THE OVERVIEW OF WASTE MANAGEMENT ISSUES RELATED TO BANDUNG CITY S SMART CITY CONCEPT".

Similar documents
Huge-scale illegal dumping of waste Accumulation of hazardous waste such as PCB

Japanese perspective on intercity collaboration towards

DEVELOPING A LOW CARBON SOCIETY UNDER COLLABORATION BETWEEN BANDUNG AND KAWASAKI

Resource Efficiency Policies in Japan

Promotion of the 3Rs in Asia

Country Report. (Draft) < Indonesia>

Recycling Policy and Activities. Ministry of Environment Republic of Korea

INDONESIA COUNTRY REPORT ON HA NOI 3R DECLARATION PROGRESS

Japan s New Action Plan towards a Global Zero Waste Society 1. Introduction

Hideki Minamikawa Vice-Minister of the Environment, Ministry of the Environment, JAPAN

Promotion of the 3Rs in Asia. Nobumori Otani Parliamentary Secretary of the Environment Japan 11 November 2009

Budget for Environment (2013)

Current situation and Issues

Low Carbon City Design by AIM. Intercity Cooperation between Pasir Gudang City and Kitakyushu City for the Development of Law Carbon Society

3R Implementation in Indonesia. Asia 3R Conference Tokyo,, 30 Oct 1 Nov, presented in. Ministry of Environment - Republic of Indonesia

Japan s s International Cooperation for the 3Rs in Asia

Launch of CCAC MSWI Asian Component

Green Growth Strategy in Kitakyushu, JAPAN

27 October, Kazuhiko TAKEUCHI. Vice-Rector, United Nations University

Japan s support to realize Leapfrog Low Carbon Development in Asian Cities

Yokohama s Solid Waste Management and further challenges with Smart Technologies

Recycling Technology Database for Realizing Eco-town

Japan s International Cooperation for Resource Efficiency and the 3Rs

Promotion of the 3R Initiative

URENCO s Environmental Business on 3R in Hanoi City

Summary Report. Republic of Indonesia

Integrated Assessment Model for the Global Socio economic Loss AIM Applied Equilibrium Model

Role of local governments in fostering the transition to sustainable lifestyles and livelihoods and improved wellbeing

Yohko MAKI Executive Director Kawasaki Environment Research Institute City of Kawasaki, JAPAN

3Rs and resource efficiency policy towards sound material cycle society

IGES s approach to Support Low-carbon, Resilient and Sustainable City Development. Deputy Director, Kitakyushu Urban Centre (KUC), IGES

3R Whitepaper and the Indicators of 3R Goals Achievements

Circular Economy through Territories. The Case of Crete Island, Greece

Solid Waste Management Policy in Historic City of Kyoto

Institute for Global Environmental Strategies, Kawasaki City Government

LEGOK NANGKA REGIONAL SOLID WASTE TREATMENT AND FINAL DISPOSAL SITE PROJECT

Performance Indicators in the 3Rs and Resource Efficiency -Overview of Session Background and 3R Policy Indicator Factsheets-

Promoting JCM scheme in Indonesia. Dicky Edwin Hindarto Head of Indonesia JCM Secretariat

Country Report on Waste management in Sri Lanka Status, Achievements and Challenges

3R Implementation in Indonesia. Mohammad Helmy Tri Bangun Laksono Dida Gardera

Application of Environmental Technologies in Developing Countries

Public Participation and Municipal Solid Waste Management in Selected Asian Cities

Reform of the Containers and Packaging Recycling Law in Japan. April, 2006 Rengo Co., Ltd

PRIORITIES AND ACTIONS

Organic Waste. an underutilized resource

Waste Management and Recycling in Japan Opportunities for EU SMEs. Christine Yolin, MINERVA Visiting Fellow Tokyo, 29 September 2015

Promotion of Resource-Circulating Society

Promotion of Sound Material- Cycle Society (SMC) and 3R Initiative in Japan and Asia

Project on Low-Carbon and Environmentally Sustainable City Planning in Surabaya, Indonesia. Inception Meeting

Kitakyushu City s Best Practices and Available Technologies in the 3Rs

Community-Based Recycling Activities

PERSPECTIVE OF SOLID WASTE COLLECTION IN THE CITY OF KIGALI

1. Introduction: Strategy for Realizing Sustainable Development in Asian Region

Converting Waste Plastics into Diesel Fuel: Resource Conservation and GHG Emissions Reduction

Greetings Salam 1 Malaysia

1. Overview of Bangkok. 2. Measures to Tackle Climate Change. 3. Challenge for Low Carbon City Development. 4. Awards of Great Pride

Scott Pasternak. Senior Project Manager, Burns & McDonnell

International Environmental Strategies in Kitakyushu

System dynamics models for planning long-term integrated municipal solid waste management in Bandung city

Integrated Capacity Strengthening for the Clean Development Mechanism

City Report. (Draft) < Dhaka South>

Best Practice Summary Padang City, Indonesia. Aspect of Governance: Thematic Area 3: Inclusive urban public services

SANITATION AND SUSTAINABLE DEVELOPMENT IN JAPAN

SOLID WASTE MANAGEMENT IN SURABAYA. Solid Waste Management Seminar Kitakyushu, September 19-20, 2002

EXAMINATION OF GREEN IT STRATEGIES BY THE APPLICATION EXAMPLES

Country Report. (Draft) < Malaysia >

September Director-General. Ministry of the Environment Japan

Del Norte Regional Recycling and Transfer Station Progress Report. November 15, 2016

Proposal on APEC Low Carbon Model Town Promotion through Eco Point Programme (LCMT EPP) Mr.Kamol Tanpipat Thailand

Executive Brief for NAMA Consultation Workshop

Urban Mining: Recycling or more?

JESC NEWS. Ⅰ. Report of JESC Activities 3R Conferences for Asian Local Governments, organized by JESC

Programmatic CDM Project Using Municipal Organic Waste of 64 Districts of Bangladesh

Takahiro Fukahori Economic and Labor Affairs Bureau of Kawasaki city

Waste Management and Asset Service Improvement in Pematangsiantar

Austria target. eq (by ) from energy supply and use, including transport (Mt CO 2

Preserving scarce resources. Cesare Spreafico Director General, COREPLA, Italy

Save The Energy, Save Our Present, Save Our Future. By : SMK Negeri 1 Bandung

Way Forward to Sustainable 3R Goals Sri Lanka

A food packaging converter s view on materials. Jukka Moisio, CEO Valmet Customer Days, October 4, 2018

GoGreen Program. Best Practices in Asia and Beyond. Corporate Public Policy and Responsibility

Michikazu KOJIMA Institute of Developing Economies, JETRO. Atsushi TERAZONO National Institute for Environmental Studies

2010 Residential Waste Stream Composition Study Results. Seattle Public Utilities and Neighborhoods Committee March 8, 2011

City Report. (Draft) < Rajkot, Gujarat, India>

City Report. (Draft) < Shimla, India>

City of Hiroshima KAE MURAKAMI Energy and Global Warming Prevention Department Environment Bureau The City of Hiroshima

Biodegradable plastics fact sheet

International Conference Renewable Energy Asia 2017: Moving Towards ASEAN s Smart Cities

Partnership for Urban Waste Management

THANG LONG ENVIRONMENTAL SERVICES JOINT STOCK COMPANY INTRODUCTION

Preliminary Research on

WEEE/E-Waste Management Workshop on Take-Back System

Vietnam - Waste Sector NAMA: Waste to Resources for Cities

Case Study for Multi-Stakeholders Partnerships

Systemic Waste Management Example: EcoVecindarios - Eco Neigbourhoods (Bolivia)

Municipal Solid Waste Management Policy in Thailand. Pollution Control Department (PCD) Ministry of Natural Resources and Environment Thailand

3R from Developing Countries Perspectives and its co-benefits

Mercury wastes management by Nomura Kohsan under the Basel Convention

Yokohama. Urban Development of FutureCity Yokohama and The City-to-City Collaborations. Population 3,730,000. Number of households 1,646,676.

Greening a Local Authority - Petaling Jaya Low Carbon Green City

Transcription:

THE OVERVIEW OF WASTE MANAGEMENT ISSUES RELATED TO BANDUNG CITY S SMART CITY CONCEPT".

7.63 % economic growth 55% SMEs 6 Million Tourist Annually coming to bandung

ENVIRONMENTAL ISSUES Land Use problem Air pollution Solid Waste Water Resources

Solid Waste Issues in Bandung : How it comes? Population Increase (2.6-4 Mio) Increasing the Consumption of Natural Resources and Material, increasing demography, and high economy activities in town Environmental Degradation Increasing of using packaging, such as paper, plastic bottles, plastic bags,glass cans, etc Lack of Facilities and Infrastructures Domestic Waste Increase (2% 4% per year) PROBLEMS

Source of Bandung City s Waste 5% 6% 3% 1% 19% 66% Pemukiman Residential Pasar Traditional Market Pertokoan Commercial dan Area Restoran Penyapu Road jalan Kawasan Industrial Industri Area Fasilitas Public Facilities Umum Waste To be proceed No. Source Volume (Ton) Percentage (%) (ton/day) 1. Residential 983,4 65,56 954,53 2. Tradional Market 281,55 18,77 273,29 3. Commercial Area 82,8 5,52 80,37 4. Road 89,85 5,99 87,21 5. Industrial Area 42,15 2,81 40,91 6. Public Facility 12,94 1,35 19,66 Total 1.492,69 100 1.455,97

Waste Composition of Bandung City 14% Organic 23% An Organic- Recycle 63% Residual

Mid Term Development Planning 2014-2018

THE CHANGE OF WASTE MANAGEMENT MINDSET Listed at Law Nr. 18 / 2008 END OF PIPE (reduce at source) (resources recycle)

EXISTING OPERATIONAL

Competition among cities in terms of managing the flow of people and information Why we need smart city Climate Change Financial Crisis Urbanization Scarcity of Natural Resources

Why Smart City?

3 Principles Developing Bandung City

Government academia business Collaborative City community Media

MANUAL TECHNOLOGY COSTLY EFFICIENT INACCESIBLE OPEN GOV TOP DOWN PARTICIPATORY SLOW SERVICE FASTER SERVICE CORRUPT CLEAN BY DESIGN BANDUNG

Related to waste management

Bandung Smart City Command Center as Decision Support System

Waste Picking (GPS) Movement

Zero Waste Model Area

Local Law Number 17 of 2012, regarding Reducing Plastic Bag

COLLABORATION BETWEEN BANDUNG CITY S DIVISIONS,NGO, CITIZEN, COMMUNITIES BEFORE AFTER NGO,Citizen UNDER COURTESY OF PDK KOTA BANDUNG

COLLABORATION WITH GOBER 1500 GOBER TROOPS GOBER (GORONG- GORONG & KEBERSIHAN) UNDER COURTESY OF PDK

PUBLIC PARTICIPATION AND COMPLAINTS MANAGEMENT BY SMART CITY APPLICATION PD.Kebersihan Kota Bandung & Bebas Sampah ID SMART CITY APPLICATION http://pdkebersihan.bandung.go.id http://bebassampah.id

RAPID RESPONSE TEAM COMPLAINTS RAPID RESPONSE TEAM APRECIATION FROM COMPLAINANT

UNDER COURTESY OF PD KEBERSIHAN GPS Tracking REJUVENATION OF OUR TRANSPORTATION MODE OPTIMIZATION OF AN EFFECTIVE FREIGHT LINE

BILLING APPLICATION facilitating the cunsomers to pay their bill 80 % PERFORMANCE SYSTEM The application is still in process of improving the data such as the addition and modification of existing data, balance sheet, issuing invoice and receiot, export and import data features.

OnTest Stages GPS TRACKING GPS tracking on our operational vehicle is aim to monitor our solid waste freighting to final disposal, and to arrange the most effective route 90 % PERFORMANC E SYSTEM Target of operation : Dec 2017 Still in progress : refinement of the data, will be integrated with Bandung Smart City

E-REPORTING USING SMART PHONE APPLICATION 95% This system is called rapid reaction unit. Citizen can submit their complaint on PDK Hotline, LAPOR, social media rapidly and could be directly addressed by PDK. PERFORMANCE SYSTEM The highest rapid reaction unit is using twitter. This e reporting using smart phone application still in progress.

Gerakan #KANGPISMAN

CLEAN CITY AWARD, THE HIGHEST AWARD IN THE ENVIRONMENTAL FIELD FOR THE CITIES OF INDONESIA

COOPERATION BETWEEN BANDUNG CITY AND KAWASAKI CITY

KAWASAKI CITY-BANDUNG Continuous cooperation between Bandung City and Kawasaki City through Asian Pacific Eco-business Forum (from 2006 to present) in collaboration with UNEP 13th Asian Pacific Eco-business Forum Feb. 16th 2017

KAWASAKI CITY-KOTA BANDUNG B. KERI, IGES and JESC conducted feasibility studies for JCM scheme (supported by Ministry of the Environment, Japan) in Bandung City during FY2014 to FY2015 C. Exchange the MOU between Bandung City and Kawasaki City (Feb. 18 th 2016)

Request from Bandung City after MOU exchanging ceremony 37 Technology and knowledge transfer on waste to energy process using organic wastes (such as food wastes), with installation of facility (such as bio-digester) Investigation of effective utilization methods for plastic wastes sorted out from inorganic wastes Support of establishment and management of recycling center Part of the request will be fulfilled with this JICA Partnership Project (From 2017 Mar. to 2020 Mar.)

Facilitate using compost, bio-digester, waste bank and other 3R related facilities Output 1 (Community) Output 2 (Food-related business) 6 Mixed wastes Organic Recyclable Separated wastes Recyclable Organic Separated wastes Mixed wastes Output 3 (TPS 3R) Waste Bank Bio-digester Reduce the burden to TPA or compost others Output 4 (Masterplan & Action plan) Acts &rules for changing into better quality city Material and Energy Recycle

HATUR NUHUN