SECTION WOOD AND ATHLETIC FLOORING. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Similar documents
SECTION WOOD AND ATHLETIC FLOORING. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

WOOD ATHLETIC FLOORING

MFMA Guide Specification for Sleeper and Sleeper with Plywood Floor Systems

SECTION WOOD GYMNASIUM FLOORING

INSTRUCTIONS FOR EDITING AND COORDINATION SECTION WOOD FLOORING - ATHLETIC

SECTION ARCHITECTURAL SPECIFICATIONS FOR INDOOR WOOD ATHLETIC FLOORING

CHAMPAIGN CENTRAL HIGH SCHOOL COMBES GYM FLOOR REPAIR. A. Submittals: Product Data, Specification Sheets, Samples and Manufacturer Warranty.

CONNOR PERMAFLEX & PERMAFLEX II Page 1 of 5

ActionCush I Floating Resilient Floor System

HARO SPORTS FLOOR C.S.I. GUIDE SPECIFICATION Helsinki-Gymnasium Floor System 10/2010 SECTION WOOD ATHLETIC FLOORING

A. Drawings and general provisions of the Contract apply to this Section including all documentation provided in RFP#

ActionCush II Floating Resilient Floor System

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.

1. Division 09 Section "Rough Carpentry."

Bid: Seventy-First High School Gym Floor Refinishing

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE

CONNOR Control XT Page 1

ARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment

1. CONCRETE SUBFLOORS.SECTION a. Slab Depression: Equal to thickness of selected flooring (6, 8,10,12,13 or 14mm).

Union County Vocational - Technical Schools Scotch Plains, New Jersey

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

Section II Subfloor Guidelines & Specifications Page Chapter 4 Wood Subfloor Guidelines 23 Chapter 5 Concrete Subfloor Guidelines 26 Chapter 6

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

SECTION EPOXY TERRAZZO

GUIDE SPECIFICATION

RESILIENT FLOORING: Hot and Heavy - Secoya

GUIDE SPECIFICATION

Bldg. 751 GOETTGE MEMORIAL FIELD HOUSE REFINISH GYM USMC CAMP LEJEUNE MAXIMO: FLOORING A-1 LOCATION & GENERAL DISCRITION

SECTION EPOXY FLOORING SYSTEMS

COMPOSITE (WPC) ENGINEERED VINYL FLOORING INSTALLATION

SECTION EPOXY TERRAZZO

RESILIENT FLOORING: Select Step Wood

WATER TUFF VINYL FLOORING ATTENTION! READ BEFORE INSTALLING! Angle-Tap Installation Instructions

1.3 Work shall include all reinforcement and accessories necessary to complete installation.

A. Section includes surface preparation and application of wood finishes[.]

STATEMENT OF WORK (SOW)

SECTION PREFINISHED ENGINEERED WIDE-PLANK FSC OAK FLOORING

SECTION RESILIENT SHEET FLOORING

SECTION PREFINISHED FSC MAPLE FLOORING. This is a template: edit this specification carefully to suit specific project requirements.

Suggested Specification for Tri-Patch Versatile Concrete Patching Compound

ENGINEERED WATERPROOF FLOORING GENERAL INSTALLATION INSTRUCTIONS FOR VÄLINGE 2G LOCKING FLOORING

B. Store products in dry spaces protected from the weather, with ambient temperatures maintained between 50 and 90 deg F (10 and 32 deg C).

SECTION RESILIENT SHEET FLOORING

Page 1 of 5 PART 1 GENERAL

1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards

HI-TEK POLYMERS T-Poxy Terrazzo Arch Data

Action ReFlex Spin Resilient Floor System

Installation Guidelines for EcoDomo Echelon Collection RECYCLED LEATHER TILES AND SHEETS GLUE-DOWN METHOD WITH WATER BASED CONTACT CEMENT

SECTION LATEX-MODIFIED MEDIUM BED MORTAR

PLYWOOD FLOATING FLOOR

Recommended Design Considerations. and. Guide Specifications For. Commercial Building Insulation

TILE TILE

Installation and Maintenance Instructions VINYL FLOORING (Premium Resilient Tile (PRT) / Commercial Resilient Tile (CRT)

A. Section includes hydraulic-cement-based, polymer-modified, self-leveling underlayment for application below interior floor coverings.

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

ARDEX GUIDE SPECIFICATION ARDEX MC RAPID One-Coat Moisture Control System For Concrete to Receive ARDEX Products

UNIFIED FACILITIES GUIDE SPECIFICATIONS

WOOD FLOORING WOOD FLOORING

Interior finishes include wall finishes, floor finishes, wall base finishes, and ceiling finishes.

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

1. The subfloor must be structurally sound and able to withstand live and dead loads with a deflection limitation of L/360.

ENGINEERED LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

RESILIENT TILE FLOORING

Façade Architectural Wall Panel System - Guide Specification 3/11/2017 SECTION FRAMED DECORATIVE PANEL SYSTEMS PART 1 - GENERAL 1.

Kolorines Glass Mosaic Tiles Project Specification

RESILIENT CORK TILE 3 PART SPECIFICATION #Z 624

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOCKING FLOORING

SECTION POLYACRYLATE MODIFIED CEMENTITIOUS TERRAZZO FLOORING

ATTENTION! READ BEFORE INSTALLING!

SECTION HYDRAULIC CEMENT UNDERLAYMENT

Application Specification:

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

PREPARATION IS THE KEY TO SUCCESSFUL FLOOR COATINGS By Bob Cusumano

SECTION PRE-ENGINEERED BUILDING INSULATION

POLYURETHANE FOAM SAMPLE DESIGN GUIDELINES URETHANE

FLUID APPLIED WATERPROOFING

SECTION CERAMIC TILING

SECTION TERRAZZO FLOOR TILE

SECTION CERAMIC TILE

INSTALLATION INSTRUCTIONS

SECTION RESIDENTIAL OVERHEAD DOORS SIGNATURE COLLECTION WOOD GARAGE DOORS

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

PREFINISHED WIDE PLANK BAMBOO FLOORING Teragren Craftsman II

Product Installation Manual

Ash Brook Golf Course Scotch Plains, New Jersey

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing

SECTION COLD APPLIED RUBBER MODIFIED ASPHALT WATERPROOFING

Installation Guide LVP Glue Down

Series - 1

Chapter 2. Basic practices. Topics. 7 Basic practices. Notes. 2.5 Existing flooring and adhesive residue Job site conditions 8

SECTION RESINOUS MATRIX TERRAZZO FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?

ComforTech Cushioned Rubber Sheet Flooring

LOOSE LAY INSTALLATION GUIDE PAGE 1 of 6

Section HIGH-TENSION Stretched-Fabric Wall Systems SoftWalls, Inc.

Signature Sports Flooring Installation Instructions. For SignaDeck Premium Rubber Tiles

SECTION COMMON WORK RESULTS FOR CONCRETE SSPECIALTY COATINGS

1.02 DESCRIPTION A. This Section specifies furnishing and installing Surface Applied Detectable/Tactile Warning Surface Tiles where indicated.

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

Transcription:

SECTION 096466 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting a bid for the work of this SECTION. 1.02 SCOPE OF WORK A. Furnish and install the following items required to complete the work of this SECTION, as shown on the Drawings and specified herein: 1. Wood flooring system at auditorium stage comprised of the following: a. 6 mil polyethylene membrane. b. Resilient pads with air channels on plywood sub flooring panels, and all necessary fasteners. c. Maple flooring, with polyurethane sealer and finish. d. Perimeter ventilating base. e. Leveling of sub floor to blend athletic flooring with adjacent finish elevations. 2. Wood stairs to auditorium stage consisting of: a. Maple treads and risers. 3. Sand and refinish existing wood gymnasium floor; including repainting of games lines. 1.03 RELATED WORK SPECIFIED ELSEWHERE A. The following related work is to be performed under the designated SECTIONS: 1. Wood framing and subfloor for stage stairs: SECTION 061000-ROUGH CARPENTRY. 2. Thresholds and expansion covers: SECTION 055000-MISCELLANEOUS METALS and SECTION 087100-FINISH HARDWARE. 096466-1

1.04 SHOP DRAWINGS A. Submit complete shop drawings, including manufacturer's specifications, and installation data for wood flooring systems and finishes specified herein, in accordance with the provisions of SECTION 013300-SUBMITTALS. 1.05 SAMPLES A. Submit the following samples in accordance with the provisions of SECTION 013300-SUBMITTALS. 1. Assembled section of the floor system, 24 inch x 24 inch minimum, including all components and finish. 2. Fasteners for system flooring. B. Submit care and maintenance instructions for flooring. 1.06 QUALIFICATIONS A. Work of this SECTION shall be performed by an established flooring installation firm approved by the flooring system manufacturer, and qualified by a minimum of five (5) years of experience and in a financial position to do the work specified hereunder. B. Submit, with transmission of initial samples required, the following: 1. Experience record showing the wood flooring installation firm's training and experience in similar work. 2. List and give brief description of similar work, satisfactorily completed, with location, date of contracts, together with names and addresses of owners. 3. List of facilities and equipment available to do the work. C. The flooring installer shall be experienced in the supervision of wood and athletic flooring installation in this type of work. The actual work shall be done by qualified and experienced mechanics working under his supervision. D. The Architect reserves the right to reject the wood and athletic flooring firm if (1) the required qualification data is not received, or (2) the data submitted indicates an unsatisfactory experience record. 1.07 DELIVERY, STORAGE AND HANDLING A. Materials shall not be delivered or installed until all masonry, painting, plastering, tile work, marble and terrazzo work are completed. All overhead mechanical work, lighting, backstops, scoreboards shall be installed. Room temperature shall be at least 55 degrees or higher, and moisture content of concrete slab of 4.5% or less, or vapor transmission not to exceed 4.5 pounds per 1,000 square feet. Environmental temperatures must average a minimum of 65 degrees and 096466-2

relative humidity 50% or lower for a period of one week before, during, and 72 hours following installation. B. Area where materials are to be stored shall be maintained at 55 degrees and under 50% relative humidity by the General Contractor. Store materials at project site for sufficient length of time to equalize with site conditions. Open cartons minimum 48 hours before installation. 1.08 GUARANTEE A. Upon completion of the work, submit to the Architect, for transmission to the Owner, two (2) copies of a written guarantee, covering prompt and proper replacement and repair of any and all improper work and materials that may become apparent within twelve (12) months after the date of Substantial Completion under the work is performed. 096466-3

PART 2 PRODUCTS 2.01 MANUFACTURER A. To establish a standard of quality, design and function, drawings have been based on Bio-Cushion Panel/Panel Subfloor System by Robbins, Inc. Similar systems by Aacer Flooring and other manufacturers of similar quality, design, and function will be considered for approval as an equal upon receipt of product literature as required by the Architect. 2.02 MATERIALS STAGE FLOORING A. Membrane - 6 mil polyethylene. B. Pads Robbins green (for dance) 7/16 inch thick EPDM rubber pads with reverse cavity. Lower and upper surfaces shall be non-coextensive. Install pads 12 inches on center each direction, 32 pads per sheet. C. Panel/Panel Subfloor System: 1. Plywood - Two (2) layers of 15/32 thick x 4 feet x 8 feet, C-D-X exposure I, 4 ply minimum plywood. Sheets shall be laid perpendicular to each other and laminated with water proof panel adhesive and with screws or annular nails as recommended by the manufacturer. Wood staples shall not be allowed. 2. Cleats 2 inch barbed cleats or equivalent. 3. Maple flooring 25/32 inch thick x 2-1/4 inch width, second and better, T&G and EM, KD Northern Hard Maple, Continuous StripXL flooring, grade in accordance with MFMA Standards. 4. Total floor system thickness 2 1/4 inches. D. Perimeter Base - Coved, 3 inch x 4 inch ventilating type in color as selected by the Architect. E. Finishing Materials As specified under paragraph 2.04. F. Leveling Materials - As recommended by a floor system manufacturer for concrete subfloor conditions. 2.04 WOOD FLOOR FINISH AT STAGE A. Two part water based epoxy wood floor finish system, Hillyard The Contender System or equal approved by the Architect, comprised of the following: 1. Contender Seal - A penetrating waterborne sealer and primer manufactured for wood floors. 096466-4

2. Contender Finish - Clear two-part waterborne modified epoxy wood floor finish compatible over a wide variety of conventional solvent based epoxies and oil modified urethanes. The product shall be approved by Underwriters Laboratories for slip resistance, with the following statement on all container labels: Classified by Underwriters Laboratories, Inc. as to slip all resistance only 1865. The product shall be currently listed by Maple Flooring Manufacturers Association in Group 5. 096466-5

PART 3 EXECUTION 3.01 PRE-INSTALLATION CONDITIONS A. Do not install floor system until concrete has been cured 60 days and the proper depression and floor tolerance with steel trowel finish has been provided. B. After floors are finished, the floor shall be protected by covering with non-fibered kraft paper or red rosin paper with taped joints by the General Contractor. 3.02 INSTALLATION - WOOD FLOOR SYSTEM AT STAGE A. All products covered by this SECTION shall be installed by qualified personnel in strict accordance with the manufacturerʼs written specifications, and the additional provisions herein specified. B. Install polyethylene with joints lapped a minimum of 6 inches and turned up 4 inches at the walls. C. Install first layer of sub floor perpendicular to direction of finished flooring. Apply ribbons of panel adhesive in a double box-x pattern. Over this, secure second layer of underlayment on a diagonal (approximately 45 degrees) to first layer with fasteners placed no greater than 12 O.C. in both directions and 6 along perimeter. All sub floor joints shall be staggered and spaced 1/4. D. Machine nail maple finish flooring 10 to 12 O.C. running the direction of the main playing court with end joint properly driven up and proper spacing provided for humidity conditions. Provide 2 inch expansion voids at the perimeter and at all vertical obstructions. E. Sanding - Floor shall be sanded after all other trades are finished. All wood floors shall be sanded with a heavy power-driven sander. For the first cut, the floor shall be traversed in both directions going with the grain of the flooring using No. 2 1/2 sandpaper. Follow with No. 1 1/2 paper, then with No. 1/2 and finishing with No. 00. All cuts should be made with the grain. Rough or finish sanding on the diagonal will not be permitted without specific permission from the Architect. Particular attention should be given on each finishing cut to completely remove the coarser grit marks from the preceding cut. Sanding machine shall not be moved more than two boards at a time for each traverse on any of the four cuts. After sanding, contractor shall thoroughly vacuum floor with heavy duty commercial type vacuum and request inspection by the Architect or his authorized representative before any finishing work shall start. F. Sealing - After sanding, floor shall be thoroughly swept and vacuumed. Tack rag floor with a Turkish towel dampened with recommended solvent until no traces of sanding dust remain on floor. With a clean synthetic lambswool applicator, apply an even coat of sealer. While working 4 ft. by 4-ft. sections, apply product first across the grain then smooth out (feather) with the grain. After the first coat is thoroughly dry (usually 2-4 hourʼs) entire surface should be abraded using blue or green scrub pad under a single brush floor machine. Floor shall again be tack ragged using a Turkish towel slightly moistened with water. Now apply the first 096466-6

coat of floor finish following manufacturerʼs recommended procedures. Allow the floor to dry overnight. G. Painting Game Lines (gym floor) - Mark game lines with proper colors of recommended game line paint according to Architectʼs drawings and with the use of precision taping machine for circles and arches. Note: Masking tape should be pulled as soon as the paint starts to set and not allowed to stand overnight. Paint should be allowed to dry for at least 12 hours. H. Finishing 1. After lines have dried overnight, abrade with blue or green scrub pad and tack rag with Turkish towel slightly moistened with water until no traces or powder remain on floor. Now apply the second coat of finish following same procedures as the first coat of finish. Allow to dry overnight. Abrade the floor with green or blue scrub pad and tack rag the floor with Turkish towel slightly moistened with water. Apply the third, fourth and fifth (final) coat of finish in the same manner as above. After the final coat of finish do not use floor for at least 72 hours. Avoid heavy traffic for at least one week. 2. During product application and drying time, floor must be free of dust and dirt. Following the final coat turn on the air handling system to get good air movement. Temperatures of the floor, room, and materials should be 65 degrees F. or above during treatment and curing. Allow adequate ventilation for proper curing. Product must be abraded with 150 grit screens (instead of blue or green scrub pad) if allowed to cure more than 48 hours between coats. 3. Total coats, floor finish system: (1) seal coat plus (5) finish coats. I. Perimeter Base - Install Robbins vent cove base anchored to walls with base cement or screws and anchors. Use premoulded outside corners and neatly mitered inside corners. J. Coordinate wood floor installation with athletic equipment mountings, flush mounted thresholds and expansion covers. 3.03 GYMNASIUM FLOOR REFINISHING A. Sanding 1. Floors shall be sanded after all other trades are finished. All wood floors shall be sanded with a heavy power-driven sander. For the first cute, the floor shall be traversed in both directions going with the grain of the flooring using No. 2 ½ sandpaper. Follow with No. 1 ½ paper, then with No. ½ and finishing with No. 00. All cuts should be made with the grain. Rough or finish sanding on the diagonal will not be permitted without specific permission from the Architect. Particular attention should be given on each finishing cut to completely remove the coarser grit marks from the preceding cut. Sanding machine shall not be moved more than two boards at a time for each traverse on any of the four cuts. 096466-7

B. Sealing 1. After sanding, floor shall be thoroughly swept and vacuumed. Tack rag floor with a turkish towel dampened with recommended solvent until no traces of sanding dust remain on floor. With a clean synthetic lambswool applicator, apply an even coat of sealer. While working 4 ft. by 4 ft. sections, apply product first across the grain then smooth out (feather) with the grain. After the first coat is thoroughly dry (usually 2-4 hours) entire surface should be abraded using blue or green scrub pad under a single brush floor machine. Floor shall again be tack ragged using a turkish towel slightly moistened with water. Now apply the first coat of floor finish following manufacturerʼs recommended procedures. Allow the floor to dry overnight. C. Painting Game Lines 1. Mark game lines with proper colors of recommended game line paint according to Architectʼs blueprints and with the use of precision taping machine for circles and arches. Note: Masking tape should be pulled as soon as the paint starts to set and not allowed to stand overnight. Paint should be allowed to dry at least 12 hours. D. Finishing 1. After lines have dried overnight, abrade with blue or green scrub pad and track rag with turkish towel slightly moistened with water until no traces of powder remain on the floor. Now apply the second coat of finish following same procedures as the first coat of finish. Allow to dry overnight. Abrade the floor with green or blue scrub pad and tack rag the floor with turkish towel slightly moistened with water. Apply the third and final coat of finish in the same manner as above. After the final coat, do not use floor for at least 72 hours. Avoid heavy traffic for at least one week. 2. During product application and drying time, floor must be free of dust and dirt. Following the final coat turn on the air handling system to get good air movement. Temperatures of the floor, room and materials should be 65 degrees F or above during treatment and curing. Allow adequate ventilation for proper curing. Product must be abraded with 150 grit screens (instead of blue or green scrub pad) if allowed to cure more than 48 hours between coats. 3. Total coats, floor finish system: (1) seal coat plus (5) finish coats. E. Perimeter Base Install Robbins vent cove base anchored to walls with base cement or screws and anchors. Use premoulded outside corners and neatly mitered inside corners. F. Coordinate wood floor installation with athletic equipment mountings, flush mounted thresholds and expansion covers. 3.04 CLEAN-UP A. Clean up all unused materials and debris and remove same from the premises and legally dispose of. 096466-8

3.04 CLEAN-UP A. Clean up all unused materials and debris and remove same from the premises and legally dispose of. END OF SECTION 096466-9