The Hong Kong Polytechnic University Facilities Management Office

Similar documents
EMPLOYEE SAFETY HANDBOOK

HEALTH AND SAFETY AT WORK ACT 1974 HEALTH AND SAFETY POLICY OF:

Constraints on how the Contractor Provides the Works

HEALTH AND SAFETY MANUAL

OSH LEGISLATION LAW AND REGULATION TO CONSTRUCTION SAFETY LAW AND REGULATION TO CONSTRUCTION SAFETY 20/2/2013

PICS Health and Safety Policy and Arrangements

HEALTH & SAFETY MANUAL Legislated Duties and Responsibilities

Legal Summary SHE-037 Handbook of Business Operation in Thailand s Industrial Estate Version 2

HEALTH AND SAFETY POLICY

XXVI. Contractor Safety & Environmental Guidelines (For General Contractors and Sub-Contractors)

HEALTH & SAFETY POLICY TABLE OF CONTENTS RESPONSIBILITIES

Health and Safety Policy

This document sets out the rules applicable to all contract companies and their personnel when working on a CF Fertilisers UK Limited (CF) site.

OSHA Occupational Safety and Health Authority

Employee Summary of Company Safety Arrangements SAFETY ARRANGEMENTS

Health & Safety Policy

Construction, Demolition & Excavation Works Doc Reference: DoMN-WHSMS 3.14 Version Number: 2.2

Iron Ore Company of Canada Health, Safety & Environment

GUELPH WATER RECLAMATION HEALTH, SAFETY AND SECTION GUELPH, ON. EMERGENCY PROCEDURES PAGE 1 PROJECT NO

Level 2 NVQ Diploma in Removal of Hazardous Waste (Construction) Licensed Asbestos

Contractors Safety Code of Practice

DRAKS INTERIOR DOOR SYSTEMS LTD STATEMENT OF INTENT

LEVEL 3 HEALTH & SAFETY IN THE WORKPLACE

Contractors Code of Practice

Property and Public Protection Plan

Contractor EHS Program Attachments

MVDC F041 Safety Inspection Checklist

CHAS Assessment Standards

Jobsite Specifications The A standard provides jobsite specifications for each of the following hazards:

M.B. Power Services (Essex) Ltd

Health Safety, & Environment

TITLE: CONTRACTOR SAFETY. Safety Procedures and Policies. Issuing Authority: Multi-Color Corporation, Page Number: 1 of 5. Date Effective: 4/1/2011

SUBCONTRACTOR SAFETY, HEALTH, AND ENVIRONMENTAL MINIMUM PERFORMANCE STANDARD (MPS)

Environmental, Health and Safety Policy for Contractors

Contractor and Supplier Expectations

Adelaide Airport Limited

SUMMES1 (SQA Unit Code - F9H3 04) Apply health & safety legislation and working practices

OSHA 1994 AND FMA Chapter 4 (cont.)

CONSTRUCTION SITES (SAFETY) (AMENDMENT) REGULATION 2003

Health and Safety Tools. Copies of these checklists and forms can be downloaded from ACT WorkCover s website:

CHEMICAL CONTRACTORS DC WATER CONTRACTOR SAFETY PROGRAM CONTRACT PROVISIONS FOR CHEMICAL DELIVERIES 1. RESPONSIBILITY FOR COMPLIANCE

HFM Asset Management Contractor Induction Queens Riverside Apartments

Contractor EHS Program Attachments

Health & Safety Policy & Management Systems. Guidance Note 13

Ensure your own actions reduce risks to health and safety

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

Cavan and Monaghan ETB, Cavan AES. Programme Module Descriptor for. Health and Safety. leading to

Unit: 101 Contribute to the maintenance of a healthy and safe working environment. Element: Maintain personal hygiene, health and safety

MMM MASONRY, INC. Employee Safety Guidelines

SECTION TEMPORARY FACILITIES AND CONTROLS

SAMPLE PAGES. Construction Safety and Health Program. [Company name]

REFURBISHMENT DEMOLITION

SCOTTISH BADGERS HEALTH AND SAFETY POLICY

Ras Al Khaima Investment Authority LLC

TECHNICAL SUPPORT ASSOCIATES HEALTH AND SAFETY POLICY STATEMENT

Permit-to-Work. Procedure and Requirements EHSP-005. Page 1 of 18

SAFETY STATEMENT. ABC Company. Address Line 1 Address Line 2. Approved by number. owner. number 01 xx/xx/xx Manager 1 Manager 1 1

Fall Protection Program For Working on Flat Roofs

ENVIRONMENTAL, HEALTH AND SAFETY INFORMATION FOR CONTACTORS. Rules of the House

The Health & Safety Policy

Newcastle University. Estate Support Service. Contractor Induction Booklet

DIVISION 02 SELECTIVE DEMOLITION

Health and Safety Policy

FAIR LABOR ASSOCIATION INDEPENDENT EXTERNAL MONITORING REPORT

A2B. Construction (Design and Management) Regulations 2015 PRE CONSTRUCTION INFORMATION PACK (V ) PROJECT:

CONTRACTOR WHS SYSTEM STANDARD RISK MANAGEMENT EXTERNAL USE ONLY

Your Guide To Health & Safety For Self-Managed Projects

Today, we re going to talk about disaster planning. Proper planning for workplace disasters, pandemics, and other emergencies is necessary to prevent

I write with reference to the meeting between abc concerning your intention to stage a def at ghi..

HEALTH AND SAFETY POLICY

1. PURPOSE 2. SCOPE 3. APPLICATIONS AND INTERPRETATION. This document is to be read and understood in conjunction with the following, inter alia:

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

RISK ASSESSMENT. HAZARD POTENTIAL 3 x MAJOR 2 SERIOUS 1 SLIGHT. RISK POTENTIAL 3 x HIGH 2 MEDIUM 1 LOW

SECTION 2 - HEALTH AND SAFETY RESPONSIBILITIES

Workplace Transport Guidance

RISK ASSESSMENT SHEET

St Francis School District Code of Safe Practices

Health, Safety and Environmental Policy

Health & Safety Policy

DEMOLITION TRADE SPECIFICATION

CAL/OSHA ELECTRICAL HIGH VOLTAGE

CORPORATE HEALTH AND SAFETY POLICY

CONTRACTOR WHS HAZARD STANDARD FORMWORK & FALSEWORK EXTERNAL USE ONLY

Spray Booth Guideline

Safety, Health and Environmental Essentials for Contractors Working at the Rutherford Appleton Laboratory

Drag Chain Conveyor Installation and Operation Manual

Scaffolding. Safety Guide. STOP! Before you climb

Contractor safety for schools and services. Guidance

Procedure Plant Management Procedure

HEALTH & SAFETY POLICY AND ORGANISATIONAL ARRANGEMENTS

BOAT MAINTENANCE FACILITY RULES

Construction Method Statement

MATERIAL HANDLING, STORAGE, AND DISPOSAL

Unit Standard 497 Demonstrate knowledge of workplace health and safety requirements Version 7 Level 1 3 Credits. Student Checklist & Instructions

Approved Date : April 6 th, 2010 Revised : Prepared by : Health and Safety Committee

HEALTH AND SAFETY POLICY AND PROCEDURES

ETELÄ KARJALAN JÄTEHUOLTO OY DRY DIGESTION FACILITY AND BIOGAS UPGRADING AND FILLING STATION DESIGN AND TURN KEY CONTRACT

Contractor Health, Safety and Environment Guidelines (Pacific Region)

This policy will be reviewed annually from the date of first issue, or when significant changes have occurred.

HS41 Guidance Note - Contractor Guidelines

Transcription:

The Hong Kong Polytechnic University Facilities Management Office Safety Precautions and Requirements The Contractor shall ensure as a priority in all activities connected with the Works, the safety and health of all persons on or adjacent the Site and in particular that all persons employed on the Works are appropriately trained for their task and in safety and health. The Contractor shall comply with all legislation relating to safety and health including but not limited to - (a) the Factories and Industrial Undertakings Ordinance (Sections 6A & 6B) (b) (c) (d) the Construction Sites (Safety) Regulations the Factories and Industrial Undertakings (Safety Officers and Safety Supervisors) Regulations the Factories and Industrial Undertakings (Confined Spaces) Regulations (e) the Dangerous Goods Ordinance (Section 6) (f) (g) the Electricity Ordinance (Part VII) the Electricity (Wiring) Regulations The Contractor shall comply with the requirements contained in the document 'Safety Guide to Working in Confined Space' published by Government and the Institute of Electrical Engineers Wiring Regulations (16th Edition 1991) Section "Construction Site Installations". The Contractor shall also comply with the requirements contained in the document Health and Safety Guide published by Health & Safety Office of The Hong Kong Polytechnic University. Should inspection on this document be so required, the Contractor shall contact the Contract Administrator. The Contractor shall keep himself updated about the status of all relevant codes of practice published by Government and by the Occupational Safety and Health Council and comply with the provisions in the codes of practice. 1. Reporting of Accidents and Incidents The Contractor shall notify the Contract Administrator immediately of any accident, incidents, dangerous occurrences, which result in death, serious bodily injury, or damage to the property of the University. 1

The initial notification may be verbal but shall in any events be followed by a preliminary written report, in a format agreed by the University/ Contract Administrator, within 24 hours of occurrence. A detailed written report shall be submitted to the Contract Administrator within 7 days. The Contractor shall deliver to the Contract Administrator within 48 hours of the occurrence, a copy of any Form 2 or 2a, or other statutory reports he submits to Government authorities. 2. Alcohol and Drugs The Contractor shall ensure that alcohol drinks, drugs are not sold or consumed on site. The Contractor shall ensure that his personnel and those of his sub-contractors of any tiers are not engaged in the execution of works when under the influence of alcohol or drugs. The Contractor shall immediately remove or cause to be removed from site any person employed by him or sub-contractor who is found to be under the influence of alcohol or drugs. Such persons shall not be employed again in connection with the works without prior consent of the Contract Administrator. 3. Safe Working Practices within the University premises 1. Elimination of Nuisance and Interference. 1.1 All works activities shall be executed so as to cause minimum inconvenience and interference to students, staff and other users of the affected premises. 1.2 All practicable precautions must be taken to minimize: - the generation of dust excessive construction noise. chemical odor improper usage of lifts poor housekeeping of the affected common areas. 1.3 In the case of unavoidable interference, the Contractor shall give Sufficient warning to the Contract Administrators o that appropriate arrangement (e.g. announcement) can be made. 2

1.4 All debris caused by Contractor's works activities must be properly stacked and disposed of regularly. The clearing process should be at the intervals agreed by the Contract Administrator. All skips must be well covered and safely fenced off when placed in the agreed location. 1.5 The Contractor must not block any public access during the execution of the works. Alternative arrangement shall be effected when this is not possible, but shall have prior consent from the Contract Administrator. 2. Public Protection 2.1 The Contractor shall provide, erect, maintain and finally remove Works/Warning Notices. These shall be erected at locations, positions and levels to be agreed by the Contract Administrator. 2.2 Where works operations requires lifting, or otherwise working at height and over public area, the Contractor shall arrange suitable measures to protect the users of the affected area. Note: Public areas include common areas within the University premises. 2.3 In no event shall the Contractor conduct works which could cause injury to public members until all access by all public member has been prevented by barricades or otherwise, to ensure that no public member inadvertently enters the works area during the operations. Note: Public members include all users of the University premises. 2.4 The Contractor shall provide and maintain sufficient and adequate lighting around the works boundary and throughout the site area as agreed by the Contract Administrator. 2.5 All works areas, when designated for the sole use by the contractor, shall be enclosed within a perimeter fence of at least 2 meters high, all entrances shall be properly locked when the area is unattended. Suitable arrangement shall be put in place for after work access under emergency situation. 2.6 For works areas sharing with other users of the premises, the Contractor shall segregate it by suitable means. Examples are movable metal barrier, barrier tapes etc. 3

2.7 All plants, equipment and works materials must be properly guarded and stored in suitable locations. Hazardous materials must have adequate and proper warning signs displayed. All signs must be English and Chinese. 3. Traffic Safety 3.1 The Contractor must observe all traffic regulations and signs within the University premises. 3.2 All vehicles must be properly licensed and insured and driven by qualified personnel. 4. Use of Chemicals and Offensive Substances. 4.1 The Contractor shall notify the Contract Administrator and seek approval before delivery to, storing and using any hazardous substances. This includes acids (for cleaning), solvents, and strong smell substances. 4.2 Material Safety Data Sheets of hazardous materials must be submitted to the Contract Administrator for reference and record. 5. Electrical Safety 5.1 All electrical equipment to be used within the University premises must be of a safe design and suitable for the purpose. All live parts must be suitably protected. 5.2 Power cables must not be allowed to trail across common area. If this is unavoidable, it shall be properly guarded by appropriate type of cable cover or protector to avoid tripping hazards. 5.3 All temporary electrical connections are to be made by using proper plugs and sockets. Tapping is not permitted. 5.4 All electrical wiring should be installed by a qualified electrician. 4

6. Fire Prevention and Fire Fighting 6.1 Hot works work. All combustible materials should be removed from the immediate vicinity. A portable fire extinguisher should be placed at immediate readiness. 6.2 Excessive flammable materials shall be stored in appropriate DG stores. Any unused flammable material should be returned to and store at approved stores. 6.3 Contractor shall maintain good housekeeping. Discarded combustible materials, wood chips, and saw dust etc. should be periodically disposed off site. 6.4 No obstruction shall be caused to any fire escape route. 6.5 The work area shall be adequately ventilated and where necessary mechanical ventilation shall be provided. 6.6 Floor opening shall be adequately covered to prevent welding sparks from falling through. 6.7 Upon completion of hot work, the works area and the adjacent areas should be thoroughly inspected to identify any smouldering fire. 7. Prevention of False Fire Alarms 7.1 The contractor shall carefully check the site environment before carrying out any work and take due care and/or make necessary measures/ arrangements to avoid causing any false fire alarms. 7.2 The contractor shall not, without prior approval from Facilities Management Office, tamper with the as-fitted fire service installations on site. Should any fire system be tampered with by the on-site workers which results in the mal-functioning of the system, all losses suffered by the University shall be borne by the Contractor. 7.3 For any single event of false fire alarm caused by any work activities of the Contractor, the University may direct that a compensatory charge of $1,000.00 be levied on the Contractor unless a reasonable explanation, to the satisfaction of the Contract Administrator, is given. The compensatory charge shall be deducted from any amounts due to the Contractor. Notwithstanding this compensatory charge, if imposed, the liability of the Contractor will not be relieved under the conditions of contract. 5

8. Wearing of Uniform and Identity Badge All the Contractor s workers, while working on site, shall wear uniform, which has been approved by the Contract Administrator, and identity badge prominently with the names of the worker and Contractor clearly displayed, failing which the worker may be requested to leave the site immediately and/or for each occasion the Contractor will be imposed a compensatory charge of HK$500.00 for each worker. The compensatory charge shall be deducted from any amounts due to the Contractor. Notwithstanding this compensatory charge, if imposed, the liability of the Contractor will not be relieved under the conditions of contract. 9. Non-smoking Policy The University adopts a non-smoking policy and smoking on the University premises is strictly prohibited. Any offence against the Non-smoking Policy may result in suspension of works and in a compensatory charge of $1,000 per head per occurrence. The compensatory charge shall be deducted from any amounts due to the Contractor. Notwithstanding this compensatory charge, if imposed, the liability of the Contractor will not be relieved under the Conditions of Contract or the Laws of Hong Kong. 10. Permit-to-work for Hot Works (1) The contractor shall apply least one working day in advance for a permit from The Hong Kong Polytechnic University for carrying out any hot work (definition of which is specified in sub-paragraph 3 below) in any area on University premises. The contractor shall not carry out any hot work on University premises without the permit approved by The Hong Kong Polytechnic University. Should the contractor carry out hot works without a "hot work permit", The Hong Kong Polytechnic University may direct that a compensatory charge of HK$1,000.00 per event be levied on the Contractor. (2) The Site Agent or the Safety Personnel of the contractor, in addition to any statutory safety regulations, shall strictly comply with the safety measures specified in the permit when carrying out hot work in the time and location specified in the permit for avoidance of the outbreak of fire. (3) "Hot work" shall refer to electric arc, gas welding and cutting, lighting of fires or any other activities which could result in the deliberate introduction or an ignition source (such as hot sparks or ember) into the work area. 6

11. Failure to keep fire doors closed The Contractor shall keep all fire doors closed at all times. Should the Contractor fail to do so for whatever reason, a compensatory charge of $500.00 may be imposed to the Contractor for each occurrence. The compensatory charge may be deducted from any amount due or to become due to the Contractor. Revision 1 at (16 May 2012) 7