1.1 All the testing apparatus shall be periodically checked and calibrated and records of such checks/calibration maintained.

BUREAU OF INDIAN STANDARDS (CMD II)

BUREAU OF INDIAN STANDARDS (Central Marks Department - III) Our Ref : CMD-III/16: Oct 2006

CENTRAL MARKS DEPARTMENT II. Ref: CMD-II/16:

SCHEME OF TESTING AND INSPECTION FOR CERTIFICAATION OF VENEERED DECORATIVE PLYWOOD ACCORDING TO IS 1328:1996 (Third Revision)

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF TAPER ROLLER BEARINGS ACCORDING TO IS 12102:1987

SCHEME OF TESTING AND INSPECTION CERTIFICATION OF PHOSPHORIC ACID, FOOD GRADE ACCORDING TO IS 10508:1983

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SILVERED GLASS MIRRORS FOR GENERAL PURPOSES ACCORDING TO IS :

DOC:STI/3087/4 September 2006

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT III

1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained.

2. 0 Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

BUREAU OF INDIAN STANDARDS (Central Marks Department III) Our ref: CMD-III/16: November 2007

2.0 TEST RECORDS- All records of tests and inspection shall be kept in suitable forms approved by the Bureau of Indian Standards.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF RESPIRATORY PROTECTIVE DEVICES FULL FACE MASKS ACCORDING TO IS 14166:1994

1.2 All the testing equipment shall be periodically checked and calibrated and records of such checks/ calibration maintained.

CENTRAL MARKS DEPARTMENT-II

2. Test Record - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

BUREAU OF INDIAN STANDARDS (Central Marks Department-III) Our Ref : CMD-III/16: October 2008

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SWITCHES FOR DOMESTIC & SIMILAR PURPOSE ACCORDING TO IS 3854:1997

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF TITANIUM DIOXIDE, ANATASE, FOR PAINTS ACCORDING TO IS :

BUREAU OF INDIAN STANDARDS (CENTRAL MARKS DEPARTMENT-III)

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF FLAVOURED MILK ACCORDING TO IS 4709: 1968

CENTRAL MARKS DEPARTMENT-II. Our Ref: CMD-II/16: Subject: Information of revised version of Alumino-Ferric as per IS 299.

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF GALVANIZED STEEL BARBED WIRE FOR FENCING ACCORDING ACCORDING TO IS 278:2009 (Fourth Revision)

BUREAU OF INDIAN STANDARDS CMD-II

2.2 Copies of any records and other connected papers that may be required by the Bureau shall be made available at any time on request.

1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained.

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

Doc: STI/1223(Section-2)/5 Oct 2003

CENTRAL MARKS DEPARTMENT-III

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SELF BALLASTED LAMPS FOR GENERAL LIGHTING SERVICES ACCORDING TO IS 15111(Part 1 & 2):2002

STI /15392 /1 April, 2009

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

1.1 All the testing apparatus shall be periodically checked and calibrated and records of such checks/calibration maintained.

CENTRAL MARKS DEPARTMENT-III. Our Ref.:CMD-III/16:

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF STEEL WIRE ROPES FOR GENERAL ENGINEERING PURPOSES ACCORDING TO IS 2266:2002 (Fourth Revision)

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF COPPER SULPHATE ACCORDING TO IS :

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF PLASTIC FEEDING BOTTLES ACCORDING TO IS : 1999 (Incorporating Amendment No.

CENTRAL MARKS DEPARTMENT II. Subject: Implementation of revised Indian Standard Specification for Nitric Acid

DOC: STI/8783(Part 4/Sec1)/1 August 1998

GUIDELINES FOR IMPLEMENTATION OF IS 13334(PART 1):2014

DOC:STI/9573/2 January 2003

BUREAU OF INDIAN STANDARDS ( CENTRAL MARKS DEPARTMENT-III ) Our Ref: CMD-III/16:

1.1 All the testing apparatus shall be periodically checked and calibrated and records of such checks/calibration maintained.

SCHEME OF TESTING AND INSPECTION FOR CERIFICATION OF SISAL ROPES PART 1 UNTARRED VARIEITES ACCORDING TO IS 1321(Part 1):2003 (Fourth Revision)

2.0 TEST RECORDS - All records of tests and inspection shall be kept in suitable forms approved by the Bureau.

Doc: STI/1166/6 July 2008

SPECIFICATION ACCORDING TO IS

1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained.

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF MALLIABLE CAST IRON PIPE FITTINGS ACCORDING TO IS: 1879:2010 (Third Revision)

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SWITCH-SOCKET-OUTLETS (NON-INTERLOCK TYPE) ACCORDING TO IS 15787:2008

2. Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF TOOTH PASTE ACCORDING TO IS 6356: 2001 (Third Revision)

2.1 All records of tests and inspection shall be kept in suitable forms approved by the Bureau.

1.1 All testing apparatus shall be periodically checked and calibrated and records of such checks/calibration shall be maintained.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ALLUMINIUM ALLOY TUBES FOR IRRIGATION PURPOSES; WELDED TUBES ACCORDING TO IS: 7092 (PART I)-1992

CMD-II(Legal) CMD-II/16:

1.1 All testing apparatus shall be periodically checked and calibrated. Records of such checks/calibration shall be maintained.

CENTRAL MARKS DEPARTMENT III. Our Ref : CMD-III/16: Mar 2007

2. Test Records - All records of tests and analysis shall be kept in suitable forms approved by the Bureau.

CENTRAL MARKS DEPARTMENT-II

2. 0 Test Records - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

BUREAU OF INDIAN STANDARDS CENTRAL MARKS DEPARTMENT-III

2.2 Copies of any records and other connected papers that may be required by the Bureau shall be made available at any time on request.

1.1 All testing apparatus shall be periodically checked and calibrated records of such checks/calibration shall be maintained.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF HAND OPERATED STIRRUP-TYPE SPRAYER ACCORDING TO IS 1971:1996 (Fifth Revision)

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF GRAIN ORIENTED ELECTRICAL STEEL SHEET AND STRIP ACCORDING TO IS 3024:2006 (Second Revision)

CENTRAL MARKS DEPARTMENT-3. Our Ref: CMD-3/16: Subject: STI as per IS 13714: 1993 DUNNAGE PALLETS-WAREHOUSING

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SHAVING CREAMS ACCORDING TO IS ( Incorporating Amendment No.

2. Test Record - All records of analysis and tests shall be kept in suitable forms approved by the Bureau of Indian Standards.

1.1 All the testing apparatus shall be checked periodically and records of such checks shall be maintained.

MARKS DEPARTMENT-III. ROs/BOs may also propose the implementation date in view of revision of Indian

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SLUICE VALVE FOR WATER WORKS PURPOSES (50 TO 1200 MM SIZE) ACCORDING TO IS 14846:2000

CENTRAL MARKS DEPARTMENT-2. Ref: CMD-2/16:

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF 53 GRADE ORDINARY PORTLAND CEMENT ACCORDING TO IS:

(ड चद र ) ञ न क ई (स ए ड -3)

(अन भ ग अध क र ) (स ए ड -3)

CENTRAL MARKS DEPARTMENT-2

स ल न प ए, (द सर स श धन) (स श धन 1 स 6 श "मल)

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF BORAX ACCORDING TO IS 1109:1980

Subject: Implementation of IS 9798:2013 Low Pressure Regulators for use with Liquefied Petroleum Gas (LPG) Specification (Second Revision).

2. TEST RECORDS - All records of tests, inspection and calibration shall be kept in suitable forms approved by the Bureau.

2. TEST RECORDS: All records of tests and analysis shall be kept in suitable forms approved by the Bureau.

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF ORDINARY PORTLAND CEMENT, 33 GRADE ACCORDING TO

SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF MALT EXTRACT ACCORDING TO IS 2404 : 1993

BUREAU OF INDIAN STANDARDS (CENTRAL MARKS DEPARTMENT-III) Our Ref: CMD-III/16:1239(Pt 1) 11 Oct 2004

ALUMINIUM CONDUCTORS FOR OVERHEAD TRANSMISSION PURPOSES

BUREAU OF INDIAN STANDARD (Faridabad Branch Office)

Transcription:

CENTRAL MARKS DEPARTMENT (FCT) Ref: CMD-II/16:2933 (Part 1) 20 03 2014 Subject: Implementation of revised STI for IS 2933 (Part for ENAMEL, EXTERIOR: (a) UNDERCOATING (b) FINISHING SPECIFICATION PART 1 FOR DOMESTIC AND DECORATIVE APPLICATIONS. 1. Indian Standard Specification for for ENAMEL, EXTERIOR: (a) UNDERCOATING (b) FINISHING as per IS 2933 (Part 1):1975 has been revised as IS 2933 (Part 1): 2013 for ENAMEL, EXTERIOR: (a) UNDERCOATING (b) FINISHING SPECIFICATION PART 1 FOR DOMESTIC AND DECORATIVE APPLICATIONS. 1. The main changes effected in revised IS 2933 (Part are as follows : i. The limit of lead restriction has been introduced in this standard. In this revision, lead restriction up to a maximum permissible limit of 90 ppm has been prescribed keeping in view to use this product for painting in houses and buildings. ii. In this revision, along with lead restriction, a suitable cautionary notice has been included in the marking clause 7.2. iii. The existing specification has been bifurcated into two parts namely Part 1 of the standard for household/decorative purposes and Part 2 of the standard for commercial/industrial applications. iv. Terminology for different requirements and reference has been given to various parts/sections of IS 101 for the requirements given in the standard. 3. The STI has been revised as Doc: STI/2933 (Part 1)/3, taking in to consideration all the changes introduced in the revised specification IS 2933 (Part 1): 2013. 4. In order to implement the revised Scheme of Testing and Inspection, following procedure shall be adopted; For existing licensee: i. Endorsement in the licence as per revised standard shall be made after obtaining the following documents from the licensees: (a) Declaration regarding availability of testing equipment as per revised specification on CMD/PF 306. (b) Acceptance of revised STI. (c) Test report indicating conformity of the product to the revised specification.(in-house factory test report/independent test report) (ii) An early inspection shall be planned to verify the availability of testing equipment as per revised specification with the licensees after obtaining declaration on CMD/PF 306. During the inspection sample shall be drawn for independent testing to ensure conformity of the product to the revised standard. (iii) Action shall be taken as per OMPC 2004, if the licensee fails to submit the acceptance of STI in stipulated time. Likewise, in case sample drawn during inspection fails in factory/independent Testing as per the revised version, further actions are to be taken as per OMPC 2004.

For Applicants: i. All new applications may be recorded and processed as per revised IS 2933 (Part. ii. In case applicant sample is already tested, the GOL shall be processed as per as per the old/revised version of the Specification as requested by the firm. However, in case the GOL has been processed as per the old version of the Specification, an undertaking shall be obtained from the firm that the actions required as per revised IS 2933(Part 1): 2013. shall be completed before 31 st March 2014. iii. In case applicant sample is yet to be tested by Lab, necessary action may be taken immediately by BO for considering the case as per IS 2933 (Part after consulting the applicant. REVISED STI Doc: STI/2933 (Part 1)/3 WILL BE IMPLEMENTED and will run concurrently with earlier version of the STI till 31 March 2014 after which the earlier version of the STI will cease to exist. Rao) FCT) (B. Ramakrishna Sc.F & H (CMD- All ROs/BOs ITS - with a request to host on BIS website

SCHEME OF TESTEING AND INSPECTION FOR CERTIFICATION OF ENAMEL, EXTERIOR (a) UNDERCOATING (b) FINISHING PART 1 FOR DOMESTIC AND DECORATIVE APPLICATIONS. ACCORDNING TO IS:2933:2013 Doc:STI 2933/3 1. LABORATORY: A laboratory shall be maintained which shall be suitably equipped and staffed where the tests shall be carried out in accordance with the methods given in the specification. 1.1 All the testing equipment shall be periodically checked and records of such checks shall be maintained. 2. TEST RECORDS: All records of tests and analysis shall be maintained as specified in Table 1. 2.1 Copies of any records or charts that may be required by BIS shall be made available at any time on request 3. Quality Control - It is recommended that, as far as possible, Statistical Quality Control (SQC) methods may be used for controlling the quality of the products as envisaged in this Scheme [See IS 397 (Part 1), IS 397(Part 2), IS 397 (Part 3) & IS 397(Part 4)]. 3.1 In addition, effort should be made to gradually introduce a Quality Management System in accordance with IS/ISO 9001:2008. 3.2 All instruments/equipment are required to be brought under calibration control. 4. STANDARD MARK: The Standard Mark, as given in Column (1) of the First Schedule of the license shall be printed on each container or on the label applied to the container; provided always that the material in each container on which this Mark is thus applied conforms to every requirement of the specification. 5. Marking - In addition, the following information should be given on each container or on the label applied to it: a) Name of material and indication whether undercoating or finishing b) Indication of source of manufacturer; c) Lead Content (Max); d) A statement synthetic, if the material contains pthalic anhydride. e) Volume of the material; f) Batch No. or Lot No in code or otherwise; g) Month and year of manufacture; h) Colour/shade of the material; i) A cautionary note as given below: 1) Keep out of reach of children 2) Dried film of this paint may be harmful if eaten or chewed. 3) This product may be harmful swallowed or inhaled. j) Licence No. CM/L

6. Packing The material shall be packed as per cl. 7.1 of IS 2933:2013. Doc:STI 2933/3 7. Levels of Control: The tests as indicated in Table 1, and at the levels of control specified therein shall be carried out on all that part of the production of the factory which in covered by this Scheme and appropriate records and charts maintained in accordance with paragraph 2 above. 7.1 Control Unit: For the purpose of sampling, enamel of same colour and same class produced during a shift at one uniroll and thoroughly homogenized shall constitute a control unit. 7.2 On the basis of the tests on the samples drawn from a control unit, the conformity to the various requirements of the specification shall be made as follows: 7.2.1 A sample drawn from a control unit shall be tested for its colour by matching it with a specified IS Colour, or to an agreed colour where IS colour is not specified. In case of undercoating, the colour shall be of approximate match to the finishing enamel. If it fails to conform to the requirement, the control unit from which the sample is drawn shall be considered unfit for the purpose of marking. 7.2.1.1 In addition to the test as given in para 7.2.1 above, a sample taken from every control unit shall also be tested for its consistency, drying time, finish and stripping. Two samples from every control unit shall also be tested for scratch hardness, flexibility, adhesion, and Mass, Kg/10 litre. If any sample fails in respect of one or more of these requirements, the control unit represented by that sample shall be considered unfit for the purpose of marking. 8. Each consignment of the thinner received in the factory shall be tested for flash point and only those conforming to the specification shall be used for enamel s production. Only such resins, pigments and vehicles, received in the factory, shall be used for certified enamel s production whose composition is similar to that of the raw materials used for manufacture of the registered sample. Each consignment of these material shall be tested for the moisture content and in no case, the moisture shall exceed 0.5% by weight, when tested by Dean & Stark Method. The composition of the material shall be as specified in clause 6.1 of IS 2933(Part 1). The composition of the raw material used for certified enamel s production shall be determined and the test results shall be kept in suitable form. Alternatively, a test certificate shall be obtained from the suppliers of raw materials for each consignment received. 9. In respect of all other clauses of the specification, the factory will maintain appropriate controls and checks to ensure that their product conforms to the various requirements of the specification.

Doc:STI 2933/3 10. REJECTIONS: A separate record shall be maintained giving information relating to the rejection of paint not conforming to the specification and the method of their disposal. Such material, if packed, shall in no case be stored together with that conforming to the specification. 11. SAMPLES: The licensee shall supply, free of charge, the samples required in accordance with the Bureau of Indian Standards (Certification) Regulations from his factory or godown. BIS shall, however, pay for the samples taken by it from the open market. 12. REPLACEMENT: Whenever a complaint is received soon after the goods with certification Mark have been purchased and used and if there is adequate evidence that the goods have not been misused, defective goods shall be replaced free of cost by the licensee in case the complaint is proved to be genuine and the warranty period (where applicable) has not expired. The final authority to judge conformity of the product to the Standard shall be with BIS. The firm should have its own complaint investigation systems as per IS/ISO 10002. 12.1 In the event of any damages caused by the goods bearing the Standard Mark, or claim being filed by the consumers against BIS Standard Mark and not "conforming to" their relevant Indian Standard, entire liability arising out of such non conforming product shall be of licensee and BIS shall not in any way be responsible in such cases. 13. STOP MARKING: The marking of the product shall be stopped under intimation to BIS, if, at any time, there is some difficulty in maintaining the conformity of the product to the specification or the testing equipment goes out of order or if directed to do so by BIS for any reason. The marking may be resumed as soon as the defects are removed under intimation to BIS. The marking of the product shall be stopped immediately if directed to do so by BIS for any reason. The marking may then be resumed only after permission by BIS. The information regarding resumption of marking shall also be sent to BIS. 14. PRODUCTION: The licensee shall send to BIS a statement of quantity produced, marked and exported by him and the trade value thereof, at the end of each operative year of the licence (to be authenticated by a Chartered Accountant or by the manufacturer by giving an affidavit /undertaking).

Doc:STI 2933/3

Claus e Requirements 6.1 to 6.1.5 Composition Durability IS: 2933(Part Enamel, Exterior, (a) Undercoating (b) Finishing Table 1 Levels of Control TEST DETAILS LEVELS OF CONTROL Test Method Reference No. of Samples Frequency IS 2933(Part Each consignment of raw material received Doc:STI 2933/3 6.2 6.2.1 Registered sample Annex B-3 of IS 2933(Part Annex B-4 of IS 2933(Part IS 101(Part6/Sec5) Sample for registration as per cl. 6.2,1 6.2.2 Bulk Sample Annex B-2 of IS 2933(Part Annex B-4 of IS 2933(Part IS 101(Part4/Sec4) Representative sample of bulk supply as per cl. 6.2,2 6.3 & IS 101(Part1/Sec7) Table Mass Each control unit 2 6.4 Lead Restriction IS 101(Part 8/Sec5) 6.5 & Table 2 i) a)consistency b) Viscosity Drying time i) Surface dry* ii) Hard dry iii) Tack free* Annex C of IS 2933(Part IS 101(Part1/Sec5) IS 101(Part3/Sec1) Wet opacity IS 101(Part4/Sec1) Finish IS 101(Part 3/Sec 4)

-do Fineness of Grind IS 101(Part 3/Sec 5) microns Colour IS 101(Part4/Sec 2) Water content* IS 101(Part 2/Sec 1) Flexibility & adhesion a) Scratch Hardness IS 101(Part5/Sec 2) Each consignment of raw material received b) Bend Test IS 101(Part5/Sec 2) Stripping test IS 2933(Part 1): 2013 Flash Point IS 101(Part1/Sec 6) Each consignment of thinner received Keeping properties IS 101(Part 6/Sec 2) Once in six month. Two Each Control Unit Doc:STI 2933/3 6.6 Optional Requirements Spreading capacity*1 Annex E of IS 2933(Part Each control unit Spreading time*1 Annex E of IS 2933(Part * Only for finishing enamel.

Doc:STI 2933/3