Landscaping and Irrigation X X X X X X X X X X X X X X X X X X X X X X

Team Member s Experience Inspection Staff Javier Grass Senior Inspector 14 years of Experience East Pembroke Road Project and SR 7/US 441 Michael Babcock Senior Inspector 13 years of Experience Hallandale Beach Blvd, Red Road and I75 Improvements at Pembroke Road Mark Zuniga Inspector 14 years of Experience Earthwork specialist for Eller Drive and Turnpike Express Lanes projects Background in Quality Control Testing

Construction Management I. Project Scope Phases of Construction Traffic Control Plan Restrictions Perimeter Wall Construction Subsoil Excavation Drainage New Road Construction Concrete Elements Specialty Items Milling and Resurfacing II. III. Coordination Utility Companies Stakeholders Environmental Drainage work at Canal Irrigation Pumps

Phases of Construction Scope

Perimeter Wall Construction City of Miramar Walls City of Pembroke Pines Walls

Drainage 5,000 feet of Drainage Pipe Connecting to Existing Drainage Modifications to Existing Drainage New Drainage Inlets and Boxes 500 feet of French Drain

Concrete Asphalt 14,000 LF of Curb and Gutter Sidewalks and ADA Ramps 4 Bus Stops and 2 Bus Bays Mast Arm Foundations Widening New Roadway Construction Milling and Resurfacing Driveways

Traffic Signalization Equipment Solar School Flasher Overhead Mast Arm Lighting Landscaping and Irrigation

Value Engineering Alternatives that offer benefits in the areas of engineering design, equipment and material selection, construction and operations and maintenance. Primary objective to identify cost reductions without impairing essential functions, ease of maintenance Subsoil Excavation Wall Post and Panels

Stakeholders Broward County HCED, Traffic Engineering City of Miramar City of Pembroke Pines Broward County Transit Broward County Public Schools Emergency Services South Broward Drainage District Homeowners Associations Silver Shores Grand Palms Estates of Pembroke Shores Pembroke Shores Utilities AT&T Broward County City of Miramar City of Pembroke Pines Public Services Comcast Cable FPL Distribution FPL Fibernet Broward County Traffic Engineering

Challenges and Solutions Silver Shores Elementary School Entrance Challenge: Maintain Access to school for Drainage Crossing and Driveway Construction Solution: Broward County School Calendar Coordinate with Silver Shores Elementary School and Broward County School Board Reconstruct the drainage and driveway in phases Construct a temporary two way traffic driveway

Challenges and Solutions Public Access Challenge: Minimize impacts to bikes and pedestrians during construction. Solution: Maintain sidewalks Provide safe alternate routes around construction activities Coordinate alternate routes with Broward County Traffic Engineering Division and EOR in MOT Plans

Challenges and Solutions Subsoil Excavation Challenge: Some subsoil excavation in plans was already performed in east project Solution: Redefine limits of demuck to match as built plans of east project Demuck Previously Performed East of Pembroke Shores Blvd Demuck Work Shown in Plans

Challenges and Solutions 28,000 CY of Subsoil Excavation and Utilities Challenge: Avoid utility damage during excavation Solution: Maintain locates and soft dig utility Utilize As Built Plans from the Utility Owner Monitor high impact equipment near Utilities

Challenges and Solutions Installation of Perimeter Wall Under Utilities Challenge: Install wall posts and panels below overhead utilities lines Solution: Coordinate de energizing of lines Ensure Contractor meets OSHA and utility owners clearance regulations Flag overhead Utilities Contractor to assign a spotter

Challenges and Solutions Deep Drainage Installation Adjacent to Wall Challenge: Risk of damage to wall posts due to confined space between existing utilities, perimeter wall and right of way Solution: Temporarily bracing the perimeter wall posts while constructing french drain and adjacent structures Protection of the posts

Challenges and Solutions Adjacent Projects Grand Palms Entrance Challenge: Coordination between Pembroke Road construction and proposed Grand Palms Entrance. Solution: Facilitate coordination between Grand Palms HOA, Contractors and Broward County. Recommend adding plan note about proposed Grand Palms Entrance.

Your Solutions Team Thank You!