CHAPTER 8 RESPONSIBILITIES OF CONTRACTOR AND INSPECTOR Contract and Specifications

Similar documents
VIRGINIA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION MEMORANDUM. Charles A. Babish, PE State Materials Engineer Approved:

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

WYOMING DEPARTMENT OF TRANSPORTATION. SUPPLEMENTARY SPECIFICATION FOR STRUCTURAL CONCRETE WITH QUALITY CONTROL and QUALITY ACCEPTANCE

STATE OF ALASKA CAREER AREA: ENGINEERING TECHNICIAN

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

CHAPTER 11 EQUIPMENT

Special Provision No. 199S53 February 2005

SAMPLE SPECIFICATION ONLY FOR INFORMATIONAL PURPOSES NOT INTENDED FOR DUPLICATION OR USE SECTION XX.XX WELDED WIRE REINFORCEMENT

ROAD COMMISSION FOR OAKLAND COUNTY SPECIAL PROVISION FOR QUALITY CONTROL AND ACCEPTANCE OF PORTLAND CEMENT CONCRETE

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams

FACILITIES MANAGEMENT

2003 SPECIFICATIONS SECTION 301 DIVISION 300 BASES AND GRANULAR SURFACES

SAMPLE SPECIFICATION ONLY FOR INFORMATIONAL PURPOSES NOT INTENDED FOR DUPLICATION OR USE SECTION XX.XX WELDED WIRE REINFORCEMENT

Exhibit A Scope of Work

DIVISION II CONSTRUCTION AND MATERIAL SPECIFICATIONS SECTION 2700 STRUCTURES

MATERIALS DIVISION MEMORANDUM SIGNATURE:

Design -- geometric and structural design of roadways and bridges, and preparation of detailed plans and specifications for individual projects;

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

Exhibit A Scope of Work

C. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products.

REQUEST FOR PROPOSAL

Make copies of all test results and control charts readily available to the Engineer at the project site.

San Antonio Water System Standard Specifications for Construction

Virginia Department of Transportation. Post Construction Manual (Imperial & Metric)

SPECIAL PROVISION Concrete Pavement

CHAPTER 1 INTRODUCTION

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

The work required for this project includes, but is not limited to, the following items, not listed in order of execution.

J&C Construction Agency

FULL-TIME BUILDING INSPECTOR

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following:

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

Quality Management Review. MoDOT Dave Ahlvers P.E. Dennis Brucks P.E. Josh Kincaid P.E.

CE & I for Construction. Brian Buckel. HQ Construction Division Chief Construction Engineer

Facilities Planning and Construction (FP&C)

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

Virginia Department of Transportation. Inspection Manual. March Construction Division VDOT GOVERNANCE DOCUMENT

LAP Manual Appendix 12.6B March 2016 Project Development

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS

CONTRACT PROPOSAL/CONTRACT ACCEPTANCE HIGDON LOOP ROAD BRIDGE

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

STATEMENT OF SPECIAL INSPECTION FORM

***************************************************************************************************************

Release 10 11/7/

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:

SPECIFICATION 1035 M

Special Provision No. 999S02 March 2018 REQUIREMENTS FOR GLASS FIBRE REINFORCED POLYMER (GFRP) REINFORCING BAR

SECTION MINOR CONCRETE

The following Specifications of the Special Provisions have been revised and/or added (in red):

MATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS

Section REINFORCING STEEL

SPECIFICATIONS FOR INSTALLATION OF PRECAST PRESTRESSED CONCRETE DECK PANELS

SECTION BITUMINOUS SURFACE TREATMENT

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR QUALITY CONTROL AND ACCEPTANCE OF STRUCTURAL PRECAST CONCRETE

FIVE STAR PRODUCTS, INC. (800)

SECTION 315 ASPHALT CONCRETE PAVEMENT. Materials shall be furnished by the Contractor in accordance with Section 200.

Minnesota Concrete Flatwork Specifications for Local Government Agencies

CHAPTER VII - MATERIALS ACCEPTANCE AND MATERIALS NOTEBOOK PROGRAM... VII-2

Special Provision No. 904S11 July Section of OPSS 904, January 1995 is amended by the addition of the following:

SECTION CONTROLLED LOW STRENGTH MATERIAL

SPECIAL SPECIFICATION 8625 All-Weather Traffic Markings

Project Address: Name of Person Completing Form:

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

SIMPLE STREAM CROSSINGS GUIDELINES FOR BCTS COORDINATING REGISTERED PROFESSIONALS. Ministry of Forests, Lands and Natural Resource Operations

2. Determine Random Numbers: Determine random numbers for testing locations using the Probing, Coring, Texture and MIT-SCAN T2 Report.

This specification refers to the latest (current) edition of the following: For the purposes of this specification the following definitions apply:

Urban. Initiative. Meeting. Construction. Annual. City of Lynchburg

Striping Special Provisions

DEPARTMENT OF TRANSPORTATION

SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving

Non-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method

STATE OF ALASKA COMPETENCY SPECIFICATION

SECTION 3200 CONCRETE CURB AND GUTTER

SECTION 503 TEMPORARY PAVEMENT RESTORATION

SDDOT CONSTRUCTION MANUAL PROJECT MANAGEMENT SECTION CHAPTER 1 - GENERAL TABLE OF CONTENTS

Special Provision No. 999S02 June 2017 CONSTRUCTION SPECIFICATION FOR GLASS FIBRE REINFORCED POLYMER (GFRP) REINFORCING BAR TABLE OF CONTENTS

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

Maine Turnpike Authority Construction Resident Engineer/Inspector SCOPE OF WORK July 14, 2014

A. Submittal Procedures: See Article 13 of the General Conditions.

Lesson 4 INSPECTOR S ROLE

TDOT PROPOSED SCOPE OF WORK CEI

POLICY AND PROCEDURES MANUAL FOR THE INSPECTION OF LOCALLY FUNDED CONSTRUCTION PROJECTS

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

Exhibit A Mn/DOT Contract No SCOPE OF WORK AND DELIVERABLES

SPECIAL INSPECTOR REGISTRATION (Application forms are a part of this bulletin)

Arlington County, VA Materials Testing Specification Reference Guide (8/18/2016) MATERIAL AND TEST (REF. - VDOT TEST METHODS MANUAL )

Arlington County, VA Materials Testing Specification Reference Guide (8/18/2016) MATERIAL AND TEST (REF. VDOT TEST METHODS MANUAL )

SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course

MATERIALS A Concrete A.1 Concrete Walk... Mix No. 3F52. A.2 Concrete Walk, Exposed Aggregate Finish... Mix No.

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 3 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS

WELCOME TO THE PILE DRIVING INSPECTOR COURSE

Transcription:

CHAPTER 8 RESPONSIBILITIES OF CONTRACTOR AND INSPECTOR Contract and Specifications Road and highway construction in Virginia is performed under contract. The contract is a written agreement between the Department and the contractor. It states the obligations of both parties, including labor, materials, performance and payment. The contractor agrees to do the work that meets the specifications and standards included in the contract and, in return for acceptable work, the contractor is paid by the Commonwealth of Virginia. The plans are the physical layout and design of the job, location and dimensions. The specifications are the technical directions and required standards for the work to be done. Special Provisions can be combined with the specifications. They must all be followed during construction. The contract includes the Signature sheet, Bid Item sheets (these sheets have the same status as the Special Provision Copied Notes), and a page that will make reference to the plans, books, or manuals that will govern construction. Normally the VDOT Road and Bridge Specification Book year dated, the Road and Bridge Standard Book year dated, and the Work Area Protection Manual year dated is specified on that sheet. The typical Contract will also include Special Provision Copied Notes, Special Provisions, and any needed Supplemental Specifications. These documents may differ as to how an operation should be performed. A hierarchy denoting which document takes precedence over all other documents is located in Section 105.05 of the Road and Bridge Specification Book and is illustrated in the above graphic. Generally, the contract requirements take precedence over all other documents. VDOT Road and Bridge Specifications are at the bottom of the hierarchy and apply when a construction operation is not specifically addressed in any other document. Contract Special Provision Copied Notes Special Provisions Plans Supplemental Specifications Road and Bridge Specifications Contractor s Responsibility The Contractor is responsible for having a Certified Concrete Field Technician present to provide quality control during placing operations. The candidate must satisfactorily complete an examination administered by the Department of Transportation and obtain ACI certification. 2011 v1.0 8-1

A Certified Concrete Field Technician is that person who is responsible for quality control of concrete work at the project site. The technician also provides the necessary liaison between field and plant operations. The Contractor shall have at least one Certified Concrete Field Technician on the project for single or multiple incidental concrete placements. The Contractor shall have at least one Certified Concrete Field Technician present at each site during the placement of pavements, bridge decks, bridge piers and abutments, box culverts and any placement of 50 or more cubic yards (40 or more cubic meters). Certified Concrete Field Technicians shall provide control over methods used for discharging, conveying, spreading, consolidating, screeding, finishing, texturing, curing and protecting the concrete. Deficiencies in conformance to specification requirements and good concreting practices shall be corrected as soon as they begin to occur. Also, a Concrete Field Technician shall ensure that the contractor s construction operations conform to Sections 316, 404, 405, 410, 412, 415, 502, 505, 506, and 509 of the Road and Bridge Specification Book. Inspector s Responsibility The inspector s job is vital to every road construction project, ensuring a strong, durable, reliable pavement is produced based on the pavement design in accordance with the plans and specifications. An inspector should keep abreast of new developments which may effect the job and to refresh his/her knowledge periodically to brush up on infrequently used procedures. To ensure specifications are being followed, the owner has an agent on hand throughout production and construction. That agent is the inspector. The inspector s duty is to see that construction produces the specified results. The inspector has the responsibility to identify deviations from project specifications and to alert the contractor. Inspectors do not have the authority to approve changes in specifications. The inspector is to keep the Engineer informed of the progress and quality of the work being done. The inspector inspects all work and materials. Upon visual inspection, the inspector can reject any material not in compliance with the specifications. The inspector must know what is being inspected and be familiar with materials, equipment and construction procedures. They should recognize potential problems and know what could be causing them. Inspectors must read and interpret all contract documents and be able to perform accurate mathematical calculations. The more knowledgeable an inspector is, the better prepared they are to perform their duties. A good inspector must use common sense. While common sense is no substitute for knowledge, it is a means of interpreting the specifications to enforce their intent. Common sense cannot be learned but grows out of knowledge and experience. The inspector can act only on what is observed. What is not seen is missed. Thus it is important not only for an inspector to look carefully at everything going on, but also to see what is being observed. Seeing in this context means thinking carefully about what the eyes observe. Without seeing, an inspector can observe an incorrect condition and not even realize it. The inspector and contractor must work together so that the inspector is present at all critical phases of construction. 8-2 2011 v1.0

The inspector s job is to inform the contractor when unsatisfactory conditions exist or when the specifications are not being followed. Contractors expect valid criticism and objections from the inspector; however the inspector s manner of presenting comments can decide future relations between the Department and the contractor. Experience shows that it is not what is said, so much as the way it is said that is important. Both the inspector and the contractor should strive to cooperate, respect, and maintain a good working relationship. Once the relationship between the inspector and contractor starts to deteriorate the work suffers. One of the primary duties of an inspector is to review construction operations for compliance with VDOT requirements, specifications and standards. Locating the requirements and specifications that cover a specific operation is a necessary skill. An inspector must be able to find and understand Road and Bridge Specifications in order to assess compliance with them. Appendix C contains most of the Road and Bridge Specifications that apply to hydraulic cement concrete operations; however, these specifications are for educational purposes only. A copy of the current Road and Bridge Specifications Book can be obtained by contacting VDOT s Construction Division. To locate specifications applicable to a concrete operation, first determine the division to which the operation applies. For a hydraulic concrete operation, the applicable divisions include General Provisions, Materials, Roadway Construction, Bridges and Structures and Incidental Construction. After finding the division that applies, look for the specific item within that division. For example, if you are looking for the approved coating for tie wires with epoxy-coated reinforcing steel, reinforcing steel is covered in Section 406 of Division IV Bridges and Structures. This section discusses the procedures (Section 406.03) for placing and fastening of reinforcing steel. The procedure for coating of tie wires states: Tie wires used with epoxy-coated steel shall be plastic coated or epoxy-coated. 2011 v1.0 Tools Tools that the inspector needs consist of: Thermometer, pencils and markers, calculator, 100 foot (30 meter) steel tape measure, hammer and shovel, report forms and notebook, 6 foot (1.8 meter) ruler, string-line, flashlight, and anything else that is required. Another tool, which will aid in measuring and recording is on-the-job training. Things are happening on the job site that an inspector must know. It is the ideal place to observe, to ask questions, and to get answers. On the job, the novice inspector develops inspection skills first-hand and discovers what occurs during construction and why certain methods achieve certain results. The more experienced the inspector becomes, the better enabled he/she is to do the job effectively. The inspector is only required to make a one-line entry into the Materials Notebook identifying the time over which the material was shipped (From - To), grading or type mix, total tonnage and source. Safety Safety on the job is everyone s business, but the inspector must be alert to ensure that safe working conditions and practices are maintained on the project. The inspector must see that safety requirements specified in the contract are being followed. This may involve monitoring equipment operation and the use of such items as barricades, warning lights, reflectors, road signs, flaggers, cones and Pilot Trucks. The inspector should set an example by practicing personal safety. Equipment such as hard hats, steel-toed shoes, gloves, safety vest, protective clothing, safety glasses or anything else necessary to assure worker safety should be worn. Practicing good safety is the responsibility of everyone on the job. 8-3

Records One of the most important functions of the inspector is to keep accurate records and reports. Records are necessary to determine contract and specification compliance, substantiate payments to the contractor, and ensure that all the materials are used on the roadway. Records and reports should be kept current, submitted on time and be neat and legible. The inspector is usually given standard forms for routine reporting. Reports may be required daily, weekly or monthly. Report forms normally include items such as date, location of the work, weather conditions, test results, equipment in use, equipment idle, source of materials and production rates. Besides standard forms, the inspector should keep a diary of the principal activities that occur. It should contain all the information concerning work being inspected. This is very important for future reference if problems should arise. The diary should contain such information as work being inspected, important conversations, visitors on the job site, verbal orders received, unusual incidents, equipment breakdowns, length of work stoppages, number of men and equipment affected and changes in appearance of the material, and anything else that might be pertinent to the work being done. Although many desired qualities for inspectors have been listed, the bottom line is this: To do a professional job, the inspector must want to do a job, know how to do it, and then go about it in a way that contributes favorably to the project. 8-4 2011 v1.0

Chapter 8 Study Questions 1. What are the duties of a Hydraulic Cement Concrete Field Inspector? 2. What daily records must the Hydraulic Cement Concrete Field Inspector keep? 3. What is a Certified Concrete Field Technician responsible for at the project site? 4. What is the purpose of inspection? 5. What are the qualifications of an inspector? 6. What is a good relationship of an Inspector with the Contractor? 7. Should an inspector know what testing is required at both the concrete plant and on the road? 8. What safety equipment should be used during road construction? 9. Between the following pairs of documents, which one has priority? Special Provision Copied Notes or Plans Plans or Special Provisions Specifications or Plans 2011 v1.0 8-5