Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

Similar documents
Facility Improvements

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

COOLIDGE SENIOR HIGH SCHOOL

STUART-HOBSON MIDDLE SCHOOL

LASALLE - BACKUS EDUCATION CAMPUS

2 Main School Building BLDG-124A Building Purpose Building Area Administrative, Classrooms, Cafeteria and Gymnasium 61,905 SF Inspection Date June 28-

WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

WILKINSON ELEMENTARY SCHOOL

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

Priority 1 Maintenance Projects Total Investment Needed: $54,875,317. Elementary Schools

BVSC BVSC. Midwest Technical Inspections Survey Worksheet. Account / Account Code: Insured: Policy #: Building Data - Section 1

Facility Assessment Report, Montgomery Independent School District

PLUMMER ELEMENTARY SCHOOL

LECKIE ELEMENTARY SCHOOL

FACILITY ASSESSMENT PRESENTATION 11 October SCHRADERGROUP architecture

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet

School Without Walls

Schedule of Values Cruise Terminal 2 Expansion

CITY OF NOVI. Police Department

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

Velma F Thomas Early Childhood Center

BOWIE LEARNING CENTER

VOLUME 4 DIVISION SPECIFICATIONS

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

Property Condition Assessment

LEWIS ELEMENTARY SCHOOL

Cost Estimate Details

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

Operational Services Facility Innovation & Readiness Stakeholder Team

FEASIBILITY STUDY SEPTEMBER 1 8,

APPLICATION AND CERTIFICATE FOR PAYMENT

College of the Desert Athletics Facilities

NEW YORK STATE MAIN STREET PROGRAM BEFORE & AFTER

Capital Needs Data. Prepared for BRANDON SCHOOL DIVISION

Building Inspection Report

Cheldelin Middle School

CUYAHOGA COUNTY PUBLIC LIBRARY EXISTING FACILITY ASSESSMENT December Beachwood Branch Shaker Blvd., Beachwood, Ohio

OFFICE OF EDUCATIONAL FACILITIES FLORIDA BUILDING CODE SECTION 423 APPLICATION MATRIX

ABC OFFICE BUILDING. Madison County, Virginia Capital Improvement Program. I. Facility Description

HISTORIC PLAN, FLOOR PLANS, AERIAL PHOTOS

CHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS A. ITEMS FROM PREVIOUS SITE INSPECTIONS-INCOMPLETE OR ON HOLD

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

GEORGETOWN ISD 2010 BOND PROGRAM UPDATE. Huckabee APRIL 2012

BUILDING FOR OUR FUTURE

Penns Valley Area School District

Toronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI

St. Germain Facility Study

Madison School District. Strategic Five-Year Facility Maintenance Plan

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC

Division 09 FINISHES TABLE OF CONTENTS

Section X - Miscellaneous

Horace Greeley Elementary School 832 W Sheridan Rd Chicago, IL 60613

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

Montgomery County Public Schools Facilities Guide DIVISION 0 - CONDITIONS OF THE CONTRACT

BuildingAdvisor.com Estimating Checklist

Concrete. Conveying Systems. Doors, Windows & Interiors

Cazenovia Central Schools Proposed Building Project Information Session December 17, 2013

Office of Design & Construction State University Plaza Albany, New York

San Angelo ISD Preventative Maintenance Program. Forward Maintenance Crew

County of Santa Barbara, California Facility Condition Assessment 2014

Capital Projects Update

Yardmen Arena Expansion & Renovation Project Update

LOVEJOY Independent School District

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

CARL E. SCHLUTER ELEMENTARY SCHOOL

CAREERS. in the Construction TRADES

SANDTOWN CROSSING PROFESSIONAL OFFICE PARK Atlanta, GA

CODE COMPLIANCE PLAN REVIEW PROCEDURES

Capital Projects Update

90% Draft - NOT FINAL. A Presentation For: the architectural studio. By Principals: George Moore & Curt Santee October 28th 2014

Davis Frame Co., Inc. Construction Budget Considerations

RESIDENTIAL COMPONENT TECHNOLOGY Mobile Manufactured Housing

Connaught. Facility Audit report for: Connaught Regina, SK. Report Created: Page 1 of 20

Paul Laurence Dunbar Career Academy High School 3000 S King Dr Chicago, IL 60616

M-DCPS MASTER SPECIFICATION GUIDELINES TABLE OF CONTENTS (TOC) Division 2 SITEWORK Last Revised


SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

Revised Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Additi

Jane Addams Elementary School S Avenue H Chicago, IL 60617

M-DCPS MASTER SPECIFICATION GUIDELINES TABLE OF CONTENTS (TOC) Division 2 SITEWORK Last Revised

BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY

*Additional Projects were not part of the voter-approved 2006 Bond. They were able to be completed due to savings from other projects.

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

Feasibility Report. Property Inspection Engineers, Inc. (248) Property Address. 405 Fairgrove Royal Oak, MI.

Morehouse School of Medicine

REO Client Safety Hazard Requirements

New Homes Forestbrook Road. Yes, it s INCLUDED!

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

UPPER ARLINGTON SCHOOLS 2015 FACILITIES ASSESSMENT. Windermere Elementary School Physical Assessment

Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates

Transcription:

Chenango Bridge Elementary School Phase 1 Asphalt Pavement Reconstruction Reconstruct asphalt parking located on west side of building including access drive. Sidewalk Replacement Replace cracked sections of concrete sidewalk. Repoint Mortar Lintel Repair Repoint brick mortar joints at select areas and clean brick surface. Remove surface rust and paint exterior lintels. Roof Replacement Replace small roof near loading dock with single ply roof membrane system. Porcelain Panel Replacement Provide new exterior panel above windows at rear of building. Window Replacement Replace windows throughout building. Phase 2 Structural Floor Repair Remove surface rust on metal deck in basement and paint to prevent further corrosion. Hollow Metal Door Replacement Replace deteriorated hollow metal doors with FRP doors in aluminum frames. Corridor Terrazzo Refinishing Grind down terrazzo flooring in corridors. Quarry Tile Replacement Replace cracked quarry tile in specific locations. Gymnasium Equipment Replacement Replace gym scoreboards, wall padding and basketball backstop assemblies. Arc Flash Study Provide arc flash study and label all panelboards and required equipment. Clean main electrical gear. Classroom LED Lighting Upgrade classrooms to LED lighting with dimming control, daylight harvesting, and occupancy control. 11/7/2017 1

Chenango Bridge Elementary School Classroom Power Pole Removal Remove power poles in existing classrooms. Multi-Purpose Room Technology Upgrades Provide new sound system and projector in multi-purpose room. Hot Water Distribution Piping Improvements Reconfigure pipe recirculating loop to get hot water to all parts of the building. Hose Bibb Replacement Replace hose bibbs due to age of equipment. Mixing Valve Replacement Replace mixing valve due to age. Provide unit with low flow capacity. Backflow Preventer Add backflow preventer to boiler. Makeup Water Meter Add makeup water meter to boiler. Water Bottle Filler Replace one drinking fountains with water bottle filler. Boiler Room Ventilation Add boiler room ventilation. Heat Pump Replacement Replace obsolete heat pumps due to age. Gas Piping Support Replacement At rooftop units, replace natural gas piping supports on the roof. Crawl Space Ventilation Provided tempered mechanical ventilation in the crawlspace to help reduce the amount of moisture. Exit Discharge Lighting Add emergency exterior fixtures at exits. Accessible Signage Provide accessible signage. Cabinetry Replacement Consider replacement of all plastic laminate cabinetry with new laminate cabinets and solid surfacing counters. Nurses Office Expansion Renovate existing space to create an expanded nurses office area Add Faculty Toilet Rooms Add faculty toilet rooms by renovating existing space. 11/7/2017 2

Chenango Bridge Elementary School Corridor Finish Improvements Improve appearance of corridors by upgrading finishes. Splitting Up of Classroom Create flexible classroom space by adding folding partitions to existing classroom. Updating of Finishes Improve appearance of classrooms by upgrading finishes. OT/PT Improvements Create more functional OT/PT space. Classroom Furniture Replacement Replace classroom furniture STEAM Classroom Renovate an existing classroom into a STEAM room. FACILITY TOTAL $3,473,000 11/7/2017 3

Port Dickinson Elementary School Phase 1 Bus Drive Pavement Reconstruction Replace bus loop pavement. Curb Replacement Replace bus loop concrete curb. Concrete Sidewalk Replacement Replace bus loop concrete walk. Play Area Pavement Replacement Replace pavement at play area. Fence Replacement Repoint Mortar Provide new chain link fence along a majority of the southern property line. Repoint mortar joints at exterior brick and repair damaged plaster in required areas. Stone Step Replacement Replace worn stone steps at front of original building, clean stone and paint upper railing. Window Replacement Replace windows with higher quality windows to allow better operation despite window size. Replace window panels and interior shades at same time. Gutter Refurbishment Replace sections of wood as needed and paint gutter system. Wood Trim Replacement Replace deteriorated wood as needed and paint trim. Investigate condition of copper. Shingle Roof Replacement Replace aging asphalt shingles at sloped roof areas of original building. Phase 2 Hollow Metal Door Replacement Provide FRP door in aluminum frame at roof and rear door. Provide new hollow metal door and frame matching original design at front door. Carpet Replacement Consider replacement of library and main office carpet. Vinyl Tile Replacement Replace areas of vinyl tile. 11/7/2017 4

Port Dickinson Elementary School Corridor Terrazzo Refinishing Grind down terrazzo flooring in corridors. Gymnasium Equipment Replacement Replace gym scoreboards, wall padding and basketball backstop assemblies. Water Bottle Filler Arc Flash Study Replace one drinking fountains with water bottle filler. Provide arc flash study and label all panelboards and required equipment. Clean main electrical gear. Classroom LED Lighting Upgrade classrooms to LED lighting with dimming control, daylight harvesting, and occupancy control. Classroom Power Pole Removal Remove power poles in existing classrooms. Multi-Purpose Room Technology Upgrades Provide new sound system and projector in multi-purpose room. Heat Pump Replacement Replace half of the heat pumps that are starting to get older. Circulation Pump Replacement Replace circulation pumps on heat pump loop due to age. Cabinet Heater Replacement Replace cabinet heaters due to age. Health Office HVAC Provide ventilation at health office separate from the rest of the building. Work Room HVAC Provide HVAC system for second floor work room. Exit Discharge Lighting Add emergency exterior fixtures at exits. Handicap Toilet Room Renovations Renovate nurses office and three toilet rooms off of classrooms to make accessible. Accessible Signage Provide accessible signage. Toilet Partition Replacement Replace partitions with solid plastic partitions. Gym Operable Partition Laminate Screw gym folding partition laminate to adhere it to substrate. Toilet Room Renovations Renovate toilet rooms to make more aesthetic. 11/7/2017 5

Port Dickinson Elementary School Handicap Changing Area at Nurses Office Create handicap changing area at nurses office. Locker Room Conversions Convert locker rooms to storage rooms. OT/PT Improvements Create more functional OT/PT space. Updating of Finishes Improve appearance of classrooms by upgrading finishes. Classroom Furniture Replacement Replace classroom furniture including Library. Replace Bus Entrance Doors Replace bus entrance doors and frames Cabinetry Replacement Consider replacement of all plastic laminate cabinetry with new laminate cabinets and solid surfacing counters. STEAM Classroom Renovate an existing classroom into a STEAM room. 2nd Floor Toilet Room Add an individual toilet room on the 2nd floor level. FACILITY TOTAL $4,311,000 11/7/2017 6

Middle / High School Phase 1 Trench Drain Replacement Replace trench drain at west side parking lot with a concrete structure and replace adjacent asphalt. Other option is to remove drain and associated exit drive. South Drive Asphalt Reconstruction Reconstruct existing asphalt at the south drive. Athletic Field Parking Lot Pave existing gravel parking lot. Sidewalk Repair Provide sealant at locations of large gaps between sections of concrete sidewalk. Tennis Court Repair Patch tennis court cracks and apply new acrylic coating. Softball Field Netting Provide netting between softball field and parking area. Gas House Updates Replace windows and doors and repoint brick at gas house. Leveling Replacement Remove loose leveling material in storage room and provide new concrete leveling to match existing thickness. Repoint Mortar Repair exterior cracks in brick and repoint mortar in required areas. Concrete Pad Replacement Replace concrete pads at Exterior Doors that have deterioration. MS Gym Floor Replacement Replace wood floor in Middle School gym. MS Gym Wall Padding Provide wall padding in MS gym. MS Gym Mat Hoist Provide matt hoist in MS gym for storage of wrestling mats. Stadium Lights Provide athletic lights at stadium Phase 2 Hollow Metal Door Replacement Replace existing hollow metal doors and frames with FRP doors and aluminum frames. Vinyl Tile Replacement Remove cracked vinyl tile and install new tile. Cut in control joints where cracking is occurring at building expansion joints. 11/7/2017 7

Middle / High School Ceiling Tile Replacement Replace ceiling in 2nd floor storage room and stained tiles in specific locations. Pool Locker Replacement Replace rusted pool lockers with plastic lockers that will not rust. Wood Door Replacement Replace deteriorated wood doors with FRP doors at pool. Window Replacement Replace windows in the MS gym and pool to allow more light into the spaces. Bleacher Fencing Provide fencing in front of bleachers Baseball Field Bleachers Replace existing bleachers with new aluminum bleacher system on concrete pad with panels at front. Gym Bleacher Replacement Replace HS gym bleachers. HS Gym Floor Refinishing Refinish wood floor in High School gym. HS Gym Score Board Replacement Replace scoreboard in HS gym Bleacher Side Curtains Provide curtains at bleacher sides to prevent access under bleacher. HS Gym Wall Padding Replace HS gym wall padding. Batting Cage Provide batting cage for HS gym with automatic operation for raising and lowering. Handicap Accessible Door Operator Provide automatic door operator at two entries to improve handicap accessibility. Arc Flash Study Provide arc flash study and adhere labelling to equipment. Classroom LED Lighting Upgrade classrooms to LED lighting with dimming control, daylight harvesting, and occupancy control. LED Gym Lighting Upgrade High School gym to LED High Bay gym lighting with dimming and day lighting controls. Clock System Replacement Provide new wireless clock system / bell system. 11/7/2017 8

Middle / High School Pool Timing System Replacement Replace pool timing system including new scoreboard and touchpads. Pool Repairs Replace pool filtration tanks. Backflow Preventer Installation Add backflow preventer to boiler system. Makeup Water Meter Installation Add makeup water meter to Boiler. Water Bottle Fillers Replace two drinking fountains with water bottle fillers. Cafeteria Serving Line HVAC Improvements MS & HS cafeteria serving line HVAC Improvements. Middle School Gym Air Conditioning Provide air conditioning in the MS gym. Visual Fire Alarm Devices Add visible signal devices in all multi-occupant support spaces and all classrooms. Add Emergency Transfer Switch Separate the life safety loads into a "life safety" transfer switch with priority over non-essential loads. Refeed emergency lighting panels and circuits from life safety system. Gender Neutral Locker Area Create gender neutral changing areas in each locker room. Create Outdoor Classroom Create outdoor classroom adjacent to pond. STEAM Room Renovation Convert classroom into a room dedicated to STEAM. Library Renovations Renovate existing library to create modern technology library and provide professional development space. Athletic Field Concession and Toilet Rooms Create addition adjacent to HS gym for toilet rooms and concession stand for multi-purpose field use. MS Main Office Entry Improvements Remove lockers and add glass adjacent to entrance door. CSE Office Waiting Area Create waiting area at SCE office by removing toilet room. Gender Neutral Toilet Rooms Create gender neutral toilet rooms. Fitness Room Expansion Expand existing fitness room into existing wrestling room. Cost does not include equipment. 11/7/2017 9

Middle / High School Sustainable Greenhouse Provide greenhouse adjacent to the pond with sustainable features. FACILITY TOTAL $4,048,000 11/7/2017 10

Bus Garage Phase 2 Hollow Metal Door Replacement Replace older hollow metal doors with FRP doors in aluminum frames. Overhead Door Replacement Replace wood overhead doors with steel doors. Window Replacement Replace original windows with aluminum frame windows with insulated glass. Switchgear Replacement Replace switchgear due to age. Backflow Preventer Installation Add a backflow preventer. Makeup Water Meter Installation Add a makeup meter. Office Exhaust Fan Replacement Replace office exhaust fan due to age. Parts Storage Exhaust Fan Replacement Replace parts storage exhaust fan due to age. New Gas Rooftop System Provide rooftop unit to eliminate thru wall A/C units. Insulate Piping Insulate hot water piping in boiler room. Fire Alarm System Add fire alarm system. Accessible Toilet Rooms Adjust fixture and locations to make toilet room accessible. Accessible Door Hardware Provide accessible door hardware. Accessible Signage Provide accessible signage. Asbestos Vinyl Tile Although in good condition, consider replacement of asbestos floor tile with vinyl tile. Bus Storage Area Expansion Expand existing bus storage area on one side of building. 11/7/2017 11

Bus Garage Maintenance Bay Lift Provide a lift in open maintenance bay. Includes raising the roof height up to provide the proposer clearance. Kitchen Area Upgrades Replace finishes and cabinets in kitchen area. FACILITY TOTAL $1,025,000 11/7/2017 12

Storage Building (Field House) Phase 2 Accessible Entrance Build-up asphalt at team room entrance doors to provide proper accessibility. Accessible Signage Provide accessible signage at toilet rooms and team rooms. FACILITY TOTAL $4,000 11/7/2017 13

Maintenance Storage Building Phase 2 Metal Panel Replacement Provide new exterior metal panels. Wood Door Replacement Install new FRP door in aluminum frame. Roof Replacement Provide new metal roof panels. Fascia Replacement Provide new wood blocking and metal fascia. Gutter Replacement Provide continuous gutter system and tie into future storm system. Accessible Door Hardware Provide accessible door hardware. FACILITY TOTAL $93,000 11/7/2017 14